JPS62113983A - 合成樹脂製管の地中への埋設方法 - Google Patents

合成樹脂製管の地中への埋設方法

Info

Publication number
JPS62113983A
JPS62113983A JP60251065A JP25106585A JPS62113983A JP S62113983 A JPS62113983 A JP S62113983A JP 60251065 A JP60251065 A JP 60251065A JP 25106585 A JP25106585 A JP 25106585A JP S62113983 A JPS62113983 A JP S62113983A
Authority
JP
Japan
Prior art keywords
pipe
synthetic resin
buried
burying
pipes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP60251065A
Other languages
English (en)
Japanese (ja)
Other versions
JPH0255677B2 (enrdf_load_stackoverflow
Inventor
金尾 史朗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP60251065A priority Critical patent/JPS62113983A/ja
Publication of JPS62113983A publication Critical patent/JPS62113983A/ja
Publication of JPH0255677B2 publication Critical patent/JPH0255677B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)
  • Pipe Accessories (AREA)
JP60251065A 1985-11-09 1985-11-09 合成樹脂製管の地中への埋設方法 Granted JPS62113983A (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP60251065A JPS62113983A (ja) 1985-11-09 1985-11-09 合成樹脂製管の地中への埋設方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP60251065A JPS62113983A (ja) 1985-11-09 1985-11-09 合成樹脂製管の地中への埋設方法

Publications (2)

Publication Number Publication Date
JPS62113983A true JPS62113983A (ja) 1987-05-25
JPH0255677B2 JPH0255677B2 (enrdf_load_stackoverflow) 1990-11-28

Family

ID=17217104

Family Applications (1)

Application Number Title Priority Date Filing Date
JP60251065A Granted JPS62113983A (ja) 1985-11-09 1985-11-09 合成樹脂製管の地中への埋設方法

Country Status (1)

Country Link
JP (1) JPS62113983A (enrdf_load_stackoverflow)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01105729A (ja) * 1987-07-17 1989-04-24 Dainippon Plastics Co Ltd プラスチックス螺旋巻き二重管の製造法
JPH0285087U (enrdf_load_stackoverflow) * 1988-12-20 1990-07-03
JPH05187580A (ja) * 1992-06-12 1993-07-27 Yuuc Sangyo Kk 耐圧合成樹脂管

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01105729A (ja) * 1987-07-17 1989-04-24 Dainippon Plastics Co Ltd プラスチックス螺旋巻き二重管の製造法
JPH0285087U (enrdf_load_stackoverflow) * 1988-12-20 1990-07-03
JPH05187580A (ja) * 1992-06-12 1993-07-27 Yuuc Sangyo Kk 耐圧合成樹脂管

Also Published As

Publication number Publication date
JPH0255677B2 (enrdf_load_stackoverflow) 1990-11-28

Similar Documents

Publication Publication Date Title
JPS62113983A (ja) 合成樹脂製管の地中への埋設方法
JPH11215675A (ja) 埋設ケーブル保護部材
JP3042928B2 (ja) ガス導管用配管材
JP2660328B2 (ja) 鞘管挿入用プレハブ多孔管の接合構造
KR100389533B1 (ko) 지하 매설물 공동 덕트 구조체
JPH07189588A (ja) 推進工法用二重鋼管
JPH10220645A (ja) 構造物周りの配管構造
KR200236601Y1 (ko) 지하 매설물 공동 덕트 구조체
JP3172438B2 (ja) 電線共同溝用コンクリート製管路並びに該管路に用いるポリエチレン管
JP2848261B2 (ja) ケーブル埋設用管
JP3615594B2 (ja) 配管敷設方法及び配管構造
JPH075345Y2 (ja) 推進工法用埋設管の接続構造
JP2940876B2 (ja) 埋設管の管継手構造
JPS61252988A (ja) 小径管の推進工法
JPH02203032A (ja) 断熱複数管路の敷設方法
JP3182336B2 (ja) 多孔管路用接続ユニット
JPH0326767Y2 (enrdf_load_stackoverflow)
JPH0419275Y2 (enrdf_load_stackoverflow)
JPH0512394Y2 (enrdf_load_stackoverflow)
JP3808751B2 (ja) 建物の基礎構造及び建物の基礎施工方法
JP3044243B2 (ja) ケーブル地中敷設用管路
JP2905708B2 (ja) ハンドホール及び工事方法
JPH10185043A (ja) 継ぎ輪機能付き異形管
JPH0320626Y2 (enrdf_load_stackoverflow)
JPH0337490A (ja) 配管類の敷設方法

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term