JP2009522637A - 予備部品の在庫管理 - Google Patents
予備部品の在庫管理 Download PDFInfo
- Publication number
- JP2009522637A JP2009522637A JP2008548506A JP2008548506A JP2009522637A JP 2009522637 A JP2009522637 A JP 2009522637A JP 2008548506 A JP2008548506 A JP 2008548506A JP 2008548506 A JP2008548506 A JP 2008548506A JP 2009522637 A JP2009522637 A JP 2009522637A
- Authority
- JP
- Japan
- Prior art keywords
- parts
- demand
- inventory
- spare
- individual
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Human Resources & Organizations (AREA)
- Tourism & Hospitality (AREA)
- General Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Theoretical Computer Science (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Multi-Process Working Machines And Systems (AREA)
Abstract
【選択図】図1
Description
図1は、設備10、12、14、及び16の例示的構成を示す図である。個々の設備は、1又は複数の建物からなり、そこでは、製造工程A、B、及びC、又はそれら工程の部品を稼働させることができる。例示の設備は単なる例であり、本発明の対象となる方法は、図1に示す設備よりもさらに多数の設備又は少数の設備で実行することが可能である。個々の設備は、同じ数の又は異なる数の製造工程を収容することができる。図1の設備10に例示されているように、1つの実施形態では、企業は1又はそれ以上の部品倉庫を維持管理し、そこでは製造工程は実際に稼働していない。部品倉庫を中央保管庫として利用し、単一の又は複数のハブアンドスポーク構成の形で複数の設備へ部品を供給してもよい。或いは、稼働中の製造工程を有する設備がハブとしての機能を果たし、他の製造工程の設備がスポークとしての機能を果たすようにしてもよい。これらの設備は、互いから物理的に任意の距離に位置することができ、企業規模でコンピュータネットワーク19とリンクされる。部品及び材料の輸送ネットワーク18は、トラック、鉄道、飛行機、及び別の輸送手段を介して輸送及び物流サポートを提供する。
実需と一定の在庫量とに基づく応答管理ではなく、部品の需要予測に基づく革新的な予備部品管理を通じて、コスト削減と製造工程のダウンタイムの短縮との両方が達成可能となる。
現在、製造設備は、SAP(登録商標)などの専門ソフトウェアを利用することができ、このSAPには、平均故障間隔、平均メンテナンス間隔の計算などの部品性能データに基づくメンテナンスサイクルの計画を可能にする工場のメンテナンスモジュールが含まれる。部品のメンテナンス要求を追跡するのにこのソフトウェアを利用することも可能であり、非破損需要レベルから部品の破損需要レベルを分離するのにこのようなデータを利用することも可能である。非破損需要レベルとは、計画済みのメンテナンスサイクルなどに従って、サービスから外される計画部品に対する要望を表わすものである。破損需要レベルとは、思いがけない部品の故障時に、製造工程の稼働状態を保持する目的で手元に保持しておく必要がある部品(安全在庫)を反映したものである。
システムは、部品のリードタイムを考慮に入れ、部品交換が計画されたとき、適切な部品が手元にあるように保証することにより、部品に対する非破損需要に備えることができる。上記データを用いて、計画済みのメンテナンスサイクルと、部品の性能データと、部品のリードタイムとの組み合わせに基づいて、計画済みの及び予測済みのメンテナンスのために部品を購入するように設備を移行させることができ、1つの実施形態では、計画上の必要性に基づく部品の配送指示を受けて、このような部品を中央保管庫から取り出すことができる。この予測済みのメンテナンスは、部品供給者により提供される場合と、部品を使用した実際の経験から導き出される場合とにおける両方の平均故障間隔(MTBF)、及び部品が使用される環境などの他の懸案事項のような値に基づいて決定することができる。
非破損需要の場合、統計分析を行って安全在庫の最適レベルを決定し、該最適レベルの在庫を中央保管庫に保持することができる。例えば、破損需要の分析により、部品が故障した場合でも設備の稼働状態を保持するために、メーカーが設備全体にわたって十分な数の部品を手元に保有していることを示すことが可能となる。一定の購入目標に基づいて、これら同じ部品のさらなる購入に資本を拘束するのではなく、故障部品をさらに購入する必要が本当に生じるまで、或いは安全在庫用として必要な在庫部品に資金が再割り当てされるまで、或いは、非破損需要を満たすために部品を購入する必要が本当に生じるまで、価値の下がらない資産に資金を投資することが可能となる。この統計分析には、企業の(単複の)コンピュータデータベースに保持されている過去の部品需要レベルを利用することができる。
SAP(登録商標)などの製造管理コンピュータシステムとの統合化に加え、予備部品管理システムを既存の1又は複数の技術設計システムと統合化して、革新的な部品管理を可能にすることができる。図3に大まかに示すように、新たな工程の追加、又は既存の工程の再設計などの技術変更が行われた場合、予備部品管理システムの需要計画を計算する際に、上記変更に起因して生じる部品要求を考慮に入れることができる。
図2に示されるステップ120において需要予測が得られると、上述のような必要部品の入手可能性、リードタイム、及び経済上の考慮などの部品注文基準が、部品管理者により仕様化された規定に従って考慮される。ステップ130において、特定の部品にはさらなる分析が必要となることを示す基準に照らして、計画された部品注文のチェックが部品管理方法により進められる。その場合、135において示されるように、その部品は、再分析の対象としてフラグされ、注文が行われる前に当業者の介入を受けることになる。当業者であれば、この部品管理者による介入は、製造企業の特定の要望、及び部品管理システムのために仕様化された基準に依存して、部品管理プロセスの任意の段階において行われ得るということに気付くであろう。例外がないものと仮定すれば、140において示されるように、最終ステップでは、部品の注文、又は別の指示が生成されることになる。例えば、OEMから部品の注文を行うことも可能であるし、或いは設備間で部品の転送を行うことも可能である。
