JP6296068B2 - 監視制御システム及び作業支援方法 - Google Patents
監視制御システム及び作業支援方法 Download PDFInfo
- Publication number
- JP6296068B2 JP6296068B2 JP2016006086A JP2016006086A JP6296068B2 JP 6296068 B2 JP6296068 B2 JP 6296068B2 JP 2016006086 A JP2016006086 A JP 2016006086A JP 2016006086 A JP2016006086 A JP 2016006086A JP 6296068 B2 JP6296068 B2 JP 6296068B2
- Authority
- JP
- Japan
- Prior art keywords
- plant
- emergency stop
- monitoring
- control system
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0259—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
- G05B23/0286—Modifications to the monitored process, e.g. stopping operation or adapting control
- G05B23/0291—Switching into safety or degraded mode, e.g. protection and supervision after failure
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0208—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
- G05B23/0216—Human interface functionality, e.g. monitoring system providing help to the user in the selection of tests or in its configuration
Description
プラント運転画面の多くは、プラントの一部(プラントに設置された機器、装置、設備の一部)を表示するものであるのに対し、プラントの緊急停止が行われた後にプラントの運転員が確認すべき重要箇所(例えば、重要なセンサ、緊急遮断弁)はプラント全体に散在している。このため、プラントの運転員が、プラント全体の状況を把握するためには、プラント運転画面を切り替えながら情報を収集する必要があり、プラント全体の状況把握に時間を要するという問題がある。
前述の通り、従来の監視制御システムでは、プラントの緊急停止が行われた後の処置は考慮されていない。このため、従来は、プラントの運転員が、プラント運転画面に表示される情報を総合して作業進捗を把握しなければならず、作業進捗の把握が困難であるという問題がある。また、作業進捗の把握及びプラントの状態遷移の把握は、プラントの運転員の能力や経験に大きく依存することから、作業品質のバラつき、ひいては全体の作業安全性・効率の低下を招く虞が考えられる。
プラントの緊急停止の要因は、1つのみの場合は希で、複数である場合が多い。特に、大規模プラントでは、プラントの緊急停止の要因が複数であることが殆どである。従来は、アラームサマリやイベントログ等の時系列情報を解析することで緊急停止の要因を把握していたが、プラントの緊急停止の要因が複数である場合には解析に時間を要するという問題がある。
前述の通り、プラントの緊急停止が行われた後の処置はプラントの運転員の判断に委ねられているため、従来の監視制御システムでは、操作の自由度がある程度高く設定されている。例えば、プラントの状態(緊急停止中、停止中、運転中)に関係なく、運転員の操作によってインターロック(例えば、緊急遮断弁等)の回避(バイパス、リセット)が可能とされている。熟練の運転員による冷静な判断の下で、このような操作が行われれば何ら問題が無いが、プラントの緊急停止が行われた緊急時に誤った判断でこのような操作が行われると問題である。このため、プラントの緊急停止が行われた緊急時等においては、然るべき条件(例えば、プラントを再起動することができる条件)が整うまでインターロックを回避するような操作を制限した方が、運転員の負担を軽減できるととともに安全性を高められると考えられる。
また、本発明の監視制御システムは、前記状態監視部が、プラントの緊急停止の要因を検出し、前記表示装置が、前記状態監視部で検出された前記要因を前記緊急停止時画面に表示する。
また、本発明の監視制御システムは、前記表示装置が、プラントに設けられた機器、装置、或いは設備のうち、プラントの緊急停止後の作業を行う上で必要となる機器、装置、或いは設備を集約したプロセスフロー図を前記緊急停止時画面に表示する。
また、本発明の監視制御システムは、前記表示装置が、プラントの緊急停止後に監視が必要となる機器、装置、或いは設備から得られる時系列情報を前記緊急停止時画面に表示する。
また、本発明の監視制御システムは、前記表示装置が、プラントの緊急停止後に監視が必要となる機器、装置、或いは設備のうち、前記プロセスフロー図に含まれている機器、装置、或いは設備から得られる時系列情報を、前記プロセスフロー図に重ねて表示する。
