CN102127966B - 一种现浇钢筋混凝土柱模板固定装置 - Google Patents

一种现浇钢筋混凝土柱模板固定装置 Download PDF

Info

Publication number
CN102127966B
CN102127966B CN2011100380789A CN201110038078A CN102127966B CN 102127966 B CN102127966 B CN 102127966B CN 2011100380789 A CN2011100380789 A CN 2011100380789A CN 201110038078 A CN201110038078 A CN 201110038078A CN 102127966 B CN102127966 B CN 102127966B
Authority
CN
China
Prior art keywords
template
support arm
post
jacking
external frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011100380789A
Other languages
English (en)
Other versions
CN102127966A (zh
Inventor
高行友
李亮
李庆录
林小坤
刘宏政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU XINGBANG CONSTRUCTION ENGINEERING GROUP Co Ltd
SUQIAN HUAXIA CONSTRUCTION (GROUP) ENGINEERING Co Ltd
Original Assignee
JIANGSU XINGBANG CONSTRUCTION ENGINEERING GROUP Co Ltd
SUQIAN HUAXIA CONSTRUCTION (GROUP) ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU XINGBANG CONSTRUCTION ENGINEERING GROUP Co Ltd, SUQIAN HUAXIA CONSTRUCTION (GROUP) ENGINEERING Co Ltd filed Critical JIANGSU XINGBANG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN2011100380789A priority Critical patent/CN102127966B/zh
Publication of CN102127966A publication Critical patent/CN102127966A/zh
Application granted granted Critical
Publication of CN102127966B publication Critical patent/CN102127966B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种现浇钢筋混凝土柱模板固定装置:所述固定装置由模板固定外支架、模板压紧装置和柱角钢筋自锚装置组成,所述模板固定外支架由型钢焊接,高度大于柱的浇筑高度,可分节制作,用螺栓连接加高,底部外支架设有加宽基座,基座设有调平装置,中部外支架设有爬梯,上部外支架设有操作平台;所述模板压紧装置包括水平横杆、木方压板杆,压紧丝杆通过水平横杆表面设置的压紧丝母与木方压板杆连接,压紧丝杆一端设置压紧摇把,水平横杆横向两端设置固定螺栓;所述柱角钢筋自锚装置由顶升横梁、顶升螺母、顶升套管、紧固夹片组成。本发明结构简单、操作方便,能够有效地减少在浇筑过程中模板位移的现象,减少工程质量事故的发生。

