MA56738B1 - Procédé de construction pour corbeille suspendue haubanée de plateforme longue et section de poutre principale - Google Patents

Procédé de construction pour corbeille suspendue haubanée de plateforme longue et section de poutre principale

Info

Publication number
MA56738B1
MA56738B1 MA56738A MA56738A MA56738B1 MA 56738 B1 MA56738 B1 MA 56738B1 MA 56738 A MA56738 A MA 56738A MA 56738 A MA56738 A MA 56738A MA 56738 B1 MA56738 B1 MA 56738B1
Authority
MA
Morocco
Prior art keywords
cable
guy
section
anchor block
main beam
Prior art date
Application number
MA56738A
Other languages
English (en)
Other versions
MA56738A1 (fr
Inventor
Dong Chen
Wei Xiao
Zhao Yang
Shaopeng Huang
Hongbing Xie
Guangjin Cheng
Haihong Li
Yifeng Chen
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd filed Critical China Railway Major Bridge Engineering Group Co Ltd
Publication of MA56738A1 publication Critical patent/MA56738A1/fr
Publication of MA56738B1 publication Critical patent/MA56738B1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/04Cable-stayed bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Une méthode de construction d’une section de poutre principale basée sur un panier suspendu à haubans à longue plate-forme. La méthode comprend les étapes suivantes: extension d’une extrémité porteuse d’un mécanisme porteur (1) à partir d’une section en béton coulé (2) à une position définie et ancrage de celle-ci; levage d’un bloc d’ancrage préfabriqué (31) à la position préréglée au-dessus de l’extrémité porteuse, reliage du bloc d’ancrage préfabriqué (31) et l’extrémité porteuse au moyen de la pièce d’ancrage (32), et fourniture d’un mécanisme de cisaillement (4) entre la section en béton coulé (2) et le bloc d’ancrage préfabriqué (31); et une fois qu’un câble de hauban (5) est installé sur un conduit de câble (311) et tendu, coulage du béton entre la section en béton coulé (2) et le bloc d’ancrage préfabriqué (31) pour terminer le coulage de la section de la poutre principale. La méthode résout les problèmes suivants: lorsque le câble de hauban est connecté à une tête en forme d’arc du panier suspendu à hauban en utilisant des tiges de hauban, une fois que le béton de la poutre principale est coulé, tendu et précontraint, les tiges de hauban doivent être démantelés, et la force de câble du câble de hauban doit être convertie de la tête en forme d’arc à la poutre principale en béton, et au cours d’un processus de « conversion du système », il y aura une grande force de câble instantanée, ce qui peut facilement endommager la structure. La méthode peut réduire le nombre de haubans et augmenter l’efficacité de la construction. Fig. 3
MA56738A 2020-08-28 2020-10-27 Procédé de construction pour corbeille suspendue haubanée de plateforme longue et section de poutre principale MA56738B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010888770.XA CN112064519B (zh) 2020-08-28 2020-08-28 一种长平台牵索挂篮及主梁节段施工方法
PCT/CN2020/123973 WO2022041449A1 (fr) 2020-08-28 2020-10-27 Procédé de construction pour corbeille suspendue haubanée de plateforme longue et section de poutre principale

Publications (2)

Publication Number Publication Date
MA56738A1 MA56738A1 (fr) 2023-07-31
MA56738B1 true MA56738B1 (fr) 2023-12-29

Family

ID=73660093

Family Applications (1)

Application Number Title Priority Date Filing Date
MA56738A MA56738B1 (fr) 2020-08-28 2020-10-27 Procédé de construction pour corbeille suspendue haubanée de plateforme longue et section de poutre principale

Country Status (5)

Country Link
CN (1) CN112064519B (fr)
GB (1) GB2608555A (fr)
LU (1) LU501962B1 (fr)
MA (1) MA56738B1 (fr)
WO (1) WO2022041449A1 (fr)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112709140B (zh) * 2020-12-23 2022-08-05 中铁广州工程局集团有限公司 中承式提篮钢管混凝土拱桥混凝土箱梁施工方法
CN114737489B (zh) * 2022-03-31 2023-04-28 中铁第五勘察设计院集团有限公司 自走式悬臂造桥机的施工方法
CN116695589A (zh) * 2023-06-21 2023-09-05 中铁广州工程局集团有限公司 一种牵索挂篮结构整体拼装提升施工方法

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2994935B2 (ja) * 1993-10-06 1999-12-27 三菱重工業株式会社 橋梁張出し架設工法及びその装置
CN1123861A (zh) * 1995-08-28 1996-06-05 铁道部大桥工程局 预应力混凝土斜拉桥短平台复合型牵索挂篮施工工艺
JP2006077521A (ja) * 2004-09-13 2006-03-23 Oriental Construction Co Ltd 橋梁構築装置
JP5056608B2 (ja) * 2008-06-17 2012-10-24 鹿島建設株式会社 片持架設用移動作業車の後退撤去方法および後退装置
CN201635013U (zh) * 2010-02-26 2010-11-17 广东省长大公路工程有限公司 一种用于抵抗斜拉索水平分力的装置
CN102230312B (zh) * 2011-02-28 2012-08-15 中铁五局(集团)有限公司 一种牵索挂篮弧形首
CN105887680B (zh) * 2016-06-02 2018-04-17 中铁第四勘察设计院集团有限公司 一种混合索梁锚固结构
CN105951611A (zh) * 2016-06-23 2016-09-21 贵州路桥集团有限公司 倒挂式三角斜拉斜爬挂篮
WO2018052030A1 (fr) * 2016-09-13 2018-03-22 清水建設株式会社 Procédé de construction de pont
CN106638318B (zh) * 2016-11-25 2019-03-15 中铁大桥局集团第五工程有限公司 斜拉桥梁端锚固点的定位方法及索导管安装方法
CN107100074A (zh) * 2017-05-03 2017-08-29 中铁十六局集团第三工程有限公司 一种下承式拱桥混凝土桥面施工方法
CN210104575U (zh) * 2019-03-21 2020-02-21 联建建设工程有限公司 大跨度前支点牵索挂篮抗弯结构
CN110528401A (zh) * 2019-09-02 2019-12-03 曾勇 悬浇施工挂篮系统

Also Published As

Publication number Publication date
MA56738A1 (fr) 2023-07-31
GB2608555A (en) 2023-01-04
WO2022041449A8 (fr) 2022-05-27
CN112064519B (zh) 2021-09-14
GB202214658D0 (en) 2022-11-23
CN112064519A (zh) 2020-12-11
WO2022041449A1 (fr) 2022-03-03
LU501962B1 (en) 2022-05-10

Similar Documents

Publication Publication Date Title
MA56738A1 (fr) Procédé de construction pour corbeille suspendue haubanée de plateforme longue et section de poutre principale
CN111926720B (zh) 适用于黄土地区连续钢构悬臂梁合龙的施工方法
CN211815489U (zh) 一种带有自锚悬索体系的超大跨径飞燕式钢管混凝土拱桥
CN108547223A (zh) 钢混叠合的混合梁桥施工方法
CN111335187B (zh) 一种空腹式刚构桥三角区施工工艺
KR20140084107A (ko) 셀프-런칭 이동식 비계공법
CN110761168A (zh) 一种先缆后梁的自锚式悬索桥设计与施工方法
CN106988229A (zh) 一种拱梁组合连续刚构桥扣挂支结合式施工装置及方法
CN210151596U (zh) 高墩连续梁边跨现浇段及合龙段一体化施工体系
CN1123861A (zh) 预应力混凝土斜拉桥短平台复合型牵索挂篮施工工艺
CN107059592B (zh) 一种斜拉桥辅助墩墩顶节段先梁后墩施工方法
CN113756209B (zh) 一种大跨径钢梁斜拉顶推施工方法
CN109577206B (zh) 空心高墩支模体系及施工方法
CN107419670A (zh) 拱梁组合式连续刚构桥上弦行走式挂篮施工装置及方法
CN110629996A (zh) 型钢悬挑免穿墙加高锚固支撑体系的施工方法
CN206769199U (zh) 后穿式后张法竖向预应力现浇混凝土柱结构
CN206769200U (zh) 先穿式后张法竖向预应力现浇混凝土柱结构
CN106758827B (zh) 人字型预应力混凝土先张法架桥机及使用方法
CN209907223U (zh) 一种斜拉桥桥塔与π型主梁临时锚固装置
CN115679844A (zh) 钢管混凝土拱桥拆建一体化拆除方法
CN114541283A (zh) 一种用于解决大跨度pc梁桥持续下挠问题的结构及方法
CN211736430U (zh) 型钢悬挑梁可拆卸同平面组合整体锚固结构
CN108867548B (zh) 一种现浇水上高桩码头的施工平台及施工平台架设方法
CN113832829A (zh) 一种梁拱组合刚构桥下弦梁施工方法
CN208815473U (zh) 一种现浇水上高桩码头的施工平台