GB2608555A - Long platform guy-wire hanging basket and construction method for main girder section - Google Patents
Long platform guy-wire hanging basket and construction method for main girder section Download PDFInfo
- Publication number
- GB2608555A GB2608555A GB2214658.3A GB202214658A GB2608555A GB 2608555 A GB2608555 A GB 2608555A GB 202214658 A GB202214658 A GB 202214658A GB 2608555 A GB2608555 A GB 2608555A
- Authority
- GB
- United Kingdom
- Prior art keywords
- load
- bearing
- cast concrete
- concrete section
- guy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D11/00—Suspension or cable-stayed bridges
- E01D11/04—Cable-stayed bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010888770.XA CN112064519B (zh) | 2020-08-28 | 2020-08-28 | 一种长平台牵索挂篮及主梁节段施工方法 |
PCT/CN2020/123973 WO2022041449A1 (zh) | 2020-08-28 | 2020-10-27 | 一种长平台牵索挂篮及主梁节段施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
GB202214658D0 GB202214658D0 (en) | 2022-11-23 |
GB2608555A true GB2608555A (en) | 2023-01-04 |
Family
ID=73660093
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB2214658.3A Pending GB2608555A (en) | 2020-08-28 | 2020-10-27 | Long platform guy-wire hanging basket and construction method for main girder section |
Country Status (5)
Country | Link |
---|---|
CN (1) | CN112064519B (zh) |
GB (1) | GB2608555A (zh) |
LU (1) | LU501962B1 (zh) |
MA (1) | MA56738B1 (zh) |
WO (1) | WO2022041449A1 (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112709140B (zh) * | 2020-12-23 | 2022-08-05 | 中铁广州工程局集团有限公司 | 中承式提篮钢管混凝土拱桥混凝土箱梁施工方法 |
CN114737489B (zh) * | 2022-03-31 | 2023-04-28 | 中铁第五勘察设计院集团有限公司 | 自走式悬臂造桥机的施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07102531A (ja) * | 1993-10-06 | 1995-04-18 | Mitsubishi Heavy Ind Ltd | 橋梁張出し架設工法及びその装置 |
CN1123861A (zh) * | 1995-08-28 | 1996-06-05 | 铁道部大桥工程局 | 预应力混凝土斜拉桥短平台复合型牵索挂篮施工工艺 |
JP2009299418A (ja) * | 2008-06-17 | 2009-12-24 | Kajima Corp | 片持架設用移動作業車の後退撤去方法および後退装置 |
CN105951611A (zh) * | 2016-06-23 | 2016-09-21 | 贵州路桥集团有限公司 | 倒挂式三角斜拉斜爬挂篮 |
CN107100074A (zh) * | 2017-05-03 | 2017-08-29 | 中铁十六局集团第三工程有限公司 | 一种下承式拱桥混凝土桥面施工方法 |
WO2018052030A1 (ja) * | 2016-09-13 | 2018-03-22 | 清水建設株式会社 | 橋梁の施工方法 |
CN210104575U (zh) * | 2019-03-21 | 2020-02-21 | 联建建设工程有限公司 | 大跨度前支点牵索挂篮抗弯结构 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006077521A (ja) * | 2004-09-13 | 2006-03-23 | Oriental Construction Co Ltd | 橋梁構築装置 |
CN201635013U (zh) * | 2010-02-26 | 2010-11-17 | 广东省长大公路工程有限公司 | 一种用于抵抗斜拉索水平分力的装置 |
CN102230312B (zh) * | 2011-02-28 | 2012-08-15 | 中铁五局(集团)有限公司 | 一种牵索挂篮弧形首 |
CN105887680B (zh) * | 2016-06-02 | 2018-04-17 | 中铁第四勘察设计院集团有限公司 | 一种混合索梁锚固结构 |
CN106638318B (zh) * | 2016-11-25 | 2019-03-15 | 中铁大桥局集团第五工程有限公司 | 斜拉桥梁端锚固点的定位方法及索导管安装方法 |
CN110528401A (zh) * | 2019-09-02 | 2019-12-03 | 曾勇 | 悬浇施工挂篮系统 |
-
2020
- 2020-08-28 CN CN202010888770.XA patent/CN112064519B/zh active Active
- 2020-10-27 MA MA56738A patent/MA56738B1/fr unknown
- 2020-10-27 GB GB2214658.3A patent/GB2608555A/en active Pending
- 2020-10-27 WO PCT/CN2020/123973 patent/WO2022041449A1/zh active Application Filing
- 2020-10-27 LU LU501962A patent/LU501962B1/en active IP Right Grant
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07102531A (ja) * | 1993-10-06 | 1995-04-18 | Mitsubishi Heavy Ind Ltd | 橋梁張出し架設工法及びその装置 |
CN1123861A (zh) * | 1995-08-28 | 1996-06-05 | 铁道部大桥工程局 | 预应力混凝土斜拉桥短平台复合型牵索挂篮施工工艺 |
JP2009299418A (ja) * | 2008-06-17 | 2009-12-24 | Kajima Corp | 片持架設用移動作業車の後退撤去方法および後退装置 |
CN105951611A (zh) * | 2016-06-23 | 2016-09-21 | 贵州路桥集团有限公司 | 倒挂式三角斜拉斜爬挂篮 |
WO2018052030A1 (ja) * | 2016-09-13 | 2018-03-22 | 清水建設株式会社 | 橋梁の施工方法 |
CN107100074A (zh) * | 2017-05-03 | 2017-08-29 | 中铁十六局集团第三工程有限公司 | 一种下承式拱桥混凝土桥面施工方法 |
CN210104575U (zh) * | 2019-03-21 | 2020-02-21 | 联建建设工程有限公司 | 大跨度前支点牵索挂篮抗弯结构 |
Also Published As
Publication number | Publication date |
---|---|
CN112064519B (zh) | 2021-09-14 |
GB202214658D0 (en) | 2022-11-23 |
CN112064519A (zh) | 2020-12-11 |
LU501962B1 (en) | 2022-05-10 |
WO2022041449A1 (zh) | 2022-03-03 |
MA56738B1 (fr) | 2023-12-29 |
MA56738A1 (fr) | 2023-07-31 |
WO2022041449A8 (zh) | 2022-05-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
LU501962B1 (en) | Long Platform Guy-Wire Hanging Basket and Construction Method For Main Girder Section | |
WO2021212921A1 (zh) | 一种中承式拱桥变宽段施工系统 | |
CN112227206B (zh) | 一种地锚转自锚架梁工艺设计及施工方法 | |
CN111764282B (zh) | 基于斜拉扣挂法的刚性悬索加劲钢桁梁桥施工方法 | |
CN111691298B (zh) | 一种中承式拱桥变宽段施工方法 | |
CN110761168A (zh) | 一种先缆后梁的自锚式悬索桥设计与施工方法 | |
CN109972494B (zh) | 一种节段间带铰的大节段吊装自锚式悬索桥设计与施工方法 | |
CN109338894A (zh) | 移动模架浇筑宽窄箱梁施工方法 | |
CN111236077B (zh) | 一种钢箱梁卸载施工方法 | |
CN109252656B (zh) | 高层建筑爬升模板及组装、灌注和提升方法 | |
CN210151596U (zh) | 高墩连续梁边跨现浇段及合龙段一体化施工体系 | |
CN114182647B (zh) | 一种弱拱提升转体施工方法 | |
CN210439705U (zh) | 一种预制混凝土叠合板吊装装置 | |
CN108104260B (zh) | 装配式建筑悬挑构件施工方法 | |
CN211368423U (zh) | 斜拉索塔顶提升牵引操作平台 | |
CN111379227A (zh) | 一种快速施工双肢索塔的液压爬模的变宽平台装置及施工方法 | |
CN112458900A (zh) | 用于钢混叠合梁斜拉桥合龙段桥面吊机联合吊装施工方法 | |
CN209260578U (zh) | 悬索桥混凝土加劲梁安装的纵向临时连接结构 | |
CN201511439U (zh) | 箱梁钢筋骨架整体绑扎、整体吊装系统 | |
CN113235435B (zh) | 一种先缆后梁的自锚式悬索桥体系转换施工方法 | |
CN212358012U (zh) | 一种快速施工双肢索塔的液压爬模的变宽平台装置 | |
CN212561183U (zh) | 一种中承式拱桥变宽段施工系统 | |
CN112962455A (zh) | 一种先缆后梁的节段吊装自锚式悬索桥施工方法 | |
CN214031386U (zh) | 用于沉管模板的吊装工具 | |
CN206693070U (zh) | 拱梁组合式连续刚构桥上弦行走式挂篮施工装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
789A | Request for publication of translation (sect. 89(a)/1977) |
Ref document number: 2022041449 Country of ref document: WO |