また、本発明の監視制御システムは、前記表示装置が、前記作業進捗監視部が作業完了を判断した場合には、プラントの緊急停止を解除するための解除ボタン(B2)を前記緊急停止時画面に表示する。
また、本発明の監視制御システムは、前記状態監視部が、プラントの緊急停止後にプラントに設けられた機器、装置、或いは設備の異常が発生した場合には、前記表示装置に対して異常発生箇所の通知を行い、前記表示装置が、前記状態監視部からの通知内容に応じて、前記緊急停止時画面における状態監視部の監視結果と前記作業進捗監視部の監視結果との少なくとも一方の表示を変える。
また、本発明の監視制御システムは、前記表示装置が、前記安全制御装置によってプラントの緊急停止が行われた場合に、前記緊急停止時画面へのリンクボタン(B1)をプラント運転画面に表示し、該リンクボタンに対する操作が行われたときに前記緊急停止時画面を表示する。
また、本発明の監視制御システムは、プラントの緊急停止後のプラントに対する処置を実行する処置実行部(14)を有し、プラントに設けられた機器、装置、或いは設備から得られるプロセス情報に基づいて、プラントに設けられた機器、装置、或いは設備の制御を行う制御装置(10)を備えており、前記作業進捗監視部が、前記制御装置の前記処置実行部の実行状況に応じてプラントの緊急停止後の作業進捗を監視する。
本発明の作業支援方法は、プラント(100)の緊急停止後に行われる作業を支援する作業支援方法であって、プラントの緊急停止後のプラントの状態を監視する第1ステップ(S11)と、プラントの緊急停止後の作業進捗を監視する第2ステップ(S12)と、前記第1ステップで得られた監視結果と前記第2ステップで得られた監視結果とを含む緊急停止時画面(G)を表示する第3ステップ(S16)と、を含む。
図1は、本発明の一実施形態による監視制御システムの全体構成を示すブロック図である。図1に示す通り、本実施形態の監視制御システム1は、制御ステーション10(制御装置)、安全制御ステーション20(安全制御装置)、操作監視端末30(表示装置)、及びエンジニアリング端末40,50を備えており、プラントの自動操業を行うとともにプラントの維持管理等を行う。
(a)一次処置完了監視
緊急停止後の一次処置の対象となっている機器(例えば、反応器110)が、予め規定された安全状態(例えば、原料供給の完全停止が行われ、温度が安全範囲に収まっている状態)に遷移したか否かの監視
(b)二次処置完了監視
緊急停止後の二次処置の対象となっている機器(例えば、蒸留塔130)が、制御ステーション10の二次処置ロジック14の制御によって、予め規定された運転状態に遷移し、安定状態になっているか否かの監視
(c)安全状態監視
一次処置及び二次処置が全て完了し、プラント100全体の状態が安定化したこと(機器の異常、その他の外乱が発生せず、且つ不安定な挙動を示していないこと)の監視
次に、上述した監視制御システム1によって行われる作業支援方法について説明する。図4は、本発明の一実施形態による作業支援方法の一例を示すフローチャートである。尚、図4に示すフローチャートの処理は、安全制御ステーション20に設けられた安全ロジック23からトリガー信号が出力されることによって開始される。
14 二次処置ロジック
20 安全制御ステーション
24a プラント状態監視ロジック
24b 作業進捗監視ロジック
30 操作監視端末
100 プラント
B1 リンクボタン
B2 インターロックリセットボタン
G 緊急停止時画面
Claims (10)
- プラントに異常が発生した場合にプラントを緊急停止させる安全制御部と、プラントの緊急停止後のプラントの状態を監視する状態監視部と、プラントの緊急停止後の作業進捗を監視し、作業完了を判断した場合にプラントの緊急停止を解除する許可を行う作業進捗監視部とを備える安全制御装置と、
前記安全制御装置によってプラントの緊急停止が行われた場合に、前記状態監視部の監視結果と前記作業進捗監視部の監視結果とを含む緊急停止時画面を表示する表示装置と、
を備える監視制御システム。 - 前記状態監視部は、プラントの緊急停止の要因を検出し、
前記表示装置は、前記状態監視部で検出された前記要因を前記緊急停止時画面に表示する、
請求項1記載の監視制御システム。 - 前記表示装置は、プラントに設けられた機器、装置、或いは設備のうち、プラントの緊急停止後の作業を行う上で必要となる機器、装置、或いは設備を集約したプロセスフロー図を前記緊急停止時画面に表示する請求項1又は請求項2記載の監視制御システム。
- 前記表示装置は、プラントの緊急停止後に監視が必要となる機器、装置、或いは設備から得られる時系列情報を前記緊急停止時画面に表示する請求項1から請求項3の何れか一項に記載の監視制御システム。
- 前記表示装置は、プラントの緊急停止後に監視が必要となる機器、装置、或いは設備のうち、前記プロセスフロー図に含まれている機器、装置、或いは設備から得られる時系列情報を、前記プロセスフロー図に重ねて表示する請求項3記載の監視制御システム。
- 前記表示装置は、前記作業進捗監視部がプラントの緊急停止を解除する許可を行った場合には、プラントの緊急停止を解除するための解除ボタンを前記緊急停止時画面に表示する請求項1から請求項5の何れか一項に記載の監視制御システム。
- 前記状態監視部は、プラントの緊急停止後にプラントに設けられた機器、装置、或いは設備の異常が発生した場合には、前記表示装置に対して異常発生箇所の通知を行い、
前記表示装置は、前記状態監視部からの通知内容に応じて、前記緊急停止時画面における状態監視部の監視結果と前記作業進捗監視部の監視結果との少なくとも一方の表示を変える、
請求項1から請求項6の何れか一項に記載の監視制御システム。 - 前記表示装置は、前記安全制御装置によってプラントの緊急停止が行われた場合に、前記緊急停止時画面へのリンクボタンをプラント運転画面に表示し、該リンクボタンに対する操作が行われたときに前記緊急停止時画面を表示する請求項1から請求項7の何れか一項に記載の監視制御システム。
- プラントの緊急停止後のプラントに対する処置を実行する処置実行部を有し、プラントに設けられた機器、装置、或いは設備から得られるプロセス情報に基づいて、プラントに設けられた機器、装置、或いは設備の制御を行う制御装置を備えており、
前記作業進捗監視部は、前記制御装置の前記処置実行部の実行状況に応じてプラントの緊急停止後の作業進捗を監視する、
請求項1から請求項8の何れか一項に記載の監視制御システム。 - プラントの緊急停止後に行われる作業を支援する作業支援方法であって、
安全制御装置が、プラントの緊急停止後のプラントの状態を監視する第1ステップと、
前記安全制御装置が、プラントの緊急停止後の作業進捗を監視する第2ステップと、
表示装置が、前記第1ステップで得られた監視結果と前記第2ステップで得られた監視結果とを含む緊急停止時画面を表示する第3ステップと、
前記安全制御装置が、プラントの緊急停止後の作業完了を判断した場合にプラントの緊急停止を解除する許可を行う第4ステップと、
を含む作業支援方法。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016006086A JP6296068B2 (ja) | 2016-01-15 | 2016-01-15 | 監視制御システム及び作業支援方法 |
US15/389,932 US10216179B2 (en) | 2016-01-15 | 2016-12-23 | Monitoring control system and work support method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016006086A JP6296068B2 (ja) | 2016-01-15 | 2016-01-15 | 監視制御システム及び作業支援方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2017126258A JP2017126258A (ja) | 2017-07-20 |
JP6296068B2 true JP6296068B2 (ja) | 2018-03-20 |
Family
ID=59313810
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2016006086A Active JP6296068B2 (ja) | 2016-01-15 | 2016-01-15 | 監視制御システム及び作業支援方法 |
Country Status (2)
Country | Link |
---|---|
US (1) | US10216179B2 (ja) |
JP (1) | JP6296068B2 (ja) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7163117B2 (ja) * | 2018-09-14 | 2022-10-31 | 株式会社東芝 | プロセス監視支援装置、プロセス監視支援システム、プロセス監視支援方法及びプロセス監視支援プログラム |
EP3982219A1 (en) * | 2020-10-08 | 2022-04-13 | ABB Schweiz AG | Visual interlock specification for industrial automation |
CN112723142B (zh) * | 2020-12-03 | 2023-02-10 | 安徽中旭机械科技有限公司 | 一种可防止脱钩的起重机用挂钩 |
JP7347468B2 (ja) * | 2021-03-26 | 2023-09-20 | 横河電機株式会社 | 装置、方法およびプログラム |
Family Cites Families (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4042813A (en) * | 1973-02-23 | 1977-08-16 | Westinghouse Electric Corporation | Secondary system modeling and method for a nuclear power plant training simulator |
JPS5651695A (en) * | 1979-10-03 | 1981-05-09 | Hitachi Ltd | Nuclear reactor power control method |
US4616216A (en) * | 1984-07-27 | 1986-10-07 | Earl Joseph Schnur | Emergency stop monitor |
DE3805736A1 (de) * | 1988-02-24 | 1989-08-31 | Hochtemperatur Reaktorbau Gmbh | Sicherheitssystem fuer einen gasgekuehlten hochtemperaturreaktor |
US5227122A (en) * | 1989-11-02 | 1993-07-13 | Combustion Engineering, Inc. | Display device for indicating the value of a parameter in a process plant |
US5263061A (en) * | 1992-06-24 | 1993-11-16 | Westinghouse Electric Corp. | Nuclear reactor control room construction |
US5422808A (en) * | 1993-04-20 | 1995-06-06 | Anthony T. Catanese, Jr. | Method and apparatus for fail-safe control of at least one electro-mechanical or electro-hydraulic component |
US5462114A (en) * | 1993-11-19 | 1995-10-31 | Catanese, Jr.; Anthony T. | Shut-off control system for oil/gas wells |
US5586050A (en) * | 1994-08-10 | 1996-12-17 | Aerojet General Corp. | Remotely controllable LNG field station management system and method |
US5608657A (en) * | 1996-01-25 | 1997-03-04 | Delta H. Systems, Inc. | Interactive diagnostic system |
JPH09230927A (ja) * | 1996-02-23 | 1997-09-05 | Toshiba Corp | プロセス監視システム |
JPH1097317A (ja) * | 1996-09-19 | 1998-04-14 | Toshiba Corp | 監視画面表示装置 |
JP3594769B2 (ja) * | 1997-07-17 | 2004-12-02 | 株式会社日立ビルシステム | 遠隔監視装置 |
JPH1196489A (ja) * | 1997-09-16 | 1999-04-09 | Toshiba Eng Co Ltd | プラント警報処理支援システム |
JP4371592B2 (ja) * | 2001-01-19 | 2009-11-25 | 大阪瓦斯株式会社 | コージェネレーション監視制御システム及び操作支援設備 |
JP2003015701A (ja) * | 2001-07-04 | 2003-01-17 | Matsushita Electric Ind Co Ltd | 着脱操作器付き産業機器の緊急措置方法と装置 |
US6898468B2 (en) * | 2003-03-28 | 2005-05-24 | Fisher-Rosemount Systems, Inc. | Function block implementation of a cause and effect matrix for use in a process safety system |
WO2006078709A2 (en) * | 2005-01-19 | 2006-07-27 | Tosoh Smd Etna, Llc | Automated sputtering target production |
JP2007115178A (ja) * | 2005-10-24 | 2007-05-10 | Yokogawa Electric Corp | プラント運転支援装置 |
JP4671131B2 (ja) * | 2006-08-10 | 2011-04-13 | 横河電機株式会社 | 安全計装システム |
US8201624B2 (en) * | 2007-10-23 | 2012-06-19 | Saudi Arabian Oil Company | Clustered wellhead trunkline protection and testing system with ESP speed controller and emergency isolation valve |
US20120042721A1 (en) * | 2008-02-28 | 2012-02-23 | Tareq Nasser Al-Buaijan | Partial stroke testing system coupled with fuel control valve |
WO2011028420A1 (en) * | 2009-09-03 | 2011-03-10 | Fisher Controls International Llc | Emergency test control panel device, system and method |
