WO2003064781A1 - Unite de montage pour dalle de plancher de batiment et son procede de montage - Google Patents
Unite de montage pour dalle de plancher de batiment et son procede de montage Download PDFInfo
- Publication number
- WO2003064781A1 WO2003064781A1 PCT/CN2003/000069 CN0300069W WO03064781A1 WO 2003064781 A1 WO2003064781 A1 WO 2003064781A1 CN 0300069 W CN0300069 W CN 0300069W WO 03064781 A1 WO03064781 A1 WO 03064781A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- floor
- installation
- traction
- traction member
- equipment according
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
- E04B1/3516—Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by erecting a vertical structure and then adding the floors from top to bottom
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/38—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/16—Members, e.g. consoles, for attachment to the wall to support girders, beams, or the like carrying forms or moulds for floors, lintels, or transoms
Definitions
- the present invention relates to equipment and methods for building construction, and more particularly, to installation equipment and methods for multi-story floors.
- the floor of the building divides the space of the entire building longitudinally to meet the user's needs for the use of the building space.
- Most of the existing building floor adopts a concrete structure.
- the installation method is to complete each floor. After the construction of load-bearing structures such as concrete frames or the completion of the load-bearing structure of the entire building, floor slabs are installed upwards one by one. After the concrete of the lower floor slabs has been poured, it needs to wait for a period of time to allow the concrete to reach a certain degree of solidity and be able to withstand a certain amount of For strength, install a support frame on this floor and continue the installation on the next floor.
- the installation method is to install floor slabs from top to bottom.
- the fixed code is fixed on the bearing structure of the building.
- the floor formwork is pressed on the fixed code.
- a support frame is also supported under the floor formwork.
- the support frame is suspended by a traction device. Fix the code on the floor, then pour the floor;
- install a new fixed code on the floor of the lower floor suspend the support frame on the fixed code on the lower floor through the traction device, and then remove the upper floor.
- the floor template is pulled down by the traction device under the action of gravity and lowered to the position of the fixed code on the lower level. It is pressed on the upper end of the fixed code to start the new floor pouring.
- the invention aims to provide a building floor installation equipment and a method for installing the floor slab. After the floor slab is poured, the floor slab formwork can be disassembled after the floor slab has a certain degree of solidification, and the next step can be performed.
- the installation equipment of the floor slab includes a load bearing member for lifting the floor slab, the load bearing member is higher than the plane where the floor slab is located, and a traction member is connected between the load bearing member and the floor slab.
- the load bearing member may be an installation code fixed on the wall of the building; it may be a truss connected to the fixed code supporting the formwork on the upper layer; or a traction member towing the floor on the upper layer.
- the traction member may be a tie rod, a threaded rod, a wire rope, or an iron chain.
- the floor slab is installed as follows: first install the floor slab template; connect the upper end of the traction element to the load-bearing member located above the slab, place the lower end of the traction element at the height of the slab, and then inject the concrete; After a certain degree of solidification, the formwork is removed for the installation of the lower floor; after the floor has solidified enough to support its own weight, the traction member is removed.
- the floor slab during the solidification process is not subjected to the pressure from the upper floor slab, the deformation phenomenon of the lower floor slab bearing the weight load of the upper floor slab is avoided; Due to the upward pulling force of the traction member, it is not necessary to wait for the floor to solidify to support its own weight, and then remove the formwork to install the lower floor, which greatly increases the installation rate of the floor; Since the floor is installed from top to bottom After the template is disassembled, it can be lowered to the next layer for installation with the traction of the traction device under the action of gravity, which reduces the installation and transportation of the template.
- Figure 1 is a schematic diagram of an existing floor installation method
- FIG. 2 is one of the schematic diagrams of the installation process of the first embodiment
- FIG. 3 is a second schematic diagram of the installation process of the first embodiment
- FIG. 5 is a fourth schematic diagram of an installation process according to the first embodiment
- Embodiment 6 is a schematic plan view of Embodiment 1;
- FIG. 7 is a partially enlarged view of A in FIG. 1;
- FIG. 8 is a schematic structural diagram of a second embodiment
- FIG. 9 is an enlarged view of a part B in FIG. 8;
- FIG. 10 is a partial enlarged view of a position C in FIG. 8;
- FIG. 11 is a schematic structural diagram of a third embodiment
- FIG. 12 is a partially enlarged view at D in FIG. 11
- FIG. 12 is a partially enlarged view at D in FIG. 11;
- FIG. 13 is a partially enlarged view at E in FIG. 11; FIG.
- FIG. 14 is a schematic structural diagram of a fourth embodiment
- FIG. 15 is a partially enlarged view at F in FIG. 14;
- FIG. 16 is a partially enlarged view at G in FIG. 14;
- FIG. 17 is a schematic structural diagram of a fifth embodiment
- FIG. 18 is a partially enlarged view at H in FIG. 17; FIG.
- FIG. 19 is a schematic structural diagram of a sixth embodiment
- FIG. 20 is a partially enlarged view at I in FIG. 19; FIG.
- 21 is a schematic structural diagram of a seventh embodiment
- FIG. 22 is a partially enlarged view at J in FIG. 21; FIG.
- the rapid floor slab installation method and device according to the present invention can be used in combination with various floor slab installation methods.
- it is used in combination with the installation method disclosed in Chinese Patent 01129796 as follows:
- the fixed code 5 is fixed, a floor template 4 is installed above the fixed code 5, and the support frame 8 is pulled by the traction device 6 under the fixed code 5 to support the support frame 8.
- the component is the installation code 1 on the wall 9 (as shown in Figs. 2 and 7). After the pouring is completed, wait for the floor to solidify to a certain degree.
- the traction member is a hook-shaped tie rod 2, and the formwork 4 and the floor reinforcement are installed. Once installed, one end of the hook-shaped tie rod 2 is inserted into the floor 3 and bent into a folded angle, and the other end is bent into a hook shape to be connected with the steel bar 9 'on the wall 9 as a load bearing member, and the tie rod 2 is inclined.
- the plate 7 and the connecting rod 14 are welded into a “T” -shaped installation code and embedded in the wall 9.
- the lower end of the connecting rod 14 is threaded and protrudes from the wall 9.
- the connection between the traction member and the floor 3 is also realized by a "T" shaped structure in which the plate 7 and the connecting rod 14 are connected.
- the traction member may be a threaded sleeve 11.
- the traction member is a tie rod 2, one end of the tie rod 2 is connected to the floor 3 through a plate 7, and the other end of the tie rod 2 is connected to the wall 9 through a plate 7.
- the plate-like object 7 is threadedly connected to the tie rod 2.
- Embodiment 4 is a diagrammatic representation of Embodiment 4:
- the two ends of the tie rod 2 are bent into hooks to be respectively connected to the steel bars 3 ′ on the floor 3 and the steel bars 9 ′ of the wall 9;
- the tie rods 2 are threaded.
- the tie rods 2 can be tightened or loosened to adjust the force state of the tie rods.
- Embodiment 5 is a diagrammatic representation of Embodiment 5:
- the rebar 2 is before the floor concrete is poured. After passing through the floor 3, the concrete expands after solidification and generates pressure on the rebar 2. Due to the ribs and grooves on the rebar 2 ', when the unsolidified floor 3 is deflected downward by its gravity, the rebar The friction between 2 'and the concrete is sufficient to overcome the gravity of the floor slab 3, so that the deflection generated by the floor slab 3 within the normal range is within the normal range.
- the upper part of the rebar 2 ' is connected to the truss, and the lower end passes through the unsolidified floor 3; when the upper part is the traction member of the previous floor of the unsolidified floor 3, that is, the last rebar 2', the thread
- the steel 2 'and the steel are connected together by welding, and the pips are above each floor.
- Embodiment 6 is a diagrammatic representation of Embodiment 6
- the traction member is a steel cable 2 ".
- One end of the steel cable 2" is connected to the unsolidified floor 3 through a hook 12 and the other end is connected to the load bearing member above the unsolidified floor 3
- the bottom of the hook 12 is connected with a wedge block 13 which is large and small, and the wedge block 13 passes through the floor 3, and the lower end of the wedge block 13 is provided with a hook 12 to suspend a weight to straighten the steel cable 2 ". After pouring the concrete, it can generate an upward pulling force against the gravity of the floor slab 3 against the solidified floor.
- Embodiment 7 is a diagrammatic representation of Embodiment 7:
- the traction member in this embodiment is an iron chain 2 "', and the rest are the same as those in the sixth embodiment.
- the rapid installation method of the building floor slab according to the present invention is not limited to the method described in this embodiment, and its core content is that when the floor slab is installed, the slab is suspended from the load bearing member of the building by using multiple traction members. Therefore, there is no need to wait until the floor slab is solidified to withstand its own weight before disassembling and installing the floor slab, speeding up the installation speed of the floor slab, and during the installation, the forces between the floor slabs are independent from each other, which will not cause damage to the lower floor slab structure.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Working Measures On Existing Buildindgs (AREA)
Description
Claims
Priority Applications (10)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2004-7011736A KR20040078146A (ko) | 2002-02-01 | 2003-01-24 | 건물 바닥층 슬래브용 가설 유닛 및 그 가설 방법 |
US10/503,017 US20050076599A1 (en) | 2002-02-01 | 2003-01-24 | Erection unit for a building floor slab and the erection method thereof |
UA20040706343A UA77250C2 (en) | 2002-02-01 | 2003-01-24 | Erection unit for a building floor slab and method to erect the slab |
JP2003564362A JP2005525485A (ja) | 2002-02-01 | 2003-01-24 | 建物用床板の取付装置とその取付方法 |
EP03734643A EP1484457A4 (en) | 2002-02-01 | 2003-01-24 | MOUNTING UNIT FOR BUILDING FLOOR SLAB AND METHOD OF MOUNTING |
MXPA04007379A MXPA04007379A (es) | 2002-02-01 | 2003-01-24 | Una unidad de montaje para una losa de piso de edificio y el metodo de montaje de la misma. |
AU2003240022A AU2003240022B2 (en) | 2002-02-01 | 2003-01-24 | An erection unit for a building floor slab and the erection method thereof |
BR0307536-2A BR0307536A (pt) | 2002-02-01 | 2003-01-24 | Unidade eretora para laje de piso de edifìcio e método para eregir laje de piso |
CA002473755A CA2473755A1 (en) | 2002-02-01 | 2003-01-24 | An erection unit for a building floor slab and the erection method thereof |
NO20043225A NO20043225L (no) | 2002-02-01 | 2004-07-30 | Oppforingsenhet for et bygningsetasjeskille og fremgangsmate for oppforing av dette |
Applications Claiming Priority (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02114828 CN1364967A (zh) | 2002-02-01 | 2002-02-01 | 建筑物楼板的快速安装的装置及其方法 |
CN02114828.7 | 2002-02-01 | ||
CN 02250110 CN2589586Y (zh) | 2002-12-09 | 2002-12-09 | 建筑物楼板的固定装置 |
CN 02250109 CN2589585Y (zh) | 2002-12-09 | 2002-12-09 | 一种建筑物楼板的固定装置 |
CN02250109.6 | 2002-12-09 | ||
CN02250110.X | 2002-12-09 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2003064781A1 true WO2003064781A1 (fr) | 2003-08-07 |
Family
ID=27669601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2003/000069 WO2003064781A1 (fr) | 2002-02-01 | 2003-01-24 | Unite de montage pour dalle de plancher de batiment et son procede de montage |
Country Status (11)
Country | Link |
---|---|
US (1) | US20050076599A1 (zh) |
EP (1) | EP1484457A4 (zh) |
JP (1) | JP2005525485A (zh) |
KR (1) | KR20040078146A (zh) |
AU (1) | AU2003240022B2 (zh) |
BR (1) | BR0307536A (zh) |
CA (1) | CA2473755A1 (zh) |
MX (1) | MXPA04007379A (zh) |
NO (1) | NO20043225L (zh) |
RU (1) | RU2281364C2 (zh) |
WO (1) | WO2003064781A1 (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109403523A (zh) * | 2018-11-27 | 2019-03-01 | 福建卓越建设工程开发有限公司 | 预制拼装式叠合板悬挂式支撑结构及叠合板施工方法 |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100460613C (zh) * | 2005-08-02 | 2009-02-11 | 浙江展诚建设集团股份有限公司 | 悬浮架施工方法 |
KR101445365B1 (ko) * | 2012-12-10 | 2014-09-26 | (주)나우기술 | 터널 라이닝에 고정된 풍도슬래브 |
US11408188B1 (en) | 2019-06-04 | 2022-08-09 | Peri Formwork Systems, Inc. | Suspended translating platform |
TWI789970B (zh) * | 2021-03-05 | 2023-01-11 | 台灣櫻花股份有限公司 | 預埋結構 |
TWI762228B (zh) * | 2021-03-05 | 2022-04-21 | 台灣櫻花股份有限公司 | 預埋結構的安裝方法 |
CN114809579B (zh) * | 2022-05-08 | 2023-07-07 | 山西三建集团有限公司 | 搭设采光井四周模架体系用的升降施工平台的架设方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5263835A (en) * | 1989-02-08 | 1993-11-23 | Lubeca Construction Systems Pty. Ltd. | Building construction system |
US5469684A (en) | 1993-08-10 | 1995-11-28 | Franklin; James W. | Concrete building frame construction method |
CN1131225A (zh) * | 1995-03-10 | 1996-09-18 | 李文元 | 建筑楼板模材施工的方法及装置 |
JPH0921184A (ja) * | 1995-07-05 | 1997-01-21 | Satougumi:Kk | 建築物の基礎の構築工法 |
EP0770737A1 (de) * | 1995-10-25 | 1997-05-02 | Pecon AG | Schalungselement |
JP2000045524A (ja) * | 1998-07-24 | 2000-02-15 | Hazama Gumi Ltd | 建築物の構築方法 |
CN1342824A (zh) * | 2001-10-22 | 2002-04-03 | 李渊河 | 建筑物楼板的安装方法及其安装设备 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1701113A (en) * | 1927-05-09 | 1929-02-05 | Will E Keller | Method of and apparatus for pouring concrete walls and floors of steel and concrete frame buildings |
US3275719A (en) * | 1963-08-07 | 1966-09-27 | Brian H Dudson | Method of building in situ construction using sequential molding techniques |
DE1684430C3 (de) * | 1966-08-09 | 1978-10-05 | Dyckerhoff & Widmann Ag, 8000 Muenchen | Verfahren zum Errichten von Hochhäusern o.dgl. sowie Vorrichtung zur Durchführung des Verfahrens |
-
2003
- 2003-01-24 MX MXPA04007379A patent/MXPA04007379A/es not_active Application Discontinuation
- 2003-01-24 WO PCT/CN2003/000069 patent/WO2003064781A1/zh active Application Filing
- 2003-01-24 JP JP2003564362A patent/JP2005525485A/ja active Pending
- 2003-01-24 EP EP03734643A patent/EP1484457A4/en not_active Withdrawn
- 2003-01-24 BR BR0307536-2A patent/BR0307536A/pt not_active IP Right Cessation
- 2003-01-24 AU AU2003240022A patent/AU2003240022B2/en not_active Expired - Fee Related
- 2003-01-24 CA CA002473755A patent/CA2473755A1/en not_active Abandoned
- 2003-01-24 US US10/503,017 patent/US20050076599A1/en not_active Abandoned
- 2003-01-24 KR KR10-2004-7011736A patent/KR20040078146A/ko active IP Right Grant
- 2003-01-24 RU RU2004126670/03A patent/RU2281364C2/ru not_active IP Right Cessation
-
2004
- 2004-07-30 NO NO20043225A patent/NO20043225L/no unknown
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5263835A (en) * | 1989-02-08 | 1993-11-23 | Lubeca Construction Systems Pty. Ltd. | Building construction system |
US5469684A (en) | 1993-08-10 | 1995-11-28 | Franklin; James W. | Concrete building frame construction method |
CN1131225A (zh) * | 1995-03-10 | 1996-09-18 | 李文元 | 建筑楼板模材施工的方法及装置 |
JPH0921184A (ja) * | 1995-07-05 | 1997-01-21 | Satougumi:Kk | 建築物の基礎の構築工法 |
EP0770737A1 (de) * | 1995-10-25 | 1997-05-02 | Pecon AG | Schalungselement |
JP2000045524A (ja) * | 1998-07-24 | 2000-02-15 | Hazama Gumi Ltd | 建築物の構築方法 |
CN1342824A (zh) * | 2001-10-22 | 2002-04-03 | 李渊河 | 建筑物楼板的安装方法及其安装设备 |
Non-Patent Citations (1)
Title |
---|
See also references of EP1484457A4 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109403523A (zh) * | 2018-11-27 | 2019-03-01 | 福建卓越建设工程开发有限公司 | 预制拼装式叠合板悬挂式支撑结构及叠合板施工方法 |
CN109403523B (zh) * | 2018-11-27 | 2024-01-05 | 福建卓越建设工程开发有限公司 | 预制拼装式叠合板悬挂式支撑结构及叠合板施工方法 |
Also Published As
Publication number | Publication date |
---|---|
NO20043225L (no) | 2004-10-27 |
RU2004126670A (ru) | 2006-02-10 |
US20050076599A1 (en) | 2005-04-14 |
EP1484457A1 (en) | 2004-12-08 |
EP1484457A4 (en) | 2006-06-07 |
RU2281364C2 (ru) | 2006-08-10 |
AU2003240022B2 (en) | 2007-03-22 |
BR0307536A (pt) | 2005-06-28 |
KR20040078146A (ko) | 2004-09-08 |
MXPA04007379A (es) | 2004-12-06 |
CA2473755A1 (en) | 2003-08-07 |
JP2005525485A (ja) | 2005-08-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102127966B (zh) | 一种现浇钢筋混凝土柱模板固定装置 | |
CN202090591U (zh) | 一种建筑施工升降式爬升模板 | |
CN110306774B (zh) | 一种承插式悬挑脚手架的安装方法及装置 | |
CN105464216B (zh) | 基于整体提升式模板加固系统超高超大截面斜柱的施工方法 | |
CN107882328B (zh) | 大跨度钢桁架悬吊结构的施工方法 | |
CN114278083B (zh) | 高低台吊模施工结构及施工方法 | |
CN111456425A (zh) | 楼承板临时支撑装置、临时支撑结构及临时支撑方法 | |
CN108729640B (zh) | 一种装配式建筑悬挑板的安装方法 | |
WO2003064781A1 (fr) | Unite de montage pour dalle de plancher de batiment et son procede de montage | |
CN101240658B (zh) | 外斜柱支模施工方法 | |
CN201802072U (zh) | 一种应力夹紧装置及系统 | |
KR100832100B1 (ko) | 주탑 기부 응력저감 가설구조 및 주탑 기부 응력저감 공법 | |
CN216196612U (zh) | 一种悬挑脚手架的支撑结构及其悬挑模板的支撑体系 | |
CN205975377U (zh) | 跨河大桥主桥墩二次锁定临时固结结构 | |
CN107630553B (zh) | 一种用于大跨度楼板的先张快速施工装置及方法 | |
CN115075613A (zh) | 装配式建筑支撑体系及其施工方法 | |
KR200439750Y1 (ko) | 피에쓰씨 빔용 정착구 및 이를 이용한 거푸집 설치구조 | |
CN108240070B (zh) | 一种高大斜柱的浇筑方法 | |
CN216766824U (zh) | 一种预制板吊拉杆 | |
ZA200406087B (en) | An erection unit for a building floor slab and theerection method thereof. | |
CN210368655U (zh) | 一种预应力公路钢桁梁桥面板预制整体滑移模型 | |
CN115538678B (zh) | 一种大角度悬挑观景平台侧面小平台施工方法 | |
CN215977348U (zh) | 一种承台设置组件 | |
CN107630554B (zh) | 一种用于楼板的快速施工装置及方法 | |
CN217629436U (zh) | 一种适用于异形桥墩的装配式托架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 1200400719 Country of ref document: VN |
|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ OM PH PL PT RO RU SC SD SE SG SK SL TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PT SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2473755 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2003564362 Country of ref document: JP Ref document number: 1-2004-501125 Country of ref document: PH |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2003734643 Country of ref document: EP Ref document number: 10503017 Country of ref document: US |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2004/06087 Country of ref document: ZA Ref document number: 200406087 Country of ref document: ZA Ref document number: 1020047011736 Country of ref document: KR |
|
WWE | Wipo information: entry into national phase |
Ref document number: PA/A/2004/007379 Country of ref document: MX |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2003240022 Country of ref document: AU |
|
WWE | Wipo information: entry into national phase |
Ref document number: 534662 Country of ref document: NZ |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2004126670 Country of ref document: RU |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2004/02987 Country of ref document: TR |
|
WWP | Wipo information: published in national office |
Ref document number: 2003734643 Country of ref document: EP |