WO2006077759A1 - 建設機械の制御モード切換装置および建設機械 - Google Patents

建設機械の制御モード切換装置および建設機械 Download PDF

Info

Publication number
WO2006077759A1
WO2006077759A1 PCT/JP2006/300246 JP2006300246W WO2006077759A1 WO 2006077759 A1 WO2006077759 A1 WO 2006077759A1 JP 2006300246 W JP2006300246 W JP 2006300246W WO 2006077759 A1 WO2006077759 A1 WO 2006077759A1
Authority
WO
WIPO (PCT)
Prior art keywords
pressure
mode
pilot
hydraulic
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2006/300246
Other languages
English (en)
French (fr)
Inventor
Noboru Kanayama
Koutarou Sasano
Koichi Kawamura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to US11/795,636 priority Critical patent/US7904224B2/en
Priority to GB0716153A priority patent/GB2439475B/en
Priority to CN2006800028212A priority patent/CN101107400B/zh
Publication of WO2006077759A1 publication Critical patent/WO2006077759A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2004Control mechanisms, e.g. control levers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • E02F9/2225Control of flow rate; Load sensing arrangements using pressure-compensating valves
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2025Particular purposes of control systems not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • E02F9/2225Control of flow rate; Load sensing arrangements using pressure-compensating valves
    • E02F9/2228Control of flow rate; Load sensing arrangements using pressure-compensating valves including an electronic controller
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • E02F9/2232Control of flow rate; Load sensing arrangements using one or more variable displacement pumps
    • E02F9/2235Control of flow rate; Load sensing arrangements using one or more variable displacement pumps including an electronic controller
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2285Pilot-operated systems
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2292Systems with two or more pumps
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2296Systems with a variable displacement pump
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S37/00Excavating
    • Y10S37/902Hydraulic motors

Definitions

  • Construction machine control mode switching device and construction machine
  • the present invention relates to a construction machine control mode switching device and a construction machine. More particularly, the present invention relates to a control mode switching device and a construction machine that can easily perform a work mode switching operation in a construction machine such as an excavator.
  • FIGS. 13A and 13B As a construction machine for excavating and loading earth and sand, as shown in FIGS. 13A and 13B, as shown in FIG. 13A and FIG. 13B, a traveling hydraulic motor 1 for a lower traveling body a, a hydraulic hydraulic motor 2 for a swinging upper body b, Boom 3, arm 4, packet 5 as work machine c mounted on the front of rotating body b, and boom cylinder 6, arm cylinder 7, bucket cylinder 8 for operating these work machines c Hydraulic excavators are known.
  • This hydraulic excavator performs a series of continuous operations such as excavation, lifting and swiveling, earth removal and swiveling while excavating.
  • the excavation position force is also stopped at a position near 45 °, 90 ° or 180 °. Rotate to the loading platform of d.
  • the pressure of the turning circuit is affected by the boom circuit and arm circuit, and when the boom circuit and arm circuit are low pressure, the turning circuit is also low pressure. Turning may not be performed smoothly.
  • the operator controls the supply flow rate to each circuit by controlling the spool opening degree of the flow control valve of these hydraulic actuators, Operated to adapt both movements. For example, when the dump truck d is stopped at a position where the excavation position force is also 45 °, the boom raising operation becomes faster and the turning speed becomes slower, and the dump truck d is positioned 180 ° from the excavation position. When the vehicle stops, the flow rate to each circuit is controlled so that both the movements are adapted so that the turning speed is increased and the boom raising operation is delayed. . However, such an operation is very difficult and involves fatigue. [0004] Therefore, the present applicant has previously proposed a hydraulic control circuit for a hydraulic excavator that solves these problems (see Patent Document 1).
  • each hydraulic actuator based on the operation of each hydraulic actuator for raising the boom, raising the arm, turning operation, boom operation lever, arm operation lever and turning operation lever, and these operation levers.
  • a work mode selection switch for selecting a work mode is provided, and the boom priority mode, turning priority mode, or standard mode is selected by this work mode selection switch. Then, the pressure oil is configured to flow preferentially in the hydraulic circuit corresponding to the selected mode.
  • Patent Document 1 Japanese Patent No. 2583148
  • a main object of the present invention is to provide a control mode switching device and a construction machine that can easily perform a switching operation of a work mode.
  • a control mode switching device for a construction machine includes a plurality of actuators that perform different operations, a drive unit that drives the respective actuators, and a plurality of operation levers that command the operations of the respective drive units.
  • the output of one or more specific drive means is higher than usual.
  • a mode determination unit that determines whether the output mode is a priority operation mode in which the output ratio is high in comparison with other drive units, and when the mode determination unit determines that the operation mode is the priority operation mode, The output of one or more specific drive means corresponding to the priority work mode is higher than normal.
  • a drive control means for controlling the drive means so that the output ratio becomes high in comparison with other drive means.
  • the output of the driving means means speed or force.
  • the output of one or more specific drive means when the output of one or more specific drive means is higher than normal, it means that the output in the priority work mode is higher than the output in the standard work mode. If the output ratio of one or more specific drive means is high in comparison with other drive means, the output of one or more specific drive means will not change, but the output of other drive means will be reduced. This includes all cases where the output ratio is relatively high in relation to the output of other driving means.
  • the actuator when the operation lever is operated, the actuator is operated via the driving means. Therefore, a desired work can be executed by operating a plurality of actuators simultaneously or sequentially by operating a plurality of operation levers. During this work, the speed of the operation of a specific actuator has been increased, for example.
  • V operate the operating lever that operates the actuator to near the end of the operating area. Then, it is detected by the detection means that the operation lever has reached the vicinity of the end of the operation area, and then it is determined whether or not it is the priority work mode according to the combination of detection states of the detection means. If it is determined that the priority work mode is selected, the output ratio is set so that the output of one or more specific drive means corresponding to the priority work mode is higher than normal or compared with other drive means. The drive means is controlled to be higher. In this way, the speed of the operation of a specific actuator can be increased, for example. Therefore, it is possible to switch to the priority work mode by operating the control lever without releasing the control lever force to the vicinity of the end of the operation area while operating the control lever. It can be done easily.
  • the mode determination unit includes a storage unit that stores a plurality of priority work modes corresponding to combinations of detection states of the detection unit, and It is desirable to include selection means for selecting a priority operation mode corresponding to the combination of detection states from the storage means.
  • a plurality of priority operation modes corresponding to combinations of detection states of the detection means are stored in advance in the storage means.
  • the priority work mode set by matching can be easily changed.
  • the actuator is constituted by a hydraulic actuator, and each of the driving means is constituted by a hydraulic circuit, and the flow rate control for controlling the flow rate of the hydraulic circuit.
  • the drive control means includes a hydraulic oil supply amount supplied to one or more specific hydraulic circuits when the mode determination means determines that the priority work mode is selected. It is desirable to control the flow rate control means so as to be larger than the pressure oil supply amount.
  • the actuator is constituted by a hydraulic actuator, and each driving means is constituted by a hydraulic circuit. Therefore, the invention is applied to a machine that requires a relatively strong force, such as an excavator. Even so, it can exert a great force and realize sufficient excavation work. Since the drive control means is configured to control the flow rate control means so that the pressure oil supply amount supplied to the hydraulic circuit is larger than the pressure oil supply amount supplied to the other hydraulic circuits, the drive control means is relatively simple. Can be realized with a simple configuration.
  • the control mode switching device for a construction machine preferably includes an engine that drives the plurality of drive units, and the drive control unit preferably increases or decreases the engine output.
  • control mode switching device for a construction machine it is preferable that a battery for driving the plurality of drive means is provided, and the drive control means increase or decrease the battery output.
  • the priority operation mode is executed by increasing or decreasing the output of the engine or the battery that drives the plurality of driving means, the entire power can be increased.
  • the actuator is constituted by a hydraulic actuator, and each of the driving means is constituted by a hydraulic circuit, and the variable of the pressure of the hydraulic circuit is variable.
  • the variable pressure control valve includes a mold pressure control valve, and the drive control means is configured to increase the pressure of one or more specific hydraulic circuits when the mode determination means determines that the priority work mode is selected. It is desirable to control the valve.
  • the actuator is constituted by a hydraulic actuator, each drive means is constituted by a hydraulic circuit, and the variable pressure control valve provided in the hydraulic circuit is controlled to control the priority work mode. It is possible to configure easily.
  • control mode switching device for a construction machine according to the present invention, it is preferable that the control device includes notification means for allowing the operator to recognize that the operation lever has reached the vicinity of the end of the operation area.
  • the operator is provided with notification means for recognizing that the operation lever has reached the vicinity of the end of the operation area. You can recognize that you have reached it.
  • a construction machine according to the present invention includes the above-described control mode switching device according to the present invention.
  • FIG. 1 is a conceptual diagram of an operation lever according to a first embodiment of the present invention.
  • FIG. 2 is a diagram showing the relationship between the operating force of the operating lever and the PPC pressure according to the first embodiment.
  • FIG. 3 is a diagram showing a hydraulic control circuit according to the first embodiment.
  • FIG. 4 is a diagram showing the inside of the controller according to the first embodiment.
  • FIG. 5 is a view showing the contents of a priority work mode according to the first embodiment.
  • FIG. 6 is a view showing the contents of a priority work mode according to a modification of the first embodiment.
  • FIG. 7 is a flowchart of the modified example.
  • FIG. 8 is a diagram showing a hydraulic control circuit according to a second embodiment of the present invention.
  • FIG. 9 is a conceptual diagram of an operation lever according to the second embodiment.
  • FIG. 10 is a diagram showing a relationship between an operation force of an operation lever and an output signal according to the second embodiment.
  • FIG. 11 is a diagram showing a control system circuit according to a third embodiment of the present invention.
  • FIG. 12 is a view showing a modification of the operation lever of the present invention.
  • FIG. 13A is a diagram for explaining the turning operation of the excavator.
  • FIG. 13B is a diagram for explaining the turning operation of the excavator.
  • swivel operation lever 22c boom operation lever
  • 22d to 22f electric operation lever
  • FIG. 1 is a conceptual diagram of an operation lever used in the present embodiment
  • FIG. 2 is an operation force diagram showing an output characteristic of an operation force of the operation lever and a PPC (Pilot Pressure Control) pressure.
  • PPC Peak Pressure Control
  • the operation lever 22 of the present embodiment has a structure in which the valves VI and V2 are opened according to the operation direction and the operation angle, and the pressure oil from the pilot pump P is sent to the pilot pipelines P Tl and PT2 through the valves VI and V2. It is.
  • the operation lever 22 of this embodiment can be operated up to about 110%.
  • an operation feeling that does not power is created unless an operation force that is larger than the previous operation force is applied.
  • the movable part of the operating lever 22 abuts against a biasing means such as a spring, and the reaction force from the biasing means is much larger than the previous operating force. Do not apply any operating force! It is configured as follows.
  • KDE kick down area
  • FIG. 3 shows a hydraulic cylinder 6 for operating a boom according to the present invention (hereinafter simply referred to as a boom cylinder) and a hydraulic cylinder 7 for operating an arm (hereinafter simply referred to as an arm).
  • This hydraulic control circuit consists of a two-pump system with two variable displacement hydraulic pumps 10 and 13.
  • a boom cylinder 6 is connected to the discharge pipe 11 of the variable displacement hydraulic pump 10 via a pressure compensation flow control valve 12 that controls the flow rate and the flow direction.
  • the discharge pipe 14 of the variable capacity hydraulic pump 13 has two branch pipes 14a and 14b.
  • a turning hydraulic motor 2 is connected to the branch pipe 14a via a flow control valve 15 with pressure compensation.
  • An arm cylinder 7 is connected to the branch pipe 14b via a flow control valve 16 with pressure compensation.
  • variable displacement hydraulic pumps 10 and 13 are driven by the engine 91 (in FIG. 3, the force expressed by the engine 91 connected to each of the pumps 10 and 13 is actually a simple unit. Pumps 10 and 13 are driven by one engine 91.) The maximum speed and maximum output of engine 91 are controlled by a command signal from controller 23 via a governor (not shown).
  • the boom cylinder 6, the arm cylinder 7 and the swing hydraulic motor 2 are connected in parallel to the two variable displacement hydraulic pumps 10 and 13, and are also connected to the tank 18 via the return circuit 17. ing.
  • the flow rate control valves 12, 15, and 16 with pressure compensation also have a pilot operation system force.
  • the main pipe 20 of the pilot pump 19 is connected to both ends of the pressure compensation flow control valves 12, 15 and 16 via the pilot pipes 73a to 73f of the respective operation levers 22a, 22b and 22c.
  • the boom operation lever 22c has a limit switch 72a that detects that the operation lever 22c has reached the kick-down area when the operation lever 22c is operated in the boom raising direction.
  • the swing operation lever 22b has an operation lever.
  • Limit switches 72c and 72d that detect that the control lever 22b has reached the kick-down area when the control lever 22b is operated in both the left and right rotation directions are provided on the arm control lever 22a.
  • Limit switches 72e are provided for detecting that the operation lever 22a has reached the kick-down area when operated.
  • Switches 72a, 72c, 72d and 72e are connected to the controller 23 via signal circuits 71a, 71c, 71d and 71e.
  • Variable pressure control valves 67, 66 are connected to the discharge pipes 11, 14 of the variable displacement hydraulic pumps 10, 13, respectively.
  • the pilot valve 61, 63 force is switched by the command signal output from the controller 23 through the signal circuit 60, 62, the pilot pressure from the pilot pump 19 passes through the pilot lines 64, 65, and the variable pressure control valve 67 , 66 acts on the operation part.
  • the maximum pressure (relief pressure) of the discharge pipes 11 and 14 of the variable displacement hydraulic pumps 10 and 13 is controlled.
  • Reference numeral 26 denotes a norottle hydraulic return pipe.
  • the pressure compensation flow control valves 12, 15, 16 are provided with a mechanism capable of limiting the spool stroke in the control valve.
  • the pilot valve 75b, 75c, 75d is switched by the command signal output from the controller 23 through the signal circuits 74b, 74c, 74d, the pilot pressure from the pilot pump 19 passes through the pilot line valves 76b, 76c, 76d.
  • the flow rate of the flow control valves 12 and 15 with pressure compensation is controlled to be limited.
  • a hydraulic circuit is configured as a driving means for driving the motor.
  • the pressure control flow control valves 12, 15, and 16 have the discharge pressures of the hydraulic pumps 10 and 13 corresponding to the required flow rates of the respective hydraulic actuators (boom cylinder 6, arm cylinder 7, and swing hydraulic motor 2).
  • Pressure compensation valves 27a, 27b, 27c for detecting and compensating are provided.
  • the pressure compensation valves 27a, 27b and 27c are connected to the hydraulic pumps 10 and 13 via the norot lines 29a and 29b. Connected to load sensing regulators 28a and 28b!
  • a pilot line 33 that detects the maximum load pressure of the hydraulic motor 2 for rotation from an outlet port 32 of the pressure control flow control valve 15 and an outlet port 30 of the pressure control flow control valve 16 From the pilot line 31 that detects the maximum load pressure of the arm cylinder 7 from the pilot valve 31, the pressure on the maximum load pressure side is detected by the shuttle valve 34, and the pilot line 35 connected to this shuttle valve 3 4 and the pressure compensation In the pilot line 37 that detects the maximum load pressure of the boom cylinder 6 from the outlet port 36 of the flow control valve 12, the pressure on the maximum load pressure side is detected by the shuttle valve 38, and this is detected via the pilot line 39.
  • One is connected to the load sensing regulator 28a of the hydraulic pump 10 through the pilot line 29a, and the other is connected to the other hydraulic pump 13 through the pilot line 29b. We have entered an advanced da regulator 28b.
  • the load sensing circuit is provided with a turning load sensing switching valve 40.
  • the switching valve 40 is controlled to be switched by an electromagnetic pilot valve 52 which is controlled by a signal circuit 51 of the controller 23 through a norottle line 41.
  • the load sensing regulators 28a and 28b are pilot operated between the discharge pipes 11 and 14 and the servo pistons 42a and 42b that control the amount of swash plate tilt of the hydraulic pumps 10 and 13, respectively.
  • the discharge pressure P1 of the hydraulic pump 10 is reduced from the pipeline 43a to the load sensing valve 44a.
  • the load pressure LP1 and the spring force guided from the pilot pipe 29a act on the other operation portion of the load sensing valve 44a.
  • the discharge pressure P2 of the hydraulic pump 13 acts on one operating portion of the load sensing valve 44b from the pipe 43b, and the load pressure LP2 and the spring force guided from the pilot pipe 29b are connected to the other of the load sensing valve 44b. Acts on the operation unit.
  • P2> LP2 the swash plate angle of the hydraulic pump 13 is controlled to decrease
  • P2 ⁇ LP2 the swash plate angle of the hydraulic pump 13 is controlled to increase.
  • each hydraulic actuator boost
  • each pressure compensation valve 27a, 27b, 27c is controlled by the maximum load pressure among the cylinder 6, the arm cylinder 7, and the turning hydraulic motor 2).
  • the discharge lines 11 and 14 of the two variable displacement hydraulic pumps 10 and 13 are connected by a communication line 46.
  • the communication pipe 46 is provided with a confluence / diversion switching valve 47 for the discharge pressure oil of the hydraulic pumps 10 and 13.
  • the switching valve 47 is controlled by the pilot hydraulic pressure in the pilot line 48 by the operation of the electromagnetic pilot valve 50 commanded from the controller 23 via the signal circuit 49.
  • a load sensing pressure on / off switching valve 53 controlled in conjunction with the merging / dividing switching valve 47 is provided in the load sensing circuit.
  • the hydraulic control circuit of the hydraulic excavator having the load sensing system configured as described above has a flow rate in the simultaneous operation of the boom, the arm and the swivel, such as the loading of the earth and sand in the dump truck.
  • Various priority modes are set in advance in the controller 23 so that the matching of work by distribution can be changed, and further, excavation work on hard soil or work instantaneously at an output exceeding the rated output of the engine is possible. Has been.
  • the controller 23 has a specific 1 according to the combination of signals from the limit switches 72a, 72c, 72d, 72e provided on the operation levers 22a, 22b, 22c.
  • the output of the above drive means can be higher than normal, or with other drive means
  • the mode determination means 23A for determining whether or not the priority work mode is capable of increasing the output ratio in the comparison of the above, and when the mode determination means 23A determines that the priority work mode is selected, a specific 1 corresponding to the priority work mode is selected.
  • Drive control means 23B for controlling the drive means is provided so that the output of the above drive means can be made higher than usual or the output ratio can be made higher in comparison with other drive means. .
  • the mode determination means 23A includes a storage means 23A1 that stores a plurality of priority work modes corresponding to combinations of the ON / OFF states of the limit switches 72a, 72c, 72d, and 72e, and the limit switches 72a, 72c, And a selection means 23A2 for selecting a priority work mode corresponding to the combination of the ON / OFF states of 72d and 72e from the storage means 23A1.
  • the drive control means 23B is a pilot valve 50, a pilot valve 75b to 75d, a pilot valve 52, a pilot valve 61, which executes this priority work mode according to the priority work mode selected by the mode determination means 23A. Send command signal to 63.
  • the recording means 23A1 includes (I) a standard work mode and a combination of the U-switches 72a, 72c, 72d, and 72e. 7 priority work modes: (II) Excavation force up mode, (III) Turning priority mode, (IV) Boom raising priority mode, (V) Arm excavation priority mode, (VI) Power up mode (swivel + boom) , (VII) Power-up mode (boom + arm), and (VIII) Power-up mode (turn + arm) are stored.
  • priority work modes (II) Excavation force up mode, (III) Turning priority mode, (IV) Boom raising priority mode, (V) Arm excavation priority mode, (VI) Power up mode (swivel + boom) , (VII) Power-up mode (boom + arm), and (VIII) Power-up mode (turn + arm) are stored.
  • the states of the valves 75b, 75c, 75d, and the engine rotation 'output state are stored.
  • Reference numeral 55 denotes a monitor, which displays each work mode.
  • the turning control lever 22b When the turning control lever 22b is operated, the pressure oil from the pilot pump 19 is given to the operating part of the pressure compensated flow control valve 15 through the pilot pipes 73c and 73d according to the operating direction and operating angle. Then, the turning hydraulic motor 2 is rotated left and right. That is, it is turned.
  • the load pressure for driving the turning hydraulic motor 2 is shut off by the turning load sensing switching valve 40, so that the load pressure of the boom cylinder 6 is detected by the shuttle valve 38.
  • This load pressure passes through the pilot line 29a and acts on the operation part of the load sensing valve 44a, and also acts on the operation part of the load sensing valve 44b through the pilot line 29b.
  • the discharge pressure P1 of the hydraulic pump 10 acts on one operation part of the load sensing valve 44a from the pipeline 43a, and the boom cylinder 6 guided from the pilot pipeline 29a
  • the load pressure LP1 and the spring force act on the other operating portion of the load sensing valve 44a.
  • the discharge pressure P2 of the hydraulic pump 13 acts on one operation part of the load sensing valve 44b from the pipe 43b, and the load pressure LP2 and the spring force of the boom cylinder 6 guided from the pilot pipe 29b are the load sensing valve. It acts on the other operation part of 44b.
  • the arm operation lever 22a is operated beyond the normal use range to the kick-down area.
  • a command signal from the controller 23 is transmitted to the pilot valve 61.
  • the pilot valve 61 since the pilot valve 61 is switched, the pilot pressure from the pilot pump 19 passes through the pilot valve 61 and acts on the operating portion of the variable pressure control valve 66 from the pilot pipe line 64.
  • the variable pressure control valve 66 is turned on and switched to the boosting position. In other words, since the drive hydraulic circuit of the arm cylinder 7 is boosted (110% boosted from the rating), the arm excavation force can be temporarily increased to work.
  • the turning force can be temporarily increased by operating the turning control lever 22b beyond the normal operating range to the kick-down area.
  • pilot valve 50 As a result, a command signal from the controller 23 is transmitted to the pilot valve 50. Then, since pilot valve 50 is switched, the pilot pressure from pilot pump 19 merges from pilot pipe line 48 through pilot valve 50 and acts on the operating portion of flow switching valve 47. As a result, the confluence / diversion switching valve 47 is turned on and switched to the diversion position.
  • the pilot pressure from the pilot pump 19 also acts on the operating portion of the load sensing pressure on / off switching valve 53 to switch the load sensing pressure on / off switching valve 53 to the position a.
  • a command signal from the controller 23 is transmitted to the pilot valve 61.
  • the pilot valve 61 since the pilot valve 61 is switched, the pilot pressure from the pilot pump 19 passes through the pilot valve 61 and acts on the operating portion of the variable pressure control valve 66 from the pilot line 64.
  • the variable pressure control valve 66 is turned on and switched to the boosting position.
  • the drive hydraulic circuit of the swing hydraulic motor 2 is boosted (110% boosted against the rating), so when turning operation and boom raising operation are performed simultaneously, only the turning force is temporarily increased. I can work.
  • the command signal from the controller 23 is not transmitted to the pilot valve 52. Therefore, Since the pilot pressure acting on the pilot valve 52 is drained from the pipeline 41 to the tank 18, the pilot valve 52 is turned off and switched to the “ON” position shown in FIG.
  • the load pressure for driving the turning hydraulic motor 2 passes through the a position of the turning load sensing switching valve 40, the shuttle valve 34, the pilot line 35, and the load sensing pressure on / off switching valve 53. Acts on the operating part of the load sensing valve 44b. Therefore, the discharge pressure P2 of the hydraulic pump 13 acts on one operation part of the load sensing valve 44b from the pipe 43b, and the load pressure LP2 and the spring force of the turning hydraulic motor 2 guided from the pilot pipe 29b are reduced. It acts on the other operation part of the load sensing valve 44b. As a result, when P2> LP2, the swash plate angle of the hydraulic pump 13 is controlled to decrease, and when P2 and LP2, the swash plate angle of the hydraulic pump 13 is controlled to increase.
  • the hydraulic pump 13 can independently supply a necessary flow rate to the turning hydraulic motor 2, and the drive circuit pressure can be increased.
  • the boom cylinder 6 is limited by the spool stroke of the pressure control flow control valve 12 with pressure compensation controlled by the differential pressure between the discharge pressure P1 and the load pressure LP 1 as in the standard mode described above.
  • the flow rate from the hydraulic pump 10 is also limited.
  • the turning angle is relatively small (for example, 45 °), and a large flow rate is required for the boom raising operation, or temporarily.
  • a command signal from the controller 23 is transmitted to the pilot valve 50.
  • pilot valve 50 since pilot valve 50 is switched, the pilot pressure from pilot pump 19 merges from pilot pipe line 48 through pilot valve 50 and acts on the operating portion of flow switching valve 47. That As a result, the diversion switching valve 47 is turned on and switched to the diversion position.
  • the pilot pressure from the pilot pump 19 also acts on the operating portion of the load sensing pressure on / off switching valve 53 to switch the load sensing pressure on / off switching valve 53 to the position a.
  • a command signal from the controller 23 is transmitted to the pilot valve 75c or the pilot valve 75d. Then, since pilot valve 75c or pilot valve 75d is switched, pilot pressure from pilot pump 19 acts on the side opposite to the drive side operation portion of flow control valve 15 with pressure compensation from pilot valve 75c or pilot valve 75d. As a result, the drive-side spool stroke in the pressure control flow control valve 15 is limited, so that the turning flow rate is limited.
  • variable pressure control valve 67 is turned on and switched to the boosting position.
  • the load pressure of the boom cylinder 6 acts on the operation part of the load sensing valve 44a through the pilot line 29a, while the load pressure of the turning hydraulic motor 2 is the operation part of the load sensing valve 4 4b. Does not work.
  • the discharge pressure P1 of the hydraulic pump 10 acts on the operating portion of the load sensing valve 44a from the pipeline 43a, and the load pressure P1 and the spring force of the boom cylinder 6 guided from the pilot pipeline 29a are reduced. It acts on the other operating portion of the load sensing valve 44a.
  • the discharge pressure PI of the hydraulic pump 10 and the load pressure LP1 of the boom cylinder are controlled so that the swash plate angle of the hydraulic pump 10 decreases when P1> LP1, and when PI ⁇ LP1, The swash plate angle is controlled to increase.
  • the arm load pressure passes through the shuttle valve 34 force pilot line 35 through the position a of the switching valve 53 and from the pilot line 29b to the operation part of the load sensing valve 44b. Act on.
  • P2> LP2 the swash plate angle of the hydraulic pump 13 is controlled to decrease, and when P2 and LP2, the swash plate angle of the hydraulic pump 13 is controlled to increase.
  • the required flow rate can be supplied.
  • pilot valve 50 As a result, a command signal from the controller 23 is transmitted to the pilot valve 50. Then, since pilot valve 50 is switched, the pilot pressure from pilot pump 19 merges from pilot pipe line 48 through pilot valve 50 and acts on the operating portion of flow switching valve 47. As a result, the diversion switching valve 47 is turned on and switched to the diversion position.
  • the pilot pressure from the pilot pump 19 also acts on the operating portion of the load sensing pressure on / off switching valve 53 to switch the load sensing pressure on / off switching valve 53 to the position a.
  • a command signal from the controller 23 is transmitted to the pilot valve 52.
  • the pilot valve 52 is switched, the pilot pressure from the pilot pump 19 passes through the pilot valve 52 and is applied to the operation portion of the turning load sensing switching valve 40 from the pilot pipe line 41. As a result, the load pressure that drives the swing hydraulic motor 2 is blocked by the swing load sensing switching valve 40.
  • a command signal from the controller 23 is transmitted to the pilot valve 75b.
  • the pilot valve 75b is switched, so that the pilot pressure from the pilot pump 19 acts from the pilot valve 75b to the lower-side operation portion of the pressure compensation flow control valve 12.
  • the raising side spool stroke in the pressure compensation flow control valve 12 is restricted, so that the boom raising side flow rate is restricted.
  • a command signal from the controller 23 is transmitted to the pilot valve 61. Then, since the pilot valve 61 is switched, the pilot pressure from the pilot pump 19 acts on the operating portion of the variable pressure control valve 66 from the pilot line 64 through the pilot valve 61. As a result, the variable pressure control valve 66 is turned on and switched to the boosting position.
  • the drive hydraulic circuit of the arm cylinder 7 is boosted (110% boosted against the rating), so when performing the arm excavation operation and the boom raising operation at the same time, the arm excavation speed is increased or temporarily increased. It is possible to work by increasing only the arm excavation force.
  • the load pressure of the arm cylinder 7 passes through the pilot line 29b and acts on the operating portion of the load sensing valve 44b, while the load pressure of the turning hydraulic motor 2 is the operating portion of the load sensing valve 4 4b. Does not work.
  • the discharge pressure P2 of the hydraulic pump 13 acts on the operating portion of the load sensing valve 44b from the pipeline 43b, and the load pressure LP2 and the spring force of the arm cylinder 7 guided from the pilot pipeline 29b are loaded. It acts on the other operation part of the sensing valve 44b.
  • the command signal from the controller 23 is not transmitted to the pilot valve 50. Accordingly, since the pilot valve 50 is in the position shown in FIG. 3, the pilot pressure acting on the operating portion of the merging / dividing switching valve 47 is drained from the pilot line 48 to the tank 18, and the merging / dividing switching valve 47. Is turned off to the merging position shown in Fig. 3. That is, the pressure oil from the hydraulic pump 10 and the pressure oil from the hydraulic pump 13 are merged through the merge / divergence switching valve 47.
  • a command signal from the controller 23 is transmitted to the pilot valve 52. Then, since the pi-mouth valve 52 is switched, the pilot pressure of the pilot pump 19 force acts on the operating portion of the turning load sensing switching valve 40 from the pilot line 41 through the pilot valve 52. As a result, the load pressure for driving the turning hydraulic motor 2 is shut off by the turning load sensing switching valve 40.
  • a command signal from the controller 23 is transmitted to the pilot valves 61 and 63.
  • the pilot valves 61 and 63 are switched, the pilot pressure from the pilot pump 19 passes through the pilot valves 61 and 63 and acts on the operation parts of the variable pressure control valves 66 and 67 from the pilot pipe lines 64 and 65. As a result, the variable pressure control valves 66 and 67 are turned on and switched to the boosting position.
  • command signal force from the controller 23 is transmitted to a governor (not shown) that controls the rotation and output of the engine that drives the hydraulic pumps 10 and 13. Then, the engine rotation-output is controlled to increase (about 110% of the rating).
  • the load pressure of the arm cylinder 7 acts on the operation part of the load sensing valve 44b through the pilot line 29b, while the load pressure of the turning hydraulic motor 2 is the operation part of the load sensing valve 4 4b. Does not work.
  • the discharge pressure P2 of the hydraulic pump 13 acts on the operating portion of the load sensing valve 44b from the pipeline 43b, and the load pressure LP2 and the spring force of the arm cylinder 7 guided from the pilot pipeline 29b are loaded. It acts on the other operation part of the sensing valve 44b. Therefore, when the differential pressure between the discharge pressure P2 of the hydraulic pump 13 and the load pressure LP2 of the arm cylinder 7 is P2> LP2, the swash plate angle of the hydraulic pump 13 is controlled to decrease, and when P2 ⁇ LP2, the hydraulic pump 13 The swash plate angle is controlled to increase.
  • the boom operating lever 22c and the arm operating lever 22a should be set within the normal operating range. Operate to the kickdown area.
  • the command signal from the controller 23 is not transmitted to the pilot valve 50. Accordingly, since the pilot valve 50 is in the position shown in FIG. 3, the pilot pressure acting on the operating portion of the merging / dividing switching valve 47 is drained from the pilot line 48 to the tank 18, and the merging / dividing switching valve 47. Is turned off to the merging position shown in Fig. 3. That is, the pressure oil from the hydraulic pump 10 and the pressure oil from the hydraulic pump 13 are merged through the merge / divergence switching valve 47.
  • a command signal from the controller 23 is transmitted to the pilot valve 52. Then, since the pi-mouth valve 52 is switched, the pilot pressure of the pilot pump 19 force acts on the operating portion of the turning load sensing switching valve 40 from the pilot line 41 through the pilot valve 52. As a result, the load pressure for driving the turning hydraulic motor 2 is shut off by the turning load sensing switching valve 40.
  • a command signal from the controller 23 is transmitted to the pilot valves 61 and 63.
  • pilot valves 61 and 63 are switched, pilot pressure from pilot pump 19 passes through pilot valves 61 and 63 and from pilot lines 64 and 65 to variable pressure control valves 66 and 67. It acts on the operation part. As a result, the variable pressure control valves 66 and 67 are turned on and switched to the boosting position.
  • command signal force from the controller 23 is transmitted to a governor (not shown) that controls the rotation / output of the engine 91 that drives the hydraulic pumps 10 and 13. Then, the rotation-output of the engine 91 is controlled to increase (about 110% of the rating).
  • the arm operating lever 22a Operate the swivel control lever 22b beyond the normal operating range to the kick-down area.
  • one limit switch 72a is provided on the boom control lever 22c
  • two limit switches 72c and 72d are provided on the turning control lever 22b
  • one limit switch 72e is provided on the arm control lever 22a.
  • a packet control lever is provided, each of which has two limit switches that detect the kick-down area. The priority work mode may be set according to the combination of the on / off state of the switch.
  • boom switch BSW1 raising and lowering
  • arm switch ASW digging ij, dump
  • packet switch BSW2 digging ij, dumping
  • swivel switch Corresponding to the combination of TSW (right, left) on and off, drilling force up mode, Mode priority mode, arm priority mode, packet priority mode, turn priority mode, and power-up mode may be set, and the combination of the ON / OFF state of the switch may be selected and executed.
  • the combination force mode of the on / off state of these switches is determined (ST2). For this, it is determined whether or not the combined force in the ON / OFF state of the switch is in the setting mode shown in FIG. If it is not in the setting work mode, normal operation is performed as the standard mode (normal mode) (ST3).
  • excavation force up mode (ST4), boom priority mode (ST5), arm priority mode (ST6), packet priority mode (ST7), turn priority mode (ST 8), power up mode ( ST9)!
  • variable pressure control valve In the excavation force up mode (ST4), the variable pressure control valve is subsequently boosted (ST10). That is, the variable pressure control valves 66 and 67 are switched to the boosting position.
  • the control hydraulic flow other than the boom is slightly reduced in each drive hydraulic circuit, and then the processing of ST10 is performed.
  • arm priority mode control the ST10 after slightly reducing the control flow rate except for the arm in each drive hydraulic circuit.
  • packet priority mode control the ST10 after slightly reducing the control flow rate except for the arm in each drive hydraulic circuit.
  • the processing flow of ST10 is performed after the control flow rate other than the packet is slightly reduced in each drive hydraulic circuit.
  • turning priority mode after the control flow rate other than turning is slightly reduced in each drive hydraulic circuit, the processing of ST10 is performed.
  • power-up mode ST9
  • the operation of ST91 is performed after the operation to increase the output of engine 91 is performed.
  • FIG. 8 shows a hydraulic control circuit of the hydraulic excavator in the second embodiment of the present invention.
  • the hydraulic control circuit of this embodiment differs from the hydraulic control circuit of the first embodiment in the following points.
  • the PPC operation levers 22a, 22b, 22c, the limit switches 72a, 72c, 72d, 72d, the main pipe 20, the notlot lines 73a, 73b, 73c, 73d, 73e, 73f and the force S instead of this, electric operation levers 22d, 22e, and 22f are provided instead.
  • Pilot signal 25a, 25b, 25c, 25d which also has an electromagnetic proportional control valve force via signal circuit 24a, 24b, 24c, 24d, 24e, 24f 25n, 25f are provided and connected to both ends of these nozzle valves 25a, 25b, 25c, 25d, 25e, 25f force pressure compensation flow rate ffilj control valves 12, 15, 16.
  • the electric operation levers 22d, 22e, and 22f used in the second embodiment are the same as the operation levers 22a, 22b, and 22c used in the first embodiment.
  • the lever can be operated up to approximately 110% (kick-down area) for a lever stroke range of 100%.
  • the operation stroke of the control lever 22 exceeds 100%, an operation feeling without power is created unless an operation force that is larger than the previous operation force is applied.
  • the output signal is uniformly changed up to a stroke of 110% in the stroke 0% force kick-down region.
  • the controller 23 receives the output signal from the operation levers 22d, 22e, 22f, it recognizes that the operation levers 22d, 22e, 22f have reached the kick-down area when the output signal exceeds a certain set value (SL).
  • SL set value
  • FIG. 11 shows an electric excavation control system circuit according to the third embodiment of the present invention.
  • the control system circuit of this embodiment differs from the hydraulic control circuit of the second embodiment in the following points.
  • the swing actuator (swivel hydraulic motor 2), the pressure control flow control valve 15 of the swing hydraulic motor 2, the boom actuator (boom cylinder 6), the pressure control flow control valve of the boom cylinder 6 12.
  • Arm finisher (arm series 7), instead of the flow compensation valve 16 with pressure compensation of the arm cylinder 7, the swing actuator (swing electric motor 102), the inverter 115 of the swing electric motor 102, the boom actuator (boom cylinder device 106), An inverter 112 of the boom cylinder device 106, an arm actuator (arm cylinder device 107), and an inverter 116 of the arm cylinder device 107 are provided.
  • a battery 110 is connected to these inverters 115, 112, 116 via a power controller 120, and a capacitor (capacitor) 113 charged from the battery 110 is connected via a power controller 120. It has been.
  • control signal force from the controller 23 through the signal circuits 24a, 24c, 24e, 24 g, 24h, 24i, the inverters 115, 112, 116, the power controller 120, the battery 110 and the capacitors Directed to 113.
  • the electric operation levers 22d, 22e, and 22f used in the third embodiment are configured by levers similar to the electric operation levers used in the second embodiment, so that the first embodiment also includes the first operation lever. The same effect as the embodiment can be expected.
  • the output when the power-up mode is on (110%) is similarly controlled. It is increased from 23 by the command to each inverter 12, 15, 16 and power controller 120.
  • the present invention may be applied to a so-called hybrid excavator in which a hydraulic actuator and an electric actuator are combined.
  • the operation feeling (notification means) to be given to the operation lever is configured so that it does not move unless the operation lever reaches the kick-down area unless an operation force that is larger than the previous operation force is applied. Power is not limited to this. Conversely, when the operating lever reaches the kick-down region, the operating lever may be operated with a force that is much smaller than the operating force up to that point, or the notification means 80 shown in FIG. 12 may be configured.
  • the notification means 80 shown in FIG. 12 includes a fan-shaped rotation plate 81 provided at the rotation fulcrum of the operation lever 22 and the rotation of the rotation plate 81 in contact with each oblique side of the rotation plate 81.
  • the two slide rods 83A and 83B that have cutout grooves 82A and 82B in the axial direction with the projections 87A and 87B in the middle and the tips of these slide rods 83A and 83B are pivot plates 81
  • Springs 84A and 84B for urging the slide rods 83A and 83B in the axial direction so that they come into contact with the hypotenuse of 85A and 85B are provided with springs 86A and 86B that press and urge 85A and 85B in a direction to contact the side surfaces of the slide rods 83A and 83B.
  • the operation force may be one that can be recognized by the operator's vision, hearing, touch, and the like. In other words, it may be possible to notify that the operating lever has reached the kick-down area with characters or symbols on the display device, as a sound with a speaker, or with the vibration of the operating lever.
  • the detection means for detecting that the operation lever has reached the vicinity of the operation area is not limited to the limit switch raised in the above embodiment, and other means may be used.
  • an electrical contact that makes electrical contact with the operation lever is provided in the vicinity of the operation area of the operation lever, and this electrical contact detects that the operation lever has been detected.
  • An optical sensor may be provided near the operation area, and detection may be performed when the operation lever shuts off the optical sensor.
  • the present invention can be used not only for a hydraulic excavator but also for other construction machines in general.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Operation Control Of Excavators (AREA)
  • Fluid-Pressure Circuits (AREA)