JP5429068B2 (ja) * | 2010-06-18 | 2014-02-26 | 三菱電機株式会社 | プラント監視装置ならびにプラント |
JP5622553B2 (ja) * | 2010-12-15 | 2014-11-12 | 株式会社東芝 | 発電プラントの運転管理支援装置 |
JP5975802B2 (ja) * | 2012-09-03 | 2016-08-23 | アズビル株式会社 | 点検保全データ検証装置、点検保全データ検証システムおよび点検保全データ検証方法 |
-
2016
- 2016-01-15 JP JP2016006086A patent/JP6296068B2/ja active Active
- 2016-12-23 US US15/389,932 patent/US10216179B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
US10216179B2 (en) | 2019-02-26 |
JP2017126258A (ja) | 2017-07-20 |
US20170205819A1 (en) | 2017-07-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6296068B2 (ja) | 監視制御システム及び作業支援方法 | |
KR900008661B1 (ko) | 원자력 발전소 감시방법 | |
Albalawi et al. | Process operational safety using model predictive control based on a process Safeness Index | |
FI79199C (fi) | Foerfarande och anordning foer styrning av ett komplext olinjaert processreglersystem. | |
CA2870849C (en) | Control room for nuclear power plant | |
CN103744316B (zh) | 一种基于温度测量的控制系统保护装置及保护方法 | |
EP1727009B1 (en) | System for displaying alarms and related information for supporting process operation | |
KR101577385B1 (ko) | 발전 플랜트의 운전 관리 지원 장치 | |
CN103823401B (zh) | 用于在机组级自启停控制系统中报警的方法与装置 | |
Xu et al. | Analysis of operator support method based on intelligent dynamic interlock in lead-cooled fast reactor simulator | |
JP2003167624A (ja) | プラント制御監視装置 | |
US10572493B2 (en) | Computerized process safety management system | |
TWI631443B (zh) | 用於監測及控制製造設備之整合控制器解決方案 | |
JP6633313B2 (ja) | 原子力プラント監視支援システム | |
JP2017015592A (ja) | 原子力発電プラント警報監視支援システム | |
JP2009020787A (ja) | プラント保安管理システム | |
CN106970597B (zh) | 控制装置以及控制方法 | |
CN110699527A (zh) | 热镀锌立式退火炉上下氧含量检测氮气联锁控制系统操作方法 | |
CN107831720A (zh) | 优化设备运行模式的控制方法及计算机设备 | |
JP2020052054A (ja) | 原子力プラント監視支援システム | |
JP7112934B2 (ja) | 発電プラントの運転管理支援装置 | |
CN108520788B (zh) | 一种核电厂机组启动和停运报警的处理系统和方法 | |
JP6656593B2 (ja) | 安全計装制御装置及びその方法並びに安全計装システム | |
CN113516399A (zh) | 一种核电厂作业风险数据库逻辑处理和智能分析预警系统 | |
JP5416069B2 (ja) | 警報処理システム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20171018 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20171031 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20171206 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180123 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180205 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6296068 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |