JP5825985B2 - 一体型金属プロセシング設備 - Google Patents
一体型金属プロセシング設備 Download PDFInfo
- Publication number
- JP5825985B2 JP5825985B2 JP2011247980A JP2011247980A JP5825985B2 JP 5825985 B2 JP5825985 B2 JP 5825985B2 JP 2011247980 A JP2011247980 A JP 2011247980A JP 2011247980 A JP2011247980 A JP 2011247980A JP 5825985 B2 JP5825985 B2 JP 5825985B2
- Authority
- JP
- Japan
- Prior art keywords
- casting
- metal
- temperature
- heat treatment
- mold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D11/00—Process control or regulation for heat treatments
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D29/00—Removing castings from moulds, not restricted to casting processes covered by a single main group; Removing cores; Handling ingots
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D29/00—Removing castings from moulds, not restricted to casting processes covered by a single main group; Removing cores; Handling ingots
- B22D29/001—Removing cores
- B22D29/003—Removing cores using heat
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D47/00—Casting plants
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D9/00—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
- C21D9/0068—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for particular articles not mentioned below
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22F—CHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
- C22F1/00—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D1/00—General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
- C21D1/34—Methods of heating
- C21D1/52—Methods of heating with flames
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D1/00—General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
- C21D1/34—Methods of heating
- C21D1/53—Heating in fluidised beds
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Organic Chemistry (AREA)
- Materials Engineering (AREA)
- Thermal Sciences (AREA)
- Metallurgy (AREA)
- Physics & Mathematics (AREA)
- Crystallography & Structural Chemistry (AREA)
- Molds, Cores, And Manufacturing Methods Thereof (AREA)
- Furnace Details (AREA)
- Heat Treatments In General, Especially Conveying And Cooling (AREA)
- Tunnel Furnaces (AREA)
- Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
- Internal Circuitry In Semiconductor Integrated Circuit Devices (AREA)
- Design And Manufacture Of Integrated Circuits (AREA)
- Furnace Charging Or Discharging (AREA)
Description
本願は、米国仮出願番号60/266,357(2001年2月2日出願)の利益を主張する。
本発明は、概して、冶金学的キャスティングおよび処理プロセス、より詳細には、一体型金属処理設備およびキャスティングを熱処理する方法に関する。
伝統的に、金属キャスティングを形成するための従来のプロセスにおいて、鋳型(例えば、本明細書中で規定される所望のキャスティングの外部の特徴を有する内部チャンバを有する金属ダイスまたは砂鋳型)は、溶融金属で満たされる。このキャスティングの内部の特徴を規定する砂中子が加えられ、そして/または鋳型内に配置されて、溶融金属が中子の周囲で固化する際にキャスティングの内部の細部を形成する。キャスティングの溶融金属が固化した後、キャスティングはその後、一般的に、キャスティングの熱処理、砂中子および/または鋳型からの砂の除去、ならびに必要な場合、他のプロセスのために処理炉に移される。熱処理プロセスは、このキャスティングの金属または金属合金を調整し、その結果、それらは、異なる適用に適した所望の物理的特性を有して提供される。
簡単に述べると、本発明は、概して、金属または金属合金上に形成されたキャスティングの鋳込み、形成、熱処理、およびさらなる処理のための統合された金属処理設備を包含する。この統合された金属処理設備は、概して、溶融金属(例えば、アルミニウムまたは鉄、あるいは金属合金)を鋳型またはダイス(例えば、永久金属製鋳型、半永久鋳型、または砂鋳型)に鋳込む、鋳込みステーションを備える。次いで、この鋳型は、この鋳込みステーションの鋳込み位置またはキャスティング位置から移送位置に移され、移動位置で、キャスティングは、その鋳型から取り除かれるか、または、鋳型は次いで、キャスティングをその中に含んだ状態で、移送機構により熱処理ラインに移される。移送機構は、代表的に、ロボットアーム、クレーン、オーバーヘッドホイストまたはリフト、プッシャー、コンベヤまたは類似の輸送機構を備える。いくつかの場合、同一の機構はまた、キャスティングをそれらの鋳型から取り除くためおよびキャスティングを熱処理ラインに移すために使用され得る。この鋳込み位置もしくは鋳込み点から移送位置もしくは移送点へ、および/または熱処理ラインへの輸送の間、キャスティングの溶融金属は、金属が固化してその中にキャスティングを形成するのに十分な程度まで冷却され得る。
ここで、図面(ここで、いくつかの図を通して、同様の数は、同様の部分を参照する)を詳細に参照して、図1A〜3は、一体型金属処理炉またはシステム5および金属キャスティングを処理する方法を概略的に図示する。金属キャスティングプロセスは、一般的に当業者に周知であり、そして伝統的なキャスティングプロセスは、参照の目的のために手短にしか記載しない。本発明は、任意の種類のキャスティングプロセス(アルミニウム、鉄、鋼および/または他の種類の金属および金属合金のキャスティングを形成するための金属キャスティングプロセスを含む)において使用され得ることはまた、当業者によって理解される。従って、本発明は、特定のキャスティングプロセスまたは特定の種類の金属もしくは金属合金での使用のみに限定されるべきではない。
(項1)
金属キャスティングを形成および熱処理するための一体型金属プロセシング設備であって、以下:
溶融金属を一連の鋳型に鋳込んで該キャスティングを形成するための、鋳込みステーション;
該キャスティングの熱処理のための少なくとも1つの熱処理ステーションを備える、熱処理ユニット;
該鋳込みステーションから該熱処理ユニットへと該キャスティングを移動させるための、移送システム;および
該キャスティングの移動経路に沿って位置する熱源であって、該キャスティングを該熱処理ステーションに導入する前に該キャスティングに熱を付与して、該キャスティングの金属に対するプロセス制御温度以上に該キャスティングを維持するための、熱源、
を備え;
これによって、該キャスティングが該鋳込みステーションから該熱処理ユニットへと移動される場合に、該キャスティングの溶融金属は、固化することが可能であり、一方で該キャスティングは、該キャスティングが該熱処理ステーションに導入されるまで、該キャスティングのプロセス制御温度以上に維持される、一体型金属プロセシング設備。
(項2)
前記移送システムが、ロボットアームまたは機械式アームを備え、該アームが、内部の該キャスティングと共に前記鋳型を把持し、そして前記鋳込みステーションから前記熱処理ステーションへと移動させるよう適合されている、項1に記載の一体型金属プロセシング設備。
(項3)
前記熱源が、前記移送システムに取り付けられた加熱要素を備え、該加熱要素が、前記鋳込みステーションから前記熱処理ラインへの移動の間に、前記キャスティングに熱を付与するためのものである、項1に記載の一体型金属プロセシング設備。
(項4)
前記熱処理ステーションの入口端部に隣接して位置する、プロセス温度制御チャンバをさらに備える、項1に記載の一体型金属プロセシング設備。
(項5)
前記プロセス温度制御ステーションが、放射チャンバを備え、該放射チャンバを通して、前記キャスティングが移動され、前記熱源が、該放射チャンバに熱を供給するために、該プロセス温度制御ステーションに沿って取り付けられた一連の加熱要素を備える、項4に記載の一体型金属プロセシング設備。
(項6)
前記加熱要素が放射ヒータを備える、項5に記載の一体型金属プロセシング設備。
(項7)
前記加熱要素が対流ヒータを備える、項5に記載の一体型金属プロセシング設備。
(項8)
前記加熱要素が、燃料源に接続された一連のバーナーを備える、項5に記載の一体型金属プロセシング設備。
(項9)
前記熱処理ラインが、複数の炉チャンバを有する炉を備え、該炉チャンバの各々が、熱処理ステーションを規定している、項1に記載の一体型金属プロセシング設備。
(項10)
前記熱処理ラインが、プロセス温度制御ステーションおよび複数の熱源をさらに備え、該プロセス温度制御ステーションは、細長チャンバを備え、該細長チャンバを通して、前記キャスティングが前記熱処理ステーションに導入される前に、該キャスティングが受容され、そして該複数の熱源は、該チャンバに熱を供給して、該チャンバ内に加熱環境を作製し、ここで、該キャスティングが冷めることが阻止され、これによって、該キャスティングは、前記プロセス制御温度以上に維持される、項1に記載の一体型金属プロセシング設備。
(項11)
金属キャスティングを形成および処理する方法であって、以下:
溶融金属を鋳型に鋳込む工程;
該鋳型内の該溶融金属を、該溶融金属が固化してキャスティングを形成し得るに十分な温度まで冷ます工程;
該キャスティングが熱処理ラインの熱処理ステーションに移動する際に、該キャスティングが冷めることを阻止し、そして該キャスティングの金属に対するプロセス制御温度以上に該キャスティングを維持する工程;および
該キャスティングを熱処理する工程;
を包含する、方法。
(項12)
前記キャスティングが冷めることを阻止し、そしてプロセス制御温度以上に該キャスティングを維持する工程が、該キャスティングの金属に対する溶体熱処理温度(solution heat treatment temperature)より高温に該キャスティングを加熱することなく、該キャスティングが冷めることを阻止するために十分な温度で、該キャスティングに熱を付与する工程を包含する、項11に記載の方法。
(項13)
前記キャスティングが冷めることを阻止し、そしてプロセス制御温度以上に該キャスティングを維持する工程が、該キャスティングに熱を付与するための一連の加熱源が内部に取り付けられた放射チャンバを通して、該キャスティングを移動させる工程を包含する、項12に記載の方法。
(項14)
前記熱源が、前記キャスティングに向けて熱を放射する放射ヒータを備える、項13に記載の方法。
(項15)
前記熱源が、前記キャスティングに向けて加熱された媒体の流れを方向付ける、対流ヒータを備える、項13に記載の方法。
(項16)
前記キャスティングを移送する工程が、該キャスティングを鋳型から取り出す工程、およびその後、該キャスティングを鋳込みステーションから前記熱処理ラインへと移動させる工程を包含する、項11に記載の方法。
(項17)
前記キャスティングを移送する工程が、移送機構を用いて、前記鋳型を該鋳型の内部に含まれるキャスティングと係合させる工程、および該キャスティングを、鋳込みステーションから、前記熱処理ラインのための入口コンベヤへと移動させる工程を包含する、項11に記載の方法。
(項18)
前記キャスティングが冷めることを阻止する工程が、前記キャスティングおよび鋳型が前記熱処理ラインに移送される際に、前記移送機構に取り付けられた熱源からの熱を該キャスティングに向けて方向付ける工程を包含する、項17に記載の方法。
(項19)
キャスティングのバッチにおいて前記キャスティングを加熱するためのバスケットに、該キャスティングを装填する工程をさらに包含する、項11に記載の方法。
(項20)
廃棄ガスおよび熱を、前記放射チャンバから前記熱処理ステーションへと方向付ける工程をさらに包含する、項13に記載の方法。
(項21)
前記キャスティングが冷めることを阻止する工程が、該キャスティングを前記鋳込みステーションから前記熱処理ラインへと移送する間に、該キャスティングに熱を付与する工程を包含する、項11に記載の方法。
(項22)
前記キャスティングを熱処理する前に、前記鋳型からチルを除去する工程をさらに包含する、項11に記載の方法。
(項23)
溶融金属から形成されたキャスティングをプロセシングするためのシステムであって、以下:
該溶融金属が一連の鋳型に鋳込まれて、該キャスティングを形成する、鋳込みステーション;ならびに
該鋳込みステーションの下流の熱処理ラインであって、以下:
少なくとも1つの熱処理炉であって、該熱処理炉を通って、該キャスティングの熱処理のために該キャスティングが通過する、熱処理炉;および
プロセス温度制御ステーションであって、該熱処理炉の上流に位置し、そしてチャンバおよび一連の加熱要素を有し、該チャンバを通って、熱処理の前に該キャスティングが通過し、該加熱要素は、該チャンバ内で、該金属キャスティングに対するプロセス制御温度以上で、該キャスティングに、該キャスティングが冷めることを阻止するために十分な熱を付与するためのものである、プロセス温度制御ステーション、
を備える、熱処理ライン、
を備える、システム。
(項24)
前記キャスティングを、前記鋳込みステーションから前記熱処理ラインへと移送するための、移送機構をさらに備える、項23に記載のシステム。
(項25)
前記加熱要素が放射ヒータを備える、項23に記載のシステム。
(項26)
前記加熱要素が対流ヒータを備える、項23に記載のシステム。
(項27)
前記加熱要素が、燃料源に接続された一連のバーナーを備える、項23に記載のシステム。
(項28)
前記チャンバが、天井および側壁を有する細長トンネルを備え、該細長トンネルは、放射材料を含み、該放射材料は、前記キャスティングが該トンネルを通る際に、該キャスティングに向けて熱を方向付けるためのものである、項23に記載のシステム。
(項29)
前記移送機構に取り付けられた熱源をさらに備え、該熱源は、前記キャスティングを前記鋳込みステーションから前記熱処理ラインへと移動する間に、該キャスティングに熱を付与するよう適合されている、項24に記載のシステム。
(項30)
前記熱処理ラインが、複数の炉チャンバを有する炉を備え、該チャンバの各々が、熱処理ステーションを規定している、項23に記載のシステム。
(項31)
収集トレイをさらに備え、該収集トレイは、前記キャスティングを前記鋳込みステーションから受容するためのものであり、そして該収集トレイは、連続的なキャスティングが該トレイ内部に配置されるにつれて、前記プロセス温度制御ステーションの内へおよび外へ往復的に移動可能である、項23に記載のシステム。
Claims (30)
- キャスティング金属をプロセシングする方法であって、
キャスティングされるべき金属についてのプロセス制御温度を決定する工程であって、ここで
該プロセス制御温度は、その温度未満に該キャスティング金属の温度が低下する1分ごとに、該キャスティングをその熱処理温度まで再加熱するためにさらなる1分より長い熱処理が必要とされる温度であり、そして
該プロセス制御温度は、400℃から1300℃である、
工程;
該金属を溶融状態で鋳型に鋳込む工程;
該鋳込まれた金属を、熱処理炉を備える熱処理ユニットに移動させる工程;
該鋳型内の該鋳込まれた金属を該熱処理炉内で熱処理する工程;および
該鋳込む工程から該熱処理する工程まで、該鋳込まれた金属の温度を該プロセス制御温度またはそれを超える温度に、かつ該キャスティング金属についての熱処理温度未満の温度に維持する工程であって、これによって、該金属がキャスティングを形成するために十分に固化することを可能にしながら、該キャスティングのためにより短い熱処理時間を可能にし、ここで該維持する工程は、該鋳型内の該鋳込まれた金属の温度を監視すること、および該監視に応答して、該鋳型内の該鋳込まれた金属に必要に応じて熱を加えることを包含する、工程
を包含する、方法。 - 金属キャスティングを形成および処理する方法であって、
溶融金属を鋳型に鋳込む工程;
該溶融金属の凝固冷却を可能にして、該鋳型内の該溶融金属が少なくとも部分的に固化してキャスティングを形成することを可能にする工程;
該鋳込む工程と該キャスティングの熱処理との間に、該金属についてのプロセス制御温度またはそれを超える温度で該キャスティングの冷却を止めるために、必要に応じて該キャスティングに熱を加える工程であって、ここで
該プロセス制御温度は、該金属についての所望の熱処理未満であり、そしてその温度未満に該キャスティングの温度が低下する1分ごとに、該キャスティングをその熱処理温度まで再加熱するためにさらなる1分より長い熱処理が必要とされる温度であり、そして
該プロセス制御温度は、少なくとも400℃である、
工程;
該キャスティングを、熱処理炉を備える熱処理ステーション内に移動させる工程;
該キャスティングについての該所望の熱処理温度を達成するために、該キャスティングに熱を加える工程;および
該熱処理炉内で該キャスティングを熱処理する工程
を包含する、方法。 - 前記鋳込まれた金属の温度が前記プロセス制御温度またはそれを超える温度に維持される場合に、該鋳込まれた金属が少なくとも部分的に固化することを可能にする工程をさらに包含する、請求項1に記載の方法。
- 前記キャスティングの温度を前記プロセス制御温度またはそれを超える温度に維持する工程が、該キャスティングを、複数の赤外線熱源、電磁熱源、または誘導放射熱源を備える放射チャンバに通して移動させることを包含する、請求項1に記載の方法。
- 前記金属がアルミニウム合金、銅合金、またはアルミニウムおよび銅合金であり、そして前記プロセス制御温度が400℃から470℃である、請求項1に記載の方法。
- 前記金属が鉄合金であり、そして前記プロセス制御温度が1000℃から1300℃である、請求項1に記載の方法。
- 前記金属についての前記プロセス制御温度またはそれを超える温度で前記キャスティングの冷却を止めるために、該キャスティングに熱を加える工程が、該キャスティングを、熱源を備えるプロセス温度制御ステーションに通して移動させることを包含する、請求項2に記載の方法。
- 前記熱源が、赤外熱源、電磁熱源または誘導放射熱源、前記キャスティングに方向付けられた加熱された流体媒体のための対流熱源、燃料源に接続されたバーナー、あるいはこれらの任意の組み合わせを備える、請求項7に記載の方法。
- 前記鋳型内の前記キャスティングを運搬トレイに入れる工程をさらに包含する、請求項2に記載の方法。
- 前記鋳型内の前記キャスティングを既知の示された位置で運搬トレイに入れる工程をさらに包含する、請求項2に記載の方法。
- 前記キャスティングを熱処理した後に該キャスティングを前記鋳型から取り出す工程をさらに包含する、請求項2に記載の方法。
- 前記キャスティングを熱処理する前に該キャスティングを前記鋳型から取り出す工程をさらに包含する、請求項2に記載の方法。
- 前記鋳型から取り出された前記キャスティングを運搬トレイに入れる工程をさらに包含する、請求項12に記載の方法。
- 前記鋳型から取り出された前記キャスティングを既知の示された位置で運搬トレイに入れる工程をさらに包含する、請求項12に記載の方法。
- 前記金属がアルミニウム合金、銅合金、またはアルミニウムおよび銅合金であり、そして前記プロセス制御温度が400℃から470℃である、請求項2に記載の方法。
- 前記金属が鉄合金であり、そして前記プロセス制御温度が1000℃から1300℃である、請求項2に記載の方法。
- キャスティング金属物品をプロセシングする方法であって、
キャスティングされるべき金属についてのプロセス制御温度を決定する工程であって、ここで
該プロセス制御温度は、その温度未満に該金属の温度が低下する1分ごとに、該キャスティングをその熱処理温度まで再加熱するために1分より長いさらなる熱処理が必要とされる温度であり、そして
該プロセス制御温度は570℃未満である、
工程;
該金属を溶融状態で鋳型に鋳込む工程;
該鋳型を、熱処理炉を備える熱処理ステーションに移動させる工程;
該鋳型内の該金属を該キャスティング金属物品の熱処理温度未満の温度に冷却することを可能にする工程;
該鋳型を移動させる間に、該鋳型内の該金属の温度を監視し、該鋳型内の該金属が、該キャスティング金属物品の該熱処理温度未満の温度に到達した後に、該鋳型内の該金属に必要に応じて熱を加える工程であって、これによって、該鋳型内の該金属の温度を、該鋳込みから該キャスティング金属物品の熱処理まで、プロセス制御温度またはそれを超える温度であるが該鋳型内の金属についての熱処理温度より低く維持することにより、該キャスティング金属物品を形成するために十分に該金属が固化することを可能にし、同時に該キャスティング金属物品に対するより短い熱処理時間を可能にする、工程;および