予測需要、並びに、必要時に部品の即時配送を行う保証の両方を考えるにあたって、部品在庫を決定する場合はすべて、部品のリードタイムを考慮に入れることが可能となる。例えば、技術システムに変更が行われた日付から90日後に、新しい工程がラインに導入された場合について考えてみる。さらに、この工程は、7日のリードタイムを伴う部品と、30日のリードタイムを伴う部品の2つの部品を必要とするものと仮定する。部品に対する需要計算を行った後、在庫管理システムは、必要な購入許可伝票を作成し、第1の(リードタイムが7日の)部品を変更の発生後83日で配送し、第2の(リードタイムが30日の)部品を変更後60日で配送するように部品に対して注文を出すことができる。
予備部品の在庫管理システム内に保証管理モジュールを組み込んで、修理過程をさらに合理化し、資産活用を最適化することが可能となる。この保証モジュールは、個々の部品における保証範囲及び損害賠償請求の履歴を追跡することができる。例えば、データベースの中に、保証範囲、どのような種類の修理が保証されているか、修理用部品がどこへ出荷されるか、及び修理過程を完了させるために必要な別の情報の長さ又は別の尺度を含まれるようにしてもよい。或る部品の修理には、故障の原因又は種類によっては保証が適用されない場合もあり、保証モジュールは、部品についての保存データに基づいてこのような考察を評価するか、或いはユーザにさらに多くの情報を要求することができる。
部品在庫管理の当業者には自明であるように、本明細書に開示される方法及びシステムは、コンピュータソフトウェアを利用して実現することが可能である。このようなソフトウェアは、オブジェクト指向のプログラム言語及び別のプログラム言語、並びにマイクロソフト社の.NET(登録商標)フレームワークなどのアプリケーション間で共通のプログラミングフレームワークを含むものである。本明細書に開示される方法論に基づく規則及び計算に従って、1又はそれ以上の構造型又は非構造型データベースにアクセスして、情報の保存、検索、及び変更を行うことが可能である。本明細書に開示される部品の在庫管理システムは、単一のコンピュータにおいて、又は複数のコンピュータシステムにわたって実行が可能であり、特定の企業に対する最適な構成に依存して、他の関連性のないコンピュータシステムに保存されているデータ、及び他の関連性のないコンピュータシステムにより保存されているデータの利用又は変更を行うことも可能である。部品の在庫管理システムは、個別のサブモジュールの組み合わせを利用して、或いはソフトウェアの統一部分として実現及び実行が可能である。さらに、私的ネットワーク、公衆インターネット、又は複数のネットワークの組み合わせを介して、予備部品の管理システムの作動に利用されるデータを送信することが可能である。
Claims (24)
- 企業規模で部品在庫を管理する方法であって、
a.各々が少なくとも1つの製造工程のサポートに用いられる部品又は工具からなる複数の部品を識別するステップと、
b.前記部品の少なくとも1つの在庫保管庫を維持管理するステップと、
c.前記部品の各々について企業規模で需要計画を計算するステップと、
d.前記在庫保管庫において維持管理される前記部品の個数を、前記需要計画に基づいて調整するステップと、
を含むことを特徴とする方法。 - 前記需要計画を計算するステップは、製造工程の部品表の変更により開始されるトリガに応答するステップを含む、
ことを特徴とする請求項1に記載の方法。 - 前記トリガは工程からの部品の削除により開始され、前記需要計画は前記部品の残りの在庫を使い切るように計算される、
ことを特徴とする請求項2に記載の方法。 - 前記トリガは以前使用していない部品の追加により開始され、前記需要計画は前記部品の最初の在庫レベルを準備するように計算され、その結果、以前使用した部品のサービスの有効日以降の需要を満たすために前記予備部品が入手可能となるようにする、
ことを特徴とする請求項2に記載の方法。 - 前記少なくとも1つの在庫保管庫を維持管理するステップは、中央保管庫に複数の部品を保管するステップを含み、前記需要計画を計算するステップは、前記部品のリードタイムを含む以前の需要の統計的な分析に基づいて、前記部品の安全在庫レベルを決定するステップを含む、
ことを特徴とする上記請求項のうちのいずれかに記載の方法。 - 前記部品の履歴を追跡するステップをさらに含み、該履歴は前記需要計画の計算時に利用される、
ことを特徴とする上記請求項のうちのいずれかに記載の方法。 - 前記需要計画の計算時に利用される前記履歴は、前記部品の故障頻度を含む、
ことを特徴とする請求項6に記載の方法。 - 前記履歴を追跡するステップは、前記部品の少なくとも1つの個々の例の記録を維持管理するステップを含む、
ことを特徴とする請求項6に記載の方法。 - 前記維持管理される記録は、前記部品の前記個々の例についての修理履歴を含む、
ことを特徴とする請求項8に記載の方法。 - 前記維持管理される記録は、前記部品の前記個々の例の物理的所在位置を含む、
ことを特徴とする請求項8に記載の方法。 - 前記追跡ステップは、前記部品の前記個々の例に関連する少なくとも1つのRFID装置をスキャンするステップを含む、
ことを特徴とする請求項8に記載の方法。 - 結果として生じる捲き数比は、例えば2.5よりも大きいように、1よりも大きい、
ことを特徴とする上記請求項のうちのいずれかに記載の方法。 - a.部品に関連する少なくとも1つの識別装置をモニタするステップと、
b.前記モニタステップに応答して、前記部品の物理的所在位置を判定するステップと、
c.前記部品の前記所在位置に基づいて、前記部品の在庫データを調整するステップと、
を含むことを特徴とする請求項1、2、3、4又は5に記載の方法。 - 前記モニタステップは、製造工程において使用中の部品に関連するRFIDタグをスキャンするステップを含む、
ことを特徴とする請求項13に記載の方法。 - 前記モニタステップは、複数の保管された部品に関連するRFIDタグをスキャンするステップを含む、
ことを特徴とする請求項13に記載の方法。 - 企業規模で部品在庫を管理する方法であって、
a.複数の設備において存在する複数の製造工程のサポートに用いられる予備部品の需要値を特定するステップと、
b.前記予備部品の少なくとも1つの在庫保管庫を維持管理するステップと、
c.個々の予備部品についての破損需要を、個々の予備部品についての非破損需要から分離させるステップと、
d.個々の予備部品についての平均需要レベルを決定するステップと、
e.破損需要値の統計的分布、前記部品の計画された配送時刻、及び前記部品に対する入手可能性を求める要求の分析に基づいて、個々の予備部品についての理論的安全在庫レベルを計算するステップと、
f.前記平均需要レベル、計画された配送時刻、及び理論的安全在庫レベルに基づいて、個々の予備部品について予測需要を計算するステップと、
g.前記在庫保管庫に十分な個数の個々の予備部品を保管して、前記計算された需要を満たすように個々の予備部品に対して注文を出すステップと、
h.計画された配送時刻に従って十分な部品を設備へ配送し、非破損需要を満たすように個々の予備部品に対して注文を出すステップと、
を含むことを特徴とする方法。 - 前記在庫保管庫は、複数の製造設備にサービスを提供する中央ハブであり、前記部品注文は、前記中央ハブが十分な個数の個々の予備部品を保管して、前記ハブに関連する前記すべての設備について計算された需要を満たすように出される、
ことを特徴とする請求項16に記載の方法。 - 前記予備部品の需要値は、部品の利用を打ち切る、工程の部品要件の変更に応答して調整され、前記予測需要は、前記打ち切られた部品の在庫を使い切るように調整される、
ことを特徴とする請求項16又は17に記載の方法。 - 前記予備部品の需要値は、新たな部品を追加する、工程の部品要件の変更に応答して調整され、前記予測需要は、前記新たな部品の最初の在庫レベルを準備するように調整される、
ことを特徴とする請求項16、17又は18に記載の方法。 - 前記需要値は、企業の資源計画コンピュータシステムに関連するデータを用いて特定される、
ことを特徴とする請求項16、17、18又は19に記載の方法。 - 企業規模で部品在庫を管理する方法であって、
a.各々が少なくとも1つの製造工程のサポートに用いられる部品又は工具からなる複数の部品を識別するステップと、
b.個々の部品についての保証データを維持管理するステップと、
c.前記部品の履歴と前記保証データとを含む、部品の状態に基づく部品データを評価するステップと、
d.個々の部品についての前記保証データに従って修理を行うステップと、
を含むことを特徴とする方法。 - 前記識別ステップは、前記部品に関連する少なくとも1つの識別装置をモニタするステップを含む、
ことを特徴とする請求項21に記載の方法。 - 前記識別装置は、無線周波数信号を放出するスマートタグを備え、前記識別ステップは、前記放出される無線周波数信号をスキャニング装置から受信するステップを備える、
ことを特徴とする請求項22に記載の方法。 - 前記修理を行うステップは、保証範囲が有効であれば、修理サービスプロバイダに対して前記部品についての修理要求及び積荷書類を生成するステップを含む、
ことを特徴とする請求項21、22又は23に記載の方法。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/321,759 US7266518B2 (en) | 2005-12-29 | 2005-12-29 | Spare parts inventory management |
US11/321,759 | 2005-12-29 | ||
PCT/US2006/038937 WO2007078371A2 (en) | 2005-12-29 | 2006-10-04 | Spare parts inventory management |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2009522637A true JP2009522637A (ja) | 2009-06-11 |
JP2009522637A5 JP2009522637A5 (ja) | 2011-12-22 |
JP5072863B2 JP5072863B2 (ja) | 2012-11-14 |
Family
ID=38225742
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2008548506A Active JP5072863B2 (ja) | 2005-12-29 | 2006-10-04 | 予備部品の在庫管理 |
Country Status (7)
Country | Link |
---|---|
US (1) | US7266518B2 (ja) |
EP (1) | EP1966745A4 (ja) |
JP (1) | JP5072863B2 (ja) |
KR (1) | KR20080081004A (ja) |
BR (1) | BRPI0619359A2 (ja) |
MX (1) | MX2008008356A (ja) |
WO (1) | WO2007078371A2 (ja) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011067810A1 (ja) * | 2009-12-02 | 2011-06-09 | 株式会社日立製作所 | 部品在庫制御方法、部品需要予測方法、部品在庫制御プログラム、情報処理装置、および部品在庫制御システム |
WO2012067087A1 (ja) * | 2010-11-18 | 2012-05-24 | 三菱重工業株式会社 | 需要予測システム |
JP2017525049A (ja) * | 2014-07-31 | 2017-08-31 | アー・ファウ・エル・リスト・ゲゼルシャフト・ミト・ベシュレンクテル・ハフツング | 設備の監視対象物の在庫を検出するためのシステム |
JP2017151901A (ja) * | 2016-02-26 | 2017-08-31 | 三菱日立パワーシステムズ株式会社 | プラント設備の保守計画方法 |
JP2017191486A (ja) * | 2016-04-14 | 2017-10-19 | ファナック株式会社 | 複数の製造設備に対して供給品を補充する設備管理装置および生産システム |
KR101815241B1 (ko) | 2016-03-07 | 2018-01-05 | 삼성전자주식회사 | 지능형 통합 공구관리시스템 |
Families Citing this family (59)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7376599B1 (en) * | 2000-01-28 | 2008-05-20 | General Electric Company | Virtual warehouse parts distribution system and process |
US7210624B1 (en) | 2000-10-26 | 2007-05-01 | I2 Technologies Us, Inc. | Redistribution of parts in a distribution network |
US7685015B2 (en) | 2000-10-26 | 2010-03-23 | I2 Technologies Us, Inc. | Optimized deployment of parts in a supply chain network |
TW594528B (en) * | 2002-09-11 | 2004-06-21 | Hon Hai Prec Ind Co Ltd | System and method for rescheduling purchase order |
DE10335035A1 (de) * | 2003-08-01 | 2005-03-03 | Siemens Ag | System und Verfahren zur Identifizierung von Automatisierungskomponenten |
US7647255B2 (en) * | 2004-01-23 | 2010-01-12 | United Technologies Corporation | Rotable inventory calculation method |
AU2004202060B2 (en) * | 2004-05-14 | 2006-08-24 | Kim Gilbert Davidson | Spare part procurement method |
US7996284B2 (en) * | 2005-07-11 | 2011-08-09 | At&T Intellectual Property I, L.P. | Spare plug management system |
US20070016496A1 (en) * | 2005-07-11 | 2007-01-18 | Bar Hena M | Spare plug management system |
JP4717579B2 (ja) * | 2005-09-30 | 2011-07-06 | 株式会社小松製作所 | 作業機械のメンテナンス作業管理システム |
US20100250461A1 (en) * | 2005-12-22 | 2010-09-30 | Greenpak Development, Inc. | System and methods for transportation utilization and control |
JP4961766B2 (ja) * | 2006-02-15 | 2012-06-27 | ミツミ電機株式会社 | 電子棚札システム及び電子棚札 |
US7577535B2 (en) * | 2006-07-31 | 2009-08-18 | Exacter, Inc. | System and method for locating and analyzing arcing phenomena |
US20080270270A1 (en) * | 2006-10-25 | 2008-10-30 | Ramachandra Girish A | System and method for monitoring and management of inventory of products and assets in real time |
GB0702092D0 (en) * | 2007-02-02 | 2007-03-14 | Fracture Code Corp Aps | Graphic Code Application Apparatus and Method |
US8600843B2 (en) * | 2007-05-18 | 2013-12-03 | Logistics Management Institute (Lmi) | Method and computer system for setting inventory control levels from demand inter-arrival time, demand size statistics |
US8234186B2 (en) * | 2007-11-28 | 2012-07-31 | Bank Of America Corporation | Inventory location management |
US20090164285A1 (en) * | 2007-12-20 | 2009-06-25 | International Business Machines Corporation | Auto-cascading clear to build engine for multiple enterprise order level parts management |
FR2928141A1 (fr) * | 2008-02-28 | 2009-09-04 | Oscaro Com Sa | Magasin de pieces detachees et procede d'affectation de lots de pieces detachees. |
CN101520861A (zh) * | 2008-02-29 | 2009-09-02 | 国际商业机器公司 | 数据事件发送方法和装置以及事件处理系统 |
US9047579B2 (en) * | 2008-04-17 | 2015-06-02 | Seagate Technology Llc | Advanced material tracking system (AMTS) |
US20100057531A1 (en) * | 2008-09-03 | 2010-03-04 | International Business Machines Corporation | Discovering Rarely-Planned Parts using Order Proposal Data |
US10319173B2 (en) * | 2008-10-22 | 2019-06-11 | Newzoom, Inc. | Vending store inventory management and reporting system |
US20100138304A1 (en) * | 2008-12-01 | 2010-06-03 | Library Automation Technologies, Inc. | Item assessment system |
DE102009010963A1 (de) * | 2009-03-02 | 2010-09-09 | Dr. Ing. H.C. F. Porsche Aktiengesellschaft | Verfahren zur Dokumentation, Verfolgung und Lenkung von Bauteilen |
GB201013130D0 (en) * | 2009-09-24 | 2010-09-22 | Barloworld Handling Ltd | Energy management system |
US8875139B2 (en) * | 2010-07-30 | 2014-10-28 | Mavro Imaging, Llc | Method and process for tracking documents by monitoring each document's electronic processing status and physical location |
JP5663081B2 (ja) * | 2011-02-23 | 2015-02-04 | 株式会社日立製作所 | 部品出荷数予測システム、及びプログラム |
US9904896B2 (en) * | 2011-09-12 | 2018-02-27 | The Boeing Company | Object management system |
US20130297531A1 (en) | 2012-05-02 | 2013-11-07 | Imageworks Interactive | Device for modifying various types of assets |
US20130297462A1 (en) * | 2012-05-07 | 2013-11-07 | Verizon Patent And Licensing Inc. | Spare parts on-hand inventory management |
CN103235979A (zh) * | 2013-04-02 | 2013-08-07 | 上海长合信息技术有限公司 | 地铁设备备件需求的预测方法 |
US9060595B2 (en) * | 2013-06-13 | 2015-06-23 | L'oreal | Performance regulation for a personal care appliance |
CN103426073B (zh) * | 2013-08-21 | 2016-06-29 | 易程科技股份有限公司 | 一种基于设备寿命预测的客服系统备件库存管理方法 |
US20150066565A1 (en) * | 2013-08-30 | 2015-03-05 | Kimberly-Clark Worldwide, Inc. | Systems and methods for managing an inventory of component parts |
CN104732287B (zh) * | 2013-12-19 | 2018-04-13 | 广州地铁集团有限公司 | 一种基于备件最佳补充周期的库存控制方法 |
CN103699968A (zh) * | 2013-12-20 | 2014-04-02 | 中广核核电运营有限公司 | 核电厂紧缺备件的计算机管理分析系统及管理处理方法 |
US20150294277A1 (en) * | 2014-04-09 | 2015-10-15 | Simmonds Precision Products, Inc. | Integrated part inventory management system and method |
US9910427B2 (en) * | 2014-09-02 | 2018-03-06 | International Business Machines Corporation | Performing hierarchical data-driven inventory and warehouse management in manufacturing environments |
US20160133066A1 (en) * | 2014-11-09 | 2016-05-12 | Scope Technologies Holdings Limited | System and method for scheduling vehicle maintenance and service |
KR101660781B1 (ko) * | 2015-03-27 | 2016-09-29 | (주) 카이엠 | 예비부품 관리방법 및 예비부품 관리장치 |
US20160314328A1 (en) * | 2015-04-22 | 2016-10-27 | Honeywell International Inc. | Systems and methods for collecting line replaceable unit removal data |
US9971991B2 (en) * | 2015-04-28 | 2018-05-15 | Accenture Global Services Limited | Automated, new spare parts forecasting and demand planning system |
US20170061374A1 (en) * | 2015-08-24 | 2017-03-02 | Toyota Motor Engineering & Manufacturing North America, Inc. | Spare Parts List Builder and Compiler Tools and Methods of Use |
US20170140450A1 (en) | 2015-11-17 | 2017-05-18 | Fazahl Ashby | Visual cable builder |
JP6690207B2 (ja) * | 2015-11-30 | 2020-04-28 | ブラザー工業株式会社 | 中継装置、および制御プログラム |
WO2018187308A1 (en) * | 2017-04-03 | 2018-10-11 | Swisslog Logistics, Inc. | Automated manufacturing facility and methods |
CN107145975B (zh) * | 2017-04-27 | 2020-06-30 | 中国人民解放军西安通信学院 | 光传输设备备件数量的预测方法 |
WO2019133935A1 (en) * | 2017-12-29 | 2019-07-04 | Matthew Higgins | Method and system for systematic maintenance of mechanical and electrical equipment |
US11810010B2 (en) | 2018-08-02 | 2023-11-07 | The Boeing Company | Two tier automatic cost estimation for automatic manufacture of spare parts |
CN109119147A (zh) * | 2018-08-02 | 2019-01-01 | 深圳智达机械技术有限公司 | 一种医院数字化医疗设备管理系统 |
US11687840B2 (en) | 2019-05-20 | 2023-06-27 | Honeywell International Inc. | Forecasting with state transitions and confidence factors |
CN110751343A (zh) * | 2019-10-30 | 2020-02-04 | 北京会达分享信息技术有限公司 | 一种备件组合优选方法及装置 |
CN110852513A (zh) * | 2019-11-13 | 2020-02-28 | 联想(北京)有限公司 | 预测方法、装置、计算设备以及介质 |
CN111062595B (zh) * | 2019-12-06 | 2022-05-20 | 珠海格力电器股份有限公司 | 代加工产品的验收方法、装置、计算机可读存储介质 |
WO2021150099A1 (en) * | 2020-01-21 | 2021-07-29 | Petroliam Nasional Berhad (Petronas) | Equipment spare part inventory optimization methods and systems |
CN111932077A (zh) * | 2020-07-10 | 2020-11-13 | 江苏玻二代网络科技有限公司 | 基于物联网的tpm全员生产维修平台及方法 |
CN112529365B (zh) * | 2020-11-19 | 2023-08-18 | 华电电力科学研究院有限公司 | 一种风力发电公司备品备件储备量分析管理设备及方法 |
CN116542606B (zh) * | 2023-05-12 | 2023-11-10 | 广州市神州联保科技有限公司 | 一种产品售后备件库存调配方法、系统、设备及存储介质 |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03136753A (ja) * | 1989-10-23 | 1991-06-11 | Internatl Business Mach Corp <Ibm> | 技術変更実施用自動化システム及び方法 |
JP2000181968A (ja) * | 1999-01-01 | 2000-06-30 | Iyo:Kk | パ―ソナルコンピュ―タサポ―ト方法 |
JP2002092745A (ja) * | 2000-09-19 | 2002-03-29 | Seiko Epson Corp | Pos端末装置における印刷装置の消耗部品の管理システム、その管理方法、コンピュータプログラム・プロダクト及び情報記録媒体 |
JP2002297812A (ja) * | 2001-03-30 | 2002-10-11 | Anritsu Corp | 保守システムおよび保守方法 |
JP2003108211A (ja) * | 2001-09-28 | 2003-04-11 | Canon Inc | 消耗品管理システム、装置及びそれらの方法 |
JP2003178152A (ja) * | 2001-12-11 | 2003-06-27 | Mitsubishi Electric Corp | 部品提供方法 |
JP2003192134A (ja) * | 2001-12-27 | 2003-07-09 | Denkodo Co Ltd | 発注区分による商品管理システム |
JP2003257808A (ja) * | 2002-03-05 | 2003-09-12 | Toshiba Corp | 半導体製造装置、その管理装置、その部品管理装置、半導体ウェーハ収納容器搬送装置 |
JP2003288110A (ja) * | 2002-03-27 | 2003-10-10 | Hitachi Ltd | 資材所要量計画の立案方法 |
JP2003346010A (ja) * | 2002-05-29 | 2003-12-05 | Honda Motor Co Ltd | サービス提供システム |
JP2004029860A (ja) * | 2002-05-20 | 2004-01-29 | Systems Reseach Ltd | 商品コードが付された商品、商品情報照会システム、商品情報照会装置及びposシステム |
JP2005015140A (ja) * | 2003-06-25 | 2005-01-20 | Mbk Ryutsu Partners Kk | 発注量算出システム |
JP2005306543A (ja) * | 2004-04-20 | 2005-11-04 | Canon System Solutions Inc | 在庫管理プログラム及び在庫管理装置並びにその方法 |
JP2005332278A (ja) * | 2004-05-20 | 2005-12-02 | Matsushita Electric Ind Co Ltd | 部品ロットトレース方法 |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4457772A (en) * | 1981-07-08 | 1984-07-03 | Ball Corporation | Management control system for forming glassware |
JPS6262762A (ja) * | 1985-09-12 | 1987-03-19 | Tokyo Kikai Seisakusho:Kk | 新聞印刷における生産工程管理方式 |
US5216612A (en) * | 1990-07-16 | 1993-06-01 | R. J. Reynolds Tobacco Company | Intelligent computer integrated maintenance system and method |
US5712989A (en) * | 1993-04-02 | 1998-01-27 | Fisher Scientific Company | Just-in-time requisition and inventory management system |
US5819232A (en) * | 1996-03-22 | 1998-10-06 | E. I. Du Pont De Nemours And Company | Method and apparatus for inventory control of a manufacturing or distribution process |
US6182053B1 (en) * | 1996-03-26 | 2001-01-30 | Recovery Sales Corporation | Method and apparatus for managing inventory |
US6882982B2 (en) * | 2000-02-04 | 2005-04-19 | Medtronic, Inc. | Responsive manufacturing and inventory control |
US6671673B1 (en) * | 2000-03-24 | 2003-12-30 | International Business Machines Corporation | Method for integrated supply chain and financial management |
TW515975B (en) | 2000-08-21 | 2003-01-01 | Singapore Technologies Logisti | Order-handling inventory management system and method |
US7315887B1 (en) | 2001-04-11 | 2008-01-01 | Alcatel Lucent | Facilitating integration of communications network equipment inventory management |
US20030055753A1 (en) | 2001-09-17 | 2003-03-20 | Eshinui Incorporated | Spare parts and consumables management system |
US20030110104A1 (en) * | 2001-10-23 | 2003-06-12 | Isuppli Corp. | Enhanced vendor managed inventory system and process |
US20030101107A1 (en) * | 2001-11-29 | 2003-05-29 | Rishi Agarwal | Inventory management system and method |
US7035877B2 (en) | 2001-12-28 | 2006-04-25 | Kimberly-Clark Worldwide, Inc. | Quality management and intelligent manufacturing with labels and smart tags in event-based product manufacturing |
TW594843B (en) * | 2003-07-30 | 2004-06-21 | Powerchip Semiconductor Corp | Management system of monitor wafers |
US20050065858A1 (en) | 2003-09-17 | 2005-03-24 | Argo Turboserve Corporation | System and method for improved excess inventory distribution |
EP1542145A1 (en) * | 2003-12-12 | 2005-06-15 | Sap Ag | A method of planning demand for at least one configurable product in a managed supply chain and a demand planner apparatus for planning demand for a configurable product in a managed supply chain |
US20050216366A1 (en) * | 2004-03-09 | 2005-09-29 | Ford Motor Company | Method and system for controlling spare parts inventory within a manufacturing plant |
JP2006120010A (ja) * | 2004-10-22 | 2006-05-11 | Hitachi Ltd | 在庫制御システム及び方法 |
-
2005
- 2005-12-29 US US11/321,759 patent/US7266518B2/en active Active
-
2006
- 2006-10-04 JP JP2008548506A patent/JP5072863B2/ja active Active
- 2006-10-04 KR KR1020087015796A patent/KR20080081004A/ko not_active Application Discontinuation
- 2006-10-04 BR BRPI0619359-5A patent/BRPI0619359A2/pt not_active IP Right Cessation
- 2006-10-04 MX MX2008008356A patent/MX2008008356A/es unknown
- 2006-10-04 WO PCT/US2006/038937 patent/WO2007078371A2/en active Application Filing
- 2006-10-04 EP EP06816303A patent/EP1966745A4/en not_active Withdrawn
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03136753A (ja) * | 1989-10-23 | 1991-06-11 | Internatl Business Mach Corp <Ibm> | 技術変更実施用自動化システム及び方法 |
JP2000181968A (ja) * | 1999-01-01 | 2000-06-30 | Iyo:Kk | パ―ソナルコンピュ―タサポ―ト方法 |
JP2002092745A (ja) * | 2000-09-19 | 2002-03-29 | Seiko Epson Corp | Pos端末装置における印刷装置の消耗部品の管理システム、その管理方法、コンピュータプログラム・プロダクト及び情報記録媒体 |
JP2002297812A (ja) * | 2001-03-30 | 2002-10-11 | Anritsu Corp | 保守システムおよび保守方法 |
JP2003108211A (ja) * | 2001-09-28 | 2003-04-11 | Canon Inc | 消耗品管理システム、装置及びそれらの方法 |
JP2003178152A (ja) * | 2001-12-11 | 2003-06-27 | Mitsubishi Electric Corp | 部品提供方法 |
JP2003192134A (ja) * | 2001-12-27 | 2003-07-09 | Denkodo Co Ltd | 発注区分による商品管理システム |
JP2003257808A (ja) * | 2002-03-05 | 2003-09-12 | Toshiba Corp | 半導体製造装置、その管理装置、その部品管理装置、半導体ウェーハ収納容器搬送装置 |
JP2003288110A (ja) * | 2002-03-27 | 2003-10-10 | Hitachi Ltd | 資材所要量計画の立案方法 |
JP2004029860A (ja) * | 2002-05-20 | 2004-01-29 | Systems Reseach Ltd | 商品コードが付された商品、商品情報照会システム、商品情報照会装置及びposシステム |
JP2003346010A (ja) * | 2002-05-29 | 2003-12-05 | Honda Motor Co Ltd | サービス提供システム |
JP2005015140A (ja) * | 2003-06-25 | 2005-01-20 | Mbk Ryutsu Partners Kk | 発注量算出システム |
JP2005306543A (ja) * | 2004-04-20 | 2005-11-04 | Canon System Solutions Inc | 在庫管理プログラム及び在庫管理装置並びにその方法 |
JP2005332278A (ja) * | 2004-05-20 | 2005-12-02 | Matsushita Electric Ind Co Ltd | 部品ロットトレース方法 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011067810A1 (ja) * | 2009-12-02 | 2011-06-09 | 株式会社日立製作所 | 部品在庫制御方法、部品需要予測方法、部品在庫制御プログラム、情報処理装置、および部品在庫制御システム |
WO2012067087A1 (ja) * | 2010-11-18 | 2012-05-24 | 三菱重工業株式会社 | 需要予測システム |
JP2017525049A (ja) * | 2014-07-31 | 2017-08-31 | アー・ファウ・エル・リスト・ゲゼルシャフト・ミト・ベシュレンクテル・ハフツング | 設備の監視対象物の在庫を検出するためのシステム |
JP2017151901A (ja) * | 2016-02-26 | 2017-08-31 | 三菱日立パワーシステムズ株式会社 | プラント設備の保守計画方法 |
KR101815241B1 (ko) | 2016-03-07 | 2018-01-05 | 삼성전자주식회사 | 지능형 통합 공구관리시스템 |
JP2017191486A (ja) * | 2016-04-14 | 2017-10-19 | ファナック株式会社 | 複数の製造設備に対して供給品を補充する設備管理装置および生産システム |
US10540633B2 (en) | 2016-04-14 | 2020-01-21 | Fanuc Corporation | Facility management unit that replenishes multiple manufacturing facilities with supplies, and production system |
US10956863B2 (en) | 2016-04-14 | 2021-03-23 | Fanuc Corporation | Facility management unit that replenishes multiple manufacturing facilities with supplies, and production system |
Also Published As
Publication number | Publication date |
---|---|
MX2008008356A (es) | 2008-11-14 |
EP1966745A4 (en) | 2011-05-18 |
JP5072863B2 (ja) | 2012-11-14 |
EP1966745A2 (en) | 2008-09-10 |
WO2007078371A2 (en) | 2007-07-12 |
US20070156543A1 (en) | 2007-07-05 |
US7266518B2 (en) | 2007-09-04 |
BRPI0619359A2 (pt) | 2011-09-27 |
WO2007078371A3 (en) | 2009-04-23 |
KR20080081004A (ko) | 2008-09-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5072863B2 (ja) | 予備部品の在庫管理 | |
US6922687B2 (en) | Closed loop asset management process | |
US7482931B2 (en) | Product flow based auto-ID infrastructure | |
US20080103843A1 (en) | Integrating information for maintenance | |
KR102257049B1 (ko) | 인바운드 구입 주문의 인텔리전트 조정에 의한 제품 재고 최적화를 위한 시스템 및 방법 | |
Barros et al. | A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process | |
KR102354795B1 (ko) | 자동화된 아웃바운드 프로파일 생성을 위한 시스템 및 방법 | |
US20170004442A1 (en) | System and method for inventory and supply chain management | |
KR20220163757A (ko) | 스마트 공장 관리 시스템 | |
KR20090090005A (ko) | 항공기 생산 및 유지보수를 위한 현장 자재관리 시스템 및그 방법 | |
CN111898914A (zh) | 一种企业制造运营系统和存储介质 | |
US20050060243A1 (en) | Method for managing tools in a power plant service environment | |
Cheng et al. | Applying RFID for cutting tool supply chain management | |
US20150066565A1 (en) | Systems and methods for managing an inventory of component parts | |
Jose et al. | Real time asset tracking in field services using barcode system: a case study | |
JP2005196484A (ja) | 生産管理システム | |
Kasat et al. | Productivity Improvement through MRP in a manufacturing industry-A | |
Barry et al. | Maintenance Parts Management Optimization | |
US20050108073A1 (en) | System and method for diagnosing production logistics abnormalities | |
Shaurya | Spare parts inventory management using an MRP-driven approach through minimum-maximum stock strategy in the manufacturing industry | |
Rao et al. | Inventory management best practices for aircraft servicing industry in India | |
Díaz-Reza et al. | Structural Equation Models-Technical Factors | |
KR20230045904A (ko) | 실시간 스마트 재고 관리 시스템 | |
Barry et al. | 6 Materials Management Optimization | |
Kar et al. | A case study of computer service parts inventory management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20090727 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20090930 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20090930 |
|
RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20091014 |
|
A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20091120 |
|
RD03 | Notification of appointment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7423 Effective date: 20100407 |
|
RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20100407 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20111104 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20111206 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20120306 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20120725 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20120821 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5072863 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20150831 Year of fee payment: 3 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |