CN101240658B - 外斜柱支模施工方法 - Google Patents

外斜柱支模施工方法 Download PDF

Info

Publication number
CN101240658B
CN101240658B CN2008100593105A CN200810059310A CN101240658B CN 101240658 B CN101240658 B CN 101240658B CN 2008100593105 A CN2008100593105 A CN 2008100593105A CN 200810059310 A CN200810059310 A CN 200810059310A CN 101240658 B CN101240658 B CN 101240658B
Authority
CN
China
Prior art keywords
batter post
ear
connector
bolt
oblique cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008100593105A
Other languages
English (en)
Other versions
CN101240658A (zh
Inventor
李宏伟
陈平
俞向阳
凌如强
陆向阳
李元武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Sanjian Construction Group Co Ltd
Original Assignee
ZHEJIANG CHANGCHENG CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG CHANGCHENG CONSTRUCTION GROUP CO Ltd filed Critical ZHEJIANG CHANGCHENG CONSTRUCTION GROUP CO Ltd
Priority to CN2008100593105A priority Critical patent/CN101240658B/zh
Publication of CN101240658A publication Critical patent/CN101240658A/zh
Application granted granted Critical
Publication of CN101240658B publication Critical patent/CN101240658B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及外斜柱支模施工方法,先预埋带锚筋的连接件,接着绑扎外斜柱钢筋笼,在外斜柱钢筋笼四周封上模板,并用抱箍固定模板,然后用可调节拉杆的一端连接抱箍,另一端连接已预埋在梁板上的带锚筋的连接件。再调整可调节拉杆的长度,将外斜柱模调至设计角度,最后浇捣外斜柱混凝土。本发明适合高空外斜柱施工,并且施工安全、方便,能够节省施工时间。

Description

外斜柱支模施工方法
技术领域
技术领哉
背景技术
本发明涉及一种外斜柱支模施工方法。
发明内容
在建筑物斜柱支模施工中,常用支撑架来支撑斜柱模板,支撑架一般放在斜柱模板下方,常用的支撑架高度不可以调节,也有采用可调节高度的支撑架,通过调节支撑架的高度来调节斜柱模板的倾斜角度。采用上述斜柱支模方法的前提是斜柱下方必须可以安放支撑架,但是有些斜柱除了一端固定在建筑物内的梁板上外,其余部份都悬空在建筑物外,这时候常用的支撑架就没有放置点。碰到这种情况,在建筑物较低时,可以在建筑物外侧搭建平台来安放支撑架,但工序相对比较繁琐;而在建筑物较高时,在建筑物外侧高空搭建安放支撑架的架子施工难度就较大,而且施工时也不安全。
本发明要解决的技术问题是提供一种安全、方便、能节省施工时间的外斜柱支模施工方法。
为解决该技术问题,本发明采用的技术方案为:
外斜柱支模施工方法,其特征在于它包括下列步聚:
①在需建外斜柱所在的梁板上预埋带锚筋的连接件;
②绑扎外斜柱钢筋笼;
③在外斜柱钢筋笼四周封上模板;
④用抱箍固定模板;
⑤用可调节拉杆的一端连接抱箍,另一端连接已预埋在梁板上的带锚筋的连接件;
⑥调整可调节拉杆的长度,将外斜柱模板调至设计角度。
⑦浇捣外斜柱混凝土。
步聚④所述抱箍由二根对称的L形型钢组成,L形型钢的长、宽与外斜柱模板相符,每根L形型钢一端固接至少有一个螺栓孔的连接件,另一端固接至少有二个螺栓孔的连接件;用螺栓连接二根L形型钢上对应的螺栓孔,将二根L形型钢连接成方形包夹住外斜柱模。
步聚⑤⑥所述可调节拉杆包括上拉耳、下拉耳、位于上、下拉耳之间并与上、下拉耳固接的杆件,该杆件的一段为花篮螺栓,调节花篮螺栓来调节杆件长度,该拉杆上的上拉耳与L形型钢上的连接件用螺栓连接,下拉耳与已预埋在梁板上的带锚筋的连接件用螺栓连接。
采用以上技术方案,用型钢抱箍固定斜柱模板四周,用一端固定在楼板上另一端固定在抱箍上的可调节拉杆拉住斜柱模板,这种方法不需要在斜柱模板下方设置支撑架,在碰到斜柱模板大部份悬空在建筑物外的情况时,就不需要在建筑体外侧搭建安装支撑架的架子,既方便又省时更安全。可调节拉杆的一端与预埋在梁板中的带锚筋的连 接件用螺栓连接,比较牢固、安全。用长宽与斜柱模板相符的型钢来作抱箍固定模板,由于型钢本身的强度较高,使固定好的模板比较稳定,不易脱落或错位。用调节拉杆上的花篮螺栓来调节拉杆的长度从而达到调节斜柱模板的倾斜角度的方法,与通过调节搭建在建筑体外的支撑架来调节斜柱模板的方法相比既方便又安全。
附图说明
图1为本发明示意图。
图2为抱箍夹住模板示意图。
具体实施方式
参见图1、图2,本实施例为外斜柱支模施工方法,它包括下列施工步聚:
①在需建外斜柱所在的梁板1上确定带锚筋的连接件2的预埋位置,并在梁板1浇捣时将带锚筋的连接件2埋入梁板1中。
②绑扎外斜柱钢筋笼3;
③在外斜柱钢筋笼3四周封上模板4;
④制作抱箍5,先制作二根长宽与外斜柱模板4相配合的L形型钢5a、5b,每根L形型钢的一端焊接带二个螺栓孔的连接钢板5c,另一端焊接带三个螺栓孔的连接钢板5d。
⑤通过连接钢板5c、5d上的螺栓孔,用四个螺栓将二根L形型钢5a、5b连接成方形,包夹住外斜柱模板4,并旋紧螺栓使二根L形型钢5a、5b紧紧夹住外斜柱模板4。
⑥制作可调节拉杆6,先制作二根二端带拉耳的杆件6a、6b,用二端带钩的花篮螺栓6c连接这二根杆件6a、6b。
⑦将可调节拉杆6的一端上的拉耳6d与连接钢板5d上余下的一个螺栓孔用螺栓连接,另一端上的拉耳6e与预埋在梁板中带锚筋的连接件2用螺栓连接。
⑧通过调节花篮螺栓6c来调节可调节拉杆6的长度,将外斜柱模板4调至设计角度。
⑨浇捣外斜柱混凝土。
斜柱浇筑完毕后,拆除模板4时,松开抱箍5上的连接螺栓,将抱箍5从模板4上取下,同时拧开可调节拉杆6与带锚筋的连接件2连接的螺栓,就能将可调节拉杆6与抱箍5一起拆下。可调节拉杆6和抱箍5还可以重复使用,而且装拆也比较方便。

Claims (3)

1. 外斜柱支模施工方法,其特征在于它包括下列步聚:
①在需建外斜柱所在的梁板上预埋带锚筋的连接件;
②绑扎外斜柱钢筋笼;
③在外斜柱钢筋笼四周封上模板;
④用抱箍固定模板;
⑤用可调节拉杆的一端连接抱箍,另一端连接已预埋在梁板上的带锚筋的连接件;
⑥调整可调节拉杆的长度,将外斜柱模板调至设计角度;
⑦浇捣外斜柱混凝土。
2. 根据权利要求1所述的外斜柱支模施工方法,其特征在于:步聚④所述抱箍由二根对称的L形型钢组成,L形型钢的长、宽与外斜柱模板相符,每根L形型钢一端固接至少有一个螺栓孔的连接件,另一端固接至少有二个螺栓孔的连接件;用螺栓连接二根L形型钢上对应的螺栓孔,将二根L形型钢连接成方形包夹住外斜柱模。
3. 根据权利要求2所述的外斜柱支模施工方法,其特征在于:步聚⑤⑥所述可调节拉杆包括上拉耳、下拉耳、位于上、下拉耳之间并与上、下拉耳固接的杆件,该杆件的一段为花篮螺栓,调节花篮螺栓来调节杆件长度,该可调节拉杆上的上拉耳与L形型钢上的连接件用螺栓连接,下拉耳与已预埋在梁板上的带锚筋的连接件用螺栓连接。
CN2008100593105A 2008-01-18 2008-01-18 外斜柱支模施工方法 Expired - Fee Related CN101240658B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100593105A CN101240658B (zh) 2008-01-18 2008-01-18 外斜柱支模施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100593105A CN101240658B (zh) 2008-01-18 2008-01-18 外斜柱支模施工方法

Publications (2)

Publication Number Publication Date
CN101240658A CN101240658A (zh) 2008-08-13
CN101240658B true CN101240658B (zh) 2011-10-05

Family

ID=39932450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100593105A Expired - Fee Related CN101240658B (zh) 2008-01-18 2008-01-18 外斜柱支模施工方法

Country Status (1)

Country Link
CN (1) CN101240658B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619327A (zh) * 2012-03-28 2012-08-01 中天建设集团有限公司 一种超高大截面劲性斜柱模板施工结构和施工方法

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606829A (zh) * 2012-03-23 2012-07-25 中建一局集团安装工程有限公司 一种抱箍固定器
CN103132692B (zh) * 2013-03-12 2015-09-02 山东天齐置业集团股份有限公司 一种内倾斜圆柱支模装置及支模方法
CN104314239A (zh) * 2014-10-17 2015-01-28 中铁八局集团建筑工程有限公司 一种用于控制斜柱钢筋骨架及保护层的装置及其施工方法
CN108661334A (zh) * 2018-07-03 2018-10-16 江苏南通二建集团有限公司 一种防止现浇钢筋砼斜圆柱平面外失稳的钢柱箍支撑装置
CN117468704A (zh) * 2023-12-26 2024-01-30 北京市第三建筑工程有限公司 三向劲性清水混凝土斜柱模板加固施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619327A (zh) * 2012-03-28 2012-08-01 中天建设集团有限公司 一种超高大截面劲性斜柱模板施工结构和施工方法
CN102619327B (zh) * 2012-03-28 2014-05-07 中天建设集团有限公司 一种超高大截面劲性斜柱模板施工结构和施工方法

Also Published As

Publication number Publication date
CN101240658A (zh) 2008-08-13

Similar Documents

Publication Publication Date Title
CN101240658B (zh) 外斜柱支模施工方法
CN102561669B (zh) 悬挑式脚手架及其施工方法
CN105649213B (zh) 一种密集布筋区大型钢结构预埋件的施工方法
CN110402313A (zh) 建筑系统
CN204781607U (zh) 预应力碳纤维板张拉锚固的一体化装置
CN105464216A (zh) 基于整体提升式模板加固系统超高超大截面斜柱的施工方法
KR100770006B1 (ko) Pc기둥 수직연결철근의 보강구조
CN102277836B (zh) 倾斜式混凝土塔座的施工方法
CN202450761U (zh) 悬挑式脚手架
CN211447707U (zh) 悬挑型钢联梁施工支撑平台
KR101440553B1 (ko) 프리텐션 거더 제조장치
CN103882868B (zh) 灌注桩围护中围檩的单侧支模结构及施工方法
KR100769318B1 (ko) 철구조물 연결형 서포트 및 이를 이용한 시스템거푸집설치구조
CN202416347U (zh) 塔式起重机基础结构
CN202706554U (zh) 一种单侧模板可调节螺栓加固件
JP2017160667A (ja) 建物用基礎構造,建物用基礎の施工方法及びこれに用いる型枠
CN106013796B (zh) 早拆模板体系及其施工方法
WO2003064781A1 (fr) Unite de montage pour dalle de plancher de batiment et son procede de montage
KR20090095736A (ko) 거푸집 결합 및 해체장치
CN108240113A (zh) 可拆卸跨洞口的支撑装置及方法
JP5028323B2 (ja) グラウンドアンカー工法
CN209011132U (zh) 一种组拼式双点固定基坑马道结构
CN210529735U (zh) 一种建筑钢结构平台基座
KR200461116Y1 (ko) 교량가설용 까치발 마운팅장치
KR200442551Y1 (ko) 거푸집 지지장치용 브라켓

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 310016 Great Wall Building, No. 60 Leiting Road, Shangcheng District, Hangzhou City, Zhejiang Province

Patentee after: ZHEJIANG PROVINCE SANJIAN CONSTRUCTION GROUP CO.,LTD.

Address before: 310009 Building No. 8, Meihua Stele, Hangzhou City, Zhejiang Province

Patentee before: Zhejiang Greatwall Construction Group Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111005

Termination date: 20220118