Abstract

 異なる動作を行う複数のアクチュエータ(2,6,7)と、この各アクチュエータを駆動させる駆動手段(10,11,12,14,15,16)と、この各駆動手段の動作を指令する複数の操作レバー(22a~22c)と、この各操作レバーが操作領域終端近傍に達したことをそれぞれ検出する複数のリミットスイッチ(72a~72e)と、これらリミットスイッチのオン・オフ状態の組み合わせに応じて、優先作業モードであるかを判定するモード判定手段(コントローラ23)と、このモード判定手段によって優先作業モードであると判定された際、特定の1以上の駆動手段の出力が通常時よりも高くなる、または、他の駆動手段との対比において出力比が高くなるように駆動手段を制御する駆動制御手段(コントローラ23)とを備える。

Description

明 細 書
建設機械の制御モード切換装置および建設機械
技術分野
[0001] 本発明は、建設機械の制御モード切換装置および建設機械に関する。詳しくは、 掘削機などの建設機械にお 、て、作業モードの切換操作を簡易に行えるようにした 制御モード切換装置および建設機械に関する。
背景技術
[0002] 土砂の掘削、積込みを行う建設機械として、図 13Aおよび図 13Bに示すように、下 部走行体 aの走行用油圧モータ 1と、上部旋回体 bの旋回用油圧モータ 2と、上部旋 回体 bの前部に装着された作業機 cとしてのブーム 3,アーム 4,パケット 5と、これらの 作業機 cを作動させるブームシリンダ 6,アームシリンダ 7,バケツトシリンダ 8とを備え た油圧式掘削機が知られて 、る。
この油圧式掘削機では、掘削作業に際して、掘削、持上旋回、排土、持下旋回な どの一連の連続作業を行う。とくに、持上旋回では、図 13Aに示すように、ブーム上 げ状態、アームダンプ状態において、図 13Bに示すように、掘削位置力も 45° 、 90 ° あるいは 180° 近辺位置に停止しているダンプカー dの荷台に旋回動作を行う。
[0003] このような旋回とブーム、旋回とアームなどの同時操作時には、旋回回路の圧力が ブーム回路やアーム回路の影響を受け、ブーム回路やアーム回路が低圧の時は旋 回回路も低圧となって旋回がスムーズに行われない場合がある。
また、ダンプカー dの停止位置によって旋回角度が異なることから、従来、オペレー タがその都度これらの油圧ァクチユエータの流量制御弁のスプール開度を制御する ことによって各回路への供給流量を制御して、両方の動きを適合させるように操作し ている。たとえば、ダンプカー dが掘削位置力も 45° の位置に停止している場合には 、ブーム上げ動作が速くなり、かつ、旋回速度が遅くなるように、また、ダンプカー dが 掘削位置から 180° の位置に停止している場合には、旋回速度が速くなり、かつ、ブ ーム上げ動作が遅くなるように各回路への供給流量を制御して、両方の動きを適合 させるように操作している。しかし、このような操作は非常に難しく疲労も伴う。 [0004] そこで、本出願人は、先に、これらの課題を解決した油圧式掘削機の油圧制御回 路を提案した (特許文献 1参照)。
これは、ブーム上げ、アーム上げ、旋回動作を行う各油圧ァクチユエータと、ブーム 用操作レバー、アーム用操作レバーおよび旋回用操作レバーと、これらの操作レバ 一の操作に基づいて各油圧ァクチユエータを駆動させる油圧回路とを備えた油圧式 掘削機の油圧制御回路において、作業モードを選択する作業モード選択スィッチを 設け、この作業モード選択スィッチによってブーム優先モード、旋回優先モード、標 準モードのいずれかを選択すると、選択されたモードに対応する油圧回路に圧油が 優先的に流れるように構成したものである。
[0005] 特許文献 1 :特許 2583148号公報
発明の開示
発明が解決しょうとする課題
[0006] しかし、上述した特許文献 1に記載の油圧式掘削機の油圧制御回路では、ブーム 用操作レバー、アーム用操作レバーおよび旋回用操作レバーを操作しながら、ブー ム優先モードや旋回優先モードを選択しょうとする場合、操作レバー力ゝら手を離して 、作業モード切換スィッチを切換操作しなければならないため、切換作業が面倒であ るという欠点がある。
[0007] 本発明の主な目的は、作業モードの切換操作を簡易に行うことができる制御モード 切換装置および建設機械を提供することにある。
課題を解決するための手段
[0008] 本発明の建設機械の制御モード切換装置は、異なる動作を行う複数のァクチユエ ータと、この各ァクチユエータを駆動させる駆動手段と、この各駆動手段の動作を指 令する複数の操作レバーと、この各操作レバーが操作領域終端近傍に達したことを それぞれ検出する複数の検出手段と、これら検出手段の検出状態の組み合わせに 応じて、特定の 1以上の駆動手段の出力が通常時よりも高くなる、または、他の駆動 手段との対比において出力比が高くなる優先作業モードであるかを判定するモード 判定手段と、このモード判定手段によって優先作業モードであると判定された際、そ の優先作業モードに対応する特定の 1以上の駆動手段の出力が通常時よりも高くな るように、または、他の駆動手段との対比において出力比が高くなるように前記駆動 手段を制御する駆動制御手段とを備えることを特徴とする。
[0009] ここで、駆動手段の出力とは、速度や力を意味する。また、特定の 1以上の駆動手 段の出力が通常時よりも高くなるとは、標準作業モード時の出力に対して、優先作業 モード時の出力が高くなることを意味する。特定の 1以上の駆動手段の出力が、他の 駆動手段との対比において出力比が高くなるとは、特定の 1以上の駆動手段の出力 は変動させないが、他の駆動手段の出力を下げた場合など、他の駆動手段の出力と の関係で、出力比が相対的に高くなる場合を全て含む。
[0010] このような本発明によれば、操作レバーを操作すると、駆動手段を介してァクチユエ ータが作動される。従って、複数の操作レバーの操作によって、複数のァクチユエ一 タを同時または順次動作させることにより、所望の作業を実行させることができる。 この作業中において、ある特定のァクチユエータの動作を、例えば、速度アップした
V、場合、そのァクチユエータを動作させる操作レバーを操作領域終端近傍まで操作 する。すると、操作レバーが操作領域終端近傍に達したことが検出手段によって検出 され、続いて、検出手段の検出状態の組み合わせに応じて、優先作業モードである か否かが判定される。優先作業モードであると判定されると、その優先作業モードに 対応する特定の 1以上の駆動手段の出力が通常時よりも高くなるように、または、他 の駆動手段との対比において出力比が高くなるように駆動手段が制御される。このよ うにして、特定のァクチユエータの動作を、例えば、速度アップさせることができる。 従って、操作レバーを操作しながら、その操作レバー力 手を離すことなぐ操作レ バーを操作領域終端近傍まで操作するだけで、優先作業モードに切り換えることが できるから、優先作業モードへの切換操作を簡易に行うことができる。
[0011] 本発明の建設機械の制御モード切換装置において、前記モード判定手段は、前記 検出手段の検出状態の組み合わせに対応して複数の優先作業モードを記憶した記 憶手段と、前記検出手段の検出状態の組み合わせに対応する優先作業モードを前 記記憶手段の中から選択する選択手段とを備えて 、ることが望ま 、。
[0012] このような本発明によれば、予め、記憶手段に検出手段の検出状態の組み合わせ に対応して複数の優先作業モードが記憶されているから、検出手段の検出状態の組 み合わせによって設定される優先作業モードを容易に変更することができる。
[0013] 本発明の建設機械の制御モード切換装置において、前記ァクチユエータは、油圧 ァクチユエータによって構成され、前記各駆動手段は、油圧回路によって構成されて いるとともに、この油圧回路の流量を制御する流量制御手段を含み、前記駆動制御 手段は、前記モード判定手段によって優先作業モードであると判定された際、特定 の 1以上の油圧回路に供給される圧油供給量が、他の油圧回路に供給される圧油 供給量より多くなるように前記流量制御手段を制御することが望ましい。
[0014] このような本発明によれば、ァクチユエータが油圧ァクチユエータによって構成され 、各駆動手段が油圧回路によって構成されているから、比較的力が必要な機械、た とえば、掘削機などに適用しても、大きな力を発揮でき、十分な掘削作業を実現でき る。し力も、駆動制御手段は、油圧回路に供給される圧油供給量を他の油圧回路に 供給される圧油供給量より多くなるように流量制御手段を制御する構成であるから、 比較的簡単な構成で実現できる。
[0015] 本発明の建設機械の制御モード切換装置においては、前記複数の駆動手段を駆 動するエンジンを備え、前記駆動制御手段は、エンジン出力を増減させることが望ま しい。
また、本発明の建設機械の制御モード切換装置においては、前記複数の駆動手 段を駆動するバッテリを備え、前記駆動制御手段は、バッテリ出力を増減させることが 望ましい。
[0016] このような本発明によれば、複数の駆動手段を駆動するエンジン、または、バッテリ の出力を増減させて優先作業モードを実行させるようにしたから、全体にパワーアツ プできる。
[0017] 本発明の建設機械の制御モード切換装置において、前記ァクチユエータは、油圧 ァクチユエータによって構成され、前記各駆動手段は、油圧回路によって構成されて いるとともに、この油圧回路の圧力を可変とする可変型圧力制御弁を含み、前記駆 動制御手段は、前記モード判定手段によって優先作業モードであると判定された際 、特定の 1以上の油圧回路の圧力が高くなるように、前記可変型圧力制御弁を制御 することが望ましい。 [0018] このような本発明によれば、ァクチユエータが油圧ァクチユエータによって構成され 、各駆動手段が油圧回路によって構成されるとともに、油圧回路に設けられた可変型 圧力制御弁を制御して優先作業モードを実行させるようにしたから、簡単に構成でき る。
[0019] 本発明の建設機械の制御モード切換装置においては、前記操作レバーが操作領 域終端近傍に達したことをオペレータに認識させる告知手段を備えていることが望ま しい。
[0020] このような本発明によれば、操作レバーが操作領域終端近傍に達したことをォペレ ータに認識させる告知手段を備えているから、オペレータは、操作レバーが操作領 域終端近傍に達したことを認識できる。
本発明の建設機械は、前述した本発明の制御モード切換装置を備えることを特徴 とする。
[0021] このような本発明によれば、前述した本発明の制御モード切換装置の機能を備えた 建設機械を実現することができる。
図面の簡単な説明
[0022] [図 1]本発明の第 1実施形態に係る操作レバーの概念図。
[図 2]前記第 1実施形態に係る操作レバーの操作力と PPC圧との関係を示す図。
[図 3]前記第 1実施形態に係る油圧制御回路を示す図。
[図 4]前記第 1実施形態に係るコントローラ内部を示す図。
[図 5]前記第 1実施形態に係る優先作業モードの内容を示す図。
[図 6]前記第 1実施形態の変形例に係る優先作業モードの内容を示す図。
[図 7]前記変形例のフローチャート。
[図 8]本発明の第 2実施形態に係る油圧制御回路を示す図。
[図 9]前記第 2実施形態に係る操作レバーの概念図。
[図 10]前記第 2実施形態に係る操作レバーの操作力と出力信号との関係を示す図。
[図 11]本発明の第 3実施形態に係る制御システム回路を示す図。
[図 12]本発明の操作レバーの変形例を示す図。
[図 13A]掘削機の旋回動作を説明するための図。 [図 13B]掘削機の旋回動作を説明するための図。
符号の説明
[0023] 2…旋回用油圧モータ(油圧ァクチユエ一タ)、 6…ブームシリンダ(油圧ァクチユエ 一タ)、 7…アームシリンダ(油圧ァクチユエ一タ)、 10· ··可変容量型油圧ポンプ (駆動 手段、油圧回路の構成要素)、 11· ··吐出管路 (駆動手段、油圧回路の構成要素)、 1 2…圧力補償付流量制御弁 (駆動手段、油圧回路の構成要素、流量制御手段)、 13 …可変容量型油圧ポンプ (駆動手段、油圧回路の構成要素)、 14· ··吐出管路 (駆動 手段、油圧回路の構成要素)、 15· ··圧力補償付流量制御弁 (駆動手段、油圧回路 の構成要素、流量制御手段)、 16· ··圧力補償付流量制御弁 (駆動手段、油圧回路 の構成要素、流量制御手段)、 22a…アーム用操作レバー、 22b…旋回用操作レバ 一、 22c…ブーム用操作レバー、 22d〜22f…電気式操作レバー、 23· "コントローラ 、 23A…モード判定手段、 23Α1· ··記憶手段、 23Α2· ··選択手段、 23B…駆動制御 手段、 66, 67· ··可変型圧力制御弁、 72a, 72c, 72d, 72e…リミットスィッチ (検出手 段)、 80· ··告知手段、 91· ··エンジン、 110· ··バッテリ。
発明を実施するための最良の形態
[0024] 以下、本発明の実施の形態を図面に基づいて説明する。
<第 1実施形態 >
図 1は、本実施形態で用いる操作レバーの概念図、図 2は同操作レバーの操作力 と PPC (Pilot Pressure Control)圧の出力特性を示す操作力線図である。
本実施形態の操作レバー 22は、操作方向および操作角度に応じて、バルブ VI, V2が開き、パイロットポンプ Pからの圧油がバルブ VI, V2を通じて、パイロット管路 P Tl, PT2へ送られる構造である。
[0025] 通常の操作レバーのストローク範囲を 100%とすると、本実施形態の操作レバー 22 では、約 110%前後まで操作が可能である。操作レバー 22の操作ストロークが 100 %を超えると、それまでの操作力よりも一段と大きな操作力を加えないと動力ない操 作フィーリングが作られている。たとえば、操作レバー 22の操作ストロークが 100%を 超えると、操作レバー 22の可動部がばね等の付勢手段に当接し、その付勢手段から の反力によってそれまでの操作力よりも一段と大きな操作力を加えな 、と動かな!/、よ うに構成されている。
[0026] 操作レバー 22の操作ストロークが 100%を超え約 110%前後の領域を、キックダウ ン領域 (KDE)と呼ぶ。操作レバー 22がキックダウン領域に達すると、つまり、操作レ バー 22が操作領域終端近傍に達すると、検出手段としてのリミットスィッチ LSI, LS 2がオンし、操作レバー 22がキックダウン領域に達したことが検知される。このキック ダウン領域での PPC圧出力は変わらない。
[0027] 図 3は、油圧式掘削機の油圧制御回路のうち、特に、本発明に係るブーム作動用 油圧シリンダ 6 (以下単にブームシリンダと略称する)、アーム作動用油圧シリンダ 7 ( 以下単にアームシリンダと略称する)および旋回用油圧モータ 2の 3つの油圧ァクチ ユエータの油圧制御回路を示して 、る。
本油圧制御回路は、 2つの可変容量型油圧ポンプ 10, 13を備えた 2ポンプ方式か らなる。可変容量型油圧ポンプ 10の吐出管路 11には、流量および流れ方向を制御 する圧力補償付流量制御弁 12を介してブームシリンダ 6が接続されている。可変容 量型油圧ポンプ 13の吐出管路 14は、 2つの分岐管路 14a, 14bを有している。分岐 管路 14aには、圧力補償付流量制御弁 15を介して旋回用油圧モータ 2が接続され ている。分岐管路 14bには、圧力補償付流量制御弁 16を介してアームシリンダ 7が 接続されている。
[0028] なお、可変容量型油圧ポンプ 10、 13は、エンジン 91により駆動されるが(図 3では 、各ポンプ 10, 13のそれぞれにエンジン 91が接続されて表現されている力 実際に は単一のエンジン 91によりポンプ 10, 13が駆動される。)、同エンジン 91の最高回 転数および最高出力は、図示していないガバナを介してコントローラ 23の指令信号 により制御される。
このように、ブームシリンダ 6、アームシリンダ 7および旋回用油圧モータ 2は、 2基の 可変容量型油圧ポンプ 10, 13にパラレルに接続されたうえ、戻り回路 17を介してタ ンク 18に接続されている。
[0029] 圧力補償付流量制御弁 12, 15, 16は、パイロット操作方式力もなる。パイロットボン プ 19の主管 20が、それぞれの操作レバー 22a, 22b, 22cのパイロット管路 73a〜7 3fを介して各圧力補償付流量制御弁 12, 15, 16の両端に接続されている。 ブーム用操作レバー 22cには、操作レバー 22cをブーム上げ方向に操作した際に 、操作レバー 22cがキックダウン領域に達したことを検知するリミットスィッチ 72aが、 旋回用操作レバー 22bには、操作レバー 22bを左右両回転方向に操作した際に、操 作レバー 22bがキックダウン領域に達したことを検知するリミットスィッチ 72c、 72dが、 アーム用操作レバー 22aには、操作レバー 22aをアーム掘削方向に操作した際に、 操作レバー 22aがキックダウン領域に達したことを検知するリミットスィッチ 72eが、そ れぞれ設けられている。
これらの!^ッ卜スィッチ 72a, 72c, 72d, 72eは、信号回路 71a, 71c, 71d, 71eを 介してコントローラ 23に接続されている。
[0030] 可変容量型油圧ポンプ 10, 13の吐出管路 11, 14には、可変型圧力制御弁 67, 6 6が接続されている。コントローラ 23から信号回路 60, 62を通じて出力される指令信 号により、パイロット弁 61, 63力切り替わると、パイロットポンプ 19からのパイロット圧 がパイロット管路 64, 65を通って、可変型圧力制御弁 67, 66の操作部に作用する。 これにより、可変容量型油圧ポンプ 10, 13の吐出管路 11, 14の最大圧力(リリーフ 圧)が制御される。なお、 26はノ ィロット油圧の戻り管路である。
[0031] 圧力補償付流量制御弁 12, 15, 16には、最大流量を制限するため、同制御弁内 のスプールストロークを制限できる機構が設けられている。コントローラ 23から信号回 路 74b, 74c, 74dを通じて出力される指令信号により、パイロット弁 75b, 75c, 75d が切り替わると、パイロットポンプ 19からのパイロット圧がパイロット管路弁 76b, 76c, 76dを通って、各圧力補償付流量制御弁 12, 15の操作部に作用することにより、圧 力補償付流量制御弁 12, 15の流量が制限されるように制御される。
ここで、油圧ポンプ 10, 13、吐出管路 11, 14および圧力補償付流量制御弁 12, 1 5, 16を含んで、油圧ァクチユエータ(旋回用油圧モータ 2、ブームシリンダ 6およびァ 一ムシリンダ 7)を駆動させるための駆動手段としての油圧回路が構成されている。
[0032] 圧力補償付流量制御弁 12, 15, 16には、それぞれの油圧ァクチユエータ(ブーム シリンダ 6,アームシリンダ 7,旋回用油圧モータ 2)の必要流量に対する油圧ポンプ 1 0, 13の吐出圧を検知し補償する圧力補償弁 27a, 27b, 27cが設けられている。圧 力補償弁 27a, 27b, 27cは、ノ ィロット管路 29a, 29bを介して油圧ポンプ 10, 13の ロードセンシングレギユレータ 28a, 28bと接続されて!、る。
[0033] ロードセンシング回路として、圧力補償付流量制御弁 15の出口ポート 32から旋回 用油圧モータ 2の最大負荷圧力を検出するパイロット管路 33と、圧力補償付流量制 御弁 16の出口ポート 30からアームシリンダ 7の最大負荷圧力を検出するパイロット管 路 31とにおいて、最大負荷圧力側の圧力をシャトル弁 34で検出し、このシャトル弁 3 4に接続されたパイロット管路 35と、圧力補償付流量制御弁 12の出口ポート 36から ブームシリンダ 6の最大負荷圧力を検出するパイロット管路 37とにおいて、最大負荷 圧力側の圧力をシャトル弁 38で検出したうえ、これを、パイロット管路 39を介して、一 方はパイロット管路 29aにより油圧ポンプ 10のロードセンシングレギユレータ 28aに、 また、他方はパイロット管路 29bにより他方の油圧ポンプ 13のロードセンシンダレギュ レータ 28bに入力している。
上記ロードセンシング回路には、旋回ロードセンシング切換弁 40が介設されている 。この切換弁 40は、ノ ィロット管路 41を介してコントローラ 23の信号回路 51によって 制御される電磁式パイロット弁 52によって切り換え制御されるようになっている。
[0034] ロードセンシングレギユレータ 28a, 28bは、それぞれ吐出管路 11, 14と、油圧ポン プ 10, 13の斜板傾転量を制御するサーボピストン 42a, 42bとの間にパイロット操作 方式のロードセンシング弁 44a, 44bを有し、一方のロードセンシング弁 44aの両端 にはパイロット管路 29a, 43aが、他方のロードセンシング弁 44bの両端には、パイ口 ット管路 29b、 43bがそれぞれ接続されている。
[0035] パイロット管路 29a, 29bにより導かれる最大負荷圧力と、ばね 45a, 45bのばね力 との和がノ ィロット管路 43a, 43bで導かれる油圧ポンプ 10, 13の吐出圧より大きく なると、ロードセンシング弁 44a, 44bが(A)位置から(B)位置に切換わり、サーボピ ストン 42a, 42bの圧油がタンク 18に戻り、油圧ポンプ 10, 13の斜板角が増加されて 吐出流量が増大される。逆に、最大負荷圧力とばね力との和が油圧ポンプ 10, 13の 吐出圧より小さくなると、ロードセンシング弁 44a, 44bが(B)位置から (A)位置に切 換わり、パイロット管路 43a, 43bからの圧油がサーボピストン 42a, 42bに入って、油 圧ポンプ 10, 13の斜板角が減少されて吐出流量が減少される。
[0036] すなわち、油圧ポンプ 10の吐出圧 P1が管路 43aからロードセンシング弁 44aの一 方の操作部に作用するとともに、パイロット管路 29aから導かれる負荷圧 LP1とばね 力とがロードセンシング弁 44aの他方の操作部に作用する。これにより、 P1 >LP1の ときは、油圧ポンプ 10の斜板角が減少するように制御され、 PKLP1のときは、油圧 ポンプ 10の斜板角が増加するように制御される。
また、油圧ポンプ 13の吐出圧 P2が管路 43bからロードセンシング弁 44bの一方の 操作部に作用するとともに、パイロット管路 29bから導かれる負荷圧 LP2とばね力とが ロードセンシング弁 44bの他方の操作部に作用する。これにより、 P2>LP2のときは 、油圧ポンプ 13の斜板角が減少するように制御され、 P2<LP2のときは、油圧ボン プ 13の斜板角が増加するように制御される。
上記のロードセンシングシステムと、圧力補償付流量制御弁 12, 15, 16とを使用 することによって、油圧ポンプ 10, 13の吐出圧油を必要流量に抑えて省エネを図り ながら、各油圧ァクチユエータ(ブームシリンダ 6,アームシリンダ 7,旋回用油圧モー タ 2)のうちの最大負荷圧によって各圧力補償弁 27a, 27b, 27cが制御される。
[0037] 2基の可変容量型油圧ポンプ 10, 13のそれぞれの吐出管路 11, 14は連通管路 4 6によって接続されている。連通管路 46には両油圧ポンプ 10, 13の吐出圧油の合 流、分流切換弁 47が設けられている。切換弁 47は、コントローラ 23から信号回路 49 を介して指令される電磁式パイロット弁 50の作動により、パイロット管路 48のパイロッ ト油圧によって切換え制御されるようになって!/、る。
なお、合流、分流切換弁 47と連動して制御されるロードセンシング圧入切用切換 弁 53がロードセンシング回路に介装されている。
[0038] このように構成されたロードセンシングシステム力もなる油圧式掘削機の油圧制御 回路には、持上旋回における土砂の掘肖 ダンプカーへの積み込みのごときブーム 、アームと旋回の同時操作での流量配分による作業のマッチングが変えられるように 、さらには、堅い土質上での掘削作業や瞬間的にエンジンの定格出力以上の出力 にて作業が可能なように、各種優先モードが予めコントローラ 23に設定されている。
[0039] すなわち、コントローラ 23には、図 4に示すように、各操作レバー 22a, 22b, 22cに 設けられたリミットスィッチ 72a, 72c, 72d, 72eからの信号の組み合わせに応じて、 特定の 1以上の駆動手段の出力が通常時よりも高くできる、または、他の駆動手段と の対比において出力比が高くできる優先作業モードであるかを判定するモード判定 手段 23Aと、このモード判定手段 23Aによって優先作業モードであると判定された際 、その優先作業モードに対応する特定の 1以上の駆動手段の出力が通常時よりも高 くできるように、または、他の駆動手段との対比において出力比が高くできるように、 駆動手段を制御する駆動制御手段 23Bとが設けられている。
[0040] モード判定手段 23Aは、リミットスィッチ 72a, 72c, 72d, 72eのオン'オフ状態の組 み合わせに対応して複数の優先作業モードを記憶した記憶手段 23A1と、リミットスィ ツチ 72a, 72c, 72d, 72eのオン.オフ状態の組み合わせに対応する優先作業モー ドを記憶手段 23A1の中から選択する選択手段 23A2とを備える。
駆動制御手段 23Bは、モード判定手段 23Aによって選択された優先作業モードに 応じて、この優先作業モードを実行すベぐパイロット弁 50、 ノ ィロット弁 75b〜75d、 ノ ィロット弁 52、パイロット弁 61, 63に対して指令信号を発信する。
[0041] 記'隐手段 23A1には、図 5に示すように、 U ッ卜スィッチ 72a, 72c, 72d, 72eの才 ン 'オフ状態の組み合わせに対応して、(I)標準作業モードと、 7種の優先作業モード 、つまり(II)掘削力アップモード、(III)旋回優先モード、(IV)ブーム上げ優先モード、 ( V)アーム掘削優先モード、(VI)パワーアップモード(旋回 +ブーム)、(VII)パワーアツ プモード(ブーム +アーム)、(VIII)パワーアップモード (旋回 +アーム)が設定記憶さ れている。さらに、この各モードに対応して、合流、分流切換弁 47、旋回ロードセンセ ンシング切換弁 40、可変型圧力制御弁 67, 66、各流量制御弁 12, 15, 16の最大 流量を制限するパイロット弁 75b, 75c, 75dの状態、さらにはエンジンの回転'出力 状態が記憶されている。
なお、 55はモニタであって、各作業モードが表示されるようになっている。
[0042] (I)標準モード
90° 旋回操作とブーム上げ操作とを同時にする場合において、旋回とブームのう ちいずれか一方を優先する程でもなく略同程度の必要流量を確保したいとき、もしく は、一時的に掘削力を増やしたりエンジン出力を上げる必要がないときには、各操作 レバー 22a, 22b, 22cを通常のストローク範囲にて使用する。つまり、キックダウン領 域まで操作せずに使用する。 この状態では、コントローラ 23からの指令信号がパイロット弁 50には発信されない。 従って、ノ ィロット弁 50は図 3に示す位置にあるため、合流、分流切換弁 47の操作 部に作用していたパイロット圧がパイロット管路 48からタンク 18へドレーンされ、合流 、分流切換弁 47はオフ動作して図 3に示す合流位置になっている。つまり、合流、分 流切換弁 47を通じて、油圧ポンプ 10からの圧油と油圧ポンプ 13からの圧油とが合 流する状態になっている。
[0043] この状態において、ブーム用操作レバー 22cを操作すると、その操作方向および操 作角度に応じて、パイロットポンプ 19からの圧油がパイロット管路 73a, 73bを通じて 、圧力補償付流量制御弁 12の操作部に与えられる結果、ブームシリンダ 6が進退動 作される。つまり、ブームの上げ下げ動作が行われる。
旋回用操作レバー 22bを操作すると、その操作方向および操作角度に応じて、パ ィロットポンプ 19からの圧油がパイロット管路 73c, 73dを通じて、圧力補償付流量制 御弁 15の操作部に与えられる結果、旋回用油圧モータ 2が左右回転される。つまり、 旋回動作される。
アーム用操作レバー 22aを操作すると、その操作方向および操作角度に応じて、パ ィロットポンプ 19からの圧油がパイロット管路 73e, 73fを通じて、圧力補償付流量制 御弁 16の操作部に与えられる結果、アームシリンダ 7が進退動作される。
[0044] 一方、標準モードにおいては、コントローラ 23からの指令信号がパイロット弁 52に 発信される。すると、パイロット弁 52が切り換わるため、パイロットポンプ 19からのパイ ロット圧がパイロット弁 52を通ってパイロット管路 41から旋回ロードセンシング切換弁 40の操作部に作用する結果、旋回ロードセンシング切換弁 40はオン動作して切換 わり「切」位置となる。
このため、旋回用油圧モータ 2を駆動する負荷圧は旋回ロードセンシング切換弁 4 0で遮断されるので、ブームシリンダ 6の負荷圧がシャトル弁 38で検出される。この負 荷圧は、パイロット管路 29aを通って、ロードセンシング弁 44aの操作部に作用すると ともに、パイロット管路 29bを通って、ロードセンシング弁 44bの操作部にも作用する。
[0045] これにより、油圧ポンプ 10の吐出圧 P1が管路 43aからロードセンシング弁 44aの一 方の操作部に作用するとともに、パイロット管路 29aから導かれるブームシリンダ 6の 負荷圧 LP1とばね力とがロードセンシング弁 44aの他方の操作部に作用する。その 結果、 P1 >LP1のときは、油圧ポンプ 10の斜板角が減少するように制御され、 Pl < LP 1のときは、油圧ポンプ 10の斜板角が増加するように制御される。
また、油圧ポンプ 13の吐出圧 P2が管路 43bからロードセンシング弁 44bの一方の 操作部に作用するとともに、パイロット管路 29bから導かれるブームシリンダ 6の負荷 圧 LP2とばね力とがロードセンシング弁 44bの他方の操作部に作用する。その結果、 P2>LP2のときは、油圧ポンプ 13の斜板角が減少するように制御され、 P2<LP2 のときは、油圧ポンプ 13の斜板角が増加するように制御される。
[0046] すなわち、標準モードによるブームと旋回との同時操作時は、ブームのァクチユエ ータ(ブームシリンダ 6)の負荷圧に見合った油圧ポンプ 10, 13の斜板角に制御され 、ブームと旋回の各ァクチユエータ(ブームシリンダ 6,旋回用油圧モータ 2)に必要流 量が供給される。
[0047] (II)掘削力アップモード (単独操作)
例えば、アーム掘削単独操作をする場合においては、アーム用操作レバー 22aを 通常の使用範囲を超えてキックダウン領域まで操作する。
これにより、コントローラ 23からの指令信号がパイロット弁 61に発信される。すると、 パイロット弁 61が切り換わるため、パイロットポンプ 19からのパイロット圧はパイロット 弁 61を通ってパイロット管路 64から可変型圧力制御弁 66の操作部に作用する。そ の結果、可変型圧力制御弁 66は、オン動作して切り換わり昇圧位置となる。つまり、 アームシリンダ 7の駆動油圧回路が昇圧 (定格に対して 110%昇圧)されるため、一 時的にアーム掘削力を増やして作業できる。
同様に旋回単独操作をする場合においても、旋回用操作レバー 22bを通常の使用 範囲を超えてキックダウン領域まで操作することにより、一時的に旋回力を増やして 作業できる。
また、ブーム上げ単独操作をする場合においては、ブーム用操作レバー 22cを通 常の使用範囲を超えてキックダウン領域まで操作する。
これにより、コントローラ 23からの指令信号がパイロット弁 63に発信される。すると、 パイロット弁 63が切り換わるため、パイロットポンプ 19からのパイロット圧はパイロット 弁 63を通ってパイロット管路 65から可変型圧力制御弁 67の操作部に作用する。そ の結果、可変型圧力制御弁 67は、オン動作して切り換わり昇圧位置となる。つまり、 ブームシリンダ 6の駆動油圧回路が昇圧 (定格に対して 110%昇圧)されるため、一 時的にブーム上げ力を増やして作業できる。
[0048] (III)旋回優先モード (旋回力および旋回速度アップ)
例えば、 180° 旋回操作とブーム上げ操作とを同時にする場合において、旋回用 油圧モータ 2の負荷圧が大きぐし力も、多くの流量が必要なとき、もしくは、一時的に 旋回力のみを増やして作業するときには、旋回用操作レバー 22bのみを通常の使用 範囲を超えてキックダウン領域まで操作する。
これにより、コントローラ 23からの指令信号がパイロット弁 50に発信される。すると、 パイロット弁 50が切り換わるため、パイロットポンプ 19からのパイロット圧がパイロット 弁 50を通ってパイロット管路 48から合流、分流切換弁 47の操作部に作用する。その 結果、合流、分流切換弁 47はオン動作して切り換わり分流位置となる。
このとき、パイロットポンプ 19からのパイロット圧はロードセンシング圧入切用切換弁 53の操作部にも作用し、ロードセンシング圧入切用切換弁 53を a位置に切り換える。
[0049] これと同時に、コントローラ 23からの指令信号がパイロット弁 75bに発信される。す ると、パイロット弁 75bが切り換わるため、パイロットポンプ 19からのパイロット圧がパイ ロット弁 75bから圧力補償付流量制御弁 12の下げ側操作部に作用する。その結果、 圧力補償付流量制御弁 12内の上げ側スプールストロークが制限されるため、ブーム 上げ側流量が制限される。
さらに、コントローラ 23からの指令信号がパイロット弁 61に発信される。すると、パイ ロット弁 61が切り換わるため、パイロットポンプ 19からのパイロット圧がパイロット弁 61 を通ってパイロット管路 64から可変型圧力制御弁 66の操作部に作用する。その結果 、可変型圧力制御弁 66はオン動作して切り換わり昇圧位置となる。つまり、旋回用油 圧モータ 2の駆動油圧回路が昇圧 (定格に対して 110%昇圧)されるため、旋回操作 とブーム上げ操作とを同時にする場合において、一時的に旋回力のみを増やして作 業できる。
[0050] 一方、コントローラ 23からの指令信号は、パイロット弁 52に発信されない。従って、 パイロット弁 52に作用していたパイロット圧は管路 41からタンク 18へドレーンされるた め、パイロット弁 52はオフ動作して切り換わり図 3に示す「入」位置となる。
これにより、旋回用油圧モータ 2を駆動する負荷圧は、旋回ロードセンシング切換 弁 40、シャトル弁 34、パイロット管路 35、ロードセンシング圧入切用切換弁 53の a位 置を通ってパイロット管路 29bからロードセンシング弁 44bの操作部に作用する。 そのため、油圧ポンプ 13の吐出圧 P2が管路 43bからロードセンシング弁 44bの一 方の操作部に作用するとともに、パイロット管路 29bから導かれる旋回用油圧モータ 2 の負荷圧 LP2とばね力とがロードセンシング弁 44bの他方の操作部に作用する。そ の結果、 P2>LP2のときは、油圧ポンプ 13の斜板角が減少するように制御され、 P2 く LP2のときは、油圧ポンプ 13の斜板角が増加するように制御される。
[0051] 従って、旋回優先モードを選択したときは、油圧ポンプ 13が独立して旋回用油圧モ ータ 2に必要な流量を供給することができるとともに、駆動回路圧を昇圧させることが できる。この場合、ブームシリンダ 6は、上記の標準モードと同様に吐出圧 P1と負荷 圧 LP 1との差圧によって制御される力 圧力補償付流量制御弁 12のスプールスト口 ークが制限されるため、油圧ポンプ 10からの流量も制限される。
すなわち、旋回優先モードによるブームと旋回同時操作時は、ブームのァクチユエ ータ(ブームシリンダ 6)への油圧ポンプ 10からの流量が制限されるとともに、旋回の ァクチユエータ (旋回用油圧モータ 2)の駆動油圧回路が昇圧すると同時に、負荷圧 に見合った油圧ポンプ 13の斜板角に制御されるため、旋回用油圧モータ 2の駆動力 と必要流量が増加される。
[0052] (IV)ブーム上げ優先モード (ブーム上げ掘削力および速度アップ)
例えば、旋回操作とブーム上げ操作とを同時にする場合において、旋回角度が比 較的小さく(例えば 45° )、しかも、ブーム上げ操作のために多くの流量を必要とする とき、あるいは、一時的にブーム上げ力のみを増やして作業するときには、ブーム用 操作レバー 22cのみを通常の使用範囲を超えてキックダウン領域まで操作する。 これにより、コントローラ 23からの指令信号がパイロット弁 50に発信される。すると、 パイロット弁 50が切り換わるため、パイロットポンプ 19からのパイロット圧がパイロット 弁 50を通ってパイロット管路 48から合流、分流切換弁 47の操作部に作用する。その 結果、分流切換弁 47はオン動作して切り換わり分流位置となる。
このときに、パイロットポンプ 19からのパイロット圧はロードセンシング圧入切用切換 弁 53の操作部にも作用し、ロードセンシング圧入切用切換弁 53を a位置に切り換え る。
[0053] これと同時に、コントローラ 23からの指令信号がパイロット弁 52に発信される。する と、パイロット弁 52が切り換わるため、パイロットポンプ 19からのパイロット圧がパイロッ ト弁 52を通ってパイロット管路 41から旋回ロードセンシング切換弁 40の操作部に作 用する。その結果、旋回用油圧モータ 2を駆動する負荷圧は旋回ロードセンシング切 換弁 40で遮断される。
[0054] また、コントローラ 23からの指令信号がパイロット弁 75cまたはパイロット弁 75dに発 信される。すると、パイロット弁 75cまたはパイロット弁 75dが切り換わるため、ノイロッ トポンプ 19からのパイロット圧がパイロット弁 75cまたはパイロット弁 75dから圧力補償 付流量制御弁 15の駆動側操作部と反対側に作用する。その結果、圧力補償付流量 制御弁 15内の駆動側スプールストロークが制限されるため、旋回流量が制限される
[0055] さらに、コントローラ 23からの指令信号がパイロット弁 63に発信される。すると、パイ ロット弁 63が切り換わるため、パイロットポンプ 19からのパイロット圧がパイロット弁 63 を通ってパイロット管路 65から可変型圧力制御弁 67の操作部に作用する。その結果 、可変型圧力制御弁 67は、オン動作して切り換わり昇圧位置となる。
つまり、ブームシリンダ 6の駆動油圧回路が昇圧 (定格に対して 110%昇圧)される ため、旋回操作とブーム上げ操作とを同時にする場合において、一時的にブーム上 げカのみを増やして作業できる。
[0056] 一方、ブームシリンダ 6の負荷圧はパイロット管路 29aを通って、ロードセンシング弁 44aの操作部に作用し、他方、旋回用油圧モータ 2の負荷圧はロードセンシング弁 4 4bの操作部に作用しない。
これにより、油圧ポンプ 10の吐出圧 P1が管路 43aからロードセンシング弁 44aの一 方の操作部に作用するとともに、パイロット管路 29aから導かれるブームシリンダ 6の 負荷圧 P 1とばね力とがロードセンシング弁 44aの他方の操作部に作用する。その結 果、油圧ポンプ 10の吐出圧 PIとブームシリンダの負荷圧 LP1とが、 P1 >LP1のとき は油圧ポンプ 10の斜板角が減少するように制御され、 PI < LP1のときは油圧ポンプ 10の斜板角が増加するように制御される。
また、旋回用油圧モータ 2からの負荷圧がロードセンシング弁 44bに作用しないとき は油圧ポンプ 13の吐出 P2によって制御され、この吐出圧 P2がばね力より大きくなる と、斜板角が減少するように制御される。
[0057] 従って、ブーム上げ優先モードによるブーム上げと旋回の同時操作時は、旋回のァ クチユエータ (旋回用油圧モータ 2)への油圧ポンプ 13からの流量が制限されるととも に、ブームのァクチユエータ (ブームシリンダ 6)の駆動油圧回路が昇圧すると同時に 、負荷圧に見合った油圧ポンプ 10の斜板角に制御されるため、ブームシリンダ 6の駆 動力と必要流量が増加される。
なお、アームシリンダ 7を駆動するときは、アームの負荷圧はシャトル弁 34力 パイ ロット管路 35を介して切換弁 53の a位置を通ってパイロット管路 29bからロードセンシ ング弁 44bの操作部に作用する。これにより、 P2>LP2のときは油圧ポンプ 13の斜 板角が減少するように制御され、 P2く LP2のときは油圧ポンプ 13の斜板角が増加 するように制御されるので、アームシリンダ 7に必要な流量を供給することができる。
[0058] (V)アーム掘削優先モード (アーム掘削力および速度アップ)
例えば、荒仕上げ時にアーム掘削操作とブーム上げ操作とを同時にする場合にお いて、アーム掘削速度を速くする必要があるとき、あるいは、一時的にアーム掘削力 のみを増やして作業するときには、アーム用操作レバー 22aのみを通常の使用範囲 を超えてキックダウン領域まで操作する。
これにより、コントローラ 23からの指令信号がパイロット弁 50に発信される。すると、 パイロット弁 50が切り換わるため、パイロットポンプ 19からのパイロット圧がパイロット 弁 50を通ってパイロット管路 48から合流、分流切換弁 47の操作部に作用する。その 結果、分流切換弁 47は、オン動作して切り換わり分流位置となる。
このとき、パイロットポンプ 19からのパイロット圧はロードセンシング圧入切用切換弁 53の操作部にも作用し、ロードセンシング圧入切用切換弁 53を a位置に切り換える。
[0059] これと同時に、コントローラ 23からの指令信号がパイロット弁 52に発信される。する と、パイロット弁 52が切り換わるため、パイロットポンプ 19からのパイロット圧がパイロッ ト弁 52を通ってパイロット管路 41から旋回ロードセンシング切換弁 40の操作部に作 用する。その結果、旋回用油圧モータ 2を駆動する負荷圧は旋回ロードセンシング切 換弁 40で遮断される。
また、コントローラ 23からの指令信号がパイロット弁 75bに発信される。すると、パイ ロット弁 75bが切り換わるため、パイロットポンプ 19からのパイロット圧がパイロット弁 7 5bから圧力補償付流量制御弁 12の下げ側操作部に作用する。その結果、圧力補 償付流量制御弁 12内の上げ側スプールストロークが制限されるため、ブーム上げ側 流量が制限される。
[0060] さらに、コントローラ 23からの指令信号がパイロット弁 61に発信される。すると、パイ ロット弁 61が切り換わるため、パイロットポンプ 19からのパイロット圧はパイロット弁 61 を通ってパイロット管路 64から可変型圧力制御弁 66の操作部に作用する。その結果 、可変型圧力制御弁 66は、オン動作して切り換わり昇圧位置となる。
つまり、アームシリンダ 7の駆動油圧回路が昇圧 (定格に対して 110%昇圧)される ため、アーム掘削操作とブーム上げ操作とを同時にする場合において、アーム掘削 速度を速くしたり、あるいは、一時的にアーム掘削力のみを増やして作業できる。
[0061] 一方、アームシリンダ 7の負荷圧はパイロット管路 29bを通って、ロードセンシング弁 44bの操作部に作用し、他方、旋回用油圧モータ 2の負荷圧はロードセンシング弁 4 4bの操作部に作用しない。
これにより、油圧ポンプ 13の吐出圧 P2が管路 43bからロードセンシング弁 44bの一 方の操作部に作用するとともに、パイロット管路 29bから導かれるアームシリンダ 7の 負荷圧 LP2とばね力とがロードセンシング弁 44bの他方の操作部に作用する。
このため、油圧ポンプ 13の吐出圧 P2とアームシリンダ 7の負荷圧 LP2と力 P2>L P2のときは油圧ポンプ 13の斜板角が減少するように制御され、 P2く LP2のときは油 圧ポンプ 13の斜板角が増加するように制御される。
従って、アーム掘削優先モードによるブーム上げとアーム掘削の同時操作時は、ブ 一ムのァクチユエータ(ブームシリンダ 6)への油圧ポンプ 10からの流量が制限される とともに、アームのァクチユエータ(アームシリンダ 7)の駆動油圧回路が昇圧すると同 時に、負荷圧に見合った油圧ポンプ 13の斜板角に制御されるため、アームシリンダ 7 の駆動力と必要流量が増加される。
[0062] (VI)パワーアップモード(旋回 +ブーム上げ)
一時的にパワーアップし積み込み作業等をスピーディに行 、た 、場合がある。例え ば、ブーム上げ速度と旋回速度を同時に上げるために、両ァクチユエータに多くの流 量を必要とする場合には、旋回用操作レバー 22bとブーム用操作レバー 22cを通常 の使用範囲を超えてキックダウン領域まで操作する。
この状態では、コントローラ 23からの指令信号がパイロット弁 50には発信されない。 従って、ノ ィロット弁 50は図 3に示す位置にあるため、合流、分流切換弁 47の操作 部に作用していたパイロット圧がパイロット管路 48からタンク 18へドレーンされ、合流 、分流切換弁 47はオフ動作して図 3に示す合流位置になっている。つまり、合流、分 流切換弁 47を通じて、油圧ポンプ 10からの圧油と油圧ポンプ 13からの圧油とが合 流する状態になっている。
[0063] 一方、コントローラ 23からの指令信号がパイロット弁 52に発信される。すると、パイ口 ット弁 52が切り換わるため、パイロットポンプ 19力 のパイロット圧がパイロット弁 52を 通ってパイロット管路 41から旋回ロードセンシング切換弁 40の操作部に作用する。 その結果、旋回用油圧モータ 2を駆動する負荷圧は旋回ロードセンシング切換弁 40 で遮断される。
[0064] これと同時に、コントローラ 23からの指令信号がパイロット弁 61, 63に発信される。
すると、パイロット弁 61, 63が切り換わるため、パイロットポンプ 19からのパイロット圧 がパイロット弁 61, 63を通ってパイロット管路 64, 65から可変型圧力制御弁 66, 67 の操作部に作用する。その結果、可変型圧力制御弁 66, 67は、オン動作して切り換 わり昇圧位置となる。
さらに、コントローラ 23からの指令信号力 油圧ポンプ 10, 13を駆動するエンジン の回転 ·出力を制御するガバナ(図示省略)へ発信される。すると、エンジンの回転- 出力がアップ (定格に対して約 110%)するように制御される。
[0065] つまり、油圧ポンプ 10, 13を駆動するエンジンの回転 ·出力がアップされるため、積 み込み作業等において、ブーム上げ速度と旋回速度を同時に上げることができるか ら、積み込み作業をスピーディに行うことができる。
[0066] 一方、アームシリンダ 7の負荷圧はパイロット管路 29bを通って、ロードセンシング弁 44bの操作部に作用し、他方、旋回用油圧モータ 2の負荷圧はロードセンシング弁 4 4bの操作部に作用しない。
これにより、油圧ポンプ 13の吐出圧 P2が管路 43bからロードセンシング弁 44bの一 方の操作部に作用するとともに、パイロット管路 29bから導かれるアームシリンダ 7の 負荷圧 LP2とばね力とがロードセンシング弁 44bの他方の操作部に作用する。この ため、油圧ポンプ 13の吐出圧 P2とアームシリンダ 7の負荷圧 LP2との差圧力 P2 > LP2ときは油圧ポンプ 13の斜板角が減少するように制御され、 P2<LP2ときは油圧 ポンプ 13の斜板角が増加するように制御される。
[0067] (VII)パワーアップモード(ブーム上げ +アーム掘削)
同様に、ブーム上げ速度とアーム掘削速度を同時に上げるために、両ァクチユエ一 タに多くの流量を必要とする場合には、ブーム用操作レバー 22cとアーム用操作レバ 一 22aを通常の使用範囲を超えてキックダウン領域まで操作する。
この状態では、コントローラ 23からの指令信号がパイロット弁 50には発信されない。 従って、ノ ィロット弁 50は図 3に示す位置にあるため、合流、分流切換弁 47の操作 部に作用していたパイロット圧がパイロット管路 48からタンク 18へドレーンされ、合流 、分流切換弁 47はオフ動作して図 3に示す合流位置になっている。つまり、合流、分 流切換弁 47を通じて、油圧ポンプ 10からの圧油と油圧ポンプ 13からの圧油とが合 流する状態になっている。
[0068] 一方、コントローラ 23からの指令信号がパイロット弁 52に発信される。すると、パイ口 ット弁 52が切り換わるため、パイロットポンプ 19力 のパイロット圧がパイロット弁 52を 通ってパイロット管路 41から旋回ロードセンシング切換弁 40の操作部に作用する。 その結果、旋回用油圧モータ 2を駆動する負荷圧は旋回ロードセンシング切換弁 40 で遮断される。
[0069] これと同時に、コントローラ 23からの指令信号がパイロット弁 61, 63に発信される。
すると、パイロット弁 61, 63が切り換わるため、パイロットポンプ 19からのパイロット圧 がパイロット弁 61, 63を通ってパイロット管路 64, 65から可変型圧力制御弁 66, 67 の操作部に作用する。その結果、可変型圧力制御弁 66, 67は、オン動作して切り換 わり昇圧位置となる。
さらに、コントローラ 23からの指令信号力 油圧ポンプ 10, 13を駆動するエンジン 9 1の回転 ·出力を制御するガバナ(図示省略)へ発信される。すると、エンジン 91の回 転-出力がアップ (定格に対して約 110%)するように制御される。
[0070] つまり、油圧ポンプ 10, 13を駆動するエンジン 91の回転 '出力がアップされるため 、掘削作業等において、ブーム上げ速度とアーム掘削速度を同時に上げることがで きるため、掘削作業等をスピーディに行うことができる。
なお、油圧ポンプ 10, 13の斜板角の制御については、前述した (VI)の作用と同じ であるため、説明を省略する。
[0071] (VIII)パワーアップモード(旋回 +アーム掘削)
一時的にパワーアップし旋回ならし作業等をスピーディに行うために、アーム掘削 速度と旋回速度を同時に上げるために、両ァクチユエータに多くの流量を必要とする 場合には、アーム用操作レバー 22aと旋回用操作レバー 22bを通常の使用範囲を超 えてキックダウン領域まで操作する。
この場合の作用については、前述した (VI)の作用と同じであるため、説明を省略す る。
[0072] <第 1実施形態の変形例 >
第 1実施形態では、ブーム用操作レバー 22cに 1つのリミットスィッチ 72aを、旋回用 操作レバー 22bに 2つのリミットスィッチ 72c, 72dを、アーム用操作レバー 22aに 1つ のリミットスィッチ 72eを設けた力 ブーム用操作レバー 22c、旋回用操作レバー 22b 、アーム用操作レバー 22aのほかに、パケット用操作レバーを設け、こられにそれぞ れキックダウン領域を検知する 2つのリミットスィッチを設け、これらのリミットスィッチの オン、オフ状態の組み合わせに対応させて優先作業モードを設定するようにしてもよ い。
[0073] たとえば、図 6に示すように、ブーム用スィッチ BSW1 (上げ、下げ)、アーム用スイツ チ ASW (掘肖 ij、ダンプ)、パケット用スィッチ BSW2 (掘肖 ij、ダンプ)、旋回用スィッチ TSW (右、左)のオン'オフ状態の組み合わせに対応して、掘削力アップモード、ブ ーム優先モード、アーム優先モード、パケット優先モード、旋回優先モード、パワーァ ップモードを設定し、スィッチのオン ·オフ状態の組み合わせ力 対応するモードを選 択し、実行するようにしてもよい。
[0074] 実行にあたっては、図 7に示すように、スィッチのオン'オフ状態を判断したのち(S T1)、これらスィッチのオン'オフ状態の組み合わせ力 モードを判定する(ST2)。こ れには、スィッチのオン'オフ状態の組み合わ力 図 6に示す設定モードの中にある か否かを判定する。設定作業モードの中にない場合には、標準モード (ノーマルモー ド)として通常の動作を行う(ST3)。
設定作業モードの中にある場合、掘削力アップモード (ST4)、ブーム優先モード( ST5)、アーム優先モード(ST6)、パケット優先モード(ST7)、旋回優先モード(ST 8)、パワーアップモード(ST9)の!、ずれかに進む。
[0075] 掘削力アップモード(ST4)の場合、続、て、可変型圧力制御弁を昇圧させる(ST 10)を行う。つまり、可変型圧力制御弁 66, 67を昇圧位置に切り換える。
ブーム優先モード (ST5)の場合、各駆動油圧回路において、ブーム以外の制御 流量を少し絞ったのち、 ST10の処理を行う。アーム優先モード(ST6)の場合、各駆 動油圧回路において、アーム以外の制御流量を少し絞ったのち、 ST10の処理を行 う。パケット優先モード (ST7)の場合、各駆動油圧回路において、パケット以外の制 御流量を少し絞ったのち、 ST10の処理を行う。旋回優先モード(ST8)の場合、各駆 動油圧回路において、旋回以外の制御流量を少し絞ったのち、 ST10の処理を行う 。パワーアップモード(ST9)の場合、エンジン 91の出力をアップさせる動作を行った のち、 ST10の処理を行う。
[0076] このような例では、選択された優先作業モード以外の駆動油圧回路の制御流量を 抑えることにより、選択された優先作業モードに対応する油圧回路の制御流量が、他 の油圧回路の制御流量より多くなるので、結果的には、選択された優先作業モード に対応する油圧回路が優先される。この場合、既存の油圧回路を適用して実施でき る利点がある。
[0077] <第 2実施形態 >
図 8は、本発明の第 2実施形態における油圧式掘削機の油圧制御回路を示してい る。本実施形態の油圧制御回路は、第 1実施形態の油圧制御回路に対して、次の点 が異なる。
第 1実施形態において、 PPC式操作レバー 22a, 22b, 22cと、リミットスィッチ 72a , 72c, 72d, 72dと、主管 20と,ノ ィロット管路 73a, 73b, 73c, 73d, 73e, 73fと力 S 省略され、それに代わって、電気式操作レバー 22d, 22e, 22fが設けられている。こ れ【こ関連して、 =3ン卜ローラ 23【こ ίま信号回路 24a, 24b, 24c, 24d, 24e, 24fを介し て電磁比例制御弁力もなるパイロット弁 25a, 25b, 25c, 25d, 25e, 25fが設けられ 、これらのノ ィ口ッ卜弁 25a, 25b, 25c, 25d, 25e, 25f力 ^圧カネ甫償付流量 ffilj御弁 1 2, 15, 16の両端に接続されている。
[0078] 第 2実施形態で用いる電気式操作レバー 22d, 22e, 22fは、図 9および図 10に示 すように、第 1実施形態で用いた操作レバー 22a, 22b, 22cと同様に、通常の操作 レバーのストローク範囲 100%に対して、約 110%前後(キックダウン領域)まで操作 が可能である。また、操作レバー 22の操作ストロークが 100%を超えると、それまでの 操作力よりも一段と大きな操作力を加えないと動力ない操作フィーリングが作られて いる。
[0079] また、操作レバー 22d, 22e, 22fを操作すると、ストローク 0%力 キックダウン領域 のストローク 110%まで、出力信号が一律に変化する。コントローラ 23は、操作レバ 一 22d, 22e, 22fからの出力信号を受けると、出力信号がある設定値 (SL)を超える と、操作レバー 22d, 22e, 22fがキックダウン領域に達したことを認識する構成にな つている。
[0080] 第 2実施形態においても、第 1実施形態と同様の作用効果が期待できる。
[0081] <第 3実施形態 >
図 11は、本発明の第 3実施形態における電動式掘削の制御システム回路を示して いる。本実施形態の制御システム回路は、第 2実施形態の油圧制御回路に対して、 次の点が異なる。
第 2実施形態において、旋回のァクチユエータ (旋回用油圧モータ 2)、旋回用油圧 モータ 2の圧力補償付流量制御弁 15、ブームのァクチユエータ(ブームシリンダ 6)、 ブームシリンダ 6の圧力補償付流量制御弁 12、アームの了クチユエータ (アームシリ ンダ 7)、アームシリンダ 7の圧力補償付流量制御弁 16に代わって、旋回のァクチュ エータ(旋回電動モータ 102)、旋回電動モータ 102のインバータ 115、ブームのァク チユエータ(ブームシリンダ装置 106)、ブームシリンダ装置 106のインバータ 112、ァ 一ムのァクチユエータ(アームシリンダ装置 107)、アームシリンダ装置 107のインバー タ 116が設けられている。また、これらインバータ 115, 112, 116には、電源コント口 ーラ 120を介してバッテリ 110が接続されて 、るとともに、電源コントローラ 120を介し てバッテリ 110から充電されるキャパシタ(蓄電器) 113が接続されて 、る。
これに関連して、コントローラ 23からの制御信号力 信号回路 24a, 24c, 24e, 24 g, 24h, 24iを介して、各インバータ 115, 112, 116、電源コントローラ 120, ノ ッテ リ 110およびキャパシタ 113に指令される。
[0082] 第 3実施形態で用いる電気式操作レバー 22d, 22e, 22fは、第 2実施形態で用い た電気式操作レバーと同様なレバーで構成することによって、第 3実施形態において も、第 1実施形態と同様な作用効果が期待できる。
また、本実施形態では、コントローラ 23から各インバータ 12, 15, 16および電源コ ントローラ 120への指令により全出力がコントロールされるため、パワーアップモード オン時の出力(110%)も同様に、コントローラ 23から各インバータ 12, 15, 16およ び電源コントローラ 120への指令により増加される。
また、油圧式ァクチユエータと電動式ァクチユエ一タとを組み合わせた、いわゆる、 ノ、イブリツド式掘削機に適用してもよ 、ことは言うまでもな 、。
[0083] なお、本発明は前述の実施形態に限定されるものではなぐ本発明の目的を達成 できる範囲での変形、改良等は本発明に含まれる。
例えば、操作レバーに持たせる操作フィーリング (告知手段)については、操作レバ 一がキックダウン領域に達すると、それまでの操作力より一段と大きな操作力を加え ないと動かないように構成されていた力 これに限られない。逆に、操作レバーがキッ クダウン領域に達すると、それまでの操作力より一段と小さい力で操作できるようにし てもよく、あるいは、図 12に示すような告知手段 80の構成でもよい。
[0084] 図 12に示す告知手段 80は、操作レバー 22の回動支点に設けられた扇型の回動 プレート 81と、この回動プレート 81の各斜辺に当接し回動プレート 81の回動に伴つ て進退するとともに途中の突起 87A, 87Bを挟んで切欠溝 82A, 82Bを軸方向に有 する 2本のスライド棹 83 A, 83Bと、この各スライド棹 83A, 83Bの先端が回動プレー ト 81の各斜辺に当接するようにスライド棹 83A, 83Bを軸方向へ付勢するスプリング 84A, 84Bと、各スライド棹 83A, 83Bの側面に摺動可能に設けられたボール 85A, 85Bと、このボール 85A, 85Bをスライド棹 83A, 83Bの側面に当接する方向へ押圧 付勢するスプリング 86A, 86Bとを備える。
[0085] このような構成であるから、操作レバー 22を回動操作すると、回動プレート 81が回 動される。すると、その回動方向に応じていずれかのスライド棹 83A, 83Bが同図中 下方へスライドされる。いずれかのスライド棹 83 A, 83Bの突起 87A, 87B力ボール 8 5A, 85B位置に達すると、突起 87A, 87B力ボール 85A, 85Bをスプリング 86A, 8 6Bに抗して押し込むため、スライド棹 83A, 83Bを同図中下方へスライドさせるため の力が一瞬変化する。これにより、操作レバー 22を操作しているオペレータは、操作 レバー 22の操作力が変化するのを感じて、キックダウン領域に達したことを認識する ことができる。
[0086] また、操作力に限らず、オペレータの視覚、聴覚、触覚などで認識できるものであつ てもよい。つまり、操作レバーがキックダウン領域に達したことを、表示装置に文字や 図柄などで告知表示、あるいは、スピーカで音として告知、さらには、操作レバーの 振動などで告知できるものでもよ 、。
[0087] また、操作レバーが操作領域近傍に達したことを検出する検出手段としては、上記 実施形態で上げたリミットスィッチに限らず、他の手段でもよい。例えば、操作レバー の操作領域近傍に、操作レバーと電気的に接触する電気的接点を設け、この電気的 接点が操作レバーの接触を検知したことを持って検知する構成、あるいは、操作レバ 一の操作領域近傍に光センサを設け、操作レバーが光センサを遮断したことをもって 検知する構成などでもよ ヽ。
産業上の利用可能性
[0088] 本発明は、油圧式掘削機に利用できる他、他の建設機械一般にも利用することが できる。

Claims

請求の範囲
[1] 異なる動作を行う複数のァクチユエータと、
この各ァクチユエータを駆動させる駆動手段と、
この各駆動手段の動作を指令する複数の操作レバーと、
この各操作レバーが操作領域終端近傍に達したことをそれぞれ検出する複数の検 出手段と、
これら検出手段の検出状態の組み合わせに応じて、特定の 1以上の駆動手段の出 力が通常時よりも高くなる、または、他の駆動手段との対比において出力比が高くな る優先作業モードであるかを判定するモード判定手段と、
このモード判定手段によって優先作業モードであると判定された際、その優先作業 モードに対応する特定の 1以上の駆動手段の出力が通常時よりも高くなるように、ま たは、他の駆動手段との対比において出力比が高くなるように前記駆動手段を制御 する駆動制御手段とを備えることを特徴とする建設機械の制御モード切換装置。
[2] 前記モード判定手段は、前記検出手段の検出状態の組み合わせに対応して複数 の優先作業モードを記憶した記憶手段と、前記検出手段の検出状態の組み合わせ に対応する優先作業モードを前記記憶手段の中から選択する選択手段とを備えて V、ることを特徴とする請求項 1に記載の建設機械の制御モード切換装置。
[3] 前記ァクチユエータは、油圧ァクチユエータによって構成され、
前記各駆動手段は、油圧回路によって構成されているとともに、この油圧回路の流 量を制御する流量制御手段を含み、
前記駆動制御手段は、前記モード判定手段によって優先作業モードであると判定 された際、特定の 1以上の油圧回路に供給される圧油供給量が、他の油圧回路に供 給される圧油供給量より多くなるように前記流量制御手段を制御することを特徴とす る請求項 1または請求項 2に記載の建設機械の制御モード切換装置。
[4] 前記複数の駆動手段を駆動するエンジンを備え、
前記駆動制御手段は、エンジン出力を増減させることを特徴とする請求項 1〜3の Vヽずれかに記載の建設機械の制御モード切換装置。
[5] 前記複数の駆動手段を駆動するバッテリを備え、 前記駆動制御手段は、ノ ッテリ出力を増減させることを特徴とする請求項 1〜3のい ずれかに記載の建設機械の制御モード切換装置。
[6] 前記ァクチユエータは、油圧ァクチユエータによって構成され、
前記各駆動手段は、油圧回路によって構成されているとともに、この油圧回路の圧 力を可変とする可変型圧力制御弁を含み、
前記駆動制御手段は、前記モード判定手段によって優先作業モードであると判定 された際、特定の 1以上の油圧回路の圧力が高くなるように、前記可変型圧力制御 弁を制御することを特徴とする請求項 1〜5のいずれかに記載の建設機械の制御モ ード切換装置。
[7] 前記操作レバーが操作領域終端近傍に達したことをオペレータに認識させる告知 手段を備えていることを特徴とする請求項 1〜6のいずれかに記載の建設機械の制 御モード切換装置。
[8] 請求項 1〜7の 、ずれかに記載の制御モード切換装置を備えたことを特徴とする建 設機械。
PCT/JP2006/300246 2005-01-20 2006-01-12 建設機械の制御モード切換装置および建設機械 Ceased WO2006077759A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US11/795,636 US7904224B2 (en) 2005-01-20 2006-01-12 Excavator control mode switching device and excavator
GB0716153A GB2439475B (en) 2005-01-20 2006-01-12 Construction machine control mode switching device and construction machine
CN2006800028212A CN101107400B (zh) 2005-01-20 2006-01-12 建筑机械的控制模式切换装置以及建筑机械

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2005012837A JP4171467B2 (ja) 2005-01-20 2005-01-20 建設機械の制御モード切換装置および建設機械
JP2005-012837 2005-01-20

Publications (1)

Publication Number Publication Date
WO2006077759A1 true WO2006077759A1 (ja) 2006-07-27

Family

ID=36692149

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2006/300246 Ceased WO2006077759A1 (ja) 2005-01-20 2006-01-12 建設機械の制御モード切換装置および建設機械

Country Status (5)

Country Link
US (1) US7904224B2 (ja)
JP (1) JP4171467B2 (ja)
CN (1) CN101107400B (ja)
GB (1) GB2439475B (ja)
WO (1) WO2006077759A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018012951A (ja) * 2016-07-20 2018-01-25 国土交通省九州地方整備局長 遠隔制御システム

Families Citing this family (59)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9085874B2 (en) * 2007-08-09 2015-07-21 Komatsu Ltd. Working vehicle and hydraulic fluid amount control method for working vehicle
WO2009060442A2 (en) * 2007-11-05 2009-05-14 Lachish Industries Ltd Cutter-mixer-feeder
US8068969B2 (en) * 2007-11-30 2011-11-29 Caterpillar Inc. Power distribution system
JP4949308B2 (ja) * 2008-04-04 2012-06-06 住友建機株式会社 旋回駆動制御装置及びこれを含む建設機械
JP5317517B2 (ja) * 2008-04-14 2013-10-16 カヤバ工業株式会社 ハイブリッド建設機械の制御装置
KR101112135B1 (ko) * 2009-07-28 2012-02-22 볼보 컨스트럭션 이큅먼트 에이비 전기모터를 이용한 건설기계의 선회 제어시스템 및 방법
JP5351702B2 (ja) * 2009-10-14 2013-11-27 株式会社三井三池製作所 リクレーマ
JP5079827B2 (ja) * 2010-02-10 2012-11-21 日立建機株式会社 油圧ショベルの油圧駆動装置
US8655558B2 (en) * 2010-02-12 2014-02-18 Kayaba Industry Co., Ltd. Control system for hybrid construction machine
JP5341005B2 (ja) * 2010-03-29 2013-11-13 日立建機株式会社 建設機械
JP5203434B2 (ja) * 2010-09-08 2013-06-05 日立建機株式会社 ハイブリッド建設機械
US8875506B2 (en) 2010-10-21 2014-11-04 Cnh Industrial America Llc Work vehicle lifting performance
JP5356427B2 (ja) * 2011-02-03 2013-12-04 日立建機株式会社 ハイブリッド式建設機械
CL2012000933A1 (es) * 2011-04-14 2014-07-25 Harnischfeger Tech Inc Un metodo y una pala de cable para la generacion de un trayecto ideal, comprende: un motor de oscilacion, un motor de izaje, un motor de avance, un cucharon para excavar y vaciar materiales y, posicionar la pala por medio de la operacion del motor de izaje, el motor de avance y el motor de oscilacion y; un controlador que incluye un modulo generador de un trayecto ideal.
JP5665652B2 (ja) * 2011-05-19 2015-02-04 日立建機株式会社 建設機械の情報管理装置
JP5797061B2 (ja) * 2011-08-24 2015-10-21 株式会社小松製作所 油圧ショベル
US8863509B2 (en) 2011-08-31 2014-10-21 Caterpillar Inc. Meterless hydraulic system having load-holding bypass
US8944103B2 (en) 2011-08-31 2015-02-03 Caterpillar Inc. Meterless hydraulic system having displacement control valve
US8966892B2 (en) 2011-08-31 2015-03-03 Caterpillar Inc. Meterless hydraulic system having restricted primary makeup
US8966891B2 (en) 2011-09-30 2015-03-03 Caterpillar Inc. Meterless hydraulic system having pump protection
US9051714B2 (en) 2011-09-30 2015-06-09 Caterpillar Inc. Meterless hydraulic system having multi-actuator circuit
US9151018B2 (en) 2011-09-30 2015-10-06 Caterpillar Inc. Closed-loop hydraulic system having energy recovery
US9057389B2 (en) 2011-09-30 2015-06-16 Caterpillar Inc. Meterless hydraulic system having multi-actuator circuit
US8984873B2 (en) 2011-10-21 2015-03-24 Caterpillar Inc. Meterless hydraulic system having flow sharing and combining functionality
US9068578B2 (en) 2011-10-21 2015-06-30 Caterpillar Inc. Hydraulic system having flow combining capabilities
US8943819B2 (en) 2011-10-21 2015-02-03 Caterpillar Inc. Hydraulic system
US8978374B2 (en) 2011-10-21 2015-03-17 Caterpillar Inc. Meterless hydraulic system having flow sharing and combining functionality
US8973358B2 (en) 2011-10-21 2015-03-10 Caterpillar Inc. Closed-loop hydraulic system having force modulation
US8919114B2 (en) 2011-10-21 2014-12-30 Caterpillar Inc. Closed-loop hydraulic system having priority-based sharing
US8978373B2 (en) 2011-10-21 2015-03-17 Caterpillar Inc. Meterless hydraulic system having flow sharing and combining functionality
US8893490B2 (en) 2011-10-21 2014-11-25 Caterpillar Inc. Hydraulic system
US9080310B2 (en) 2011-10-21 2015-07-14 Caterpillar Inc. Closed-loop hydraulic system having regeneration configuration
US8910474B2 (en) 2011-10-21 2014-12-16 Caterpillar Inc. Hydraulic system
JP5864309B2 (ja) * 2012-03-12 2016-02-17 住友重機械工業株式会社 ショベル
JP5928065B2 (ja) * 2012-03-27 2016-06-01 コベルコ建機株式会社 制御装置及びこれを備えた建設機械
US9279236B2 (en) 2012-06-04 2016-03-08 Caterpillar Inc. Electro-hydraulic system for recovering and reusing potential energy
US9290912B2 (en) 2012-10-31 2016-03-22 Caterpillar Inc. Energy recovery system having integrated boom/swing circuits
JP2014091942A (ja) * 2012-11-01 2014-05-19 Komatsu Ltd 建設機械の操作装置
CA2889909A1 (en) * 2012-11-05 2014-05-08 Volvo Construction Equipment Ab Apparatus and method for controlling swing of construction machine
KR101822931B1 (ko) * 2013-02-06 2018-01-29 볼보 컨스트럭션 이큅먼트 에이비 건설기계용 선회 제어 시스템
EP2955284B1 (en) * 2013-02-08 2019-05-08 Doosan Infracore Co., Ltd. Apparatus and method for controlling oil hydraulic pump for excavator
US9290911B2 (en) 2013-02-19 2016-03-22 Caterpillar Inc. Energy recovery system for hydraulic machine
JP6114065B2 (ja) * 2013-02-28 2017-04-12 Kyb株式会社 建設機械及びコントローラ
EP2978969B1 (en) * 2013-03-26 2020-04-29 BorgWarner Sweden AB A hydraulic pump assembly
JP5588051B2 (ja) * 2013-07-05 2014-09-10 株式会社三井三池製作所 リクレーマ
WO2015019839A1 (ja) * 2013-08-05 2015-02-12 住友重機械工業株式会社 ショベル
JP6713250B2 (ja) * 2015-03-17 2020-06-24 住友重機械工業株式会社 建設機械
KR102483963B1 (ko) * 2015-03-27 2022-12-30 스미도모쥬기가이고교 가부시키가이샤 쇼벨 및 쇼벨의 구동방법
JP6587279B2 (ja) * 2015-07-03 2019-10-09 キャタピラー エス エー アール エル 建設機械における走行制御システム
JP6565614B2 (ja) * 2015-11-06 2019-08-28 コベルコ建機株式会社 旋回式油圧作業機械
JP6586406B2 (ja) * 2016-09-30 2019-10-02 日立建機株式会社 作業車両
DE112017007331T5 (de) * 2017-03-29 2019-12-19 Komatsu Ltd. Arbeitsmaschinen-management-vorrichtung
KR102088805B1 (ko) * 2017-06-27 2020-03-13 가부시키가이샤 고마쓰 세이사쿠쇼 작업 기계
US10677269B2 (en) 2018-08-30 2020-06-09 Jack K. Lippett Hydraulic system combining two or more hydraulic functions
JP7123735B2 (ja) * 2018-10-23 2022-08-23 ヤンマーパワーテクノロジー株式会社 建設機械及び建設機械の制御システム
EP3882400B1 (en) * 2018-11-14 2026-04-29 Sumitomo Heavy Industries, Ltd. Shovel and device for controlling shovel
KR20220144379A (ko) 2020-03-02 2022-10-26 클라크 이큅먼트 컴파니 전력 공급 동력기계
CN112392093B (zh) * 2020-11-18 2022-02-25 柳州柳工挖掘机有限公司 挖掘机操作模式确认方法及系统和控制方法及系统
CA3220521A1 (en) 2021-09-02 2023-03-09 Brent DURKIN Lift arm arrangements for power machines

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2583148B2 (ja) * 1990-06-19 1997-02-19 株式会社小松製作所 油圧式掘削機の油圧制御回路
JP2711831B2 (ja) * 1997-02-10 1998-02-10 株式会社小松製作所 建設機械の制御装置
JP2001304001A (ja) * 2000-04-19 2001-10-31 Shin Caterpillar Mitsubishi Ltd 動力装置およびその制御方法

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3750877B2 (ja) * 1996-01-18 2006-03-01 株式会社小松製作所 無人車両走行コースのティーチング方法及び装置
US5704429A (en) * 1996-03-30 1998-01-06 Samsung Heavy Industries Co., Ltd. Control system of an excavator
KR100208728B1 (ko) * 1996-06-29 1999-07-15 토니헬샴 건설 중장비용 주행연동장치
DE69826790T2 (de) * 1997-07-29 2005-02-10 Nissan Motor Co. Ltd., Yokohama Schalteinrichtung für ein automatisches Getriebe
US6233511B1 (en) * 1997-11-26 2001-05-15 Case Corporation Electronic control for a two-axis work implement
JP2002179387A (ja) * 2000-10-03 2002-06-26 Komatsu Ltd 作業用車両の速度制御装置とその速度制御方法
US6564481B2 (en) * 2000-10-30 2003-05-20 Honda Giken Kogyo Kabushiki Kaisha Electric vehicle and transit control method thereof
US6725142B2 (en) * 2002-07-09 2004-04-20 Caterpillar Inc Control system for a work machine digging assembly
US6643577B1 (en) * 2002-08-22 2003-11-04 Caterpillar Inc Operator control station and method for a work machine having more than one function

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2583148B2 (ja) * 1990-06-19 1997-02-19 株式会社小松製作所 油圧式掘削機の油圧制御回路
JP2711831B2 (ja) * 1997-02-10 1998-02-10 株式会社小松製作所 建設機械の制御装置
JP2001304001A (ja) * 2000-04-19 2001-10-31 Shin Caterpillar Mitsubishi Ltd 動力装置およびその制御方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018012951A (ja) * 2016-07-20 2018-01-25 国土交通省九州地方整備局長 遠隔制御システム

Also Published As

Publication number Publication date
GB0716153D0 (en) 2007-09-26
GB2439475A (en) 2007-12-27
US20080300757A1 (en) 2008-12-04
JP2006200220A (ja) 2006-08-03
GB2439475B (en) 2008-09-10
CN101107400A (zh) 2008-01-16
US7904224B2 (en) 2011-03-08
JP4171467B2 (ja) 2008-10-22
CN101107400B (zh) 2010-11-10

Similar Documents

Publication Publication Date Title
JP4171467B2 (ja) 建設機械の制御モード切換装置および建設機械
CN100378343C (zh) 工作机的液压回路
CN101595313B (zh) 建设机械中的油压控制回路
CN102741483B (zh) 液压作业机
CN107208401B (zh) 作业机械的液压系统
JP4764923B2 (ja) 油圧走行車両および油圧走行車両の制御方法
JP6005176B2 (ja) 電動式油圧作業機械の油圧駆動装置
JP5870205B2 (ja) 液圧制御装置
WO2011046184A1 (ja) 作業機械の油圧システム
WO2019049435A1 (ja) 建設機械
WO2013121922A1 (ja) 建設機械
CN114270055B (zh) 建筑机械的油压系统
JPWO2014148449A1 (ja) 建設機械の油圧駆動装置
WO2014192458A1 (ja) 建設機械の油圧駆動装置
JP7297596B2 (ja) 建設機械の油圧システム
WO2019064555A1 (ja) 作業機械の油圧駆動装置
KR101955751B1 (ko) 건설 기계
JP2583148B2 (ja) 油圧式掘削機の油圧制御回路
JP6738782B2 (ja) 建設機械の駆動装置
CN107882789B (zh) 具有负流量控制的电液系统
JP7285736B2 (ja) 建設機械の油圧システム
KR102054519B1 (ko) 건설기계의 유압시스템
JP6591370B2 (ja) 建設機械の油圧制御装置
CN108779786B (zh) 作业车辆以及液压控制方法
JP7152968B2 (ja) 油圧ショベル駆動システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 11795636

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 200680002821.2

Country of ref document: CN

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 0716153

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20060112

WWE Wipo information: entry into national phase

Ref document number: 0716153.2

Country of ref document: GB

122 Ep: pct application non-entry in european phase

Ref document number: 06702596

Country of ref document: EP

Kind code of ref document: A1

WWW Wipo information: withdrawn in national office

Ref document number: 6702596

Country of ref document: EP