EP3074572B1 - Dispositif d'enjambement - Google Patents

Dispositif d'enjambement Download PDF

Info

Publication number
EP3074572B1
EP3074572B1 EP14806587.3A EP14806587A EP3074572B1 EP 3074572 B1 EP3074572 B1 EP 3074572B1 EP 14806587 A EP14806587 A EP 14806587A EP 3074572 B1 EP3074572 B1 EP 3074572B1
Authority
EP
European Patent Office
Prior art keywords
cross member
segment
center
bridging device
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP14806587.3A
Other languages
German (de)
English (en)
Other versions
EP3074572A1 (fr
Inventor
Christian Braun
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maurer Soehne Engineering GmbH and Co KG
Original Assignee
Maurer Soehne Engineering GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maurer Soehne Engineering GmbH and Co KG filed Critical Maurer Soehne Engineering GmbH and Co KG
Priority to PL14806587T priority Critical patent/PL3074572T3/pl
Publication of EP3074572A1 publication Critical patent/EP3074572A1/fr
Application granted granted Critical
Publication of EP3074572B1 publication Critical patent/EP3074572B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • E01D19/062Joints having intermediate beams
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/005Girders or columns that are rollable, collapsible or otherwise adjustable in length or height
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C2003/026Braces

Definitions

  • the invention relates to a bridging device in the center beam construction, for a building joint between two structural parts with at least two edge beams and at least one center carrier, which is arranged between the edge beams and at least one, the building structure bridging cross member, at their lateral ends in each case a truss bearing for storage have the traverse on the respective building parts.
  • such devices are used to bridge building joints between two parts of the structure, in particular between two bridge parts such as a bridgehead or abutment and a bridge support or bridge girder or adjoining bridge girder so that vehicles and animals safely from one component to another component can reach.
  • the construction joints also called movement joints or expansion joints, serve to compensate for movements of the building parts to each other.
  • Bridging devices are known from the prior art in various embodiments. Corresponding bridging devices in the center-carrier construction are in the DE 102 22 690 A1 and the DE 10 2011 050 977 A1 described.
  • the DE 2208680 A1 discloses, for example, a bridging device in which a plurality of center supports are traversed by a traverse.
  • a common form of lock-up device is the variant known as center-carrier construction or lamellar construction.
  • the bridging device has at least one center carrier, which is arranged fixedly or slidably on at least one traverse mounted rotatably and / or displaceably on the adjacent structural parts.
  • control devices In order to achieve uniform distances between individual center supports to each other and possibly to the edge beams and to prevent emigration of the center support, so-called control devices are used. Such control devices are formed for example by spring chains, scissors or with the help of so-called pivoting traverses.
  • receiving areas are arranged on site, in which the trusses are partially inserted. These receiving areas are also referred to as truss boxes. The shape of these receiving areas depends on the expected movement and can accordingly be very expansive.
  • truss boxes can be very difficult to practically impossible.
  • ends in steel bridges the deck plate usually with an end cross member, which may not be broken. If such a bridge is not already designed during the planning so that enough space is provided for the truss box, retrofitting a truss box is sometimes practically impossible.
  • the particularly advantageous bridging devices in center-girder or lamella construction can not be used at all.
  • the bridging device described above has a traverse with at least two truss segments, which are arranged displaceably along a longitudinal axis of the crossbar and each other in the direction of the longitudinal axis, so that the length of the traverse is variable.
  • the bridging device according to the invention is thus retractable and extendable.
  • a variable-length traverse is provided, whereby movements of the building parts to each other can be considered in a particularly space-saving manner. Since the truss according to the invention itself is longitudinally variable, now no separate receiving areas for insertion of the traverse must be provided on the building parts.
  • Telescopic arms have segments, which are usually designed as rectangular telescoping tubes. The lateral surfaces of the segments are not aligned with each other, but have a height offset, which usually corresponds to the material thickness of the segments.
  • a center carrier arranged thereon can not easily change from one segment to the other and back.
  • the center carrier of a bridging device in the center-carrier construction should / should be able to be uniformly arranged over the entire length of the traverse or the bridging device or can be displaced in order to take into account movements of the building joint.
  • the tops of the center support flush to each other or to arrange at the same height on the various segments that the tops to each other and with the tops of the edge beams and the structural parts, for. Lanes are aligned.
  • the load introduction takes place in known systems with telescopic arms substantially end. A load transfer large transverse forces transverse to the longitudinal extent of the telescopic arm, on the individual overlapping segments away, as would occur in bridging devices in center-carrier construction, has not been tested.
  • At least one truss segment is designed as a guide segment and a truss segment as a linkage segment, wherein the guide segment guides the linkage segment at least in the direction of the longitudinal axis of the truss.
  • the linkage segment can be supported by the guide segment.
  • the guide segment is according to a development at least partially formed as a tube in which the rodding segment is at least partially slidably mounted.
  • This tube may, for example, have a rectangular or otherwise angular surface, so that the rodding segment can be arranged against rotation in the tube.
  • the guide segment further has at least one spring extending parallel to the longitudinal axis of the traverse, which engages in a groove in the linkage segment or vice versa.
  • the guide segment is formed further than in the plan view U-shaped clip or H-shaped double clasp, which surrounds the rodding segment at least partially laterally and holds at least transversely to the longitudinal axis of the traverse.
  • This embodiment has the advantage that the linkage segment is not bordered by the guide segment at the top and thus has an accessible exposed area, on which a center carrier can be arranged independently of the relative position of the linkage segment to the guide segment.
  • the linkage segment may be formed corresponding to the guide segment to allow a convenient, largely backlash-free storage.
  • Developing the linkage segment is at least partially formed as a solid and / or hollow carrier, in particular as a T-beam, double T-beam and / or rectangular tube.
  • carrier forms have proven themselves for bending stresses.
  • At least two center girders are further arranged in the bridging device, wherein the upper sides of the center girders are aligned flush with one another.
  • the upper sides of the center girders can also be designed to be flush with the upper sides of the edge girders and the upper sides of the building parts. In this way, it is ensured that the bridging device spans a plane on which vehicles or living beings can safely pass the building gap.
  • the center carrier or carriers are arranged on a guide segment and / or a linkage segment of the traverse.
  • the center carrier (s) can be arranged along the entire length of the traverse. In this way, a uniform distribution of a plurality of center supports on the traverse regardless of the Traversensegmente feasible. Theoretically, it is then possible to arrange all the center carrier of the lock-up device already on a traverse or a pair of traverses, so that the lock-up device can be realized with a minimum number of traverses.
  • the center carrier (s) of the bridging devices are arranged in total on either a linkage segment or a guide segment of the crossbeam.
  • the problem of a possible height offset of the truss segments can be circumvented.
  • a bridging device with a minimum number of traverses can be realized.
  • the traverse can be designed as an obliquely arranged swivel traverse, so that a truss segment can be made particularly long, and on this long truss segment Already all center girders of the bridging device can be arranged.
  • At least one central support is at least in the direction of the longitudinal axis of the traverse slidably mounted on this further education.
  • At least one center carrier on a center support bearing which allows a storage of the center support both above a guide segment, as well as a rod segment at the same height.
  • This center support bearing it is possible to compensate for any differences in the shape between guide segment and rod segment, for example. A vertical offset.
  • this enables center carrier bearings to be displaced back and forth above the various truss segments.
  • At least one center carrier bearing is formed such that it rests only on a rod segment or a guide segment and does not touch an adjacent truss segment.
  • the center carrier bearing can be arranged on a guide segment and bridged an inserted linkage segment without contact, so that a change of the center carrier bearing between different truss segments is avoided.
  • the center-carrier bearing preferably has a U-shaped form.
  • a preferably U-shaped center carrier bearing can be used in a guide segment formed in plan view as a U-shaped clasp or H-shaped double clasp.
  • a laterally edged linkage segment is bridged without contact.
  • the center support bearing and the center support for example, in tight building joints, are pushed in an area over the boom segment. This even without the center carrier bearing would have to change the truss segment.
  • a height offset between the truss segments can be compensated or skipped.
  • At least one center carrier has a center carrier bearing which allows a rotational movement of the traverse below the center carrier.
  • the traverse is arranged obliquely in the lock-up device, that a change of or the center carrier between a rod segment and a Guide segment of the traverse is avoided.
  • a particularly long traversed in the retracted state can be arranged in the building joint. Movements of the building joint can now largely be considered with a relatively small change in length of the traverse by pivoting the Traverse.
  • the traverse then represents a pivoting traverse.
  • the Traversensegmente must only be displaced relative to each other in particularly small dimensions in order to minimize unwanted transverse movements of the building parts.
  • a bridging device having a plurality of center carriers, these can all already be arranged on a single truss segment, since at least one truss segment can be made sufficiently long for the swivel traverse for this purpose.
  • a change of the center support for a uniform distribution of a plurality of center carrier along the longitudinal extent of the traverse is not necessary and avoidable.
  • the bridging device can also be realized with a particularly small number of traverses.
  • the pivoting beam can also be designed as a pivoting traverse control device for controlling the distances between the center supports arranged on the traverse.
  • the center girders are attached to the traverse rotatably. It is also conceivable, however, the arrangement of other control devices, such as spring chains toirritaten the distances between the center support to each other.
  • At least one truss bearing preferably both truss bearings, the traverse is designed as NOTEkipplager further education.
  • the bridging device has a plurality of cross members, which are each spaced apart from one another and are preferably arranged in pairs in the bridging device. In this way, a particularly resilient bridging device is provided, since the load can be distributed to a plurality of traverses and unfavorable leverage effects are avoided. Such a bridging device is particularly suitable for relatively wide building joints.
  • adjacent trusses are substantially parallel with one another in plan view and / or arranged in opposite directions.
  • a balanced load on the bridging devices is also possible if the center supports are each mounted exclusively on guide segments of the traverse. Because each two outer guide segments can be an intermediate rod segment bridged.
  • the problems described above can be avoided because of a height offset of the truss segments.
  • an undesired transverse movement of a bridging device with pivoting traverses can be prevented by the opposing arrangement.
  • one or more center supports is / are arranged or fastened on a single truss segment or several similar truss segments, in particular only on guide segments. In this way, the problem that might arise from a height offset or the differences in shape between the Traversensegmenten avoided.
  • the shape of the boom segments for a flush alignment of the tops of the center carrier need not be considered and vice versa.
  • At least one truss bearing preferably both truss bearings, each truss, is designed such that the truss or the trusses can or may rotate under the or the center beams, so that the traverse or the traverses as Swiveling traverse (s) and in particular as a pivoting traverse control device for the control of the distances between the center support and the edge beams or between the center beams and the edge beams acts or act. In this way, it is particularly easy to realize uniform distances between the center carriers.
  • a center carrier bearing or a truss segment has at least one stop for limiting the movement of a center carrier on the truss or beams.
  • the movement of the or the center support can now be limited to a Traversensegment and in particular a change of or the center support to another truss segment can be avoided.
  • the problem described above, which could result from a height offset or differences in the shape of the truss segments, can be avoided or avoided in this way.
  • Sliding surfaces may be formed between center carrier and center carrier bearing and / or between center carrier and cross member (s) of the bridging device.
  • the bridging device may comprise at least one sliding material, in particular PTFE, UHMWPE, Polyamide and / or a multi-layer sliding material.
  • the at least one sliding material may be arranged on a center support bracket and / or a center support and / or a cross member of the bridging device.
  • at least one center carrier bearing on a sliding material and acts as a sliding bearing.
  • a center-bridge type bypass device according to a first embodiment is shown.
  • the bridging device 1 is arranged in the installed position in a building joint 2 between two structural parts 3, 4.
  • the bridging device 1 has two pairs of cross members 5, 6 bridging the structural gap 2, see also FIG Fig. 7 ,
  • These trusses 5, 6 each have two truss segments 7, 8, which are arranged displaceably along a longitudinal axis 9 of the traverse 5, 6 and each other in the direction of the longitudinal axis 9, so that the length of the trusses 5, 6 is variable.
  • a traverse segment is designed as a guide segment 7 and the other traverse segment as a linkage segment 8, whereby the guide segment 7 guides the linkage segment 8 in the direction of the longitudinal axis 9 of the traverses 5, 6.
  • the guide segment 7 is formed as a rectangular tube, wherein the rod segment 8 has a corresponding shape and is slidably mounted in the guide segment 7.
  • the rod segments 8 are largely pushed into the guide segments 7, so that the trusses 5, 6 have a relatively small length.
  • Fig. 1 shows a first pair of trusses 5, 6 of the lock-up device 1 in the retracted state.
  • the two adjacent trusses 5, 6 are spaced from each other in plan view substantially parallel to each other and arranged in opposite directions.
  • Center girders 12 are indicated here according to the dashed lines, cf. Fig. 2 ,
  • Fig. 2 shows that the lock-up device 1 according to the first embodiment, in addition, two edge beams 10, 11, which are each arranged on the building side building parts 3, 4. Between the edge beams 10, 11 and on the two pairs, the building structure 2 bridging trusses 5, 6 four center beams 12 are arranged in the present case.
  • two center carrier bearings 13 for each two of the four center beams 12 are respectively arranged between the center carrier 12 and the guide segments 7 on the trusses 5, 6.
  • the other two center supports 12 are not arranged on the traverse 5.
  • the bridging device 1 in each case has a truss bearing 16, 17 for supporting the trusses 5, 6 on the respective structural part 3, 4 on. These truss bearings 16, 17 are each arranged in truss boxes on the respective building part 3, 4.
  • Fig. 4 shows the lock-up device 1 according to the first embodiment with the building joint 2 open, that is in a wide open position.
  • the Traversensegmente 7, 8 are shifted so that the traverse 5, 6 has a relatively large length.
  • the rod segments 8 are largely pushed out of the guide segments 7.
  • the bridging device 1 is therefore extended in other words.
  • the position of the center carrier 12 is indicated by dashed lines.
  • Fig. 5 and Fig. 6 show that the center supports 12 in this state to each other and to the edge beams 10, 11 are uniformly spaced.
  • the trusses 5, 6 and the Traversensegmente 7, 8 and the control means are designed such that the center carrier 12 are arranged even with extended trusses 5, 6 with as far as possible pushed out of the guide segments 7 rod segments 8 exclusively on the guide segments 7.
  • the upper sides 18 of the center girders 12 are always flush with one another and also aligned flush with the upper sides 19 of the edge girders 10, 11.
  • Fig. 7 shows a plan view of a retracted lock-up device 1 according to the first embodiment as a whole.
  • the bridging device 1 comprises two pairs of parallel spaced and opposite trusses 5, 6 according to FIG Fig. 1 on.
  • two of the four center supports 12 are arranged on the respectively identically designed and equally aligned trusses 5, 6 of the truss pairs.
  • the center supports 12 are also indicated here by dashed lines.
  • the two left-side center girders 12 are each spaced at two, according to Fig. 2 trained trusses 5 arranged, see. Fig. 2 . 5 and 7 , The arranged therebetween, opposite cross member 6 is not touched by the two left-side center support 12.
  • the two right-hand center supports 12 are each spaced at two, according to FIG. 3 trained trusses 6 arranged, cf. Fig. 3 . 6 and 7 ,
  • the interposed, opposite cross member 5 is through the two left side Center carrier 12 not touched.
  • the center supports 12 are arranged entirely exclusively on the guide segments 7 of the trusses 5, 6. If the lock-up device is now extended, the center carrier 12 arranged on each two spaced guide segments 7 bridges an intermediate linkage segment 8 of an opposite cross-member 5, 6.
  • the alternating orientation of the cross-members 5, 6 results in a balanced loading of the bridging devices 1 and a uniform distribution of the center supports 12 is reached, although the center girders 12 are arranged exclusively on guide segments 7.
  • the problems described above because of the height offset of the truss segments 7, 8 are avoided.
  • FIGS. 8 to 12 a lock-up device 1 according to a second embodiment is shown.
  • Fig. 8 shows a first of the two trusses 5, 6 of the lock-up device and that this first cross member 5 has three truss segments 7, 8 and is arranged obliquely in the building joint 2.
  • the traverse 5 represents a pivoting traverse.
  • a middle guide segment 7 is formed as a rectangular tube, wherein two corresponding rod segments 8 protrude from the open end faces 20 of the middle Traversensegments 7 from this and are slidably mounted in this.
  • Fig. 8 shows a retracted bridging device or traverse 5.
  • the center carrier 12 are indicated by dashed lines only.
  • Fig. 9 shows that in the lock-up device 1 according to the second embodiment, four center support bearings 13 for arranging the center supports 12 are arranged on the middle guide segment 7. Opens the building gap pivoted Traverse 5.
  • the center support 13 are formed such that they allow a rotational movement of the cross member 5 below the center support 12.
  • At the protruding ends 14, 15 of the linkage segments 8 is a respective truss bearing 17 for supporting the cross member 5 to the respective building parts 3, 4 are arranged.
  • These truss bearings 17 are designed such that the cross member 5 can rotate under the center beams 12. Even when pivoting the center carrier 12 of the traverse 5 remain on the middle guide segment 7. In addition, a uniform distance between the center beams 12 is maintained.
  • the cross member 5 may be formed as a pivoting traverse control device or having springs.
  • Fig. 10 shows the lock-up device according to the second embodiment, wherein the building joint 2 by movements of the building parts 3, 4 is increased or opened.
  • the cross member 5 is pivoted, in addition, the two rod segments 8 are further pushed out of the middle guide segment 7, so that the cross member 5 has an enlarged length.
  • the bridging device 1 is thus extended.
  • the position of the center carrier 12 is indicated by dashed lines, cf. Fig. 11 ,
  • Fig. 11 shows that the four center supports 12 are equally spaced from each other and with respect to the edge supports 10, 11.
  • the cross member 5 is formed and arranged obliquely in the building joint 2, that the center support 12 and the center support 13 do not change from a truss segment 7, 8 to the next.
  • the center girder bearing 13 or a truss segment 7, 8 may have at least one stop.
  • Fig. 12 shows a plan view of a retracted lock-up device 1 according to the second embodiment as a whole.
  • the bridging device 1 has, in addition to the in Fig. 11 5 shown yet another second traverse 6 on. This is criticized by the first and differs from the first in that it is arranged in opposite directions. In this way, a movement of the lock-up device 1 transverse to the building parts 3, 4 is avoided despite the oblique arrangement of the trusses 5, 6. Dashed lines indicate the center supports 12.
  • FIGS. 13 to 17 show a lock-up device 1 according to a third embodiment. This differs from the second embodiment, that these two trusses 5, 6 each having two outside, formed in plan view as U-shaped clips guide segments 7 and also a middle linkage segment 8. This rod segment 8 has a corresponding double-TT-carrier-like shape.
  • the first cross member 5 of the lockup device is in Fig. 13 shown.
  • the center supports 12 are indicated here by dashed lines.
  • FIG. 14 shows that the U-shaped center support bearings 21, the middle truss segment 8 to a certain extent bridge. Therefore, although this central carrier bearing 21, although it would have to change from one truss segment 7, 8 to the next, remain arranged on the guide segment 7.
  • truss bearings 16 are arranged, which allow a rotational movement of the cross member 5. If this traverse 5 is now pivoted, a uniform distance between center beams 12 is maintained.
  • the cross member 5 may be formed as a pivoting traverse control device or having springs. It is also possible to arrange the cross member 5 vertically in the building joint 2.
  • FIGS. 13 and 14 are shown in a relatively small or closed building joint 2, the outer truss segments 7 of the first cross member 5 of the lock-up device 1 pushed towards each other and enclose the middle truss segment 8 side.
  • the cross member 5 has a relatively small longitudinal extension, which results essentially from the sum of the lengths of the outer cross member segments 7.
  • the lock-up device 1 is retracted.
  • FIGS. 15 and 16 show the lock-up device 1 according to the third embodiment in the open state.
  • the cross member 5 is pivoted. Furthermore, the longitudinal extension of the traverse 5 is increased by the fact that the middle rod segment 8 is largely pushed out of the two outer guide segments 7 addition.
  • the lock-up device 1 is extended.
  • dashed lines are the center carrier 12 in Fig. 15 indicated.
  • center supports 12 are equally spaced from one another and with respect to the edge supports 10, 11. Due to the differently shaped center support bearings 13, 21, the center supports 12 are mounted both above the guide segments 7 as well as the middle rod segment 8 at the same height.
  • the center support bearings 21, which are arranged on the two outer center beams 12, are designed such that the respective center support bearing 21 rests only on an associated guide segment 7 and the adjacent, middle rod segment 8 is not touched.
  • these center support bearings 12 preferably have a U-shaped configuration.
  • These center carrier bearings 21 make it possible for the associated center supports 12 on the cross member 5 to be displaced at least partially back and forth between the crosspiece segments 7, 8, cf. Fig. 14 ,
  • Fig. 17 shows a plan view of a retracted lock-up device 1 according to the third embodiment as a whole.
  • the bridging device 1 has, in addition to the in Fig. 13 5 shown yet another second, spaced Traverse 6 on. This only differs from the first in that it is arranged in opposite directions. An unwanted transverse movement of the bridging device 1 to the building parts 3, 4 is avoided by the opposite arrangement of the trusses 5, 6.
  • the center supports 12 are indicated here by dashed lines.
  • Fig. 18 shows in detail how a central support 12 is mounted on a guide segment 7 of the first cross member 5 according to the third embodiment.
  • a U-shaped center carrier bearing 21 between the center carrier 12 and guide segment 7 is arranged.
  • the U-shaped center carrier bearing 21 is designed such that it bridges over a non-contacting over the top of the guide segment 7 projecting segment portion 22 of a bordered in the guide segment 7 linkage segment 8.
  • Fig. 19 shows how a center support 12 is mounted on a central rod segment 8 of the first cross member 5 according to the third embodiment.
  • a mid-carrier bearing 13 arranged therebetween is arranged between the center carrier 12 and the guide segment 8.
  • FIGS. 20 and 21 show variants of Traverse 5. It shows Fig. 20 a first variant of the traverse 5, which differs from the first traverse 5 of the third embodiment of the lock-up device in that the or the guide segments 7 is formed in such a corresponding manner with respect to the linkage segment 8, so that the tops 23, 24th the various truss segments 7, 8 of the traverse 5 are aligned flush with each other. As a result, a height offset is avoided.
  • a center carrier bearing 13 between the cross member 5 and the center carrier 12 is arranged in each case.
  • the traverse 5 allows a displaceable mounting of the center carrier 12 without different center carrier bearing both on a guide segment 7 as well as on a rod segment 8.
  • Fig. 21 shows a further variant of the traverse 5. This is similar to the trusses 5, 6 of the first and second embodiment of the lock-up device 1 is formed.
  • the linkage segment 8 also has a spring 25, which engages in an upper-side groove 26 of the respective guide segment 7 such that the upper sides 23, 24 of the various truss segment 7, 8 of the traverse 5 are aligned flush with each other.
  • a center carrier bearing 13 is arranged between the center carrier 12 and traverse 5 arranged. This alternative also enables a displaceable mounting of the center girders 12 without different center girder bearings both on a guide segment 7 and on a rod segment 8.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Bridges Or Land Bridges (AREA)
  • Road Paving Structures (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Building Environments (AREA)

Claims (20)

  1. Dispositif d'enjambement (1) du type à poutre intermédiaire pour un joint de construction (2) entre deux éléments de construction (3, 4), ledit dispositif d'enjambement (1) comprenant au moins deux poutres de rive (10, 11) et au moins une poutre intermédiaire (12), ladite au moins une poutre intermédiaire (12) étant disposée entre lesdites poutres de rive (10, 11) et sur au moins une traverse (5; 6) enjambant le joint de construction (2) et comprenant respectivement à ses extrémités latérales un palier de traverse (16; 17) pour supporter la traverse (5; 6) sur les éléments de construction (3, 4) respectifs,
    caractérisé en ce que
    ladite traverse (5; 6) comprenant au moins deux segments de traverse (7, 8; 20) qui sont disposés le long de l'axe longitudinal (9) de la traverse (5; 6) et qui sont disposés de manière coulissante l'un par rapport à l'autre dans la direction de l'axe longitudinal (9) de sorte que la longueur de la traverse (7, 8) est variable.
  2. Dispositif d'enjambement (1) selon la revendication 1, caractérisé en ce que au moins un segment de traverse (7; 8) est réalisé en tant que segment de guidage (7) et un segment de traverse (7; 8) est réalisé en tant que segment de tige (8), le segment de guidage (7) étant destiné à guider le segment de tige au moins dans la direction de l'axe longitudinal (9) de la traverse (5; 6).
  3. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    ledit segment de guidage (7) est au moins en partie réalisé en forme de tube dans lequel le segment de tige (8) est supporté de façon coulissante de façon qu'il peut être inséré au moins en partie.
  4. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    ledit segment de guidage (7) comprend au moins une languette (25) s'étendant parallèlement à l'axe longitudinal (9) de la traverse (5; 6) et s'engageant dans une rainure (26) dans le segment de tige (8), ou vice versa.
  5. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    ledit segment de guidage (7) est réalisé, en vue de plan, dans la forme d'une agrafe en forme de U ou dans la forme d'une agrafe double en forme de H qui encadre latéralement au moins en partie ledit segment de tige (8) et retient celui-ci au moins transversalement par rapport à l'axe longitudinal (9) de la traverse (5; 6).
  6. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    ledit segment de tige (8) est au moins en partie réalisé dans la forme d'une poutre pleine et/ou creuse, en particulier dans la forme d'une poutre en T, d'une poutre en T double et/ou d'un tube rectangulaire.
  7. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    au moins deux poutres intermédiaires (12) sont disposées dans ledit dispositif d'enjambement (1), les faces supérieures (18) desdites poutres intermédiaires (12) étant alignées à fleur.
  8. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    la ou les poutre(s) intermédiaire(s) (12) est/sont disposées sur un segment de guidage (7) et/ou un segment de tige (8) de la traverse (5; 6).
  9. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    au moins une poutre intermédiaire (12) est supportée sur la traverse (5; 6) de façon à être déplaçable au moins dans la direction de l'axe longitudinal (9) de celle-ci.
  10. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    au moins une poutre intermédiaire (12) comprend un palier (13; 21) de poutre intermédiaire facilitant de supporter la poutre intermédiaire (12) sur un même niveau aussi bien sur un segment de guidage (7) que sur un segment de tige (8).
  11. Dispositif d'enjambement (1) selon la revendication 10, caractérisé en ce que ledit au moins un palier (13; 21) de poutre intermédiaire est formé de façon que le palier (13; 21) de poutre intermédiaire repose seulement sur un segment de tige (8) ou sur un segment de guidage (7) et n'est pas en contact avec un segment de traverse (7; 8) adjacent, et de préférence est en forme de U.
  12. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    au moins une poutre intermédiaire (12) comprend un palier (13; 21) de poutre intermédiaire permettant une rotation de la traverse (5; 6) en-dessous de ladite poutre intermédiaire (12).
  13. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    ladite traverse (5; 6) est disposée en oblique dans le dispositif d'enjambement (1) de façon à éviter le passage de la ou les poutre(s) intermédiaire(s) (12) entre un segment de tige (8) et un segment de guidage (7) de la traverse (5; 6).
  14. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    au moins un palier de traverse (16; 17), de préférence les deux paliers de traverse (16; 17), de la traverse (5; 6) est/sont réalisés dans la forme d'un palier de basculement ponctuel.
  15. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    ledit dispositif d'enjambement (1) comprend plusieurs traverses (5; 6) disposées écartées l'une de l'autre et de préférence disposées par paires dans le dispositif d'enjambement (1).
  16. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    traverses (5, 6) adjacentes, en vue de plan, sont disposées sensiblement en parallèle et/ou à course opposée.
  17. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    une ou plusieurs poutres intermédiaires (12) sont attachées ou disposées sur un seul segment de traverse (7; 8) ou plusieurs segments de traverse (7; 8) de même type, en particulier seulement sur des segments de guidage (7).
  18. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    au moins un palier de traverse (16; 17), de préférence les deux paliers de traverse (16; 17), de chaque traverse (5; 6) est/sont réalisés de façon à permettre une rotation de la/les traverse(s) (5; 6) en-dessous des poutres intermédiaires (12) de sorte que la/les traverse(s) (5; 6) agissent en tant que traverse(s) pivotante(s) et en particulier en tant que dispositif de réglage à traverse pivotante destiné à régler les intervalles entre la poutre intermédiaire (12) et les poutres de rive (10; 11), respectivement les poutres intermédiaires (12) et les poutres de rive (10; 11).
  19. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    des ressorts sont disposés entre les poutres de rive et/ou les poutres intermédiaires en tant que dispositif de réglage à traverse pivotante destiné à régler les intervalles entre la poutre intermédiaire (12) et les poutres de rive (10; 11), respectivement les poutres intermédiaires (12) et les poutres de rive (10; 11).
  20. Dispositif d'enjambement (1) selon l'une quelconque des revendications précédentes,
    caractérisé en ce que
    un palier (13; 21) de poutre intermédiaire ou un segment de traverse (7; 8) comprend au moins une butée pour limiter les mouvements d'une poutre intermédiaire (12) sur la/les traverse(s) (5; 6).
EP14806587.3A 2013-11-28 2014-11-27 Dispositif d'enjambement Active EP3074572B1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL14806587T PL3074572T3 (pl) 2013-11-28 2014-11-27 Układy łączące

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102013224460.6A DE102013224460A1 (de) 2013-11-28 2013-11-28 Überbrückungsvorrichtung
PCT/EP2014/075856 WO2015078991A1 (fr) 2013-11-28 2014-11-27 Dispositif d'enjambement

Publications (2)

Publication Number Publication Date
EP3074572A1 EP3074572A1 (fr) 2016-10-05
EP3074572B1 true EP3074572B1 (fr) 2019-11-27

Family

ID=52007000

Family Applications (1)

Application Number Title Priority Date Filing Date
EP14806587.3A Active EP3074572B1 (fr) 2013-11-28 2014-11-27 Dispositif d'enjambement

Country Status (18)

Country Link
US (1) US10119274B2 (fr)
EP (1) EP3074572B1 (fr)
JP (1) JP6509221B2 (fr)
KR (1) KR102312449B1 (fr)
CN (1) CN105934549B (fr)
BR (1) BR112016012062B1 (fr)
CA (1) CA2931385C (fr)
CL (1) CL2016001300A1 (fr)
DE (1) DE102013224460A1 (fr)
ES (1) ES2769891T3 (fr)
HU (1) HUE047864T2 (fr)
IL (1) IL245843B (fr)
MX (1) MX2016006989A (fr)
PL (1) PL3074572T3 (fr)
PT (1) PT3074572T (fr)
RU (1) RU2665937C1 (fr)
UA (1) UA116698C2 (fr)
WO (1) WO2015078991A1 (fr)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10767320B2 (en) * 2016-10-20 2020-09-08 Watson Bowman Acme Corporation Cover assembly for structural members
CN107119558A (zh) * 2017-06-20 2017-09-01 浙江秦山橡胶工程股份有限公司 一种适用性强的桥梁伸缩装置
CN108611971B (zh) * 2018-05-09 2019-09-06 温州晟泰建设工程有限公司 一种桥梁伸缩装置
CN109537472B (zh) * 2019-01-17 2023-08-15 中交四公局第十工程有限公司 一种预制梁端部底模转铰装置及其使用方法
DE102020201076B3 (de) * 2020-01-29 2021-05-20 Maurer Engineering Gmbh Übergangskonstruktion zur Überbrückung einer Bauwerksfuge
CN114922073B (zh) * 2022-05-19 2023-09-05 中电建路桥集团有限公司 一种快速拆卸贝雷盘扣支架体系中分配梁的装置

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2208680A1 (de) * 1971-03-08 1973-10-31 Brown Co D S In seiner laenge verstellbares konstruktionselement zum ueberspannen von oeffnungen in betondecken

Family Cites Families (49)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1523711A (en) * 1923-10-01 1925-01-20 Paul R Powell Builder's hardware
US2316233A (en) 1939-03-07 1943-04-13 Albert C Fischer Expansion joint
US3102306A (en) * 1959-08-27 1963-09-03 Herman O Mcpheeters Method of manufacturing bracing
US3090215A (en) * 1960-02-08 1963-05-21 Rosen Karl Isac Joel Device for guided feeding of yarn to knitting machines
US3324774A (en) * 1965-04-21 1967-06-13 Gomma Antivibranti Applic Expansion joint for road sections
US3520236A (en) * 1967-03-03 1970-07-14 Etienne Sequaris Means for covering and rendering waterproof expansion joints for road bridges and other civil engineering constructions
US3880540A (en) * 1971-03-08 1975-04-29 Brown Co D S Modular expansion joint
CH549696A (de) * 1971-11-23 1974-05-31 Mageba Sa Fahrbahnuebergang, insbesondere fuer dilatationsfugen von brueckenfahrbahnen.
CH546311A (de) * 1972-04-10 1974-02-28 Mageba Sa Vorrichtung zum ueberbruecken von dehnungsfugen in bruecken, strassen oder aehnlichen verkehrswegbauten.
US4030156A (en) * 1976-08-16 1977-06-21 A. J. Harris & Sons, Inc. Bridge expansion joint
US4087191A (en) * 1977-01-31 1978-05-02 Felt Products Mfg. Co. Large motion expansion joint
US4120066A (en) * 1977-06-01 1978-10-17 Yves Gerald Leroux Expansion joint for roadway sections
DE2746490C3 (de) * 1977-10-15 1982-05-19 Friedrich Maurer Söhne GmbH & Co KG, 8000 München Überbrückungsvorrichtung für Dehnungsfugen in Brücken o.dgl.
FR2537180B1 (fr) * 1982-12-06 1987-01-30 Vidal Henri Culee de pont construite en terre stabilisee
US4634133A (en) * 1983-06-21 1987-01-06 Wercholoz-Honel Systems Inc. Roadway expansion joint with improved seal securing assembly
CS265399B1 (en) * 1987-09-21 1989-10-13 Jaroslav Cihal Dilatation bridge closing device and method for producing thereof
FR2643923B1 (fr) * 1989-03-03 1991-06-21 Freyssinet Int Stup Perfectionnements aux joints de chaussee
ATE108845T1 (de) * 1991-04-29 1994-08-15 Maurer Friedrich Soehne Überbrückungsvorrichtung für dehnungsfugen in brücken oder dergleichen.
JP2615397B2 (ja) * 1991-11-07 1997-05-28 建設省土木研究所長 橋梁用バリアブルダンパー装置
US5197250A (en) * 1992-05-12 1993-03-30 Tremco Incorporated Wide expansion joint system
DE4303268C2 (de) * 1993-02-04 1997-01-30 Alfred Hartkorn Steuerung für eine Fugenüberbrückungskonstruktion für Bauwerke, insbesondere Brücken
US5537790A (en) * 1994-02-09 1996-07-23 Jackson; Roger L. Seismic bridge
DE19630328C2 (de) * 1996-07-26 1999-11-18 Maurer Friedrich Soehne Überbrückungsvorrichtung für Fugenspalte
DE19705531C2 (de) * 1997-02-13 2001-07-05 Maurer Friedrich Soehne Vorrichtung zur Überbrückung von Dehnfugen
US5887308A (en) * 1997-07-28 1999-03-30 Watson Bowman Acme Corp. Expansion joint system with seismic accommodation
US6039503A (en) * 1998-01-29 2000-03-21 Silicone Specialties, Inc. Expansion joint system
JP3161703B2 (ja) * 1998-07-07 2001-04-25 ドーエイ外装有限会社 床接続装置
JP4019295B2 (ja) * 1999-03-09 2007-12-12 日本鋳造株式会社 伸縮継手装置
JP3673447B2 (ja) * 2000-05-23 2005-07-20 ドーエイ外装有限会社 床用目地装置
US6520706B1 (en) * 2000-08-25 2003-02-18 Lockheed Martin Corporation Composite material support structures with sinusoidal webs and method of fabricating same
US7395570B2 (en) * 2002-04-02 2008-07-08 Construction Research & Technology Gmbh Expansion joint system for accommodation of large movement in multiple directions
DE10222690A1 (de) 2002-04-17 2003-11-06 Maurer Friedrich Soehne Überbrückungsvorrichtung für Fugenspalte
EP1355009B1 (fr) * 2002-04-17 2011-12-21 Maurer Söhne GmbH & Co. KG Dispositif de recouvrement pour joints
EP1614808A1 (fr) * 2004-07-07 2006-01-11 Mageba S.A. Dispositif de recouvrement pour joint d'expansion
GB0507807D0 (en) * 2005-04-18 2005-05-25 England George L A theral displacement compensation unit for integral bridges
JP4579861B2 (ja) * 2006-03-15 2010-11-10 ドーエイ外装有限会社 床用目地装置
US20080148499A1 (en) * 2006-12-13 2008-06-26 Construction Research & Technology Gmbh Expansion joint system
JP5361623B2 (ja) * 2009-09-09 2013-12-04 カネソウ株式会社 床用目地カバー装置
US8387339B2 (en) * 2010-04-20 2013-03-05 Modernfold, Inc. Adjustable wall support system and method
US20110308174A1 (en) * 2010-06-22 2011-12-22 Nicholas Meyer Erectable and retractable rod device
KR101208031B1 (ko) * 2010-07-05 2012-12-04 유니슨이테크 주식회사 교량용 신축 이음 장치
JP5491352B2 (ja) * 2010-10-25 2014-05-14 ドーエイ外装有限会社 高層階用床目地装置
DE102011050977A1 (de) 2011-06-09 2012-12-13 Maurer Söhne Engineering GmbH & Co. KG Überbrückungsvorrichtung in Mittelträgerbauweise für eine Bauwerksfuge
RU110759U1 (ru) 2011-06-30 2011-11-27 Общество с ограниченной ответственностью "Деформационные швы и опорные части" Модульный многопрофильный деформационный шов
CN202466400U (zh) * 2012-03-14 2012-10-03 衡水中铁建布朗科技有限公司 一种模数式型钢伸缩装置
CN202359497U (zh) * 2012-04-14 2012-08-01 李洪坡 多向变位模数式伸缩装置
EP2895675A4 (fr) * 2012-09-17 2016-07-20 Steelcase Inc Ensemble de mur de séparation du plafond au plancher
ITBO20120508A1 (it) * 2012-09-21 2014-03-22 Joint S R L Giunto di dilatazione per edilizia
CN202787068U (zh) * 2012-10-09 2013-03-13 张士臣 大位移量公路桥梁伸缩装置

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2208680A1 (de) * 1971-03-08 1973-10-31 Brown Co D S In seiner laenge verstellbares konstruktionselement zum ueberspannen von oeffnungen in betondecken

Also Published As

Publication number Publication date
HUE047864T2 (hu) 2020-05-28
RU2665937C1 (ru) 2018-09-05
US10119274B2 (en) 2018-11-06
CN105934549B (zh) 2018-03-06
IL245843B (en) 2019-09-26
ES2769891T3 (es) 2020-06-29
DE102013224460A1 (de) 2015-05-28
KR102312449B1 (ko) 2021-10-14
BR112016012062A2 (pt) 2017-08-08
PL3074572T3 (pl) 2020-06-01
CL2016001300A1 (es) 2016-12-02
CA2931385A1 (fr) 2015-06-04
JP2016540141A (ja) 2016-12-22
WO2015078991A1 (fr) 2015-06-04
CN105934549A (zh) 2016-09-07
US20160289967A1 (en) 2016-10-06
PT3074572T (pt) 2020-02-04
JP6509221B2 (ja) 2019-05-08
MX2016006989A (es) 2017-01-23
KR20160091987A (ko) 2016-08-03
UA116698C2 (uk) 2018-04-25
EP3074572A1 (fr) 2016-10-05
CA2931385C (fr) 2021-09-21
IL245843A0 (en) 2016-07-31
BR112016012062B1 (pt) 2021-12-28

Similar Documents

Publication Publication Date Title
EP3074572B1 (fr) Dispositif d'enjambement
DE19849747C5 (de) Verteilervorrichtung für Dickstoffe, insbesondere für Beton
EP2885587B1 (fr) Construction porteuse pour modules solaire
CH628942A5 (de) Mittels federn gegen einen vertikalen traeger einer grabenverbauvorrichtung abstuetzbarer gleitschuh.
EP3160828A1 (fr) Véhicule de transport, notamment véhicule de transport automoteur, de largeur variable
EP2557264B1 (fr) Porte sectionnelle
EP2441636B1 (fr) Installation destinée à déplacer des véhicules le long de deux voies de circulation
AT398067B (de) Teleskoparm
EP0643169B1 (fr) Dispositif de liaison de rails fixés sur une structure porteuse
DE3106337A1 (de) Vorrichtung zum festlegen der foerderseile einer mehrseiligen schacht-foerderanlage
DE1257190B (de) Vorrichtung zum Abstuetzen des Pufferbalkens gegenueber dem Rahmenkopftraeger von Schienenfahrzeugen
DE4127535A1 (de) Faltenbalg
EP2799620A1 (fr) Échafaudage pour la fabrication de constructions
EP3197817B1 (fr) Béquille et structure d'appui pour machine de travail
EP1340709A1 (fr) Installation de transport pour transporter des éléments de structure
DE202009006306U1 (de) Faltenbalg
AT393850B (de) Ueberbrueckungs-vorrichtung fuer dehnungsfugen in fahrbahnen von bruecken od. dgl.
EP2560775B1 (fr) Cadre de support modulaire
DE2159081B2 (de) Führungselement für vertikal bewegbare Lastplattformen zum Heben und Senken schwerer Lasten, insb. für Tröge von Senkrecht-Schiffshebewerken
DE1040066B (de) Messvorrichtungen fuer Eisenbahngleise
DE202014002511U1 (de) Anordnung von Energieführungsketten und Führungsrinnen zum Führen von flexiblen Leitungen
EP3141661B1 (fr) Pont
EP3078563B1 (fr) Passage entre deux véhicules reliés entre eux de manière articulée
DE3608822A1 (de) Fuehrungseinrichtung fuer blindschaechte
DE19724575C1 (de) Modulare, quer auseinander verschiebbare Spurträgertrogbrücke zum mechanischen Verlegen durch ein Transportfahrzeug

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20160602

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAX Request for extension of the european patent (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20170630

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20190621

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502014013144

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1206776

Country of ref document: AT

Kind code of ref document: T

Effective date: 20191215

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Ref document number: 3074572

Country of ref document: PT

Date of ref document: 20200204

Kind code of ref document: T

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20200128

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: TROESCH SCHEIDEGGER WERNER AG, CH

REG Reference to a national code

Ref country code: RO

Ref legal event code: EPE

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200227

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

REG Reference to a national code

Ref country code: GR

Ref legal event code: EP

Ref document number: 20200400446

Country of ref document: GR

Effective date: 20200511

REG Reference to a national code

Ref country code: HU

Ref legal event code: AG4A

Ref document number: E047864

Country of ref document: HU

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200327

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2769891

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20200629

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502014013144

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191127

26N No opposition filed

Effective date: 20200828

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20231122

Year of fee payment: 10

Ref country code: LU

Payment date: 20231120

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GR

Payment date: 20231120

Year of fee payment: 10

Ref country code: GB

Payment date: 20231123

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20231215

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20231120

Year of fee payment: 10

Ref country code: RO

Payment date: 20231122

Year of fee payment: 10

Ref country code: PT

Payment date: 20231115

Year of fee payment: 10

Ref country code: IT

Payment date: 20231130

Year of fee payment: 10

Ref country code: HU

Payment date: 20231129

Year of fee payment: 10

Ref country code: FR

Payment date: 20231124

Year of fee payment: 10

Ref country code: DE

Payment date: 20231120

Year of fee payment: 10

Ref country code: CZ

Payment date: 20231115

Year of fee payment: 10

Ref country code: CH

Payment date: 20231202

Year of fee payment: 10

Ref country code: BG

Payment date: 20231117

Year of fee payment: 10

Ref country code: AT

Payment date: 20231117

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20231120

Year of fee payment: 10

Ref country code: BE

Payment date: 20231121

Year of fee payment: 10