EP2792814A1 - Boom of concrete pump truck and concrete pump truck - Google Patents

Boom of concrete pump truck and concrete pump truck Download PDF

Info

Publication number
EP2792814A1
EP2792814A1 EP12858228.5A EP12858228A EP2792814A1 EP 2792814 A1 EP2792814 A1 EP 2792814A1 EP 12858228 A EP12858228 A EP 12858228A EP 2792814 A1 EP2792814 A1 EP 2792814A1
Authority
EP
European Patent Office
Prior art keywords
boom
boom section
section
folded
pump truck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP12858228.5A
Other languages
German (de)
English (en)
French (fr)
Inventor
Binxing WU
Ke Huang
Lingjing ZHOU
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Zoomlion Intelligent Technology Co Ltd
Zoomlion Heavy Industry Science and Technology Co Ltd
Original Assignee
Hunan Zoomlion Intelligent Technology Co Ltd
Zoomlion Heavy Industry Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Zoomlion Intelligent Technology Co Ltd, Zoomlion Heavy Industry Science and Technology Co Ltd filed Critical Hunan Zoomlion Intelligent Technology Co Ltd
Publication of EP2792814A1 publication Critical patent/EP2792814A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • E04G21/0418Devices for both conveying and distributing with distribution hose
    • E04G21/0445Devices for both conveying and distributing with distribution hose with booms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/54Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with pneumatic or hydraulic motors, e.g. for actuating jib-cranes on tractors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • E04G21/0418Devices for both conveying and distributing with distribution hose
    • E04G21/0436Devices for both conveying and distributing with distribution hose on a mobile support, e.g. truck

