Japan
Prior art keywords
project plan
plan timeline
zoom
timeline
computer program
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2016573643A
Other languages
English (en)
Other versions
JP6560264B2 (ja
JP2017509095A (ja
Filing date
Publication date
Priority claimed from US14/200,057 external-priority patent/US9423943B2/en
Application filed filed Critical
Publication of JP2017509095A publication Critical patent/JP2017509095A/ja
Publication of JP2017509095A5 publication Critical patent/JP2017509095A5/ja
Application granted granted Critical
Publication of JP6560264B2 publication Critical patent/JP6560264B2/ja
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Claims (14)

  1. ンピュータプログラムであって、前記コンピュータプログラムがプロセッサによって実行されると、前記プロセッサに自動可変ズームを実行させ、前記ズームは、
    ユーザインターフェイス内にプロジェクトプランタイムラインを表示するステップを含み、前記プロジェクトプランタイムラインは、1つ以上のタスクと、1つ以上の時間単位を含むタイムラインとを含み、
    前記表示されたプロジェクトプランタイムライン上に自動可変ズームを呼出すための指示を受信するステップと、
    条件を受信するステップと、
    前記条件に基づいて前記プロジェクトプランタイムラインの前記1つ以上の時間単位についての1つ以上のスコアを計算するステップと、
    前記1つ以上の計算されたスコアに基づいて前記プロジェクトプランタイムラインの1つ以上の部分についてのズームレベルを調整するステップとを含む、コンピュータプログラム
  2. 前記ズームはさらに、
    前記ユーザインターフェイス内において前記プロジェクトプランタイムラインの前記1つ以上の部分に対応する1つ以上のマーカを表示するステップと、
    前記1つ以上のマーカのうちのマーカのドラッグを含むユーザ対話を受信するステップと、
    前記マーカの前記ドラッグに基づいて前記マーカに対応する前記プロジェクトプランタイムラインの一部のズームレベルを調整するステップと、
    前記プロジェクトプランタイムラインの他の部分のズームレベルを自動的かつ比例的に調整するステップとを含む、請求項1に記載のコンピュータプログラム
  3. 前記ズームは、可変ズームプロファイルとして前記プロジェクトプランタイムラインの前記1つ以上のズームレベルを保存するステップをさらに含む、請求項1または2に記載のコンピュータプログラム
  4. 前記ズームは、ユーザ対話に応じて前記プロジェクトプランタイムラインの付加的部分についてのズームレベルを調整するステップをさらに含む、請求項1〜3のいずれか1項に記載のコンピュータプログラム
  5. 前記ズームは、ユーザ対話に応じて前記プロジェクトプランタイムラインの一部についての元のズームレベルを回復させるステップをさらに含む、請求項1〜4のいずれか1項に記載のコンピュータプログラム
  6. 前記ズームは、ユーザ対話に応じて前記プロジェクトプランタイムラインのすべての部分についての元のズームレベルを回復させるステップをさらに含む、請求項1〜4のいずれか1項に記載のコンピュータプログラム
  7. 前記条件は、1セットの予め規定された条件から選択される、請求項1〜6のいずれか1項に記載のコンピュータプログラム
  8. 前記1セットの予め規定された条件は、時間単位ごとのタスクの総数、時間単位ごとの高優先順位タスクの総数、時間単位ごとのマイルストーンタスクの総数、時間単位ごとの、リソースに割当てられたタスクの総数、時間単位ごとの、過剰に割当てられたリソースの総数、または、時間単位ごとの、容量が割当てられていないリソースの総数、のうち少なくとも1つを含む、請求項7に記載のコンピュータプログラム
  9. 前記条件はユーザによって規定される、請求項1〜8のいずれか1項に記載のコンピュータプログラム
  10. 前記プロジェクトプランタイムラインの前記1つ以上の時間単位についての前記1つ以上のスコアを計算するステップはさらに、
    前記条件に基づいて前記プロジェクトプランタイムラインの前記1つ以上の時間単位についての1つ以上の生スコアを計算するステップと、
    前記プロジェクトプランタイムラインの前記1つ以上の時間単位についての1つ以上の範囲スコアを計算するステップとを含み、時間単位についての範囲スコアは、前記時間単位についての生スコアと、前の時間単位についての生スコアと、後の時間単位についての生スコアとの合計を含み、
    前記プロジェクトプランタイムラインの前記1つ以上の部分についての前記ズームレベルを調整するステップは、前記1つ以上の計算された範囲スコアに基づいて前記プロジェクトプランタイムラインの前記1つ以上の部分についての前記ズームレベルを調整するステップをさらに含む、請求項1〜9のいずれか1項に記載のコンピュータプログラム
  11. 前記1つ以上の計算された範囲スコアに基づいて前記プロジェクトプランタイムラインの前記1つ以上の部分についての前記ズームレベルを調整するステップはさらに、
    前記プロジェクトプランタイムラインのうち最高の範囲スコアを有するいくつかの時間単位を選択するステップと、
    前記プロジェクトプランタイムラインの前記1つ以上の時間単位についてのズームレベルをズームアウト係数ずつ下げるステップと、
    前記プロジェクトプランタイムラインの前記選択された時間単位についてのズームレベルをズームイン係数ずつ上げるステップとを含む、請求項10に記載のコンピュータプログラム
  12. スキュー係数(「SF」)が規定され、
    選択されている前記時間単位の数が、「1/(1+SF)*前記プロジェクトプランタイムラインの前記1つ以上の時間単位の総数」に実質的に等しく、
    前記ズームアウト係数は1/SFに等しく、
    前記ズームイン係数はSFに等しい、請求項11に記載のコンピュータプログラム
  13. 自動可変ズームを提供するための、コンピュータによって実現される方法であって、
    ユーザインターフェイス内にプロジェクトプランタイムラインを表示するステップを含み、前記プロジェクトプランタイムラインは1つ以上のタスクと、1つ以上の時間単位を含むタイムラインとを含み、前記方法はさらに、
    前記表示されたプロジェクトプランタイムライン上に自動可変ズームを呼出すための指示を受信するステップと、
    条件を受信するステップと、
    前記条件に基づいて前記プロジェクトプランタイムラインの前記1つ以上の時間単位についての1つ以上のスコアを計算するステップと、
    前記1つ以上の計算されたスコアに基づいて前記プロジェクトプランタイムラインの1つ以上の部分についてのズームレベルを調整するステップとを含む、コンピュータによって実現される方法。
  14. 自動可変ズームを提供するためのシステムであって、
    ユーザインターフェイス内にプロジェクトプランタイムラインを表示するように構成されたプロジェクトプランタイムライン画面表示モジュールを含み、前記プロジェクトプランタイムラインは、1つ以上のタスクと、1つ以上の時間単位を含むタイムラインとを含み、前記システムはさらに、
    前記表示されたプロジェクトプランタイムライン上に自動可変ズームを呼出すための指示を受信するように構成された指示受信モジュールと、
    条件を受信するように構成された条件受信モジュールと、
    前記条件に基づいて前記プロジェクトプランタイムラインの前記1つ以上の時間単位についての1つ以上のスコアを計算するように構成されたスコア計算モジュールと、
    前記1つ以上の計算されたスコアに基づいて前記プロジェクトプランタイムラインの1つ以上の部分についてのズームレベルを調整するように構成されたズームレベル調整モジュールとを含む、システム。
JP2016573643A 2014-03-07 2015-01-12 プロジェクトプランタイムラインのための自動可変ズームシステム Active JP6560264B2 (ja)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US14/200,057 US9423943B2 (en) 2014-03-07 2014-03-07 Automatic variable zooming system for a project plan timeline
US14/200,057 2014-03-07
PCT/US2015/010983 WO2015134115A1 (en) 2014-03-07 2015-01-12 Automatic variable zooming system for a project plan timeline

Publications (3)

Publication Number Publication Date
JP2017509095A JP2017509095A (ja) 2017-03-30
JP2017509095A5 true JP2017509095A5 (ja) 2018-02-22
JP6560264B2 JP6560264B2 (ja) 2019-08-14

Family

ID=52450574

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016573643A Active JP6560264B2 (ja) 2014-03-07 2015-01-12 プロジェクトプランタイムラインのための自動可変ズームシステム

Country Status (5)

Country Link
US (1) US9423943B2 (ja)
EP (1) EP3114621A1 (ja)
JP (1) JP6560264B2 (ja)
CN (1) CN106104589B (ja)
WO (1) WO2015134115A1 (ja)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
USD783043S1 (en) * 2013-09-13 2017-04-04 Nikon Corporation Display screen with transitional graphical user interface
US10902364B2 (en) 2016-10-19 2021-01-26 Oracle International Corporation Automatic zoom control system for workforce timeline
US20180129997A1 (en) * 2016-11-10 2018-05-10 San Diego County Credit Union Systems and methods for tracking and managing work projects
US10380772B2 (en) * 2017-10-30 2019-08-13 Safford T Black System and method for non-linear and discontinuous project timelines

Family Cites Families (66)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994016397A2 (en) 1993-01-06 1994-07-21 Timephaser Corporation Method of enterprise-wide to do list scheduling
US5467268A (en) 1994-02-25 1995-11-14 Minnesota Mining And Manufacturing Company Method for resource assignment and scheduling
US5745110A (en) 1995-03-10 1998-04-28 Microsoft Corporation Method and apparatus for arranging and displaying task schedule information in a calendar view format
JPH11248840A (ja) * 1998-03-05 1999-09-17 Aloka Co Ltd 放射線測定器及びトレンドグラフ表示方法
US6211856B1 (en) 1998-04-17 2001-04-03 Sung M. Choi Graphical user interface touch screen with an auto zoom feature
JP2000194469A (ja) * 1998-12-28 2000-07-14 Nec Corp 項目表示制御装置
JP3756688B2 (ja) 1999-02-05 2006-03-15 富士通株式会社 スケジュール表示装置およびスケジュール表示方法並びに記録媒体
WO2000075837A2 (en) * 1999-06-04 2000-12-14 Crookshanks Rex J Building construction bid and contract management system, internet-based method and computer program therefor
WO2001018683A2 (en) 1999-09-09 2001-03-15 Accenture Llp Resource-based task scheduling system and method
US6614903B1 (en) 1999-12-15 2003-09-02 Avaya Technology Corp. Methods and apparatus for service state-based processing of communications in a call center
US7092929B1 (en) 2000-11-08 2006-08-15 Bluefire Systems, Inc. Method and apparatus for planning analysis
US8433632B2 (en) 2001-03-13 2013-04-30 Lawson Software, Inc. Interactive method and apparatus for real-time financial
US7406432B1 (en) 2001-06-13 2008-07-29 Ricoh Company, Ltd. Project management over a network with automated task schedule update
US7191141B2 (en) 2001-06-13 2007-03-13 Ricoh Company, Ltd. Automated management of development project files over a network
US7483841B1 (en) 2001-07-06 2009-01-27 Eproject Management, Llc Project management system and method
CN1545662A (zh) 2001-08-22 2004-11-10 �ʼҷ����ֵ��ӹɷ����޹�˾ 时间线显示设备
US20030061266A1 (en) 2001-09-27 2003-03-27 Norman Ken Ouchi Project workflow system
US20050149370A1 (en) 2002-01-25 2005-07-07 Kenneth Brown Project mapping
US6920632B2 (en) 2002-08-23 2005-07-19 Xyron Corporation Dynamic multilevel task management method and apparatus
AU2003902399A0 (en) 2003-05-16 2003-06-05 Crux Cybernetics Pty Ltd A system for scheduling at least one task having a plurality of activities to be performed by one or more users of the system
WO2005067614A2 (en) 2004-01-07 2005-07-28 Maxspeed A system and method of commitment management
US20070150327A1 (en) 2004-01-21 2007-06-28 Rncc Global Projects Project management method and system
US20050165631A1 (en) 2004-01-28 2005-07-28 Microsoft Corporation Time management representations and automation for allocating time to projects and meetings within an online calendaring system
US20090006156A1 (en) * 2007-01-26 2009-01-01 Herbert Dennis Hunt Associating a granting matrix with an analytic platform
US20060004618A1 (en) 2004-06-30 2006-01-05 Microsoft Corporation Explaining task scheduling for a project
CA2533148A1 (en) 2005-01-18 2006-07-18 Thomas Kapler System and method for data visualization using a synchronous display of sequential time data and on-map planning
US7921026B2 (en) 2005-03-01 2011-04-05 Microsoft Corporation Method and system for generating a timeline associated with a project schedule
JP2007094467A (ja) 2005-09-27 2007-04-12 Hitachi Software Eng Co Ltd 進捗管理システム
US7657849B2 (en) 2005-12-23 2010-02-02 Apple Inc. Unlocking a device by performing gestures on an unlock image
