JPWO2012164889A1 - 高炉の原料装入装置およびそれを用いた原料装入方法 - Google Patents
高炉の原料装入装置およびそれを用いた原料装入方法 Download PDFInfo
- Publication number
- JPWO2012164889A1 JPWO2012164889A1 JP2013517858A JP2013517858A JPWO2012164889A1 JP WO2012164889 A1 JPWO2012164889 A1 JP WO2012164889A1 JP 2013517858 A JP2013517858 A JP 2013517858A JP 2013517858 A JP2013517858 A JP 2013517858A JP WO2012164889 A1 JPWO2012164889 A1 JP WO2012164889A1
- Authority
- JP
- Japan
- Prior art keywords
- raw material
- bunker
- furnace
- specific
- charging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/18—Bell-and-hopper arrangements
- C21B7/20—Bell-and-hopper arrangements with appliances for distributing the burden
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Blast Furnaces (AREA)
- Manufacture Of Iron (AREA)
- Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)
- Vertical, Hearth, Or Arc Furnaces (AREA)
Abstract
Description
VH=(H0−H)/t ・・・(1)
VH=(H0−H)/t ・・・(1)
ここで、
VH:原料低下速度(排出開始から時刻tまでの平均速度)(mm/s)、
t:原料の排出開始時からの経過時間(s)、
H0:原料の排出開始時における原料高さ(mm)、
H:経過時間tにおける原料高さ(mm)
本試験では、高炉容積5,370m3の5.6分の1縮尺である並列バンカー式ベルレス装入模型装置を用いた。ベルレス装入模型装置の炉頂バンカーの形状は、前記図3に示した通りである。このベルレス装入模型装置に、前記図6に示す原料装入装置と同様に、炉頂バンカーの排出口の真上にレベル計(非接触式レーザー距離計)と、特定原料を一旦貯留する特定原料用バンカーと、特定原料用バンカーから排出される特定原料を炉頂バンカーのラットホールに装入する特定原料用シュートと、特定原料用バンカーから排出される特定原料の流量を調整する流量調整弁とを設けた。炉頂バンカーに主原料として鉱石である焼結鉱676kgを装入し、特定原料用バンカー12にコークス20kgを装入した。
本発明例および比較例ともに、炉頂バンカーの原料排出を開始してから試験終了までの間について約6秒毎に、炉頂バンカーから排出された原料から4〜6kgの試料を採取した。採取した試料について、磁選、および目視によりコークスを分離して質量を計測し、原料のコークス含有率(質量%)を算出した。
図8は、比較例における経過時間と、コークス含有率との関係を示す図である。図8に示す経過時間は、相対値であり、炉頂バンカーから原料排出を開始した時点を0とし、炉頂バンカーから原料排出を終了した時点(全ての原料が排出された時点)を1とする。
4:炉頂バンカー、 4a:排出口、 5:炉頂バンカーの流量調整弁、
6:開口、 7:集合ホッパー、 8:旋回シュート、
8a:旋回シュートの中心軸、 9:高炉、 9a:高炉の中心軸、
10:レベル計、 11:特定原料用バンカーの流量調整弁、
12:特定原料用バンカー、 13:特定原料、
14:主原料(鉱石)、 15:切替シュート、
16:特定原料用シュート
V H =(H 0 −H)/t ・・・(1)
ここで、
V H :原料低下速度(排出開始から時刻tまでの平均速度)(mm/s)、
t:原料の排出開始時からの経過時間(s)、
H 0 :原料の排出開始時における原料高さ(mm)、
H:経過時間tにおける原料高さ(mm)
Claims (4)
- 高炉炉内に装入する原料を一旦貯留するための2つの炉頂バンカーと、この2つの炉頂バンカーに原料を装入する第1供給系統と、前記2つの炉頂バンカーから排出される原料が集合ホッパーを介して供給され、当該原料を高炉に装入する旋回シュートとを有するベルレス式装入装置において、
前記2つの炉頂バンカーのうちで少なくとも一方の炉頂バンカーがラットホールの原料高さを測定するレベル計と、特定原料を一旦貯留する特定原料用バンカーと、当該特定原料用バンカーから排出される特定原料を前記レベル計を有する炉頂バンカーのラットホールに装入する特定原料用シュートと、前記特定原料用バンカーから排出される特定原料の流量を調整する流量調整弁とを有することを特徴とする高炉の原料装入装置。 - さらに前記第1供給系統から分岐して前記特定原料用バンカーに原料を装入する第2供給系統を有することを特徴とする請求項1に記載の高炉の原料装入装置。
- 請求項1または2に記載の高炉の原料装入装置を用いて高炉へ原料を装入する方法であって、
前記レベル計を有する炉頂バンカー内からの原料排出に際し、当該原料排出に伴って形成されるラットホールの原料高さを計測して下記(1)式により規定される原料高さが低下する速度を連続的に算出し、当該原料高さが低下する速度が増加から減少に変化する時点を検出し、前記時点を検出してから15秒経過するまでの間に前記特定原料用バンカーからの原料排出を開始することを特徴とする高炉の原料装入方法。
VH=(H0−H)/t ・・・(1)
ここで、
VH:原料低下速度(排出開始から時刻tまでの平均速度)(mm/s)、
t:原料の排出開始時からの経過時間(s)、
H0:原料の排出開始時における原料高さ(mm)、
H:経過時間tにおける原料高さ(mm) - 請求項1または2に記載の高炉の原料装入装置を用いて高炉へ原料を装入する方法であって、
事前に、前記レベル計を有する炉頂バンカー内からの原料排出を開始してから、前記(1)式により算出される原料高さが低下する速度が増加から減少に変化する時点までに経過する時間Aを把握しておき、
前記時間Aを把握した条件と同一条件で行う前記レベル計を有する炉頂バンカー内からの原料装入に際し、事前に把握した前記時間Aの15秒前から前記時間Aまでの間で前記特定原料用バンカーからの原料排出を開始することを特徴とする高炉の原料装入方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013517858A JP5585729B2 (ja) | 2011-05-31 | 2012-05-25 | 高炉の原料装入装置およびそれを用いた原料装入方法 |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2011121211 | 2011-05-31 | ||
JP2011121211 | 2011-05-31 | ||
PCT/JP2012/003423 WO2012164889A1 (ja) | 2011-05-31 | 2012-05-25 | 高炉の原料装入装置およびそれを用いた原料装入方法 |
JP2013517858A JP5585729B2 (ja) | 2011-05-31 | 2012-05-25 | 高炉の原料装入装置およびそれを用いた原料装入方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP5585729B2 JP5585729B2 (ja) | 2014-09-10 |
JPWO2012164889A1 true JPWO2012164889A1 (ja) | 2015-02-23 |
Family
ID=47258765
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013517858A Active JP5585729B2 (ja) | 2011-05-31 | 2012-05-25 | 高炉の原料装入装置およびそれを用いた原料装入方法 |
Country Status (4)
Country | Link |
---|---|
JP (1) | JP5585729B2 (ja) |
CN (1) | CN103403193B (ja) |
BR (1) | BR112013028519B8 (ja) |
WO (1) | WO2012164889A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11680748B2 (en) * | 2018-03-30 | 2023-06-20 | Jfe Steel Corporation | Method for charging raw materials into blast furnace |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6183412B2 (ja) * | 2015-05-28 | 2017-08-23 | Jfeスチール株式会社 | 高炉への原料装入装置 |
EP3394689B1 (de) | 2015-12-21 | 2020-04-22 | TGW Logistics Group GmbH | Verfahren zum sortieren von förderobjekten auf einer förderanlage mittels zeitsteuerung |
CN108885441B (zh) | 2015-12-21 | 2021-05-11 | Tgw物流集团有限公司 | 分拣输送物的方法、输送技术元件或节点和输送设备 |
BR102021000742A2 (pt) | 2021-01-15 | 2022-07-26 | Tecnored Desenvolvimento Tecnologico S.A. | Sistema e método de distribuição de cargas em um forno metalúrgico |
CN116287512A (zh) * | 2022-09-05 | 2023-06-23 | 武安市裕华钢铁有限公司 | 一种高炉冶炼炉顶设备及旋转布料溜槽 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63204093A (ja) * | 1987-02-20 | 1988-08-23 | 日本鋼管株式会社 | 竪型炉への原料装入装置 |
JPH02259005A (ja) * | 1989-03-31 | 1990-10-19 | Kawasaki Steel Corp | 高炉における原料装入方法 |
JP2001192714A (ja) * | 2000-01-12 | 2001-07-17 | Kobe Steel Ltd | 高炉への原料装入方法 |
JP2004010980A (ja) * | 2002-06-07 | 2004-01-15 | Sumitomo Metal Ind Ltd | 高炉の操業方法およびベルレス式装入装置 |
JP2010150642A (ja) * | 2008-12-26 | 2010-07-08 | Jfe Steel Corp | 高炉への原料装入方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01309909A (ja) * | 1988-06-09 | 1989-12-14 | Kawasaki Steel Corp | 高炉への原料装入方法 |
JPH0772286B2 (ja) * | 1988-12-21 | 1995-08-02 | 川崎製鉄株式会社 | ベルレス高炉の炉頂装入方法 |
JPH0665620A (ja) * | 1992-08-18 | 1994-03-08 | Sumitomo Metal Ind Ltd | ベルレス高炉における原料装入方法 |
EP1445334A1 (en) * | 2002-08-29 | 2004-08-11 | JFE Steel Corporation | Raw material charging method for bell-less blast furnace |
CN201678691U (zh) * | 2010-01-26 | 2010-12-22 | 沈阳东方钢铁有限公司 | 一种高炉无钟布料装置 |
-
2012
- 2012-05-25 CN CN201280010998.2A patent/CN103403193B/zh not_active Expired - Fee Related
- 2012-05-25 BR BR112013028519A patent/BR112013028519B8/pt not_active IP Right Cessation
- 2012-05-25 JP JP2013517858A patent/JP5585729B2/ja active Active
- 2012-05-25 WO PCT/JP2012/003423 patent/WO2012164889A1/ja active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63204093A (ja) * | 1987-02-20 | 1988-08-23 | 日本鋼管株式会社 | 竪型炉への原料装入装置 |
JPH02259005A (ja) * | 1989-03-31 | 1990-10-19 | Kawasaki Steel Corp | 高炉における原料装入方法 |
JP2001192714A (ja) * | 2000-01-12 | 2001-07-17 | Kobe Steel Ltd | 高炉への原料装入方法 |
JP2004010980A (ja) * | 2002-06-07 | 2004-01-15 | Sumitomo Metal Ind Ltd | 高炉の操業方法およびベルレス式装入装置 |
JP2010150642A (ja) * | 2008-12-26 | 2010-07-08 | Jfe Steel Corp | 高炉への原料装入方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11680748B2 (en) * | 2018-03-30 | 2023-06-20 | Jfe Steel Corporation | Method for charging raw materials into blast furnace |
Also Published As
Publication number | Publication date |
---|---|
BR112013028519A2 (pt) | 2017-01-10 |
CN103403193B (zh) | 2015-02-18 |
JP5585729B2 (ja) | 2014-09-10 |
BR112013028519B8 (pt) | 2019-09-17 |
BR112013028519B1 (pt) | 2019-01-22 |
CN103403193A (zh) | 2013-11-20 |
WO2012164889A1 (ja) | 2012-12-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5585729B2 (ja) | 高炉の原料装入装置およびそれを用いた原料装入方法 | |
JP5696814B2 (ja) | ベルレス高炉への原料装入方法 | |
JP5440077B2 (ja) | ベルレス高炉への原料装入方法 | |
CN107614707B (zh) | 向高炉装入原料的装置 | |
TWI239355B (en) | Method for charging material into blast furnace with distributing chute instead of bells | |
CN104302788B (zh) | 向高炉装入原料的方法 | |
JP5861392B2 (ja) | 高炉操業方法 | |
JP2019014951A (ja) | 高炉における中心部へコークスを装入する原料装入方法 | |
JP5387278B2 (ja) | 高炉の原料装入方法 | |
JP5338309B2 (ja) | 高炉への原料装入方法 | |
JP6943339B2 (ja) | ベルレス高炉の原料装入方法および高炉操業方法 | |
JP5135959B2 (ja) | 高炉への原料装入方法及び原料装入装置 | |
US11680748B2 (en) | Method for charging raw materials into blast furnace | |
JP6601511B2 (ja) | 高炉操業方法 | |
JP6627718B2 (ja) | 高炉への原料装入方法 | |
JP6558519B1 (ja) | 高炉の原料装入方法 | |
JP2009299154A (ja) | ベルレス高炉の原料装入装置および原料装入方法 | |
JP5853904B2 (ja) | ベル式高炉の原料装入方法 | |
JP5056563B2 (ja) | 高炉操業方法 | |
JP5217650B2 (ja) | 高炉への原料装入方法 | |
JP6558518B1 (ja) | 高炉の原料装入方法 | |
JP2005264292A (ja) | ベルレス原料装入装置を備えた高炉での原料装入方法 | |
JP6627717B2 (ja) | 高炉への原料装入方法 | |
JP2005248278A (ja) | 高炉操業方法 | |
JP2003138304A (ja) | 高炉操業方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AA91 | Notification of revocation by ex officio |
Free format text: JAPANESE INTERMEDIATE CODE: A971091 Effective date: 20140603 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20140624 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20140707 |
|
R151 | Written notification of patent or utility model registration |
Ref document number: 5585729 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |
|
S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |