JP2011520054A - 鋼箱桁を用いたセミインテグラルアバット橋の施工方法 - Google Patents
鋼箱桁を用いたセミインテグラルアバット橋の施工方法 Download PDFInfo
- Publication number
- JP2011520054A JP2011520054A JP2011509397A JP2011509397A JP2011520054A JP 2011520054 A JP2011520054 A JP 2011520054A JP 2011509397 A JP2011509397 A JP 2011509397A JP 2011509397 A JP2011509397 A JP 2011509397A JP 2011520054 A JP2011520054 A JP 2011520054A
- Authority
- JP
- Japan
- Prior art keywords
- steel box
- slab
- abutment
- stage
- box girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/04—Bearings; Hinges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/06—Arrangement, construction or bridging of expansion joints
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/268—Composite concrete-metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
【解決手段】本発明は、杭頭補強を実施する第1の段階と、支承を設ける第2の段階と、鋼箱桁と端部隔壁との連結のための連結鉄筋を配筋する第3の段階と、端部隔壁と翼壁が分離されるようにそれらの接合面に伸縮継手充填材を設ける第4の段階と、橋梁床板と端部隔壁を一体に打設する第5の段階と、橋台の背面に裏込めを実施する第6の段階と、裏込めが完了した後に第1及び第2の受けスラブを施工し、その後、第1の受けスラブの上面に橋梁床板と連結される接続スラブと本線舗装部と接続される緩衝スラブを施工し、第2の受けスラブの上面に緩衝スラブと本線舗装部を施工する第7の段階と、接続スラブと緩衝スラブとの間に伸縮調節装置を設け、橋面を舗装する第8の段階と、を含むことを特徴とする鋼箱桁を用いたセミインテグラルアバット橋の施工方法を提供する。
【選択図】図1
Description
Abutment Bridge)とセミインテグラルアバット橋(Semi-Integral Abutment
Bridge)とに類分される。
換言すると、セミインテグラルアバット橋とは、インテグラルアバット橋と同様に、温度変化による上部構造の伸縮を、一般橋梁(ジョイント橋梁)の伸縮継手装置ではなく、接続スラブと本線舗装部との間に目地形式で設けられる伸縮調節装置、橋台サイズ、裏込め材の剛性、ならびに杭と桁との連結状態で調節する橋梁のことを言う。
また、橋台端面の縮小及び伸縮継手装置を設けないため初期工事費が減少し、橋梁の伸縮継手部の漏水に対する問題点の発生を未然に防止することができて耐久性が増加され、伸縮継手装置を設けないため伸縮継手部の破損による補修及び交替に対する維持管理費が節減されて経済的である。
さらに、道路舗装部の連続化により騒音及び振動が減少して車両の走行性が向上するという効果がある。
図1及び図2は、本発明によるセミインテグラルアバット橋の施工手順を示すフローチャートである。
同図に示すように、本発明によるセミインテグラルアバット橋の施工方法は、大きく、橋台部土盛り及び基礎杭埋込み段階(第1の段階)、橋台構体及び翼壁施工段階(第2の段階)、鋼箱桁据置段階(第3の段階)、端部隔壁と桁接合面処理段階(第4の段階)、橋梁床板及び端部隔壁施工段階(第5の段階)、裏込め部施工段階(第6の段階)、受けスラブ及び接続スラブ施工段階(第7の段階)、伸縮調節装置設置段階(第8の段階)から構成される。
本発明は、鋼箱桁310の端部を補強するために内部に長手方向に設けられた補強板311を鋼箱桁310の端部に突き出るように延長し、突き出た補強板311の先端には定着板312を接合し、補強板311と鋼箱桁310の端部に横方向連結鉄筋313と垂直鉄筋314を設けた後に、端部隔壁のコンクリートを打設することにより端部隔壁と鋼箱桁を一体化している。
以上述べたように、本発明によれば、鋼箱桁を補強するために設けられる補強板を端部隔壁と鋼箱桁を一体化する連結要素として使用することにより、端部隔壁と鋼箱桁との連結を容易に行うことができ、補強板の端部に定着板を接合することにより端部隔壁と鋼箱桁との連結部に発生する負モーメントに抵抗する別途の鉄筋を配筋せずとも効果的に抵抗することができる。
Claims (7)
- 橋台部の土盛り作業を実施し、杭を施工した後に、橋台基礎の貧配合コンクリートを打設し、杭頭補強を実施する第1の段階と、
拡大基礎を施工し、橋台胸壁及び翼壁施工を完了した後に、支承を設ける第2の段階と、
工場製作して現場に運ばれてきた鋼箱桁を据置させ、前記鋼箱桁と横梁との現場継手を実施した後に、前記鋼箱桁と端部隔壁との連結のための連結鉄筋を配筋する第3の段階と、
前記端部隔壁と前記翼壁が分離されるようにそれらの接合面に伸縮継手充填材を設ける第4の段階と、
橋梁床板鉄筋と同時に端部隔壁鉄筋を配筋し、橋梁床板と前記端部隔壁を一体に打設する第5の段階と、
橋台の背面に裏込めを実施する第6の段階と、
裏込めが完了した後に第1及び第2の受けスラブを施工し、その後、第1の前記受けスラブの上面に前記橋梁床板と連結される接続スラブと本線舗装部と接続される緩衝スラブを施工し、第2の前記受けスラブの上面に緩衝スラブと本線舗装部を施工する第7の段階と、
前記接続スラブと前記緩衝スラブとの間に伸縮調節装置を設け、橋面を舗装する第8の段階と、
を含むことを特徴とする鋼箱桁を用いたセミインテグラルアバット橋の施工方法。 - 前記第6の段階は、
橋台背面から橋台土盛り部に向かって土圧低減区間、緩衝区間、一般土盛り区間に分け、前記土圧低減区間は粘着力がなく、内部摩擦角が小さく、かつ、粒子が比較的に丸い骨材を用いて緩く充填し、前記緩衝区間はつき固め装備を用いて無振動つき固めを実施し、前記緩衝区間と前記土圧低減区間との間には不織布を設けて前記緩衝区間の砂土が前記土圧低減区間に流入することを防いで土圧増加を防ぐことを特徴とする請求項1に記載の鋼箱桁を用いたセミインテグラルアバット橋の施工方法。 - 前記第6の段階は、
裏込め部を2段に分けて前記橋台胸壁の背面から橋台土盛り部に向かっては安息角を考慮して傾斜するように補助基層区間を施工し、次いで、土盛り区間を施工し、
橋台端部隔壁の背面から橋台土盛りに向かっては土圧低減区間と一般土盛り区間に分けて施工するが、前記土圧低減区間は粘着力がなく、内部摩擦角が小さく、かつ、粒子が比較的に丸い骨材を用いて緩く傾斜するように充填し、前記一般土盛り区間と前記土圧低減区間との間には不織布を設けて前記一般土盛り区間の砂土が前記土圧低減区間に流入することを防いで土圧増加を抑制し、このとき、前記不織布は離型鉄筋または釘で固定することを特徴とする請求項1に記載の鋼箱桁を用いたセミインテグラルアバット橋の施工方法。 - 前記第7の段階は、
前記受けスラブを施工した後に前記受けスラブの左右側に横勾配を考慮してポリエチレンシートと有孔管を設け前記有孔管の周りに選択層を施工した後に、前記選択層の上面に前記ポリエチレンシートを設けた後、その後、前記接続スラブと前記緩衝スラブを施工することを特徴とする請求項1から請求項3のいずれかに記載の鋼箱桁を用いたセミインテグラルアバット橋の施工方法。 - 前記鋼箱桁は、前記鋼箱桁を補強するために内部に長手方向に設けられた補強板を橋台端部との結合度を高めるために前記鋼箱桁の端部から突き出るように延長し、突き出た前記補強板の先端には定着板を接合したことを特徴とする請求項4に記載の鋼箱桁を用いたセミインテグラルアバット橋の施工方法。
- 前記鋼箱桁の端部上板にはコンクリートの流動及び垂直鉄筋の配筋のための多数の貫通孔または前記端部上板の一部を切り出した流入部が形成されていることを特徴とする請求項5に記載の鋼箱桁を用いたセミインテグラルアバット橋の施工方法。
- 前記鋼箱桁と鋼箱桁との間には桁を横方向に支持しながら剛性を高め、前記支承に砂土が流入することを防ぐとともに、前記端部隔壁のコンクリート打設を容易にするためにまたは前記端部隔壁の結合度を増加させるために隔壁板がさらに設けられたことを特徴とする請求項6に記載の鋼箱桁を用いたセミインテグラルアバット橋の施工方法。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080044205A KR100972884B1 (ko) | 2008-05-13 | 2008-05-13 | 강박스거더를 이용한 반일체식 교대 교량의 시공방법 |
KR10-2008-0044205 | 2008-05-13 | ||
PCT/KR2009/000424 WO2009139536A1 (ko) | 2008-05-13 | 2009-01-29 | 강박스거더를 이용한 반일체식 교대 교량의 시공방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2011520054A true JP2011520054A (ja) | 2011-07-14 |
JP5113290B2 JP5113290B2 (ja) | 2013-01-09 |
Family
ID=41318871
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2011509397A Active JP5113290B2 (ja) | 2008-05-13 | 2009-01-29 | 鋼箱桁を用いたセミインテグラルアバット橋の施工方法 |
Country Status (4)
Country | Link |
---|---|
JP (1) | JP5113290B2 (ja) |
KR (1) | KR100972884B1 (ja) |
CN (1) | CN102037185B (ja) |
WO (1) | WO2009139536A1 (ja) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101452178B1 (ko) | 2014-05-20 | 2014-10-22 | 주식회사 에이스이엔씨 | 프리캐스트 교대흉벽을 이용한 반일체식 교량 및 그 시공방법 |
CN105113412A (zh) * | 2015-08-26 | 2015-12-02 | 中国十七冶集团有限公司 | 一种预应力夹板台背回填加固的施工方法 |
KR101613784B1 (ko) | 2014-06-10 | 2016-04-20 | (주)지승컨설턴트 | 조인트 노후 교량을 무조인트 교량으로 시공하는 방법 |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100984758B1 (ko) * | 2010-03-11 | 2010-10-01 | 주식회사 승화이엔씨 | 흉벽이 구비된 반일체식 교대 교량 |
CN101962933B (zh) * | 2010-08-25 | 2012-05-23 | 江苏省交通科学研究院股份有限公司 | 桥梁的可拼接翼缘板 |
KR101034013B1 (ko) | 2011-01-06 | 2011-05-09 | (주)지승컨설턴트 | 단부 격벽 일체형 피에스씨 거더를 이용한 반일체식 교대 교량의 급속 시공방법 |
CN102251482A (zh) * | 2011-05-10 | 2011-11-23 | 吴江市明港道桥工程有限公司 | 桥梁搭板与水稳基层接合部位的施工方法 |
CN103485286B (zh) * | 2013-10-08 | 2015-09-02 | 中铁二局股份有限公司 | 一种箱梁预制节段箱室加固方法 |
ES2534230B1 (es) * | 2013-10-18 | 2015-11-11 | Ingeturarte Sl | Losa de transición entre el estribo y el tablero de un puente con juntas de expansión y contracción de larga vida útil, y métodos de absorción de los movimientos de expansión y contracción del tablero de un puente |
CN104294769B (zh) * | 2014-09-16 | 2015-12-30 | 杭州江润科技有限公司 | 一种补桩与增大台帽组合加固已建桥台结构的施工方法 |
CN104746436B (zh) * | 2015-04-10 | 2016-05-11 | 福建省交通规划设计院 | 一种整体式桥台桥梁的简化设计施工方法 |
CN108086126A (zh) * | 2017-12-19 | 2018-05-29 | 厦门市市政建设开发有限公司 | 整体式自行车专用桥梁结构及其施工方法 |
CN108265620A (zh) * | 2018-04-10 | 2018-07-10 | 深圳市市政设计研究院有限公司 | 无伸缩缝桥梁的整体式桥台施工方法及整体式桥台 |
KR102008516B1 (ko) * | 2018-11-16 | 2019-08-08 | 화성산업주식회사 | Crp 거더 |
CN110847006A (zh) * | 2019-12-04 | 2020-02-28 | 东南大学 | 全无缝路桥连接结构 |
CN114319113B (zh) * | 2021-12-14 | 2024-03-22 | 中铁建大桥工程局集团靖江重工有限公司 | 一种钢箱梁分体式横隔板横向对拼可调标高及对位的方法 |
KR102583155B1 (ko) * | 2022-10-26 | 2023-09-26 | 홍석희 | 2주패널 복합형 연속 라아멘교 및 그 시공방법 |
CN117436183B (zh) * | 2023-12-21 | 2024-03-05 | 湖南大学 | 深厚软土区桥梁、市政道路与邻近服务区同步施工方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005016196A (ja) * | 2003-06-27 | 2005-01-20 | Yasuhiko Okochi | 橋台背面盛土工法 |
JP2006233584A (ja) * | 2005-02-24 | 2006-09-07 | Asahi Engineering Kk | 桁橋の架橋構造 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100279124B1 (ko) | 1998-12-30 | 2001-01-15 | 유성용 | 일체식 교대 교량의 변위 허용을 위한 채움 조인트 시공방법 |
KR20020075136A (ko) * | 2001-03-23 | 2002-10-04 | (주)석탑엔지니어링 | 고정단을 갖는 접속슬래브 및 그의 시공방법 |
CN1548655A (zh) * | 2003-04-21 | 2004-11-24 | 朴大源 | 桥梁伸缩缝装置 |
KR100585987B1 (ko) * | 2003-09-24 | 2006-06-07 | 주식회사 용마엔지니어링 | 반 일체식 교대 교량의 시공방법 |
KR100743832B1 (ko) | 2006-05-11 | 2007-07-30 | (주)씨팁스이엔지 | 프리플렉스 거더와 일체식교대를 이용한 교량의 시공방법 |
CN1851139A (zh) * | 2006-05-19 | 2006-10-25 | 成都亿通达实业发展有限公司 | 桥梁支座修复方法 |
CN100513696C (zh) * | 2007-10-16 | 2009-07-15 | 中铁大桥局集团第四工程有限公司 | 墩身帽开裂体外予应力加固方法 |
-
2008
- 2008-05-13 KR KR1020080044205A patent/KR100972884B1/ko active IP Right Grant
-
2009
- 2009-01-29 JP JP2011509397A patent/JP5113290B2/ja active Active
- 2009-01-29 WO PCT/KR2009/000424 patent/WO2009139536A1/ko active Application Filing
- 2009-01-29 CN CN200980117187.0A patent/CN102037185B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005016196A (ja) * | 2003-06-27 | 2005-01-20 | Yasuhiko Okochi | 橋台背面盛土工法 |
JP2006233584A (ja) * | 2005-02-24 | 2006-09-07 | Asahi Engineering Kk | 桁橋の架橋構造 |
Non-Patent Citations (1)
Title |
---|
JPN6012051478; 小枝 芳樹,他5名: 'セミインテグラルアバット橋のわが国への適用性に関する調査・研究' 橋梁と基礎 第45巻,第3号, 20110301, p. 31-36 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101452178B1 (ko) | 2014-05-20 | 2014-10-22 | 주식회사 에이스이엔씨 | 프리캐스트 교대흉벽을 이용한 반일체식 교량 및 그 시공방법 |
KR101613784B1 (ko) | 2014-06-10 | 2016-04-20 | (주)지승컨설턴트 | 조인트 노후 교량을 무조인트 교량으로 시공하는 방법 |
CN105113412A (zh) * | 2015-08-26 | 2015-12-02 | 中国十七冶集团有限公司 | 一种预应力夹板台背回填加固的施工方法 |
Also Published As
Publication number | Publication date |
---|---|
JP5113290B2 (ja) | 2013-01-09 |
WO2009139536A1 (ko) | 2009-11-19 |
CN102037185B (zh) | 2013-02-13 |
KR20090118433A (ko) | 2009-11-18 |
CN102037185A (zh) | 2011-04-27 |
KR100972884B1 (ko) | 2010-07-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5113290B2 (ja) | 鋼箱桁を用いたセミインテグラルアバット橋の施工方法 | |
KR100743832B1 (ko) | 프리플렉스 거더와 일체식교대를 이용한 교량의 시공방법 | |
KR101006900B1 (ko) | 강성 구조체의 뒷채움 보강구조의 시공방법 | |
KR100971004B1 (ko) | 벽체를 이루는 패널과 강성 벽체구조를 이용한 보강토 옹벽 | |
KR101216511B1 (ko) | 일체식 교대 교량의 교대 시공방법 | |
KR100839439B1 (ko) | 하부구조와 상부구조를 조립식으로 결합하는 라멘교량의강접구조 및 이를 이용한 라멘교량의 시공방법 | |
KR101167511B1 (ko) | 기성 콘크리트 말뚝을 이용한 지하차도 및 그의 시공방법 | |
KR20150043913A (ko) | 편토압 보강 라멘교 및 이의 시공 방법 | |
JP2008223291A (ja) | 護岸一体ラーメン橋梁及びその施工方法 | |
KR101198286B1 (ko) | 지하외벽의 연속시공을 위한 역타지지공법용 논웨일 스트러트 시스템 및 이에 의한 지하구조물의 역타 시공방법 | |
KR101082765B1 (ko) | 교대역할 강관말뚝과 프리캐스트거더 일체화교량 시공방법 | |
JP5480744B2 (ja) | 構造物用基礎およびその構築方法 | |
KR100948059B1 (ko) | 강재 케이싱 토류벽을 이용한 도로확장 시공방법 | |
JP5915074B2 (ja) | 地上交通路の下に地下空間を形成する方法 | |
JP5280150B2 (ja) | 山留擁壁及び山留擁壁形成方法 | |
KR20170014097A (ko) | 적층형 토목섬유 보강토지반벽체와 스프레드 토대판을 사용한 무조인트교량 시공방법 | |
KR20090083106A (ko) | 교대역할 강관말뚝과 프리캐스트거더 일체화교량 시공방법 | |
JP5452416B2 (ja) | 橋梁ジョイント構造 | |
JP4020918B2 (ja) | 桁橋の架橋構造 | |
JP7417087B2 (ja) | ハーフプレキャスト構造版 | |
JP3963326B2 (ja) | 橋脚の耐震補強構造及びその施工方法 | |
KR100902640B1 (ko) | 강널말뚝을 이용한 수로암거 및 그 시공방법 | |
CN114250654B (zh) | 高速铁路无砟轨道复合加筋预应力基床结构及施工方法 | |
CN211973071U (zh) | 一种预制拼接桥头防沉降结构 | |
JP2000345502A (ja) | 拡幅道路の境界接合構造及び境界接合方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20101112 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20110330 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20120612 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20121002 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20121011 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20151019 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5113290 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |