WO1995032357A1 - Verfahren zur optimalen gasgewinnung in einer grossräumigen und bergmännisch nicht oder gering aufgeklärten steinkohlenlagerstätte - Google Patents

Verfahren zur optimalen gasgewinnung in einer grossräumigen und bergmännisch nicht oder gering aufgeklärten steinkohlenlagerstätte Download PDF

Info

Publication number
WO1995032357A1
WO1995032357A1 PCT/DE1995/000640 DE9500640W WO9532357A1 WO 1995032357 A1 WO1995032357 A1 WO 1995032357A1 DE 9500640 W DE9500640 W DE 9500640W WO 9532357 A1 WO9532357 A1 WO 9532357A1
Authority
WO
WIPO (PCT)
Prior art keywords
gas
zones
bores
loosening
areas
Prior art date
Application number
PCT/DE1995/000640
Other languages
German (de)
English (en)
French (fr)
Inventor
Wilhelm Erhardt
Joachim Loos
Uwe Kuzniak
Original Assignee
Ruhrkohle Aktiengesellschaft
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=25936812&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=WO1995032357(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Priority claimed from DE19944418015 external-priority patent/DE4418015A1/de
Application filed by Ruhrkohle Aktiengesellschaft filed Critical Ruhrkohle Aktiengesellschaft
Priority to PL95317606A priority Critical patent/PL177500B1/pl
Priority to EP95917908A priority patent/EP0760900B1/de
Priority to UA96103986A priority patent/UA41990C2/ru
Priority to RU96120196A priority patent/RU2143555C1/ru
Priority to DE59501048T priority patent/DE59501048D1/de
Publication of WO1995032357A1 publication Critical patent/WO1995032357A1/de