該熱処理炉内で該キャスティング金属物品内の該金属を熱処理する工程
を包含する、方法。 - 前記鋳込まれた金属の温度が該金属の前記決定されたプロセス制御温度またはそれを超える温度に維持される際に、該鋳込まれた金属が少なくとも部分的に固化することを可能にする工程をさらに包含する、請求項17に記載の方法。
- 前記鋳型内の前記キャスティング金属の温度を前記プロセス制御温度またはそれを超える温度に維持することが、該鋳型内に該キャスティング金属物品がある状態で、該鋳型を、複数の熱源を備える放射チャンバに通して移動させることを包含する、請求項17に記載の方法。
- 前記金属がアルミニウム合金、銅合金、またはアルミニウムおよび銅合金を含む、請求項17に記載の方法。
- 金属キャスティングを形成および処理する方法であって、
溶融金属を鋳型に鋳込む工程;
該溶融金属の凝固冷却を可能にして、該鋳型内の該溶融金属が少なくとも部分的に固化してキャスティングを形成することを可能にする工程;
該鋳込む工程と該キャスティングの熱処理との間に、該金属についてのプロセス制御温度またはそれを超える温度で該キャスティングの冷却を止めるために、該キャスティングに必要に応じて熱を加える工程であって:
該プロセス制御温度は、該金属についての所望の熱処理未満であり、該キャスティングの少なくとも部分的な固化を可能にするために十分であり、そしてその温度未満に該キャスティングの温度が低下する1分ごとに、該キャスティングをその熱処理温度まで再加熱するためにさらなる1分より長い熱処理が必要とされる温度である、工程;
該キャスティングを、熱処理炉を備える熱処理ステーション内に移動させる工程;
該キャスティングに熱を加えて該キャスティングについての所望の熱処理温度を達成する工程;および
該熱処理ステーション内で該キャスティングを熱処理する工程
を包含する、方法。 - 前記金属が鉄合金であり、そして前記プロセス制御温度が1000℃から1300℃である、請求項21に記載の方法。
- 前記金属についての前記プロセス制御温度またはそれを超える温度で前記キャスティングの冷却を止めるために、該キャスティングに熱を加える工程が、該キャスティングを、熱源を備えるプロセス温度制御ステーションに通して移動させることを包含する、請求項21に記載の方法。
- 前記熱源が、赤外熱源、電磁熱源または誘導放射熱源、前記キャスティングに方向付けられた加熱された流体媒体のための対流熱源、燃料源に接続されたバーナー、あるいはこれらの任意の組み合わせを備える、請求項23に記載の方法。
- 前記キャスティングが前記鋳型内にある状態で該鋳型を運搬トレイに入れる工程をさらに包含する、請求項4に記載の方法。
- 前記キャスティングが前記鋳型内にある状態で、該キャスティングが既知の示された位置にある状態で、該鋳型を運搬トレイに入れる工程をさらに包含する、請求項21に記載の方法。
- 前記キャスティングを熱処理した後に該キャスティングを前記鋳型から取り出す工程をさらに包含する、請求項21に記載の方法。
- 前記キャスティングを熱処理する前に該キャスティングを前記鋳型から取り出す工程をさらに包含する、請求項21に記載の方法。
- 前記金属がアルミニウム合金、銅合金、またはアルミニウムおよび銅合金であり、そして前記プロセス制御温度が570℃未満である、請求項21に記載の方法。
- 前記金属が鉄合金であり、そして前記プロセス制御温度が1300℃未満である、請求項21に記載の方法。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US26635701P | 2001-02-02 | 2001-02-02 | |
US60/266,357 | 2001-02-02 |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2008187971A Division JP2008296282A (ja) | 2001-02-02 | 2008-07-18 | 一体型金属プロセシング設備 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2014086445A Division JP2014131818A (ja) | 2001-02-02 | 2014-04-18 | 一体型金属プロセシング設備 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2012071354A JP2012071354A (ja) | 2012-04-12 |
JP5825985B2 true JP5825985B2 (ja) | 2015-12-02 |
Family
ID=23014224
Family Applications (5)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002562787A Pending JP2004523362A (ja) | 2001-02-02 | 2002-01-18 | 一体型金属プロセシング設備 |
JP2008187971A Pending JP2008296282A (ja) | 2001-02-02 | 2008-07-18 | 一体型金属プロセシング設備 |
JP2011247980A Expired - Fee Related JP5825985B2 (ja) | 2001-02-02 | 2011-11-11 | 一体型金属プロセシング設備 |
JP2014086445A Withdrawn JP2014131818A (ja) | 2001-02-02 | 2014-04-18 | 一体型金属プロセシング設備 |
JP2016193715A Withdrawn JP2016215283A (ja) | 2001-02-02 | 2016-09-30 | 一体型金属プロセシング設備 |
Family Applications Before (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002562787A Pending JP2004523362A (ja) | 2001-02-02 | 2002-01-18 | 一体型金属プロセシング設備 |
JP2008187971A Pending JP2008296282A (ja) | 2001-02-02 | 2008-07-18 | 一体型金属プロセシング設備 |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2014086445A Withdrawn JP2014131818A (ja) | 2001-02-02 | 2014-04-18 | 一体型金属プロセシング設備 |
JP2016193715A Withdrawn JP2016215283A (ja) | 2001-02-02 | 2016-09-30 | 一体型金属プロセシング設備 |
Country Status (10)
Country | Link |
---|---|
US (4) | US20020104596A1 (ja) |
EP (2) | EP2180069B1 (ja) |
JP (5) | JP2004523362A (ja) |
KR (1) | KR100850601B1 (ja) |
CN (2) | CN102277480B (ja) |
AT (1) | ATE556155T1 (ja) |
AU (1) | AU2002239968B2 (ja) |
CA (1) | CA2436749C (ja) |
MX (1) | MXPA03006906A (ja) |
WO (1) | WO2002063051A2 (ja) |
Families Citing this family (47)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6910522B2 (en) | 1999-07-29 | 2005-06-28 | Consolidated Engineering Company, Inc. | Methods and apparatus for heat treatment and sand removal for castings |
US6991767B1 (en) * | 2000-09-18 | 2006-01-31 | Procedyne Corp. | Fluidized bed gas distributor system for elevated temperature operation |
JP2004523362A (ja) * | 2001-02-02 | 2004-08-05 | コンソリデイテッド エンジニアリング カンパニー, インコーポレイテッド | 一体型金属プロセシング設備 |
US7338629B2 (en) * | 2001-02-02 | 2008-03-04 | Consolidated Engineering Company, Inc. | Integrated metal processing facility |
US7279137B2 (en) | 2001-08-30 | 2007-10-09 | Tda Research, Inc. | Burners and combustion apparatus for carbon nanomaterial production |
US7157066B2 (en) | 2001-12-05 | 2007-01-02 | Tda Research, Inc. | Combustion process for synthesis of carbon nanomaterials from liquid hydrocarbon |
US7216691B2 (en) * | 2002-07-09 | 2007-05-15 | Alotech Ltd. Llc | Mold-removal casting method and apparatus |
CA2492073C (en) * | 2002-07-11 | 2009-10-20 | Consolidated Engineering Company, Inc. | Method and apparatus for assisting removal of sand moldings from castings |
US7165600B2 (en) * | 2002-09-11 | 2007-01-23 | Alotech Ltd. Llc | Chemically bonded aggregate mold |
US7121318B2 (en) * | 2002-09-20 | 2006-10-17 | Alotech Ltd. Llc | Lost pattern mold removal casting method and apparatus |
AU2003272624A1 (en) * | 2002-09-20 | 2004-04-08 | Alotech Ltd. Llc | Lost pattern mold removal casting method and apparatus |
EP1569636B1 (en) * | 2002-10-29 | 2017-12-13 | Colorado State University Research Foundation | Use of equol for treating androgen mediated diseases |
AU2003904221A0 (en) * | 2003-08-11 | 2003-08-21 | Castalloy Manufacturing Pty Ltd | Location of casting for post casting processes |
EP2319945B1 (en) * | 2004-06-02 | 2013-03-13 | Consolidated Engineering Company, Inc. | Integrated metal processing facility |
KR20120116992A (ko) * | 2004-06-28 | 2012-10-23 | 콘솔리데이티드 엔지니어링 캄파니, 인크. | 주물로부터의 플래싱 및 방해물의 제거를 위한 방법 및 장치 |
US20060054294A1 (en) * | 2004-09-15 | 2006-03-16 | Crafton Scott P | Short cycle casting processing |
US20060103059A1 (en) * | 2004-10-29 | 2006-05-18 | Crafton Scott P | High pressure heat treatment system |
KR100603920B1 (ko) * | 2005-08-09 | 2006-07-25 | 최의용 | 화분일체식 방음벽형 옹벽 |
DE102006049869A1 (de) * | 2006-10-23 | 2008-04-24 | Bdw Technologies Gmbh & Co. Kg | Verfahren und Anlage zur Herstellung eines Gussbauteils |
KR101024795B1 (ko) | 2008-04-25 | 2011-03-24 | 현대제철 주식회사 | 주선설비 몰드콘베이어의 몰드가열장치 |
DE102008024524A1 (de) * | 2008-05-21 | 2009-11-26 | Bdw Technologies Gmbh | Verfahren und Anlage zur Herstellung eines Gussbauteils |
US8865058B2 (en) | 2010-04-14 | 2014-10-21 | Consolidated Nuclear Security, LLC | Heat treatment furnace |
DE102011114768B4 (de) * | 2010-10-26 | 2015-01-08 | Audi Ag | Verfahren zum Herstellen von Gussbauteilen |
ITVI20110076A1 (it) * | 2011-04-01 | 2012-10-02 | Ieco Keeps On Improving S R L | Macchina per la formatura di barre metalliche |
US11150021B2 (en) | 2011-04-07 | 2021-10-19 | Ati Properties Llc | Systems and methods for casting metallic materials |
DE102011122764B9 (de) * | 2011-06-17 | 2021-06-10 | Newalu GmbH | Verfahren der Wärmebehandlung eines Gussteils und Verwendung einer Beschichtung beim chargenweisen Wärmebehandeln von Gussteilen |
US9377254B2 (en) * | 2011-11-04 | 2016-06-28 | Hatch Ltd. | Cooling of chill molds using baffles |
DE102011119002A1 (de) * | 2011-11-21 | 2013-05-23 | Audi Ag | Verfahren und Vorrichtung zur Herstellung von Leichtmetall-Gussteilen |
DE102012020622A1 (de) * | 2012-10-19 | 2014-04-24 | Maschinenfabrik Niehoff Gmbh & Co Kg | Vorrichtung zur Wärmeübertragung bei der Herstellung von langgestrecktem Stranggut |
US9050650B2 (en) | 2013-02-05 | 2015-06-09 | Ati Properties, Inc. | Tapered hearth |
US20140261904A1 (en) * | 2013-03-13 | 2014-09-18 | Consolidated Engineering Company, Inc. | System and method for formation and processing of high pressure die cast metal articles |
RU2016140527A (ru) | 2014-03-31 | 2018-05-03 | Икои С.Р.Л. | Усовершенствованная литейная форма для изготовления слитков и брусков из драгоценного металла |
CN104792163B (zh) * | 2015-02-25 | 2016-08-24 | 刘冠华 | 一种基于烧结舟制备粉体的加工装置 |
US20160319411A1 (en) | 2015-04-28 | 2016-11-03 | Consolidated Engineering Company, Inc. | System and method for heat treating aluminum alloy castings |
CN109748600A (zh) * | 2017-11-08 | 2019-05-14 | 大同新成新材料股份有限公司 | 浸金属碳滑条生产设备 |
IT201800000651A1 (it) | 2018-01-09 | 2019-07-09 | Ikoi S P A | Processo di produzione di lingotti metallici e apparato per la produzione di lingotti metallici. |
KR20210021991A (ko) * | 2018-06-21 | 2021-03-02 | 프리메탈스 테크놀로지스 유에스에이 엘엘씨 | 전자기 센서들을 사용하여 열 처리 장비에서 강 스트립 미세조직을 제어하기 위한 방법 및 시스템 |
CN108820753B (zh) * | 2018-07-06 | 2024-07-02 | 湖南德景源科技有限公司 | 一种匣体生产线 |
CN109825783B (zh) * | 2019-04-16 | 2019-12-10 | 温岭市山市金德利电器配件厂 | 一种带接料桶电缆铜线退火冷却用擦拭机构 |
CN110510490B (zh) * | 2019-09-24 | 2021-10-26 | 扬州大学 | 一种可在较大温度范围内使用的电梯专用复合式滚轮、滚轮加工装置及滚轮加工方法 |
CN110681853B (zh) * | 2019-10-18 | 2021-08-24 | 广西金桦启门窗有限公司 | 门业制造设备及其加工工艺 |
KR102198963B1 (ko) * | 2020-07-13 | 2021-01-05 | 공석환 | 주물탈거장치 |
CN111842845B (zh) * | 2020-07-31 | 2021-10-29 | 吉林大学 | 一种多功能特种铸造熔炼炉及其应用 |
IT202000018775A1 (it) * | 2020-07-31 | 2022-01-31 | Tera Automation S R L | Impianto di produzione di lingotti metallici, particolarmente per lingotti in metallo prezioso, e relativo metodo di produzione |
CN113462866B (zh) * | 2021-07-01 | 2022-04-05 | 兴化市恒源特钢有限公司 | 特种铸钢件加工用自动控温模具 |
US11642719B1 (en) * | 2021-12-17 | 2023-05-09 | Hamilton Sundstrand Corporation | Hybrid casting process for structural castings |
CN115194136B (zh) * | 2022-07-14 | 2023-05-09 | 云南锡业锡材有限公司 | 一种锡条的全自动生产线及其生产方法 |
Family Cites Families (134)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB390244A (en) † | 1931-11-14 | 1933-04-06 | Horace Campbell Hall | Improvements in the heat treatment of aluminium alloys |
US2385962A (en) | 1941-08-23 | 1945-10-02 | Foundry Equipment Company | Method of and apparatus for conditioning molds and the like |
US2813318A (en) | 1954-06-29 | 1957-11-19 | Simpson Herbert Corp | Method and apparatus for treating granular material |
US2988351A (en) | 1958-06-17 | 1961-06-13 | Foundry Equipment Company | Mold drying and cooling oven |
US3194545A (en) | 1960-03-17 | 1965-07-13 | Kaiser Aluminium Chem Corp | Apparatus for continuously solution heat-treating aluminum and its alloys |
US3222227A (en) | 1964-03-13 | 1965-12-07 | Kaiser Aluminium Chem Corp | Heat treatment and extrusion of aluminum alloy |
US3432368A (en) | 1965-02-25 | 1969-03-11 | Ishikawajima Harima Heavy Ind | Method for manufacturing nitride-containing low-carbon structural steels |
US3534946A (en) | 1967-08-11 | 1970-10-20 | Volkswagenwerk Ag | Through-flow furnace |
US3604695A (en) | 1969-12-15 | 1971-09-14 | Gen Electric | Method and apparatus for controlling a slab reheat furnace |
US3675905A (en) | 1970-09-17 | 1972-07-11 | Dorn Co V | Method and apparatus for infrared heating |
US3794232A (en) | 1972-01-19 | 1974-02-26 | N Petri | Collator and web feed control means for the same |
US3856583A (en) | 1972-01-20 | 1974-12-24 | Ethyl Corp | Method of increasing hardness of aluminum-silicon composite |
NL7201998A (ja) | 1972-02-16 | 1973-08-20 | ||
US3737280A (en) | 1972-04-14 | 1973-06-05 | Hunter Eng Co | Emission-controlled paint line heat source |
US3760800A (en) | 1972-06-19 | 1973-09-25 | Procedyne Corp | Fluidotherapy apparatus utilizing gas-fluidized solids |
JPS5537570B2 (ja) | 1974-04-19 | 1980-09-29 | ||
JPS50151710A (ja) * | 1974-05-29 | 1975-12-05 | ||
US3996412A (en) | 1975-01-17 | 1976-12-07 | Frank W. Schaefer, Inc. | Aluminum melting furnace |
US4140467A (en) | 1975-06-09 | 1979-02-20 | Kenneth Ellison | Convection oven and method of drying solvents |
US4027862A (en) | 1975-12-19 | 1977-06-07 | Frank W. Schaefer Inc. | Metal melting furnace with alternate heating systems |
US4068389A (en) | 1976-04-15 | 1978-01-17 | Procedyne Corporation | Gas-diffusion plate for fluidized bed apparatus |
US4177085A (en) | 1976-04-30 | 1979-12-04 | Southwire Company | Method for solution heat treatment of 6201 aluminum alloy |
GB1591302A (en) | 1976-09-16 | 1981-06-17 | Harding B | Fluidised bed |
US4098624A (en) | 1976-12-28 | 1978-07-04 | Upton Industries, Inc. | Process for increasing the versatility of isothermal transformation |
JPS53115407A (en) * | 1977-03-17 | 1978-10-07 | Mitsubishi Keikinzoku Kogyo Kk | Engine cylinder block and the manufacture thereof |
US4620586A (en) | 1977-03-23 | 1986-11-04 | General Kinematics | Method and apparatus for reclaiming foundry sand |
YU89478A (en) | 1977-05-12 | 1983-01-21 | Przedsieb Projektowania Wyposa | Equipment for cooling and separating castings from casting sand |
US4161389A (en) | 1978-04-07 | 1979-07-17 | Procedyne, Inc. | Fluidized bed calcining system |
US4255133A (en) | 1978-04-10 | 1981-03-10 | Hitachi, Ltd. | Method for controlling furnace temperature of multi-zone heating furnace |
US4177952A (en) | 1978-04-24 | 1979-12-11 | National Engineering Company | Impact scrubber |
US4242077A (en) | 1978-11-06 | 1980-12-30 | Fennell Corporation | Fluid bed furnace and fuel supply system for use therein |
US4257767A (en) | 1979-04-30 | 1981-03-24 | General Electric Company | Furnace temperature control |
JPS55149772A (en) * | 1979-05-11 | 1980-11-21 | Nikkei Giken:Kk | Production of aluminum alloy casting |
US4392814A (en) | 1979-06-08 | 1983-07-12 | Can-Eng Holdings Limited | Fluidized bed |
US4620884A (en) | 1979-07-24 | 1986-11-04 | Samuel Strapping Systems Ltd. | Heat treat process and furnace |
JPS5638419A (en) | 1979-09-05 | 1981-04-13 | Kanto Yakin Kogyo Kk | Metal heating furnace with protective atmosphere |
US4457789A (en) | 1979-11-09 | 1984-07-03 | Lasalle Steel Company | Process for annealing steels |
JPS5848009B2 (ja) | 1979-11-26 | 1983-10-26 | 日本鋼管株式会社 | 多帯式加熱炉の温度制御方法 |
DE3102638A1 (de) * | 1980-01-29 | 1981-11-26 | Mitsubishi Denki K.K., Tokyo | Verfahren und vorrichtung zum aufrechterhalten der temperatur von metallplatten waehrend des transportes und behandlungspausen |
US4457788A (en) | 1980-02-15 | 1984-07-03 | Procedyne Corp. | Particulate medium for fluidized bed operations |
US5108520A (en) | 1980-02-27 | 1992-04-28 | Aluminum Company Of America | Heat treatment of precipitation hardening alloys |
US4457352A (en) | 1980-03-14 | 1984-07-03 | Scheffer Karl D | System and process for the abatement of casting pollution, reclaiming resin bonded sand, and/or recovering a low BTU fuel from castings |
US4325424A (en) | 1980-03-14 | 1982-04-20 | Scheffer Karl D | System and process for abatement of casting pollution, reclaiming resin bonded sand, and/or recovering a low BTU fuel from castings |
US4378434A (en) * | 1980-03-31 | 1983-03-29 | Solargizer International, Inc. | Process for the production of useful cultures and/or metabolites |
IT1188886B (it) * | 1980-12-24 | 1988-01-28 | Fata Europ Group | Forno di calcinazione a letto fluidizzato particolarmente per il recupero delle sabbie utilizzate in forme ed anime di fonderia |
JPS604262B2 (ja) | 1981-02-21 | 1985-02-02 | マツダ株式会社 | アルミニウム合金製鋳物の製造法 |
US4357135A (en) | 1981-06-05 | 1982-11-02 | North American Mfg. Company | Method and system for controlling multi-zone reheating furnaces |
US4415444A (en) | 1981-10-08 | 1983-11-15 | General Kinematics Corporation | Air cooling system for a vibratory sand reclaiming apparatus |
US4420345A (en) | 1981-11-16 | 1983-12-13 | Nippon Light Metal Company Limited | Method for manufacture of aluminum alloy casting |
US4419143A (en) | 1981-11-16 | 1983-12-06 | Nippon Light Metal Company Limited | Method for manufacture of aluminum alloy casting |