Definitions

  • the present invention relates to a transportation equipment of concrete or other building materials, in particular to a boom of concrete pump truck and a concrete pump truck with the boom.
  • a concrete transportation pump truck (abbreviated as “concrete pump truck” or “pump truck”) is a concrete transportation apparatus which a concrete pump and an articulated boom are mounted on an automobile chassis, a concrete delivery pipe is laid along the boom, and concrete is outputted through a terminal hose ultimately.
  • the articulated boom has folded state and unfolded state. In the folded state, the boom is folded onto the chassis, so that the pump truck can run on the road. In the unfolded state, the boom is unfolded, so that concrete can be poured over a long distance.
  • the folded forms of the boom mainly include R-shaped, Z-shaped, and RZ-shaped folded forms.
  • the R-shaped folded form refers to that the boom sections can be folded in a coiled or rolled up manner in a first direction (e.g., clockwise direction), and can be unfolded in a second direction being reversed to the first direction (e.g., counter-clockwise direction).
  • the Z-shaped folded form refers to that the boom sections can be folded or unfolded in reversed direction in turns.
  • the RZ-shaped folded form is a combination of R-shaped and Z-shaped folded forms. More boom sections are required in order to obtain a longer concrete transportation distance.
  • the pump truck is inevitably subjected to restrictions of the road conditions when it runs on the road, for example, when the boom is in the folded state, the length, width, and height of the pump truck are subjected to restrictions of the road transportation rules. Therefore, it is impossible to increase boom sections freely.
  • the number of the boom sections on a concrete pump truck is usually not more than 6.
  • the object of the present invention is to provide a boom of concrete pump truck, which can extend the concrete delivery range as far as possible when it is in unfolded state and has high flexibility and operability, but essentially doesn't increase the overall dimensions of the pump truck when it is in folded state.
  • the present invention provides a boom of concrete pump truck, which has a folded state and a unfolded state, and comprises seven boom sections articulated in sequence, wherein, in the folded state, the seven boom sections are essentially arranged in five straight lines staggered to each other, and at least the last two boom sections are in the same straight line.
  • the fourth boom section to the seventh boom section are in two straight lines among the five straight lines.
  • the fourth boom section and the fifth boom section are in one of the two straight lines, and the sixth boom section and seventh boom section are in the other one of the two straight lines.
  • the first boom section and the second boom section are in a first longitudinal plane
  • the fourth boom section to the seventh boom section are in a second longitudinal plane
  • the first longitudinal plane and the second longitudinal plane are parallel to each other and spaced from each other
  • the third boom section extends between the first longitudinal plane and the second longitudinal plane.
  • the first boom section to the third boom section are folded in a first direction
  • the fourth boom section is folded onto the third boom section in a second direction that is reversed to the first direction
  • the sixth boom section is folded onto the fifth boom section in the first direction.
  • the fifth boom section, the sixth boom section and the seventh boom section are in one of the two straight lines, while the fourth boom section is in the other one of the two straight lines separately.
  • the first boom section and the second boom section are in a first longitudinal plane
  • the fourth boom section to the seventh section are in a second longitudinal plane
  • the first longitudinal plane and the second longitudinal plane are parallel to each other and spaced from each other
  • the third boom section extends between the first longitudinal plane and the second longitudinal plane.
  • the first boom section to the third boom section are folded in a first direction
  • the fourth boom section is folded onto the third boom section in a second direction that is reversed to the first direction
  • the fifth boom section is folded onto the fourth boom section in the first direction.
  • the five straight lines are essentially parallel to each other.
  • the present invention further provides a concrete pump truck, which comprises an automobile chassis, a revolving platform, and a boom, with the boom mounted on the automobile chassis via the revolving platform, wherein, the boom is the boom provided in the present invention.
  • a boom that has seven boom sections can be provided, and therefore the concrete delivery range can be extended to some degree.
  • the seven boom sections are essentially arranged in five straight lines staggered from each other; therefore, the overall dimensions of the sections can be decreased greatly, and the requirement for road conditions can be met easily.
  • at least the last two boom sections are in the same straight line; therefore, the flexibility and operability of the boom for material distribution can be greatly improved.
  • the concrete pump truck mainly comprises an automobile chassis, a revolving platform, and a boom, wherein, the boom is mounted on the automobile chassis via the revolving platform 8, so that the boom can revolve around the revolving platform 8 as required, and preferably can revolve 0°-360°.
  • the concrete pump truck provided in the present invention has seven boom sections articulated in sequence, i.e., there are the first boom section to the seventh boom section when counted from the first boom section 1 connected to the revolving platform 8.
  • the boom having seven boom sections in the present invention can increase the concrete transportation distance to some degree.
  • the seven boom sections are essentially arranged in five straight lines staggered from each other; in other words, the seven boom sections form a "five-layer” structure when they are folded, rather than a "seven-layer” structure in the conventional meaning (no matter the structure is a R-shaped structure or Z-shaped structure); therefore, the overall dimensions of the boom sections, especially the height of the pump truck, can be reduced greatly, and the requirement for road conditions can be met easily.
  • the boom when the boom is in the folded state, at least the last two boom sections are in a same straight line; therefore, the flexibility and operability of the boom for material distribution can be greatly improved.
  • the seven boom sections can be folded into a "five-layer" structure just because several sections are in the same straight line.
  • three boom sections can be arranged in a same straight line, so that the seven boom sections can be arranged in five straight lines; or, four boom sections can be arranged in pairs in two straight lines respectively, so that the seven boom sections can be arranged in five straight lines.
  • the two or three boom sections arranged in the same straight line can be any adjacent sections among the seven boom sections.
  • the fourth boom section to the seventh boom section i.e., the last four boom sections
  • a terminal hose is connected to the last boom section to transfer concrete to a specified working place during the work. Therefore, the flexibility and operability of the boom for material distribution can be improved greatly by arranging the last several sections in straight lines.
  • Figure 1(a) and 1(b) show an embodiment of the present invention.
  • the fourth boom section 4 and the fifth boom section 5 are in the same straight line
  • the sixth boom section 6 and the seventh boom section 7 are in the same straight line.
  • the two straight lines are the last two straight lines among the five straight lines of the boom in the present invention. In this way, the last four boom sections are arranged in two adjacent straight lines, so that the overall dimensions of the pump truck can be reduced, and the flexibility and operability of the boom for material distribution can be greatly improved.
  • the first longitudinal plane comprising the first boom section 1 and the second boom section 2 and the second longitudinal plane comprising the fourth section 4 to the seventh boom section 7 are spaced from each other, and connected to each other via the third boom section 3, i.e., the third boom section 3 is designed into a curved shape, so that one end of the third boom section 3 is positioned in the first longitudinal plane and the other end of the third boom section 3 is positioned in the second longitudinal plane.
  • the first boom section 1 to the third section 3 are folded in a first direction (clockwise direction as shown in Figure 1(b) ), the fourth boom section 4 is folded onto the third boom section 3 in a second direction (counter clockwise direction) being reversed to the first direction, and the sixth boom section 6 is folded onto the fifth boom section 5 in the first direction.
  • the boom can be unfolded in the reversed direction.
  • Figure 2(a) and 2(b) show the second embodiment of the present invention.
  • the fifth boom section 5, the sixth boom section 6, and the seventh boom section 7 are in the same straight line
  • the fourth boom section 4 is in the other adjacent straight line separately.
  • the last three boom sections are arranged in the same straight line, so that the flexibility and operability of the boom can be improved; in addition, in some cases that the space is limited, the concrete can also be transported to a specified working place successfully.
  • the seven boom sections can be arranged in two longitudinal planes in this embodiment, so as to reduce the height of the pump truck and fully utilize the space in width direction above the chassis of the pump truck. It will not be described repeatedly herein.
  • the first boom section 1 to the third section 3 are folded in a first direction (clockwise direction as shown in Figure 2(b) ), the fourth boom section 4 is folded onto the third section 3 in a second direction (counter clockwise direction as shown in Figure 2(b) ) being reversed to the first direction, and the fifth boom section 5 is folded onto the fourth boom section 4 in the first direction.
  • the space occupied by the boom in the folded state can also be reduced effectively; therefore, the overall dimensions of the pump truck in travel state can be reduced, and the requirement for road conditions can be met easily.
  • the five straight lines formed by the seven boom sections are essentially parallel to each other. That is to say, when the boom sections are in the folded state, all of them are essentially level; therefore, the structure is stable and easy to arrange relatively.
  • a concrete pump truck mainly comprising an automobile chassis, a revolving platform, and a boom, wherein, the boom is mounted on the automobile chassis via the revolving platform 8, and the boom is the boom provided in the present invention.
  • the present invention further provides some other embodiments of the boom that comprises seven boom sections, as shown in Figures 3-10 . Hereafter these embodiments will be described.
  • the sixth boom section 6 and the seventh boom section 7 are arranged in a straight line; therefore, the flexibility and operability of the boom can be improved.
  • the first boom section 1 to the third section 3 are folded in an R-shaped pattern in clockwise direction as shown in Figure 3
  • the third boom section 3 to the sixth boom section 6 are folded in a Z-shaped pattern.
  • the sixth boom section 6 and the seventh boom section 7 are arranged in a straight line.
  • the first boom section 1 to the third section 3 are folded in a Z-shaped pattern
  • the third boom section 3 to the sixth boom section 6 are folded in a reversed Z-shaped pattern, i.e., the folded direction of the third boom section 3 to the sixth boom section 6 is reversed to the folded direction of the first boom section 1 to the third boom section 3.
  • the sixth boom section 6 and the seventh boom section 7 are arranged in a straight line.
  • the first boom section 1 to the third boom section 3 are folded in a R-shaped pattern in clockwise direction as shown in Figure 6
  • the third boom section 3 to the fifth boom section 5 are folded in a reversed R-shaped pattern, i.e., folded in counter clockwise direction
  • the sixth boom section 6 is folded to the bottom of the fifth boom section 5 in clockwise direction.
  • the fifth boom section 5, the sixth boom section 6, and the seventh boom section 7 are arranged in an inclined manner on the pump truck (higher at the front end and lower at the rear end in the front-rear direction of the pump truck), so as to improve the space utilization above the chassis and reduce the overall dimensions of the pump truck.
  • the sixth boom section 6 and the seventh boom section 7 are arranged in a straight line.
  • the first boom section 1 to the third boom section 3 are folded in a Z-shaped pattern
  • the second boom section 2 to the sixth boom section 6 are folded in an R-shaped pattern in counter clockwise direction as shown in Figure 7 .
  • the fifth boom section 5 is arranged in an inclined manner on the pump truck (lower at the front end and higher at the rear end in the front-rear direction of the pump truck).
  • the sixth boom section 6 and the seventh boom section 7 are arranged in a straight line.
  • the first boom section 1 to the third boom section 3 are folded in a R-shaped pattern in clockwise direction as shown in Figure 9
  • the boom sections 2-5 are folded in a Z-shaped pattern
  • the sixth boom section 6 is folded to the bottom of the fifth boom section 5 in clockwise direction.
  • the sixth boom section 6 and the seventh boom section 7 are arranged in a straight line.
  • the first boom section 1 to the third boom section 3 are folded in a Z-shaped pattern
  • the third boom section 3 to the fifth boom section 5 are folded in a reversed Z-shaped pattern
  • the sixth boom section 6 is folded to the bottom of the fifth boom section 5 in clockwise direction.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
EP12858228.5A 2011-12-13 2012-10-10 Boom of concrete pump truck and concrete pump truck Withdrawn EP2792814A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201110414082.0A CN102518305B (zh) 2011-12-13 2011-12-13 混凝土泵车的臂架及混凝土泵车
PCT/CN2012/082697 WO2013086893A1 (zh) 2011-12-13 2012-10-10 混凝土泵车的臂架及混凝土泵车

Publications (1)

Publication Number Publication Date
EP2792814A1 true EP2792814A1 (en) 2014-10-22

Family

ID=46289344

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12858228.5A Withdrawn EP2792814A1 (en) 2011-12-13 2012-10-10 Boom of concrete pump truck and concrete pump truck

Country Status (7)

Country Link
US (1) US20150008702A1 (zh)
EP (1) EP2792814A1 (zh)
CN (1) CN102518305B (zh)
BR (1) BR112014014442A2 (zh)
IN (1) IN2014KN01442A (zh)
RU (1) RU2014123432A (zh)
WO (1) WO2013086893A1 (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518305B (zh) * 2011-12-13 2013-08-28 中联重科股份有限公司 混凝土泵车的臂架及混凝土泵车
DE102014200396A1 (de) * 2014-01-13 2015-07-30 Putzmeister Engineering Gmbh Autobetonpumpe und Schutzschaltung dafür
CN114517578B (zh) * 2020-11-20 2023-04-28 三一汽车制造有限公司 作业车辆
CN114517580B (zh) * 2020-11-20 2024-03-08 三一汽车制造有限公司 臂架装置及作业车辆
CN115142678B (zh) * 2021-03-31 2024-02-06 三一汽车制造有限公司 臂架装置及工程机械
CN115142680B (zh) * 2021-03-31 2024-02-06 三一汽车制造有限公司 工程机械

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19644412A1 (de) * 1996-10-25 1998-04-30 Putzmeister Ag Betonverteilermast für Betonpumpen
DE10328770A1 (de) * 2003-06-25 2005-01-27 Putzmeister Ag Fahrbare Betonpumpe mit Verteilermast
DE10328769A1 (de) * 2003-06-25 2005-01-20 Putzmeister Ag Knickmast für fahrbare Betonpumpen
DE202004017771U1 (de) * 2004-11-16 2006-03-23 Liebherr-Werk Ehingen Gmbh Kranausleger
KR20080069599A (ko) * 2005-10-18 2008-07-28 푸츠마이스터 콘크리트 펌프스 게엠베하 특히 대형 매니플레이터와 이동식 콘크리트 펌프용 작동 붐
CN1932215B (zh) * 2006-09-30 2010-08-11 三一重工股份有限公司 用于抑制混凝土泵车臂架振动的方法及装置
DE102007012575A1 (de) * 2007-03-13 2008-09-18 Putzmeister Concrete Pumps Gmbh Großmanipulator
DE102008013990A1 (de) * 2008-03-13 2009-09-17 Putzmeister Concrete Pumps Gmbh Knickmast insbesondere für Betonpumpen
CN201447874U (zh) * 2009-03-27 2010-05-05 长沙中联重工科技发展股份有限公司 一种混凝土泵车末端臂架
CN201598834U (zh) * 2009-12-16 2010-10-06 三一重工股份有限公司 一种混凝土泵车及其臂架装置
US8863966B2 (en) * 2011-03-21 2014-10-21 Dynaking Crane, Llc Kingpost crane apparatus and method
CN102182319A (zh) * 2011-06-13 2011-09-14 三一重工股份有限公司 一种臂架结构及混凝土泵车
CN102409857B (zh) * 2011-10-24 2013-11-20 三一汽车制造有限公司 一种臂架装置及混凝土泵车
CN202401770U (zh) * 2011-12-13 2012-08-29 中联重科股份有限公司 混凝土泵车的臂架及混凝土泵车
CN102518305B (zh) * 2011-12-13 2013-08-28 中联重科股份有限公司 混凝土泵车的臂架及混凝土泵车
CN102588505B (zh) * 2012-02-06 2014-01-15 三一汽车制造有限公司 泵车稳定性控制系统、控制方法及泵车
DE102012215469A1 (de) * 2012-08-31 2014-03-06 Putzmeister Engineering Gmbh Betonverteilermast
US20140338233A1 (en) * 2013-05-14 2014-11-20 Cory ALBERS Methods, apparatus and systems for pond remediation
US20150059408A1 (en) * 2013-09-05 2015-03-05 Evgeny ABUSHAEV Structure printer and methods thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2013086893A1 *

Also Published As

Publication number Publication date
WO2013086893A1 (zh) 2013-06-20
US20150008702A1 (en) 2015-01-08
IN2014KN01442A (zh) 2015-10-23
CN102518305B (zh) 2013-08-28
RU2014123432A (ru) 2016-02-10
CN102518305A (zh) 2012-06-27
BR112014014442A2 (pt) 2017-06-13

Similar Documents

Publication Publication Date Title
EP2792814A1 (en) Boom of concrete pump truck and concrete pump truck
EP2764181B1 (en) Boom of concrete pump truck and concrete pump truck
EP2342400B1 (de) Fahrbare arbeitsmaschine mit stützauslegern
EP2441701B1 (de) Transportvorrichtung und Transportmittel damit
EP1636443B1 (de) Knickmast f r fahrbare betonpumpen
CN104608810A (zh) 一种用于汽车保险杠的物流台车
US10703613B2 (en) Frame support
CN204098503U (zh) 一种臂架装置及具有其的工程机械
CN202248920U (zh) 混凝土泵车的臂架及混凝土泵车
US20130106088A1 (en) Liquid Storage Tank Trailer
CN115142681B (zh) 工程机械
CN102942149A (zh) 伸缩管线输送装置以及具有其的高空作业设备
CN105621309B (zh) 地网碰碰车平台
WO2015155091A1 (de) Fahrbare betonpumpe mit abstützvorrichtung und betonverteilermast
US20240003149A1 (en) Operation vehicle
WO2022205639A1 (zh) 臂架装置及工程机械
CN207498838U (zh) 一种桥梁施工用可移动式的预应力钢绞线穿梭防崩架装置
JP5650184B2 (ja) トレーラ
KR101002035B1 (ko) 차량 운송용 트럭
CN200985783Y (zh) 可旋转移位的输砂装置
CN206667487U (zh) 集装箱模块式过道
KR101808507B1 (ko) 고소작업차의 굴절붐 구조
CN205186952U (zh) 铺贴砖搬运箱
CN114517579A (zh) 臂架装置及作业车辆
CN102650166A (zh) 臂架装置及工程机械

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20140709

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

DAX Request for extension of the european patent (deleted)
18W Application withdrawn

Effective date: 20150318