Description

一种现浇钢筋混凝土柱模板固定装置
技术领域
本发明涉及一种现浇钢筋混凝土柱模板固定装置,属于建筑工程领域。
背景技术
钢筋混凝土现浇柱施工前需要搭设脚手排架,利用排架固定柱模板。当柱高度和截面尺寸较大时,排架搭设工作量大,材料消耗大,模板校正固定困难,施工时,模板在混凝土浇筑振捣力的作用下容易移位跑模,造成工程质量事故。
发明内容
本发明针对上述不足之处,设计了一种现浇钢筋混凝土柱模板固定装置,目的在于有效解决现浇钢筋混凝土柱模板固定问题。
本发明的技术解决方案:
一种现浇钢筋混凝土柱模板固定装置,其特征在于:所述固定装置由模板固定外支架、模板压紧装置和柱角钢筋自锚装置组成,所述模板固定外支架由型钢焊接,截面形状为正方形,内部边长大于柱的最大截面尺寸,高度大于柱的浇筑高度,可分节制作,用螺栓连接加高,底部外支架设有加宽基座,基座设有调平装置,中部外支架设有爬梯,上部外支架设有操作平台;所述模板压紧装置包括水平横杆、木方压板杆,压紧丝杆通过水平横杆表面设置的压紧丝母与木方压板杆连接,压紧丝杆一端设置压紧摇把,水平横杆横向两端设置固定螺栓;所述柱角钢筋自锚装置由顶升横梁、顶升螺母、顶升套管、紧固夹片组成,顶升横梁两端支承在上部模板固定外支架的水平结构上,用扳手旋紧顶升螺母,顶升套管向上移动,紧固夹片夹紧柱角纵向钢筋并随着向上移动产生压紧力,在压紧力的作用下将外支架固定在柱下梁板结构上。
所述水平横杆由型钢制作,用固定螺栓固定在模板固定外支架上,两只压紧丝母与横杆焊接,压紧摇把转动时,带动丝杆移动木方压板调整模板位置。
所述模板压紧装置的数量、间距根据柱截面尺寸和柱的浇筑高度计算确定,同一截面布置2-6套模板压紧装置。
所述的现浇钢筋混凝土柱模板固定装置的施工方法为:
第一步:将底部模板固定外支架吊装至柱位置,使柱钢筋笼位于外支架中心,调整基座调平装置,使外支架立柱垂直,根据柱的浇筑高度加高中部外支架,安装上部外支架。
第二步:安装柱模板,旋转压紧摇把,调整模板压紧装置使模板位置初步准确。
第三步:将钢筋自锚装置套在柱角纵向钢筋上,顶升横梁两端支承在模板固定外支架的水平结构上,调整顶升横梁,使得柱角纵向钢筋位置满足要求,用扳手旋转顶升螺母,顶升套管向上移动,紧固夹片夹紧柱角纵向钢筋并随着向上移动,在张拉力的作用下模板固定外支架牢固地固定在柱下梁板结构上。
第四步:安装柱箍、对拉螺栓等加强件,调整模板压紧装置使模板位置准确。
本发明的有益效果:本发明结构简单、操作方便,能够固定住浇注钢筋混凝土柱模板,并根据需要调节模板位置,有效地减少在浇筑过程中模板位移的现象,减少工程质量事故的发生。
附图说明
图1是使用本发明浇注钢筋混凝土柱的结构示意图
图2是本发明模板压紧装置局部放大示意图
图3是本发明柱角钢筋自锚装置局部放大示意图
具体实施方式
如图1所示,模板固定外支架1由型钢焊接,截面形状为正方形(未提供图示),内部边长大于柱的最大截面尺寸,高度大于柱的浇筑高度,可分节制作,用螺栓连接加高,底部外支架设有加宽基座9,基座9设有调平装置10,中部外支架设有爬梯2,上部外支架设有操作平台3。
如图2所示,模板压紧装置由水平横杆2-4、压紧丝母2-3、压紧丝杆2-5、压紧摇把2-2和木方压板2-6组成。水平横杆2-4由型钢制作,用固定螺栓2-1固定在模板固定外支架1上,两只压紧丝母2-3与水平横杆2-4焊接,压紧摇把2-2转动时,带动丝杆15移动木方压板17调整模板位置。
如图3所示,柱角钢筋自锚装置由顶升横梁6-4、顶升螺母6-3、顶升套管6-2、紧固夹片6-1组成。顶升横梁6-4两端支承在上部模板固定外支架1的水平结构上。用扳手旋紧顶升螺母6-3,顶升套管6-2向上移动,紧固夹片6-1夹紧柱角纵向钢筋8并随着向上移动产生压紧力,在压紧力的作用下将外支架1牢固地固定在柱下梁板结构11上。
以下结合实施例来具体说明本发明:
工艺流程为:轴线测设→吊装底部外支架→基座调平→加高中部外支架→安装上部外支架→安装模板→粗调模板→安装钢筋自锚装置→张拉柱角钢筋→安装柱箍等加强件→精调模板→浇筑混凝土→养护→拆除外支架和模板。
首先弹设柱外边线,将底部模板固定外支架1吊装至柱位置,使柱外边线位于外支架中心,调整基座调平装置10,使外支架立柱垂直,根据柱的浇筑高度加高外支架,安装上部外支架。
然后安装柱模板,自下而上逐一旋转压紧摇把2-2,调整模板压紧装置使模板位置初步准确。
再将钢筋自锚装置6套在4个柱角纵向钢筋8上,顶升横梁6-4两端支承在模板固定外支架1的水平结构上,调整顶升横梁6-4,使得柱角纵向钢筋8位置满足要求。用扳手旋转顶升螺母6-3,顶升套管6-2向上移动,紧固夹片6-1夹紧柱角纵向钢筋10并随着向上移动,在压紧力的作用下模板固定外支架牢固地固定在柱下梁板结构11上。张拉时应采用对角同时张拉和四角均匀张拉,并控制张拉力的大小。
之后安装柱箍、对拉螺栓等加强件,进一步调整模板压紧装置,使模板位置准确。安装完毕后浇筑混凝土并养护。
混凝土凝固后拆卸本装置,先旋松顶升螺母6-3,取下钢筋自锚装置6,然后依次拆解移除外支架1和模板3。

Claims (4)

1.一种现浇钢筋混凝土柱模板固定装置,其特征在于:所述固定装置由模板固定外支架、模板压紧装置和柱角钢筋自锚装置组成,所述模板固定外支架由型钢焊接,截面形状为正方形,内部边长大于柱的最大截面尺寸,高度大于柱的浇筑高度,分节制作,用螺栓连接加高,底部外支架设有加宽基座,基座设有调平装置,中部外支架设有爬梯,上部外支架设有操作平台;所述模板压紧装置包括水平横杆、木方压板杆,压紧丝杆通过水平横杆表面设置的压紧丝母与木方压板杆连接,压紧丝杆一端设置压紧摇把,水平横杆横向两端设置固定螺栓;所述柱角钢筋自锚装置由顶升横梁、顶升螺母、顶升套管、紧固夹片组成,顶升横梁两端支承在上部模板固定外支架的水平结构上,用扳手旋紧顶升螺母,顶升套管向上移动,紧固夹片夹紧柱角纵向钢筋并随着向上移动产生压紧力,在压紧力的作用下将外支架固定在柱下梁板结构上。
2.如权利要求1所述的固定装置,其特征在于:所述水平横杆由型钢制作,用固定螺栓固定在模板固定外支架上,两只压紧丝母与横杆焊接,压紧摇把转动时,带动丝杆移动木方压板调整模板位置。
3.如权利要求1所述的固定装置,其特征在于:所述模板压紧装置的数量、间距根据柱截面尺寸和柱的浇筑高度计算确定,同一截面布置2-6套模板压紧装置。
4.如权利要求1所述的固定装置,使用本固定装置浇注的施工方法为:
第一步:将底部模板固定外支架吊装至柱位置,使柱钢筋笼位于外支架中心,调整基座调平装置,使外支架立柱垂直,根据柱的浇筑高度加高中部外支架,安装上部外支架;
第二步:安装柱模板,旋转压紧摇把,调整模板压紧装置使模板位置初步准确; 
第三步:将钢筋自锚装置套在柱角纵向钢筋上,顶升横梁两端支承在模板固定外支架的水平结构上,调整顶升横梁,使得柱角纵向钢筋位置满足要求,用扳手旋转顶升螺母,顶升套管向上移动,紧固夹片夹紧柱角纵向钢筋并随着向上移动,在张拉力的作用下模板固定外支架牢固地固定在柱下梁板结构上;
第四步:安装柱箍、对拉螺栓加强件,调整模板压紧装置使模板位置准确。 
CN2011100380789A 2011-02-14 2011-02-14 一种现浇钢筋混凝土柱模板固定装置 Expired - Fee Related CN102127966B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100380789A CN102127966B (zh) 2011-02-14 2011-02-14 一种现浇钢筋混凝土柱模板固定装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100380789A CN102127966B (zh) 2011-02-14 2011-02-14 一种现浇钢筋混凝土柱模板固定装置

Publications (2)

Publication Number Publication Date
CN102127966A CN102127966A (zh) 2011-07-20
CN102127966B true CN102127966B (zh) 2012-07-04

Family

ID=44266219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100380789A Expired - Fee Related CN102127966B (zh) 2011-02-14 2011-02-14 一种现浇钢筋混凝土柱模板固定装置

Country Status (1)

Country Link
CN (1) CN102127966B (zh)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101454276B1 (ko) * 2012-01-17 2014-10-23 정문형 흙 건조물의 축조 방법
CN103233520B (zh) * 2013-01-21 2017-03-22 宿迁市明远建筑安装工程有限公司 一种建筑外墙结构自防水施工方法
CN103821377B (zh) * 2014-03-10 2017-10-27 湖南金海钢结构股份有限公司 使用角度模板控制钢结构屋面梁下挠的方法
CN104389272B (zh) * 2014-10-09 2016-02-03 中建钢构有限公司 多功能移动式操作平台
CN107882325A (zh) * 2017-11-17 2018-04-06 山东枣建建设集团有限公司 一种建筑模板单弯可调式紧固件
CN109212030B (zh) * 2018-10-12 2021-01-19 华北水利水电大学 一种钢管混凝土柱密实度精准检测装置
CN109826117B (zh) * 2019-03-15 2021-07-09 中交一公局集团有限公司 电动滑模无拉杆整体通涵墙身浇筑模板台车
CN110206228B (zh) * 2019-05-18 2020-12-25 陕西建工第五建设集团有限公司 一种半装配式现浇混凝土柱施工方法
CN110485707B (zh) * 2019-07-26 2021-11-23 中国华冶科工集团有限公司 墙柱模板封堵调平装置及其施工方法
CN110748159B (zh) * 2019-10-31 2021-06-01 深圳市越众(集团)股份有限公司 一种建筑梁柱建造浇筑施工钢模板
CN111236627B (zh) * 2020-01-16 2024-07-16 浙江省一建建设集团有限公司 一种高墙体混凝土一次性浇筑成型模板
CN114991387B (zh) * 2022-06-16 2024-07-19 甘肃省安装建设集团有限公司 一种平单轴支护装置及其使用方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101191382A (zh) * 2006-11-30 2008-06-04 上海市第一建筑有限公司 钢柱支撑式整体自升钢平台脚手模板系统及其施工方法
CN202007527U (zh) * 2011-03-14 2011-10-12 江苏兴邦建工集团有限公司 一种现浇钢筋混凝土柱模板固定装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008163697A (ja) * 2006-12-29 2008-07-17 Kunimoto Co Ltd 型枠構造

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101191382A (zh) * 2006-11-30 2008-06-04 上海市第一建筑有限公司 钢柱支撑式整体自升钢平台脚手模板系统及其施工方法
CN202007527U (zh) * 2011-03-14 2011-10-12 江苏兴邦建工集团有限公司 一种现浇钢筋混凝土柱模板固定装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开2008-163697A 2008.07.17

Also Published As

Publication number Publication date
CN102127966A (zh) 2011-07-20

Similar Documents

Publication Publication Date Title
CN102127966B (zh) 一种现浇钢筋混凝土柱模板固定装置
CN202090591U (zh) 一种建筑施工升降式爬升模板
CN201666157U (zh) 仰拱整体式移动模架
CN110878522B (zh) 主塔下横梁施工体系及施工方法
CN108729640B (zh) 一种装配式建筑悬挑板的安装方法
CN202007527U (zh) 一种现浇钢筋混凝土柱模板固定装置
CN110670873B (zh) 一种超高大截面混凝土柱钢模板的托撑体系及施工方法
CN116377888A (zh) 一种斜拉桥现浇梁的可调节翼缘模板装置及施工工艺
CN215629452U (zh) 框架桥免拉杆移动台车施工装置
CN215889394U (zh) 一种用于浇筑大面积楼板标高控制的装置
CN115075613B (zh) 装配式建筑支撑体系及其施工方法
CN210947718U (zh) 一种土木施工浇筑板支撑装置
CN211948530U (zh) 一种用于埋设地脚螺栓的定位装置
CN212154137U (zh) 装配式免支撑吊模
CN103669566A (zh) 大跨度网架屋顶的钢骨混凝土基座及其施工方法
CN103243731A (zh) 剪力墙梯形截面基础的支模方法
CN203531380U (zh) 梁下局部支撑、板下无支撑、尺寸可调节模板系统
CN214739866U (zh) 一种独立式定位、承载钢筋混凝土板模的预应力架体系统
CN103410312A (zh) 梁下局部支撑、板下无支撑、尺寸可调节模板系统
CN118481288B (zh) 一种支承于钢框架的梁板一体化楼盖结构及其安装方法
CN218562389U (zh) 一种用于埋入式劲性钢柱的支撑架
CN111893897B (zh) 桥梁盖梁施工用支撑装置及桥梁盖梁施工方法
CN215977348U (zh) 一种承台设置组件
CN215760446U (zh) 一种自动整平钢砼楼梯滑动支座的模具系统
CN212772454U (zh) 一种塔吊多截面预埋固定装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Gao Xingyou

Inventor after: Li Liang

Inventor after: Wang Feng

Inventor after: Lin Xiaokun

Inventor after: Li Qinglu

Inventor before: Gao Xingyou

Inventor before: Li Liang

Inventor before: Li Qinglu

Inventor before: Lin Xiaokun

Inventor before: Liu Hongzheng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: GAO XINGYOU LI LIANG LI QINGLU LIN XIAOKUN LIU HONGZHENG TO: GAO XINGYOU LI LIANG WANG FENG LIN XIAOKUN LI QINGLU

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20160214