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells

Definitions

  • the invention relates to a method for determining the starting points of the gas production in a tectologically stressed and mines not or only slightly clarified hard coal deposit serving, the holes can be made both from above and from an underground mine.
  • the causal causes for tectomechanical structures and thus for the determination of the gas opening for the approach and the control of boreholes for gas production are the loosening, crushing and pressing defined as material balances as a result of the design of tectonic disturbances; in addition there are material transports in the mountains at disturbances, within folds, from bruises after folds and between folds themselves.
  • the prospective location of the tectonic disturbances and thus the location of the areas for favorable gas extraction must be determined from the existing outcrops, so that a basis for planning the starting points of the boreholes and the loosening measures such as carrying out blasting and the like is given.
  • the deposit is also designed as a planning basis, the basis of which are the incidence, the deletion and the dimensions of the faults.
  • the known outcrops are usually geometrically connected to each other in such a way that a supposedly accurate picture of the deposit is created as a basis for planning.
  • the invention is based on the object of specifying a method of the type mentioned at the outset in which the informative value of the planning bases is improved and thereby greater security is achieved with a cost-effective determination of the starting points for bores.
  • the basic idea of the invention is that the bores are arranged in zones of high gas permeability and sufficient gas circulation, taking into account the tectonics, whereby in addition to the incidence, the removal and the amount of discard of the disturbances, the loosening, squeezing and pressing caused by the tectonic energy as well as the tectonic mass transports affected by this can be used as a planning basis. Tectonic energy, the reduction in energy and the direction of energy flow are also used.
  • the invention is therefore associated with the advantage that the tectomechanical interrelationships when the planning of gas production from both surface and underground starting points from underlying depository bodies arises can now be used as the basis for planning for determining the starting points of the wells, with more precise information about Design and behavior of tectonics improve the basics of planning. In this way, the relationships within large electronics between large and small electronics and between initial and subsequent faults can be used for planning gas production. Taking into account the tectomechanical relationships allows an earlier indication of whether, for example, the rejection of a known disturbance is likely to remain the same or to increase or decrease in one or the other strike direction.
  • the course of the folding energy is now determined in a mountain area to be planned and the planning of the bores and any additional local loosening measures to be carried out, such as blasting, are based on this.
  • the folding energy in a mountain body is opposed by a counter pressure which is provided by the mass of the mountain; the folding energy overcomes this counterpressure and does work by creating and designing tectonic disturbances, whereby from the detected course of the folding energy the design of a disturbance can be recognized as the basis for planning the starting points for drilling.
  • the possibility of gas extraction depends to a large extent on whether the folding energy has been conducted through the mountains without new tectonic structures being created or existing structures still being changed.
  • the course of the folding energy at movement barriers and movement free zones is determined and the gas extraction possibility in the areas concerned is determined. This is based on the knowledge that the folding energy is only converted locally as long as there is a free space, such as that Daily surface for which tectonic structures are present; the possibility of gas extraction depends on the presence of movement free zones, which are opposed to movement restricted zones. It is generally more favorable to assess the gas extraction potential in movement restricted zones than in the movement free zones.
  • Crushed zones are characterized by the fact that folding energy and rock material strive towards one another, so that gas could not flow away here during the geological period due to the disturbances.
  • folding energy and rock material strive towards one another, so that gas could not flow away here during the geological period due to the disturbances.
  • Loosening measures will be stepped up in order to set up usable gas production options in these areas.
  • the existence of pressure, squeezing and loosening zones necessitates intermediate areas in which there is a tecto-echanic mass transport.
  • Mass transport has considerable effects with regard to the small electronics to be expected and thus to possible circulation routes for gas.
  • the invention therefore proposes in one exemplary embodiment to select, in particular, areas of mass transport in the vicinity of a crushing or pressing for the preferred determination of starting points for bores; there is gas nearby and circulation paths are available.
  • Sedimentation deposits such as a hard coal deposit in particular, are characterized by floor tectonics, in which thrusting starts at depth, which strike more or less at right angles to the jumps. If undulating storage with or without small-tectonic displacements and / or displacements or small-tectonic displacements and / or displacements without undulating storage is disrupted, whereby hanging areas are undisturbed or there are no outcrops above, then larger displacements start at depth. In this case, a layer-parallel glide occurs in the discharge area of the thrusts, which lubricates the fissures and leads to a gas jam with a lot of gas. In this case, such areas are suitable according to an embodiment of the invention for the preparation of holes.
  • gas and circulation paths for the gas are available, such as in the outlet area of jumps and where loosening is present on jumps as a result of changes in the coating direction; these areas are also suitable for drilling holes.
  • Stratified sliding also occurs when there is a change in the degree of thrusting at thrusting and in the discharge areas of thrusting downwards, and loosening areas are present there, which favor a preferred orientation for bores for gas production.
  • the floor tectonics not only apply to the occurrence of thrusts, but also apply to the saddle structures and convex bending axes. While undisturbed conditions usually prevail in the upper areas, underneath in the saddle area and convex bending axes follow shifts, including shifts; Thrusts are associated with stratified sliding and smearing of the fault areas, and therefore the gas content is high in the area of the thrusts, but especially below. Displacements in saddle areas and convex bend axes indicate looseness in a saddle, and the gas can circulate there.
  • the mountains are divided at certain intervals by larger, approximately parallel displacement zones or displacements in adjacent tracks. A more or less horizontal mass transport has taken place at the displacements. Mass transport hits the respective neighboring clods, which creates pressures with high gas contents.
  • the mass transport creates a backward pull on the displacements, which leads to loosening at clump-limiting jumps.
  • the gas was able to migrate here in the geological period, so that the gas content in these areas is lower.
  • the discard at the jumps often has minimum values; the loosening that occurs as a result of the mountain slipping on the jumping surfaces has consequent shrinkage that can serve as movement paths for gas circulation. Therefore, according to one embodiment of the invention, the bores for gas production are primarily oriented in areas in which the mass transport impinges on the neighboring clods due to displacements. In these cases, the displacements themselves are avoided because the gas has migrated locally in their area.
  • the mountains are mylonitized and smeared, and in these cases the gas content is very high, but at the same time the circulation possibilities for the gas are restricted.
  • the holes for the gas production are oriented in the direction of the shift zone and the mountains around the holes are loosened locally, for example by loosening up blows, such as in the region of bisectors between the strike directions of jumps and thrusts, jumps and shifts, thrusts and Displacements and plaice bisectors. This also includes areas of the large shifts to be determined.
  • the holes for gas production in these areas are primarily arranged.
  • shear areas intersect in the run-off areas of thrusts and displacements, caused by mass transports in the mountains.
  • Shear surfaces also intersect when bisecting lines intersect with shear surfaces that are triggered by the expiry of thrust and shifts. Furthermore, shearings cross when cross larger shifts. If there are loosening of jumps at a distance of more than 400 m when the thrusts are running out and at a greater distance than 1000 m when the shifts are running out, holes for gas extraction should preferably be oriented in the intersection areas; local loosening measures around the wells are restricted. However, if there are slides parallel to the layer at the same point, the local loosening measures are reinforced.
  • an embodiment of the invention provides for orienting the bores for gas extraction in these areas while at the same time providing local loosening measures to be provided; this applies in particular to the areas under the thrust.
  • Shift gliding in two directions also occurs when trough and saddle lines collapse as well as changes in the degree of thrusting of thrusting at a distance from the thrusting of less than 400 m.
  • Displacement zones or displacements are to be demonstrated in the strike direction over larger distances. In many cases, the displacements over certain distances do not exist as such or are designed as small and very small electronics (shearings). It is always to be expected that an accompanying electronic system is available, as it will be unlocked where larger shifts are unlocked.
  • the division of the mountains at certain intervals by larger, approximately parallel displacement zones or displacements influences the folding energy and the counter pressure.
  • the folding energy and the back pressure are deflected by the displacements. Since the folding energy is supplied to the mountains on a broad front, the side-by-side deflections of the energy are one Addition of energy and also back pressure combined to ever increasing values.
  • the design of other tectonic disorders is legally influenced depending on the causal relationships.
  • jumps in the area of the larger displacement zones and displacement generally have less warping or come from both sides in the neighboring area from the displacements or start again; the direction of the jumps also changes. The same applies to thrusts.
  • the position of expected loosening over longer distances can be determined from the directions in which the displacement zones and the jumps strike.
  • holes for gas production are preferably made in the middle or at a greater distance than 400 m from the exit points of the jumps or the intersection of the jumps with the displacement zones and deflected perpendicular to the displacement zones. If it turns out that the direction of strike of jumps on displacements is deflected due to the tectomechanical process, then bruises and loosening zones arise up to 600 m from the large-scale displacements as a result of the rock movements on the jumps. If jumps between two adjacent displacement zones are also known here, the position of the zones over greater distances can be determined from the directions in which the displacement zones and the jumps strike.
  • starting points of bores are preferably selected in loosening zones which are pressed together by the mass transport at the displacements.
  • the gas could not flow out there due to the pressure.
  • there are circulation paths for the gas so that gas extraction possibilities are consequently improved.
  • the design of large-scale displacements is hindered by the tectomechanical process, nevertheless, shearings in the strike direction of the large-scale displacements can be expected.
  • Jumps in the area of the larger displacement zones and displacements are less discarded and run from both sides or start again.
  • the shift zones influence the deletion directions of thrust; thrusts also often run out of shift zones.
  • the points of intersection of displacement zones and thrusts over greater distances can be determined if punctiform outcrops are present. This allows more precise information on favorable starting points and favorable distractions for the holes to be specified.
  • Mine gas often collects below the overburden.
  • tectonics depending on the tectomechanical process, influences the gas opening and the success of gas production. Since the large jumps often continue in the overburden up to the surface of the day, there are drainage options for the gas from the mountains after several days. As a result, loosening, pressing, squeezing and slashing in the mountains are also the basis for the area below the overburden for the tectonic arrangement or implementation of gas production as well as in deeper areas.
  • the planning basis is improved by taking into account gas contents, gas contents and outgassing results that are actually determined in the form of the configuration of the tectonics, and in particular taking the results into account with and without loosening measures.
  • ascertained gas contents, gas contents and gas inflows and their differences allow information about the behavior of the tectonics, so that this also results in the best possible arrangement of the starting points for the gas extraction holes.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Solid Fuels And Fuel-Associated Substances (AREA)
PCT/DE1995/000640 1994-05-24 1995-05-10 Verfahren zur optimalen gasgewinnung in einer grossräumigen und bergmännisch nicht oder gering aufgeklärten steinkohlenlagerstätte WO1995032357A1 (de)

Priority Applications (5)

Application Number Priority Date Filing Date Title
PL95317606A PL177500B1 (pl) 1994-05-24 1995-05-10 Sposób optymalnego wydobywania gazu z rozległego i górniczo wcale lub mało rozpoznanego złoża węgla kamiennego
EP95917908A EP0760900B1 (de) 1994-05-24 1995-05-10 Verfahren zur optimalen gasgewinnung in einer grossräumigen und bergmännisch nicht oder gering aufgeklärten steinkohlenlagerstätte
UA96103986A UA41990C2 (ru) 1994-05-24 1995-05-10 С Способ определения мест закладки предназначенных для добычи природного газа в тектонически нагруженном и горно-технически не разведанном или мало разведанном каменноугольном месторождении скважин
RU96120196A RU2143555C1 (ru) 1994-05-24 1995-05-10 Способ определения мест заложения буровых скважин
DE59501048T DE59501048D1 (de) 1994-05-24 1995-05-10 Verfahren zur optimalen gasgewinnung in einer grossräumigen und bergmännisch nicht oder gering aufgeklärten steinkohlenlagerstätte

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
DEP4418015.2 1994-05-24
DE19944418015 DE4418015A1 (de) 1994-05-24 1994-05-24 Verfahren zur optimalen Gasgewinnung, insbesondere in einer Steinkohlenlagerstätte
DE19510334.3 1995-03-22
DE19510334 1995-03-22

Publications (1)

Publication Number Publication Date
WO1995032357A1 true WO1995032357A1 (de) 1995-11-30

Family

ID=25936812

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/DE1995/000640 WO1995032357A1 (de) 1994-05-24 1995-05-10 Verfahren zur optimalen gasgewinnung in einer grossräumigen und bergmännisch nicht oder gering aufgeklärten steinkohlenlagerstätte

Country Status (6)

Country Link
EP (1) EP0760900B1 (ru)
DE (1) DE59501048D1 (ru)
PL (1) PL177500B1 (ru)
RU (1) RU2143555C1 (ru)
UA (1) UA41990C2 (ru)
WO (1) WO1995032357A1 (ru)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012136183A1 (de) * 2011-04-08 2012-10-11 Wilhelm Ehrhardt Verfahren zur entmethanisierung von grundwasserhorizonten

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102009010751A1 (de) 2009-02-26 2010-09-02 Ehrhardt, Wilhelm, Prof. Dr.-Ing. Verfahren zur verbesserten Vorhersage und Bewertung von Erdbeben und/oder seismischen Erschütterungen
DE102013001555A1 (de) 2012-02-07 2013-08-08 Wilhelm Ehrhardt Verfahren zur Verbesserung des Processing in der Reflexionsseismik
CN109030054B (zh) * 2018-08-17 2020-05-19 西安科技大学 一种本煤层定向钻进过程模拟试验装置及方法
CN110219692B (zh) * 2019-06-18 2020-09-01 中煤科工集团重庆研究院有限公司 利用煤层钻孔施工中瓦斯涌出数据反演突出主控参数的方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3934649A (en) * 1974-07-25 1976-01-27 The United States Of America As Represented By The United States Energy Research And Development Administration Method for removal of methane from coalbeds
DE2544394A1 (de) * 1975-10-03 1977-04-07 Ruhrkohle Ag Verfahren zum einbringen von bohrloechern
DE4339418A1 (de) * 1993-11-18 1995-05-24 Ruhrkohle Ag Verfahren zur optimierten Orientierung von Abbaubetrieben, insbesondere in einer Steinkohlenlagerstätte

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3934649A (en) * 1974-07-25 1976-01-27 The United States Of America As Represented By The United States Energy Research And Development Administration Method for removal of methane from coalbeds
DE2544394A1 (de) * 1975-10-03 1977-04-07 Ruhrkohle Ag Verfahren zum einbringen von bohrloechern
DE4339418A1 (de) * 1993-11-18 1995-05-24 Ruhrkohle Ag Verfahren zur optimierten Orientierung von Abbaubetrieben, insbesondere in einer Steinkohlenlagerstätte

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012136183A1 (de) * 2011-04-08 2012-10-11 Wilhelm Ehrhardt Verfahren zur entmethanisierung von grundwasserhorizonten

Also Published As

Publication number Publication date
UA41990C2 (ru) 2001-10-15
PL177500B1 (pl) 1999-11-30
EP0760900A1 (de) 1997-03-12
EP0760900B1 (de) 1997-11-26
PL317606A1 (en) 1997-04-14
DE59501048D1 (de) 1998-01-08
RU2143555C1 (ru) 1999-12-27

Similar Documents

Publication Publication Date Title
DE102008038377B3 (de) Verfahren zur Positions- und Lagebestimmung von Grubenräumen unter Nutzung der RFID-Technik
DE4011316A1 (de) Verfahren zur bestimmung der geodaetischen standortes von teilen eines ortsbeweglichen grossgeraetes
WO2009103306A1 (de) Verfahren zur stabilisierung der schildsäule bei einem im flözeinfallen geführten strebbetrieb
EP2242900A1 (de) Verfahren zum steuern von strebbetrieben mittels grenzschichterkennung
DE4339418A1 (de) Verfahren zur optimierten Orientierung von Abbaubetrieben, insbesondere in einer Steinkohlenlagerstätte
EP0760900B1 (de) Verfahren zur optimalen gasgewinnung in einer grossräumigen und bergmännisch nicht oder gering aufgeklärten steinkohlenlagerstätte
DE19628367A1 (de) Verfahren zur Planung von Abbaubetrieben unter Berücksichtigung einer Verhinderung und Bekämpfung von Gebirgsschlägen, insbesondere in einer Steinkohlenlagerstätte
EP0861365B1 (de) Verfahren zur optimierten orientierung von abbaubetrieben, insbesondere in einer steinkohlenlagerstätte
DE4418015A1 (de) Verfahren zur optimalen Gasgewinnung, insbesondere in einer Steinkohlenlagerstätte
DE2800376A1 (de) Liegendkufe fuer ein ausbaugestell einer untertaegigen mineralgewinnungsanlage
DE19500958A1 (de) Verfahren zur optimalen Projektierung von Kavernen zur Gasspeicherung in tektonisch beanspruchten Salzlagern, insbesondere oberhalb einer Steinkohlenlagerstätte
DE19512661A1 (de) Verfahren zur optimierten Orientierung von Abbaubetrieben, insbesondere in einer Steinkohlenlagerstätte
WO2004106976A1 (de) Verfahren zur ermittlung von migrationswegen und zur nutzung derselben für die gewinnung von erdgas und erdöl sowie zur auffindung neuer erdgas- und erdöllagerstätten
WO2004106648A1 (de) Verfahren zur nutzung natürlicher und zur herstellung künstlicher wasserwegsamkeiten in einem tektonisch beanspruchten gebirge für den wassertransport und die wassergewinnung
BE1027748B1 (de) Vorrichtung zum Durchgehen durch einen alten Einschnitt für die Kohlenabbauarbeitsfläche und ihr Verwendungsverfahren
DE2544391A1 (de) Verfahren zur ermittlung der optimalen abbaurichtung, insbesondere zur vermeidung von gebirgsschlaegen, gasausbruechen und steinfall
WO2013117181A2 (de) Verfahren zur verbesserung des processing in der reflexionsseismik
DE202009014479U1 (de) Kohlenhobel mit Firstmeißel
DE679635C (de) Langfrontabbauverfahren fuer maechtige Kohlenfloeze
DE102006022684A1 (de) Verfahren zur optimierten Orientierung von Fracs im Gebirge mit dafür entwickelten technischen Einrichtungen
DE1265094B (de) Kohlenhobel
DE3942828C1 (de) Spannungsfreie spurlattenverlagerung in sich setzenden schaechten des untertagbetriebes
DE469977C (de) Verfahren fuer den Betrieb von Tagebauen, insbesondere fuer Braunkohle
DD207949A1 (de) Bergmaennisches abbauverfahren fuer erze
DD203935A1 (de) Verfahren zur vorbereitung der in situ laugung

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): DE KZ PL RU UA

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LU MC NL PT SE

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 1995917908

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 1995917908

Country of ref document: EP

WWG Wipo information: grant in national office

Ref document number: 1995917908

Country of ref document: EP