US20070233534A1 (en) 2006-01-06 2007-10-04 Marware Inc. Project management system and method
US20100010856A1 (en) 2006-02-08 2010-01-14 Kim Huat David Chua Method and system for constraint-based project scheduling
US20070245300A1 (en) 2006-03-22 2007-10-18 Benjamin Chan Apparatus, system, and method for presenting project scheduling information in combination with workflow information
US20080103871A1 (en) 2006-10-26 2008-05-01 Raytheon Company Company project management system
US7912746B2 (en) 2006-11-14 2011-03-22 Raytheon Company Method and system for analyzing schedule trends
US20080126114A1 (en) 2006-11-27 2008-05-29 Edgeworth Properties Inc. System and method for project management of land development
US20080155433A1 (en) 2006-12-21 2008-06-26 Microsoft Corporation Zooming task management
US20080221946A1 (en) 2007-01-05 2008-09-11 Robert Balon Method and system for evaluating and summarizing weekly project progress
US10621203B2 (en) * 2007-01-26 2020-04-14 Information Resources, Inc. Cross-category view of a dataset using an analytic platform
WO2009055425A1 (en) 2007-10-24 2009-04-30 Rhett Randolph L Method for automatically developing suggested optimal work schedules from unsorted group and individual task lists
US20090133027A1 (en) 2007-11-21 2009-05-21 Gunning Mark B Systems and Methods for Project Management Task Prioritization
DE112009000173T5 (de) 2008-01-23 2011-06-09 Itid Consulting, Ltd. Informationsverarbeitungssystem, Programm und Informationsverarbeitungsverfahren
US20090198540A1 (en) 2008-02-04 2009-08-06 Stefan Kienzle Method and system for determining an execution sequence of a set of sales orders
US20090234699A1 (en) 2008-03-15 2009-09-17 Microsoft Corporation User Interface For Scheduling Resource Assignments
WO2010001555A1 (ja) 2008-06-30 2010-01-07 パナソニック株式会社 実行順序決定装置、実行順序決定プログラム、実行順序決定回路及び情報処理装置
WO2010082573A1 (ja) * 2009-01-13 2010-07-22 ワイズ・ソリューション株式会社 プロジェクト情報表示装置、プロジェクト情報表示プログラム、および電子カルテ情報表示装置
US8160911B2 (en) 2009-05-19 2012-04-17 Microsoft Corporation Project management applications utilizing summary tasks for top-down project planning
WO2011009067A2 (en) 2009-07-17 2011-01-20 Steamboat Communications, Inc. Project progress display and monitoring
WO2011014772A1 (en) * 2009-07-31 2011-02-03 Citizenglobal Inc. Systems and methods for content aggregation, editing and delivery
US8776008B2 (en) 2009-10-30 2014-07-08 Realization Technologies, Inc. Post facto identification and prioritization of causes of buffer consumption
US9064222B2 (en) 2010-05-14 2015-06-23 The Boeing Company Real time mission planning
US9183560B2 (en) * 2010-05-28 2015-11-10 Daniel H. Abelow Reality alternate
JP5511077B2 (ja) * 2010-10-05 2014-06-04 Kddi株式会社 時系列データの疎密に応じてタイムスケールを変更するユーザインタフェースプログラム、システム及び方法
RU2013128537A (ru) 2010-11-22 2014-12-27 Дакс Глобал, Инк. Система и способ управления проектами
WO2012092556A2 (en) 2010-12-30 2012-07-05 Kleinbart Kyle System and method for online communications management
CN102306162A (zh) * 2011-07-22 2012-01-04 福州锐达数码科技有限公司 一种实现多媒体对象存储与回放方法
JP2013105310A (ja) * 2011-11-14 2013-05-30 Sony Corp 情報処理装置、制御方法およびプログラム
US20130144679A1 (en) 2011-12-02 2013-06-06 The Boeing Company Simulation and Visualization for Project Planning and Management
US20130159198A1 (en) * 2011-12-19 2013-06-20 Oracle International Corporation Project mapper
BR112014016109A8 (pt) 2011-12-27 2017-07-04 Intel Corp método, sistema e dispositivo para navegação baseada em lista de coisas a fazer
WO2013162572A1 (en) 2012-04-26 2013-10-31 Hewlett-Packard Development Company, L.P. Resource planning
US9251484B2 (en) * 2012-06-01 2016-02-02 International Business Machines Corporation Predicting likelihood of on-time product delivery, diagnosing issues that threaten delivery, and exploration of likely outcome of different solutions
US8799829B2 (en) * 2012-09-28 2014-08-05 Interactive Memories, Inc. Methods and systems for background uploading of media files for improved user experience in production of media-based products
US8799756B2 (en) * 2012-09-28 2014-08-05 Interactive Memories, Inc. Systems and methods for generating autoflow of content based on image and user analysis as well as use case data for a media-based printable product
US20140122144A1 (en) * 2012-11-01 2014-05-01 Vytas Cirpus Initiative and Project Management
US9164656B1 (en) * 2013-01-09 2015-10-20 Daniel S. Keller Graphical display for scheduling and monitoring tasks
US20140244334A1 (en) 2013-02-26 2014-08-28 Oracle International Corporation Facilitating allocation of resources to tasks

Similar Documents

Publication Publication Date Title
AU2015244101B2 (en) Non-visual feedback of visual change in a gaze tracking method and device
US10324581B2 (en) Menu display method, apparatus and system
EP2784671A1 (en) Virtual machine management system and method
JP2017509095A5 (ja)
RU2017102898A (ru) Изменение размера и размещение окон приложений на основе областей
JP2014530434A5 (ja)
RU2017102896A (ru) Адаптивное изменение размера и позиции окон приложений
WO2015087332A3 (en) Controlling the display of an image stream
JP2016518658A (ja) ウィンドウレイアウト管理のためのアプリケーションウィンドウデバイダコントロール
JP2014071811A5 (ja)
JP2015100039A5 (ja) 情報処理装置、表示方法およびコンピュータプログラム
JP2006277727A5 (ja)
JP2013539091A5 (ja)
US20160077726A1 (en) User interface based interaction method and related apparatus
JP5466744B2 (ja) 多重プロセシングを用いたレンダリング処理装置及び方法
JP2016517585A5 (ja)
RU2018135284A (ru) Генерирование представлений контекстного поиска
RU2016119373A (ru) Визуализация изображений
JP2019518259A5 (ja)
RU2009128709A (ru) Медицинская система формирования изображений
TW201610817A (zh) 桌面圖標顯示系統及方法
JP2018535462A5 (ja)
JP2020173685A5 (ja)
JP2018020126A5 (ja)
JP2015532486A5 (ja)