US4490107A (en) | 1981-12-18 | 1984-12-25 | Kurosaki Furnace Industries Company Limited | Method of processing charges in a continuous combustion furnace |
IT1155658B (it) | 1982-03-23 | 1987-01-28 | Fata Ind Spa | Sistema e metodo per il recupero delle sabbie contenute in forme ed anime di fonderia mediante calcinazione in un forno a letto fluidizzato |
US4519718A (en) | 1982-07-23 | 1985-05-28 | Procedyne Corp. | Method and apparatus for thermal testing |
US4779163A (en) | 1982-07-23 | 1988-10-18 | Procedyne Corp. | Method and apparatus for controlling electrostatic charges in fluidized beds |
US4577671A (en) | 1982-08-09 | 1986-03-25 | Stephan Mark C | Casting decoring device |
US4613713A (en) | 1982-11-22 | 1986-09-23 | Procedyne Corp. | Method and apparatus for pyrolysis of atactic polypropylene |
US4512821A (en) | 1982-12-20 | 1985-04-23 | Procedyne Corp. | Method for metal treatment using a fluidized bed |
DE3307071C2 (de) | 1983-03-01 | 1986-05-22 | Joachim Dr.-Ing. 7250 Leonberg Wünning | Durchlaufofen für die Wärmbehandlung von metallischen Werkstücken |
DE3309379A1 (de) | 1983-03-16 | 1984-09-20 | Hubert Eirich | Verfahren zur regenerierung von giessereialtsand und vorrichtung zur durchfuehrung des verfahrens |
US4547228A (en) | 1983-05-26 | 1985-10-15 | Procedyne Corp. | Surface treatment of metals |
US4671496A (en) | 1983-05-26 | 1987-06-09 | Procedyne Corp. | Fluidized bed apparatus for treating metals |
JPS609550A (ja) | 1983-06-29 | 1985-01-18 | M C L:Kk | 鋳造用焼成・保持炉 |
US4499940A (en) | 1983-08-01 | 1985-02-19 | Williams International Corporation | Casting process including making and using an elastomeric pattern |
US4606529A (en) | 1983-09-20 | 1986-08-19 | Davy Mckee Equipment Corporation | Furnace controls |
US4544013A (en) | 1983-11-07 | 1985-10-01 | Ford Motor Company | Method of reclaiming sand used in evaporative casting process |
DE3400648A1 (de) | 1984-01-11 | 1985-07-18 | Delta Engineering Beratung und Vermittlung Gesellschaft mbH, Irdning | Vorrichtung und verfahren zur regeneration von giesserei-schuttsand |
US4662839A (en) | 1984-04-12 | 1987-05-05 | Kashiwa Co., Ltd. | Combustion apparatus and method of forcibly circulating a heating medium in a combustion apparatus |
US5121786A (en) * | 1984-11-09 | 1992-06-16 | Honda Giken Kogyo Kabushiki Kaisha | Process for manufacturing siamese-type cylinder block |
US4817920A (en) | 1984-11-21 | 1989-04-04 | Salem Furnace Co. | Apparatus for continuous heat treatment of metal strip in coil form |
US4623400A (en) | 1985-02-22 | 1986-11-18 | Procedyne Corp. | Hard surface coatings for metals in fluidized beds |
EP0215032B1 (de) | 1985-03-27 | 1990-03-07 | Jenny Pressen Ag | Verfahren und anlage zur serienmässigen, verzugsarmen thermomechanischen behandlung von werkstücken sowie anwendung des verfahrens |
US4604055A (en) | 1985-06-03 | 1986-08-05 | Can-Eng Holdings, Ltd. | Lip-hung retort furnace |
US5226983A (en) | 1985-07-08 | 1993-07-13 | Allied-Signal Inc. | High strength, ductile, low density aluminum alloys and process for making same |
ATE89397T1 (de) | 1985-08-07 | 1993-05-15 | Samuel Strapping Systems Ltd | Beheizung eines fliessbettofens. |
US4648836A (en) | 1985-11-26 | 1987-03-10 | Can-Eng Holdings, Ltd. | Rotary retort furnace |
DE3543062C1 (de) * | 1985-12-05 | 1987-05-14 | Dornier Medizintechnik | Verfahren und Vorrichtung zum Entfernen insbesondere keramischer Gussformen von Gussteilen mittels Stosswellen |
JPS62197269A (ja) * | 1986-02-24 | 1987-08-31 | Toyota Motor Corp | 強制冷却鋳造装置 |
DE3731598C1 (de) | 1987-09-19 | 1988-06-16 | Mtu Muenchen Gmbh | Verfahren zur Waermebehandlung von Nickel-Gusslegierungen |
US5108519A (en) | 1988-01-28 | 1992-04-28 | Aluminum Company Of America | Aluminum-lithium alloys suitable for forgings |
US4955425A (en) | 1988-09-19 | 1990-09-11 | Mckenna James F | Casting handling apparatus |
US5018707A (en) | 1989-03-14 | 1991-05-28 | Gas Research Institute | Heating furnace |
US5354038A (en) | 1989-09-29 | 1994-10-11 | Consolidated Engineering Company, Inc. | Heat treatment of metal castings and in-furnace sand reclamation |
US5294094A (en) * | 1989-09-29 | 1994-03-15 | Consolidated Engineering Company | Method and apparatus for heat treating metal castings |
US5350160A (en) | 1989-09-29 | 1994-09-27 | Consolidated Engineering Company | Method and apparatus for heat treating metal castings |
FR2656553B1 (fr) * | 1990-01-03 | 1994-12-30 | Stein Heurtey | Installation de traitement thermique avant laminage de brames minces produites par coulee continue. |
US5253698A (en) | 1990-01-23 | 1993-10-19 | Applied Process | Combination sand cleaning and heat treating apparatus for sand casted metallic parts and method |
US5178695A (en) | 1990-05-02 | 1993-01-12 | Allied-Signal Inc. | Strength enhancement of rapidly solidified aluminum-lithium through double aging |
US5340089A (en) | 1990-06-08 | 1994-08-23 | Bgk Finishing Systems, Inc. | Coolant controlled IR heat treat apparatus |
US5551670A (en) | 1990-10-16 | 1996-09-03 | Bgk Finishing Systems, Inc. | High intensity infrared heat treating apparatus |
DE4034653A1 (de) * | 1990-10-31 | 1992-05-07 | Loi Ind Ofenanlagen | Verfahren und durchstossofen zum waermebehandeln von werkstuecken |
US5120372A (en) | 1990-11-08 | 1992-06-09 | Ford Motor Company | Aluminum casting alloy for high strength/high temperature applications |
US5115770A (en) | 1990-11-08 | 1992-05-26 | Ford Motor Company | Aluminum casting alloy for high strength/high temperature applications |
JPH04218637A (ja) | 1990-12-18 | 1992-08-10 | Honda Motor Co Ltd | 高強度高靱性アルミニウム合金の製造方法 |
US5251683A (en) | 1991-03-11 | 1993-10-12 | General Motors Corporation | Method of making a cylinder head or other article with cast in-situ ceramic tubes |
US5169913A (en) | 1991-05-31 | 1992-12-08 | Procedyne Corp. | Fluidized multistaged reaction system for polymerization |
CA2081055C (en) | 1991-11-05 | 1999-12-21 | John R. Eppeland | Method and apparatus for heat treatment of metal parts utilizing infrared radiation |
CZ207994A3 (en) | 1992-02-27 | 1995-09-13 | Hayes Wheels International | Process for producing heat treated metallic parts, particularly vehicle wheels |
US5536337A (en) * | 1992-02-27 | 1996-07-16 | Hayes Wheels International, Inc. | Method for heat treating a metal component |
US5294994A (en) | 1992-04-06 | 1994-03-15 | Digital Equipment Corporation | Integrated computer assembly |
US5514228A (en) | 1992-06-23 | 1996-05-07 | Kaiser Aluminum & Chemical Corporation | Method of manufacturing aluminum alloy sheet |
US5312498A (en) | 1992-08-13 | 1994-05-17 | Reynolds Metals Company | Method of producing an aluminum-zinc-magnesium-copper alloy having improved exfoliation resistance and fracture toughness |
TW245661B (ja) * | 1993-01-29 | 1995-04-21 | Hitachi Seisakusyo Kk | |
US5329917A (en) * | 1993-03-30 | 1994-07-19 | Young David C | Fire ring |
US5327955A (en) * | 1993-05-04 | 1994-07-12 | The Board Of Trustees Of Western Michigan University | Process for combined casting and heat treatment |
FR2710657B1 (fr) * | 1993-09-28 | 1995-11-10 | Pechiney Rhenalu | Procédé de désensibilisation à la corrosion intercristalline des alliages d'Al séries 2000 et 6000 et produits correspondants. |
US5439045A (en) * | 1994-01-19 | 1995-08-08 | Consolidated Engineering Company, Inc. | Method of heat treating metal castings, removing cores, and incinerating waste gasses |
US5518557A (en) | 1994-02-02 | 1996-05-21 | Standard Car Truck Company | Process for making railroad car truck wear plates |
US5423370A (en) | 1994-03-04 | 1995-06-13 | Procedyne Corp. | Foundry sand core removal and recycle |
US5547228A (en) | 1994-04-01 | 1996-08-20 | Abbema; Wiliam D. | Cylindrical corrosion barrier for pipe connections |
US5593519A (en) * | 1994-07-07 | 1997-01-14 | General Electric Company | Supersolvus forging of ni-base superalloys |
JP3262461B2 (ja) * | 1994-09-09 | 2002-03-04 | タイホー工業株式会社 | 鋳造品の熱処理装置 |
US5547523A (en) | 1995-01-03 | 1996-08-20 | General Electric Company | Retained strain forging of ni-base superalloys |
US6241000B1 (en) * | 1995-06-07 | 2001-06-05 | Howmet Research Corporation | Method for removing cores from castings |
CA2188906C (en) * | 1995-10-27 | 2006-06-06 | Onofre Costilla-Vela | Method and apparatus for preheating molds for aluminum castings |
US5650026A (en) * | 1995-12-06 | 1997-07-22 | Illinois Tool Works Inc. | Heat treating apparatus and method |
WO1997030805A1 (en) † | 1996-02-23 | 1997-08-28 | Consolidated Engineering Company, Inc. | System and process for reclaiming sand |
DE19612500A1 (de) * | 1996-03-29 | 1997-10-02 | Bleistahl Prod Gmbh & Co Kg | Verfahren zur Herstellung von Zylinderköpfen für Verbrennungsmotoren |
US6253830B1 (en) * | 1996-09-30 | 2001-07-03 | Procedyne Corp. | Apparatus and method for sand core debonding and heat treating metal castings |
US5901775A (en) * | 1996-12-20 | 1999-05-11 | General Kinematics Corporation | Two-stage heat treating decoring and sand reclamation system |
US5738162A (en) | 1997-02-20 | 1998-04-14 | Consolidated Engineering Company, Inc. | Terraced fluidized bed |
US6033497A (en) * | 1997-09-05 | 2000-03-07 | Sandusky International, Inc. | Pitting resistant duplex stainless steel alloy with improved machinability and method of making thereof |
US6042369A (en) * | 1998-03-26 | 2000-03-28 | Technomics, Inc. | Fluidized-bed heat-treatment process and apparatus for use in a manufacturing line |
US20020170635A1 (en) * | 1998-05-04 | 2002-11-21 | Diserio Emile-Thomas | Process for manufacturing aluminum alloys and aluminium castings |
US6336809B1 (en) * | 1998-12-15 | 2002-01-08 | Consolidated Engineering Company, Inc. | Combination conduction/convection furnace |
US6217317B1 (en) * | 1998-12-15 | 2001-04-17 | Consolidated Engineering Company, Inc. | Combination conduction/convection furnace |
US6910522B2 (en) * | 1999-07-29 | 2005-06-28 | Consolidated Engineering Company, Inc. | Methods and apparatus for heat treatment and sand removal for castings |
US6672367B2 (en) * | 1999-07-29 | 2004-01-06 | Consolidated Engineering Company, Inc. | Methods and apparatus for heat treatment and sand removal for castings |
WO2001008836A1 (en) * | 1999-07-29 | 2001-02-08 | Consolidated Engineering Company, Inc. | Heat treatment and sand removal for castings |
US7275582B2 (en) * | 1999-07-29 | 2007-10-02 | Consolidated Engineering Company, Inc. | Methods and apparatus for heat treatment and sand removal for castings |
US6622775B2 (en) * | 2000-05-10 | 2003-09-23 | Consolidated Engineering Company, Inc. | Method and apparatus for assisting removal of sand moldings from castings |
JP2004523362A (ja) * | 2001-02-02 | 2004-08-05 | コンソリデイテッド エンジニアリング カンパニー, インコーポレイテッド | 一体型金属プロセシング設備 |
US6901990B2 (en) * | 2002-07-18 | 2005-06-07 | Consolidated Engineering Company, Inc. | Method and system for processing castings |
EP2319945B1 (en) * | 2004-06-02 | 2013-03-13 | Consolidated Engineering Company, Inc. | Integrated metal processing facility |
US20060103059A1 (en) * | 2004-10-29 | 2006-05-18 | Crafton Scott P | High pressure heat treatment system |
-
2002
- 2002-01-18 JP JP2002562787A patent/JP2004523362A/ja active Pending
- 2002-01-18 US US10/051,666 patent/US20020104596A1/en not_active Abandoned
- 2002-01-18 CN CN201110212904.7A patent/CN102277480B/zh not_active Expired - Fee Related
- 2002-01-18 KR KR1020037010223A patent/KR100850601B1/ko active IP Right Grant
- 2002-01-18 AU AU2002239968A patent/AU2002239968B2/en not_active Ceased
- 2002-01-18 CA CA2436749A patent/CA2436749C/en not_active Expired - Fee Related
- 2002-01-18 WO PCT/US2002/001473 patent/WO2002063051A2/en active Application Filing
- 2002-01-18 CN CNA028066820A patent/CN1526027A/zh active Pending
- 2002-01-18 AT AT02705845T patent/ATE556155T1/de active
- 2002-01-18 MX MXPA03006906A patent/MXPA03006906A/es active IP Right Grant
- 2002-01-18 EP EP09179136.8A patent/EP2180069B1/en not_active Expired - Lifetime
- 2002-01-18 EP EP02705845.2A patent/EP1356128B2/en not_active Expired - Lifetime
-
2005
- 2005-07-26 US US11/189,452 patent/US7258755B2/en not_active Expired - Lifetime
-
2007
- 2007-08-08 US US11/835,529 patent/US20070289715A1/en not_active Abandoned
- 2007-08-13 US US11/837,793 patent/US7641746B2/en not_active Expired - Fee Related
-
2008
- 2008-07-18 JP JP2008187971A patent/JP2008296282A/ja active Pending
-
2011
- 2011-11-11 JP JP2011247980A patent/JP5825985B2/ja not_active Expired - Fee Related
-
2014
- 2014-04-18 JP JP2014086445A patent/JP2014131818A/ja not_active Withdrawn
-
2016
- 2016-09-30 JP JP2016193715A patent/JP2016215283A/ja not_active Withdrawn
Also Published As
Publication number | Publication date |
---|---|
US20050257858A1 (en) | 2005-11-24 |
WO2002063051A2 (en) | 2002-08-15 |
EP1356128B1 (en) | 2012-05-02 |
EP1356128B2 (en) | 2016-01-06 |
EP2180069A1 (en) | 2010-04-28 |
US7258755B2 (en) | 2007-08-21 |
US20080264527A1 (en) | 2008-10-30 |
EP1356128A2 (en) | 2003-10-29 |
WO2002063051A3 (en) | 2002-11-14 |
MXPA03006906A (es) | 2004-01-29 |
CA2436749A1 (en) | 2002-08-15 |
JP2008296282A (ja) | 2008-12-11 |
AU2002239968B2 (en) | 2008-03-13 |
EP2180069B1 (en) | 2019-09-18 |
JP2014131818A (ja) | 2014-07-17 |
CN102277480B (zh) | 2015-12-16 |
KR100850601B1 (ko) | 2008-08-05 |
US20070289715A1 (en) | 2007-12-20 |
KR20030071882A (ko) | 2003-09-06 |
CA2436749C (en) | 2011-11-29 |
JP2004523362A (ja) | 2004-08-05 |
ATE556155T1 (de) | 2012-05-15 |
JP2012071354A (ja) | 2012-04-12 |
CN102277480A (zh) | 2011-12-14 |
US7641746B2 (en) | 2010-01-05 |
JP2016215283A (ja) | 2016-12-22 |
US20020104596A1 (en) | 2002-08-08 |
CN1526027A (zh) | 2004-09-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5825985B2 (ja) | 一体型金属プロセシング設備 | |
JP2004523362A5 (ja) | ||
AU2002239968A1 (en) | Integrated metal processing facility | |
US20050145362A1 (en) | Methods and apparatus for heat treatment and sand removal for castings | |
JP5689403B2 (ja) | 集積金属加工設備 | |
JP2012040614A5 (ja) | ||
US7338629B2 (en) | Integrated metal processing facility | |
KR100805514B1 (ko) | 금속 주물 처리 방법 및 금속 주물 제조 장치 | |
JP2006504531A (ja) | 鋳造物のための熱処理および砂除去のための方法および装置 | |
AU2003259701B2 (en) | Methods and apparatus for heat treatment and sand removal for castings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20121025 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20131018 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20140114 |
|
A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20140117 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20140205 |
|
A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20140210 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20140418 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20140626 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20140924 |
|
A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20140929 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20141224 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20141224 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20150402 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20150731 |
|
A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20150810 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20150925 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20151013 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5825985 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |