EP2651812B1 - Grue mobile telescopique - Google Patents

Grue mobile telescopique Download PDF

Info

Publication number
EP2651812B1
EP2651812B1 EP11797252.1A EP11797252A EP2651812B1 EP 2651812 B1 EP2651812 B1 EP 2651812B1 EP 11797252 A EP11797252 A EP 11797252A EP 2651812 B1 EP2651812 B1 EP 2651812B1
Authority
EP
European Patent Office
Prior art keywords
boom
jib
telescopic crane
crane according
mobile telescopic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP11797252.1A
Other languages
German (de)
English (en)
Other versions
EP2651812A1 (fr
Inventor
Alexander Knecht
Peter Kleinhans
Tobias Ebinger
Andreas Hofmann
Martin Lottes
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tadano Faun GmbH
Original Assignee
Tadano Faun GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tadano Faun GmbH filed Critical Tadano Faun GmbH
Publication of EP2651812A1 publication Critical patent/EP2651812A1/fr
Application granted granted Critical
Publication of EP2651812B1 publication Critical patent/EP2651812B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/70Jibs constructed of sections adapted to be assembled to form jibs or various lengths
    • B66C23/701Jibs constructed of sections adapted to be assembled to form jibs or various lengths telescopic
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • B66C23/42Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes with jibs of adjustable configuration, e.g. foldable
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/70Jibs constructed of sections adapted to be assembled to form jibs or various lengths
    • B66C23/701Jibs constructed of sections adapted to be assembled to form jibs or various lengths telescopic
    • B66C23/705Jibs constructed of sections adapted to be assembled to form jibs or various lengths telescopic telescoped by hydraulic jacks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/70Jibs constructed of sections adapted to be assembled to form jibs or various lengths
    • B66C23/701Jibs constructed of sections adapted to be assembled to form jibs or various lengths telescopic
    • B66C23/707Jibs constructed of sections adapted to be assembled to form jibs or various lengths telescopic guiding devices for telescopic jibs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/70Jibs constructed of sections adapted to be assembled to form jibs or various lengths
    • B66C23/701Jibs constructed of sections adapted to be assembled to form jibs or various lengths telescopic
    • B66C23/708Jibs constructed of sections adapted to be assembled to form jibs or various lengths telescopic locking devices for telescopic jibs

Definitions

  • the invention relates to a mobile telescopic crane according to the preamble of claim 1.
  • a mobile telescopic crane which has two brackets arranged on the boom and inclined to the rocker plane.
  • the guy supports are connected to increase the load capacity of the mobile telescopic crane via guy ropes with the free end of the boom and the superstructure.
  • laterally acting on the boom loads that can represent the traglastbesky criterion in an operating position of the boom can be better absorbed.
  • a disadvantage of this mobile telescopic crane that the guy supports represent a significant additional weight. The guy supports must therefore be transported separately on a truck to the site and mounted there on the boom. This is associated with a considerable cost and time.
  • the boom is composed of two juxtaposed sub-arms.
  • a material handling machine having a traveling machine frame and a telescoping boom pivotally mounted thereon.
  • the boom is constructed of a plurality of boom sections, wherein a receiving fork for a load to be moved is disposed on the outermost boom section.
  • the boom sections are telescopically formed so that the boom is retractable and retractable about the take-up fork with the one located thereon Load to and from the machine frame.
  • at least one boom section is made of a composite material. As a result, the weight of the boom and thus the Tipping moment around the front axle minimized.
  • the outermost boom section is constructed, for example, of three partial boom sections of composite material.
  • the invention has for its object to provide a mobile telescopic crane, which allows a simple way to increase the load.
  • a mobile telescopic crane with the features of claim 1.
  • the area moment of inertia of the boom is significantly increased.
  • the area moment of inertia which is a measure of the bending stiffness, results, according to Steiner's theorem, from the own shares of the sub-cantilevers and their Steiner shares.
  • the boom Due to the rigid connecting elements that connect the sub-boom sections of the sub-boom to boom sections, the boom is extremely rigid, so that the cross-sectional area remains substantially flat under load of the boom, whereby the Steiner shares in the calculation of the area moment of inertia substantially with their theoretical Values, possibly reduced by reduction factors, can be applied.
  • the at least four sub-arms can be arranged polygonal, wherein over the width and height of the boom, the stiffness with respect to perpendicular to the rocker plane and acting in the rocker bending forces is adjustable.
  • the at least four sub-arms can be triangular or quadrangular, in particular rectangular, trapezoidal or diamond-shaped be arranged. This applies if the boom has exactly four or more than four sub-arms.
  • the boom according to the invention Due to the significant increase in the area moment of inertia or the area moments of inertia of the boom according to the invention can be completely different dimensions than conventional boom, so that in comparison to a conventional boom with guy supports a corresponding increase in the load with a lower additional weight can be achieved.
  • the sub-arms are constructed of telescoping part-boom sections in the longitudinal direction, the boom can be brought from a transport position to an operating position with little effort.
  • Due to the lower additional weight of the mobile telescopic crane according to the invention - drive within a certain load class - with the full boom on public roads to the site, so that in contrast to a boom with guy supports no separate transport and no complex installation is required.
  • the inventive mobile telescopic crane thus enables a simple way to increase the load.
  • the boom according to the invention can be dimensioned such that in comparison to a conventional boom with guy supports again a significant increase in the load can be achieved.
  • the boom according to the invention also has a considerable weight, so that the mobile telescopic crane with the boom according to the invention may no longer be able to participate fully in public traffic. Individual sub-cantilevers or a group of sub-cantilevers or the entire boom must then be transported separately to the site and mounted there. In the described Dimensioning of the boom according to the invention is thus the advantage in increasing the load.
  • the boom according to the invention can be optimized in terms of its bending stiffness perpendicular to and / or parallel to the rocker plane and / or in terms of weight.
  • the boom according to the invention can be optimized with regard to its weight and / or with regard to its bending stiffness or load capacity.
  • the mobile telescopic crane according to the invention preferably has a boom with at least three, in particular at least four, and in particular at least five boom sections or respective partial boom sections.
  • a mobile telescopic crane according to claim 2 ensures a high rigidity of the boom against bending loads.
  • the respective partial cross-sectional area comprises the material cross-sectional area as well as the cavity cross-sectional area bounded by the material of the sub-arm.
  • a mobile telescopic crane according to claim 3 has an increased rigidity against bending forces acting perpendicular to the rocker plane.
  • the width B A is a maximum width of the boom or the respective boom section.
  • a mobile telescopic crane according to claim 4 has an increased rigidity against bending forces acting in the rocker plane.
  • the height H A is a maximum height of the boom or the respective boom section.
  • a mobile telescopic crane according to claim 5 ensures a similar stiffness behavior of the boom in the positive and negative lateral direction.
  • a mobile telescopic crane according to claim 6 allows an optimization of the rigidity of the boom in relation to its weight.
  • these can be arranged in particular as a rectangle, trapezoid, rhombus or kite quadrangle.
  • a mobile telescopic crane according to claim 7 ensures a compact transport position of the boom.
  • the possible change in the height of the boom if necessary, ensures, in particular, that the mobile telescopic crane does not exceed a maximum permissible height when driving.
  • the at least four partial arms can be linearly displaceable or pivotable relative to one another.
  • the sub-arms are fixable to each other in a displaced operating position. This is done in particular by means of mechanical locking units.
  • the mechanical locking units are arranged, for example, on the connecting elements.
  • a mobile telescopic crane according to claim 8 ensures in the extended operating position of the boom high rigidity by the mechanical locking of each adjacent Auslagerabroughe, since the built-up of the sub-boom sections sub-arms are extremely rigid by the lock.
  • each adjacent sub-boom sections of each sub-boom are mechanically locked to each other.
  • the locking takes place for example by means of locking bolts, the hydraulically, pneumatically or electromechanically actuated are.
  • the locking can be done by means of a bayonet-type locking mechanism.
  • a mobile telescopic crane according to claim 9 ensures a telescopability of the boom part.
  • a mobile telescopic crane according to claim 10 is simple.
  • the partial boom sections have a circular cross section.
  • a mobile telescopic crane according to claim 11 ensures a high rigidity of the boom, so that the cross-sectional area remains flat under load of the boom and the Steiner shares in the calculation of the area moment of inertia can be set approximately with their theoretical values.
  • a mobile telescopic crane according to claim 12 allows a simple way of mechanical locking adjacent sub-boom sections.
  • the respective locking bolt is hydraulically, pneumatically or electromechanically actuated, for example.
  • all adjacent sub-boom sections of each sub-boom are mechanically locked to each other by means of at least one locking bolt.
  • a mobile telescopic crane according to claim 13 allows rapid mechanical locking of adjacent sub-boom sections. Every locking bolt must be performed only by two associated locking holes of the adjacent sub-boom sections to lock them mechanically to each other. The distance to be traversed for locking the respective locking bolt is low. Because the respective locking bolt only has to be guided by two associated locking bores, a comparatively low accuracy in the alignment of the respective locking bolt is required. Preferably, exactly two locking bolts are provided, which are arranged opposite to each other and can be actuated in opposite directions.
  • a mobile telescopic crane according to claim 14 ensures a high rigidity against bending forces acting perpendicular to the rocker plane. If the at least two sub-arms with the greatest distance to the rocker plane would be arranged on an underside of the jib facing the undercarriage, so that the width of the jib would decrease from its underside to its upper side, then the at least two lower-part jibs would Both due to acting in the rocker bending forces and due to acting perpendicular to the rocker bending forces are charged to pressure. Such a construction of the boom would lead to an undesirable load limitation of the boom or the mobile telescopic crane due to the double pressure load according to the Euler kinks.
  • the at least two sub-arms are arranged with the greatest distance to the rocker plane on the side facing away from the undercarriage or upper side of the boom, so acting in the rocker plane bending forces substantially to a tensile load of at least two upper part boom lead, whereas perpendicular to the rocker plane acting bending forces to a pressure load of the upper one Lead partial boom.
  • the pressure load on the furthest to the rocker plane spaced sub-arms can thus be significantly reduced.
  • the area moment of inertia is thus increased on the one hand in accordance with the invention, but on the other hand avoided a double pressure load.
  • the width of the boom can be dimensioned at the top in wide areas as needed. If the jib has exactly four sub-jibs which are arranged in a triangular shape, then a lower sub-jib facing the undercarriage is arranged in the jockey plane and three upper sub-jibs facing away from the undercarriage are arranged at a distance from the rocking plane or in the rocker plane, so that the width of the boom increases from the lower boom to the upper boom and the upper side, respectively.
  • the jib has exactly four partial jibs which are arranged trapezoidally, then the width of the jib increases, starting from two lower jib sections facing the undercarriage, to two upper sub-jibs facing away from the undercarriage.
  • the lower part boom thus have a smaller distance to the rocker plane, as the upper part boom. Since the pressure load due to acting perpendicular to the rocker plane bending forces decreases with the distance to the rocker plane, the bending stiffness is optimized with respect to perpendicular to the rocker plane acting bending forces even with a boom with trapezoidally arranged sub-arms.
  • the width of the boom increases from a lower, in the rocker plane arranged sub-boom to two spaced apart from the rocker plane arranged upper part arms, whereby the described advantages are achieved.
  • the arranged in the rocker plane, upper part boom is not loaded due to both acting in the rocker bending forces and due to acting perpendicular to the rocker bending forces on pressure. A reduction of the width of the boom, starting from the spaced apart to the rocker plane, upper part boom to the arranged in the rocker plane, upper part boom is thus not disadvantageous.
  • a mobile telescopic crane according to claim 15 ensures a high rigidity of the boom relative to the rocker acting bending forces.
  • By the end-side locking adjacent sub-boom sections laterally acting bending forces are derived directly into the entire boom and absorbed by this. This is ensured, in particular, by the fact that the respective at least one locking bolt is fastened or displaceably mounted directly on the associated or adjacent connecting element.
  • a mobile telescopic crane according to claim 16 ensures a high flexural rigidity against bending forces acting in the rocker plane. Due to its partial cross-sectional area, the at least one partial boom facing the undercarriage can absorb high bending forces acting in the seesaw plane. The flexural rigidity of the boom is thus correspondingly high.
  • the partial cross-sectional area of the at least one lower partial cantilever corresponds in each case to at least one and a half times, and at least twice the partial cross-sectional area of the further partial cantilevers. Preferably, the further sub-arms on the same part-cross-sectional areas.
  • the at least one of the undercarriage facing part-boom serve as a receiving space for the hydraulic cylinder for telescoping the boom.
  • a mobile telescopic crane according to claim 17 allows in a simple and space-saving manner a telescoping of the boom.
  • the at least one partial boom preferably has a larger partial cross-sectional area compared to the other partial cantilevers.
  • the hydraulic cylinder is preferably arranged in this sub-boom.
  • all sub-arms are arranged at a distance from the rocker plane, a hydraulic cylinder is preferably arranged in one of the sub-arms.
  • a plurality of hydraulic cylinders, preferably two hydraulic cylinders may be arranged in sub-arms, which are arranged symmetrically to the rocker plane.
  • a mobile telescopic crane according to claim 18 has a relatively stiff and simply constructed boom.
  • a mobile telescopic crane according to claim 19 enables a simple and space-saving cable guide.
  • a mobile telescopic crane according to claim 20 ensures in the usual way the lifting of loads by means of a supporting cable.
  • the carrying cable is guided from a free end of the boom to a cable winch arranged on the superstructure.
  • the carrying cable is preferably guided in the cable guide channel.
  • a mobile telescopic crane 1 has a mobile undercarriage 2, on which an uppercarriage 3 with a counterweight 4 are arranged.
  • the undercarriage 2 is designed in the usual way for driving on public roads.
  • the undercarriage 2 on a base frame 5, on which several axes 6 with it arranged wheels 7 are mounted, which are drivable and steerable in the usual way.
  • the uppercarriage 3 and the counterweight 4 arranged thereon are mounted rotatably on the undercarriage 2 about a rotation axis 8 extending perpendicular to the base frame 5.
  • a boom 9 is arranged, which is by means of a hydraulic cylinder 10 in a rocking plane W pivotally and in a longitudinal direction L telescopic.
  • the boom 9 has for this purpose three boom sections 11 to 13, which are by means of a hydraulic cylinder 14 and telescoped out and so can be transferred from a retracted transport position to an extended operating position.
  • the first boom section 11 is pivoted at the end about a horizontal pivot axis 15 pivotally mounted on the uppercarriage 3.
  • the pivoting of the boom 9 in the rocker W is carried out by means of the hydraulic cylinder 10, which is articulated starting from the superstructure 3 spaced from the pivot axis 15 to the boom section.
  • the boom 9 has four sub-arms 16, 17, 18, 19, which are each telescopically constructed of three sub-boom sections 20 to 22, 23 to 25, 26 to 28 and 29 to 31.
  • the hydraulic cylinder 14 is disposed within a receiving space of the sub-boom 16, which is formed to form the receiving space as a hollow cylinder.
  • a hydraulic cylinder 14 may be arranged within a receiving space of the sub-arm 17, which is designed to form the receiving space as a hollow cylinder.
  • the sub-arms 16 to 19 are arranged transversely to the longitudinal direction L at a distance from each other and connected by four rigid connecting elements 32 to 35 together.
  • the connecting elements 32 and 33 are each end to the sub-boom sections 20, 23, 26 and 29 arranged and form with these the first boom section 11.
  • the connecting element 34 is in turn arranged on the first boom section 11 facing away from the end of the boom sections 21, 24, 27 and 30 and forms with these the second boom section 12. Accordingly, the connecting element 35 is remote from the boom section 12 End of the sub-boom sections 22, 25, 28 and 31 arranged and forms with these the third boom section 13.
  • Another connecting element 36 is disposed on the sub-boom sections 20, 23, 26 and 29 and between the connecting elements 32 and 33. On the connecting element 36, the hydraulic cylinder 10 is pivotally articulated.
  • the boom 9 is constructed symmetrically to the rocker W and has a designated as a heavy line and lying in the rocker plane W boom central longitudinal axis 37.
  • the sub-arms 16 to 19 correspondingly have associated sub-boom center longitudinal axes 38 to 41, which are arranged polygonal or square and symmetrical to the rocker plane W.
  • the sub-boom center longitudinal axes 38 to 41 are arranged in particular trapezoidal.
  • the boom central longitudinal axis 37 is located in the rocker plane W.
  • the sub-boom center longitudinal axes 38, 39 have perpendicular to the rocker W equal distances b 1 and b 2 and parallel to the rocker W equal distances h 1 and h 2 to the boom Center longitudinal axis 37 on.
  • the undercarriage 2 facing, lower part boom 16, 17 form an underside of the boom 9, whereas the side facing away from the undercarriage 2, upper part boom 18, 19 form an upper side of the boom 9.
  • the boom 9 has perpendicular to the rocker W a width B, which increases starting from the lower part arms 16, 17 in the direction of the upper part boom 18, 19 up to a maximum width B A. This is in Fig. 7 illustrated.
  • the partial boom sections 20 to 31 are designed as hollow cylinders and have a circular cross-section.
  • Fig. 7 illustrates the cross-sectional shape of the sub-boom sections 20, 23, 26 and 29 of the first boom section 11 and the position of these sub-boom sections 20, 23, 26 and 29 relative to each other and to the rocking plane W.
  • the sub-boom sections 20 and 23 have equal outside radii R 1 and R 2 , which are larger than the same outer radii R 3 and R 4 of the sub-boom sections 26 and 29.
  • the boom 9 thus has in the region of the boom section 11 a height or a maximum height H A , which results from the sum of R 1 , R 3 , h 1 and h 3 .
  • the boom 9 in the region of the boom section 11 has a width or a maximum width B A , which results from the sum of R 3 , R 4 , b 3 and b 4 .
  • adjacent partial boom sections 20 to 31 of each sub-boom 16 to 19 are guided into each other so as to be displaceable in the longitudinal direction L.
  • the boom sections 20, 23, 26 and 29 have perpendicular to the rocker W partial cross-sectional areas A 1 to A 4 , each resulting from the circular area with the associated outer radius R 1 to R 4 .
  • the cross-sectional area A A is in Fig.
  • the area moments of inertia provide a measure of the rigidity of the boom 9 relative to the respective bending forces. Due to the Steiner shares, the area moments of inertia are considerably increased compared to conventional cantilevers.
  • the connecting elements 32 to 36 are each essentially formed of a bottom plate or a lower connecting element part 42 facing away from the undercarriage 2 and an upper plate or an upper connecting element part 43 facing away from the undercarriage 2, which can be displaced relative to one another in the direction of the rocker plane W. and each other can be fixed.
  • the connecting elements 33 to 36 each have four passage openings 44 to 47 for the sub-boom sections 20 to 31 of the sub-boom 16 to 19, wherein the passage openings 44, 45 for the sub-boom 16, 17 respectively in the lower plate 42 and the passage openings 46, 47 for the sub-arms 18, 19 are each formed in the upper plate 43.
  • the lower plates 42 each have the upper part arms 18, 19 facing recesses 48, 49, in which the upper part boom 18, 19 are at least partially receivable.
  • the upper plates 43 each have the lower part arms 16, 17 facing recesses 50, 51, in which the lower part boom 16, 17 are at least partially receivable.
  • the connecting elements 32 to 36 each have a through opening 52 formed by the respective plates 42, 43, which form a cable guide channel 53 for guiding a supporting cable 54.
  • the support cable 54 is guided in a conventional manner from the free end of the boom 9 to a winch 55 arranged on the uppercarriage 3.
  • the support cable 54 is guided at the free end of the arm 9 via two deflection rollers 56, 57, which are rotatably supported by a support frame 58 at the free end of the arm 9.
  • the sub-arms 18 and 19 are displaceable relative to the sub-arms 16 and 17 parallel to the rocker plane W.
  • two hydraulic cylinders 59 are fixedly arranged thereon and connected to the upper plate 43 of the connecting element 32.
  • two hydraulic cylinders 60 which are connected to the upper plate 43 of the connecting element 33, are fastened at the end to the partial boom sections 20 and 23.
  • locking units 61 are provided for the displacement of the sub-arms 18, 19 and for fixing these sub-arms 18, 19 relative to the sub-arms 16, 17 .
  • two locking units 61 are arranged on a respective upper plate 43.
  • Each locking unit 61 has a locking pin 62 which is feasible for locking or unlocking in an associated locking hole 63.
  • the respective locking bolt 62 is hydraulically, pneumatically or electromechanically actuated, for example.
  • the respective guide pin 62 is slidably mounted on the respective upper plate 43, whereas the associated locking hole 63 is formed in the associated lower plate 42.
  • two associated locking holes 63 are formed for each locking pin 62, which serve for locking and unlocking of the plates 42, 43 in a retracted transport position and an extended operating position of the boom 9.
  • the locking units 61 are arranged on each of the connecting elements 32 to 35 and also on the connecting element 36.
  • the hydraulic cylinders 59, 60 and the locking units 61 of the boom 9 can be transferred from a transport position to an operating position and vice versa.
  • the cross-sectional area A and the height H A of the boom 9 is reduced compared to the operating position, whereby the mobile telescopic crane 1 has a smaller overall height.
  • the reduction of the overall height is required, for example, in order not to exceed a maximum permitted height in road traffic.
  • locking units 64 to 67 are provided, which are arranged in the region of the connecting elements 33 and 34.
  • the locking units 64 to 67 are directly mounted on the respectively associated connecting element 33, 34, so that adjacent partial boom sections 20 and 21, 21 and 22, 23 and 24, 24 and 25, 26 and 27, 27 and 28, 29 and 30 and 30 and 31 are mutually mechanically lockable end.
  • the locking units 64 to 67 each have two oppositely disposed locking pins 68 which are guided by respectively associated locking holes 69, 70.
  • the locking bolts 68 are hydraulically, pneumatically or electromechanically actuated, for example.
  • the Fig. 1 to 3 show the mobile telescopic crane 1 in the intended state for driving.
  • the boom 9 is in a fully retracted transport position.
  • the locking units 64 to 67 are unlocked and the boom sections 11 to 13 einteleskopiert.
  • the sub-arms 18 and 19 are completely lowered by means of the hydraulic cylinders 59, 60, so that the sub-arms 18, 19 in the recesses 48, 49 and the sub-arms 16, 17 are arranged in the recesses 50, 51.
  • the mobile telescopic crane 1 has the lowest possible total height, so that the maximum permitted height in the road is not exceeded.
  • Fig. 3 illustrates the transport position of the boom 9 based on a cross section through the boom section 13th
  • Fig. 4 and 5 show the mobile telescopic crane 1 in an operating position with the fully erected and austeleskop faced boom 9.
  • the locking elements 64 to 67 associated with the connecting elements 33 and 34 are also mechanically locked, so that the boom 9 has a high rigidity.
  • Fig. 6 shows a cross section through the belonging to the connecting element 34 locking units 64 to 67th
  • the boom 9 according to the invention has a high rigidity against bending forces perpendicular and parallel to the rocker plane W due to the high area moments of inertia. This can be achieved in relation to the weight of the boom 9, a significant increase in load capacity.
  • no separate transport and no complex assembly is required compared to a conventional boom with guy supports.
  • the sub-arms 16a to 19a of the boom 9a are arranged in the shape of a kite quadrangle.
  • the partial cross-sectional area A 1 of the sub-arm 16 a is greater than the respective partial cross-sectional area A 2 to A 4 .
  • the sub-arms 16a to 19a have a circular cross-section.
  • the boom 9a thus has in the region of the boom section 11a a maximum height H A , which results from the sum of R 1 , h 1 , h 4 and R 4 . Furthermore, the boom 9a in the region of the boom section 11a has a maximum width B A , which results from the sum of R 2 , b 2 , b 3 and R 3 .
  • the receiving space formed by the sub-boom 19a serves as a cable guide channel 53a.
  • the lower plates 42a of the connecting elements 33a to 35a each have a centrally arranged recess 48a, in which the uppermost part of the boom 19a is receivable.
  • the upper plates 43a each have a centrally disposed recess 50a, in which the lower part boom 16a is receivable.
  • the uppermost boom 19a can be displaced relative to the other partial arms 16a to 18a according to the first embodiment and fixed in the retracted transport position and the extended operating position by means of the locking units 16a.
  • the boom 9a and the boom sections 11a to 13a and the sub-boom sections 20a to 31a and the associated locking units 64a to 67a including the locking pin 68a and the associated locking holes 69a, 70a is referred to the first embodiment.
  • the following is based on the Fig. 14 and 15 A third embodiment of the invention described.
  • the partial boom 19b by means of the connecting elements 32b to 35b fixedly disposed on the sub-arms 16b to 18b and not displaceable relative to these. If this is the maximum allowable height of the mobile telescopic crane 1b is not exceeded, so a simplification of the structure of the boom 9b is possible.
  • the connecting elements 32b to 35b are fixedly arranged on the sub-arm 19b and are not constructed of mutually displaceable plates, the hydraulic cylinders 59a, 60a, the recesses 48a and 50a and the locking units 61a with the locking pin 62a and the associated locking holes 63a omitted.
  • the receiving space formed by the sub-boom 19b serves as a cable guide channel 53b.
  • boom 9b and the boom sections 11b to 13b and the boom sections 20b to 31b and the associated lock units 64b to 67b including the lock pins 68b and the associated lock holes 69b, 70b are formed in accordance with the second embodiment.
  • the features of the boom 9 to 9b are basically combined in any way to a boom according to the invention.
  • the boom 9 to 9b according to the invention further advantages over a conventional boom with guy supports on.
  • the booms 9 to 9b according to the invention can be optimized separately in each boom section 11 to 13b for the bending forces acting, so that they are received continuously along the boom 9 to 9b and not only at the end of the boom.
  • both the transfer of the boom 9 to 9b in the operating position and their operation is extremely simple.
  • the boom according to the invention allow 9 to 9b at a predefined weight a significant increase in load over conventional booms. In particular, a significantly easier handling of the boom 9 to 9b with respect to transport and installation or transfer to the operating position over conventional booms with guy supports is possible with the same load.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Claims (20)

  1. Grue mobile télescopique comprenant
    - un chariot inférieur (2) pouvant être déplacé,
    - un chariot supérieur (3), disposé au dessus du chariot inférieur (2), pouvant être mis en rotation,
    - une flèche (9 ; 9a ; 9b) télescopique dans le sens longitudinal et disposée sur le chariot supérieur (3), qui peut être pivotée dans un plan de basculement,
    caractérisée en ce
    que la flèche (9 ; 9a ; 9b) télescopique présente au moins quatre flèches partielles (16 à 19 ; 16a à 19a ; 16b à 19b),
    que chacune des flèches partielles (16 à 19 ; 16a à 19a ; 16b à 19b) est construite télescopique dans le sens longitudinal avec au moins deux tronçons de flèche partielle (20 à 31 ; 20a à 31a ; 20b à 31b),
    et
    que les tronçons de flèche partielle (20 à 31 ; 20a à 31a ; 20b à 31b) disposés espacés les uns des autres perpendiculairement par rapport au sens longitudinal forment chacun un tronçon de la flèche (11 à 13 ; 11a à 13a) ; 11b à 13b) comprenant au moins un élément de liaison rigide en flexion (32 à 35 ; 32a à 35a ; 32b à 35b).
  2. Grue mobile télescopique selon la revendication 1, caractérisée en ce
    que la flèche (9 ; 9a ; 9b) présente une surface de section transversale AA, générée par au moins quatre flèches partielles (16 à 19 ; 16a à 19a ; 16b à 19b), perpendiculaire par rapport au plan de basculement, et que chaque flèche partielle (16 à 19 ; 16a à 19a ; 16b à 19b) présente une surface de section transversale partielle (A1 à A4) perpendiculaire au plan de basculement, où le rapport d'une surface de section transversale partielle (A1 à A4) sur une somme AS des surfaces de section transversales partielles est tel que AA/AS > 1, en particulier, AA/AS ≥ 1,5, particulièrement AA/AS ≥ 2, et notamment, AA/AS ≥ 2,5.
  3. Grue mobile télescopique selon les revendications 1 ou 2, caractérisée en ce
    que la flèche (9 ; 9a ; 9b) présente une largeur BA verticale par rapport au plan de basculement et chaque flèche partielle (16 à 19 ; 16a à 19a ; 16b à 19b) présente une largeur Bi verticale par rapport au plan de basculement, leur rapport est tel que BA/Bi ≥ 1,5, en particulier BA/Bi ≥ 2 et notamment BA/Bi ≥ 2,5.
  4. Grue mobile télescopique selon l'une des revendications 1 à 3, caractérisée en ce
    que la flèche (9 ; 9a ; 9b) présente une hauteur HA parallèle au plan de basculement et chaque flèche partielle (16 à 19 ; 16a à 19a ; 16b à 19b) présente une hauteur Hi, leur rapport satisfaisant à la relation HA/Hi ≥ 1,5, en particulier, HA/Hi ≥ 2, notamment HA/Hi ≥ 2,5.
  5. Grue mobile télescopique selon l'une des revendications 1 à 4, caractérisée en ce
    que les flèches partielles (16 à 19 ; 16a à 19a ; 16b à 19b) sont disposées symétriquement par rapport au plan de basculement.
  6. Grue mobile télescopique selon l'une des revendications 1 à 5, caractérisée en ce
    que les flèches partielles (16 à 19 ; 16a à 19a ; 16b à 19b) sont disposées les unes par rapport aux autres sous forme d'un polygone, en particulier, sous la forme d'un triangle ou d'un carré.
  7. Grue mobile télescopique selon l'une des revendications 1 à 6, caractérisée en ce
    qu'au moins une flèche partielle (18, 19 ; 19a) peut être déplacée, pour la modification de la surface de la section transversale AA, en particulier, pour la modification de la hauteur HA de la flèche (9 ; 9a), vers au moins une autre flèche partielle (16, 17 ; 16a à 18a).
  8. Grue mobile télescopique selon l'une des revendications 1 à 7, caractérisée en ce
    que des tronçons de flèche voisins (11 à 13 ; 11a à 13a ; 11b à 13b) peuvent être verrouillés mécaniquement les uns par rapport aux autres dans le sens longitudinal.
  9. Grue mobile télescopique selon l'une des revendications 1 à 8, caractérisée en ce
    que les tronçons de flèche partielle (20 à 31 ; 20a à 31a ; 20b à 31b) de toutes les flèches partielles (16 à 19 ; 16a à 19a ; 16b à 19b) sont conçus sous forme de cylindres en bois et que des tronçons de flèches partielles voisins (20 à 31 ; 20a à 31a ; 20b à 31b) peuvent chacun être télescopé l'un dans l'autre.
  10. Grue mobile télescopique selon l'une des revendications 1 à 9, caractérisée en ce
    que les tronçons de flèches partielles (20 à 31 ; 20a à 31a ; 20b à 31b) de toutes les flèches partielles (16 à 19 ; 16a à 19a ; 16b à 19b) possèdent une section transversale de géométrie semblable et notamment identique.
  11. Grue mobile télescopique selon l'une des revendications 1 à 10, caractérisée en ce
    que des tronçons de flèche partielle (20 à 31 ; 20a à 31a ; 20b à 31b) voisins de toutes les flèches partielles (16 à 19 ; 16a à 19a ; 16b à 19b) peuvent être verrouillés mécaniquement les uns par rapport aux autres dans le sens longitudinal.
  12. Grue mobile télescopique selon l'une des revendications 1 à 11, caractérisée en ce
    qu'au moins deux tronçons de flèche partielle (20 à 31 ; 20a à 31a ; 20b à 31b) voisins peuvent être verrouillés mécaniquement l'un par rapport à l'autre au moyen d'au moins un boulon de verrouillage (68 ; 68a ; 68b).
  13. Grue mobile télescopique selon l'une des revendications 1 à 12, caractérisée en ce
    qu'au moins deux tronçons de flèche partielle (20 à 31 ; 20a à 31a ; 20b à 31b) voisins peuvent être verrouillés mécaniquement l'un par rapport à l'autre au moyen d'au moins deux boulons de verrouillage (68 ; 68a ; 68b).
  14. Grue mobile télescopique selon l'une des revendications 1 à 13, caractérisée en ce
    que la flèche (9 ; 9a ; 9b) présente une largeur se modifiant verticalement par rapport au plan de basculement, la largeur augmentant en partant d'au moins une flèche partielle (16, 17 ; 16a ; 16b) inférieure, orientée vers le chariot inférieur (2) jusqu'à au moins deux flèches partielles (18, 19 ; 17a, 18a ; 17b, 18b) supérieures, opposées au chariot inférieur (2).
  15. Grue mobile télescopique selon l'une des revendications 1 à 14, caractérisée en ce
    que les tronçons de flèche partielle (20 à 31 ; 20a à 31a ; 20b à 31b) respectivement voisins d'au moins une flèche partielle (16 à 19 ; 16a à 19a ; 16b à 19b) peuvent être verrouillés mécaniquement les uns par rapport aux autres à leurs extrémités, en particulier, l'au moins un boulon de verrouillage (68 ; 68a ; 68b) prévu pour le verrouillage de tronçons de flèche partielle (20 à 31 ; 20a à 31a ; 20b à 31b) voisins respectifs étant disposé sur au moins un élément de liaison (33, 34 ; 33a, 34a ; 33b, 34b) correspondant.
  16. Grue mobile télescopique selon l'une des revendications 1 à 15, caractérisée en ce
    qu'au moins une flèche partielle (16, 17 ; 16a ; 16b) inférieure, orientée vers le chariot inférieur (2), présente une surface de section transversale partielle (A1, A2 ; A1) supérieure en comparaison à celle des autres flèches partielles (18, 19 ; 17a à 19a ; 17b à 19b).
  17. Grue mobile télescopique selon l'une des revendications 1 à 16, caractérisée en ce
    qu'au moins une flèche partielle (16 ; 16a ; 16b) forme une espace d'admission dans lequel un cylindre hydraulique (14) est disposé pour le télescopage de la flèche (9 ; 9a ; 9b).
  18. Grue mobile télescopique selon l'une des revendications 1 à 17, caractérisée en ce
    que la flèche (9 ; 9a ; 9b) présente exactement quatre flèches partielles (16 à 19 ; 16a à 19a ; 16b à 19b) qui sont disposées en forme d'un polygone et symétriquement par rapport au plan de basculement.
  19. Grue mobile télescopique selon l'une des revendications 1 à 18, caractérisée en ce
    que les flèches partielles (16 à 19 ; 16a à 19a ; 16b à 19b) délimitent un canal de guidage pour un câble (53 ; 53a ; 53b).
  20. Grue mobile télescopique selon l'une des revendications 1 à 19, caractérisée en ce
    que le câble porteur (54) est guidé le long de la flèche (9 ; 9a ; 9b), le câble porteur (54) étant notamment agencé dans le canal de guidage pour un câble (53 ; 53a ; 53b).
EP11797252.1A 2010-12-17 2011-12-16 Grue mobile telescopique Active EP2651812B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102010063456 2010-12-17
PCT/EP2011/073024 WO2012080455A1 (fr) 2010-12-17 2011-12-16 Grue télescopique mobile

Publications (2)

Publication Number Publication Date
EP2651812A1 EP2651812A1 (fr) 2013-10-23
EP2651812B1 true EP2651812B1 (fr) 2014-12-03

Family

ID=45350773

Family Applications (2)

Application Number Title Priority Date Filing Date
EP11797252.1A Active EP2651812B1 (fr) 2010-12-17 2011-12-16 Grue mobile telescopique
EP11797251.3A Active EP2504267B1 (fr) 2010-12-17 2011-12-16 Grue mobile telescopique

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP11797251.3A Active EP2504267B1 (fr) 2010-12-17 2011-12-16 Grue mobile telescopique

Country Status (7)

Country Link
US (2) US9637358B2 (fr)
EP (2) EP2651812B1 (fr)
JP (2) JP5934717B2 (fr)
CN (2) CN103269970B (fr)
DE (1) DE202011110230U1 (fr)
RU (2) RU2547492C2 (fr)
WO (2) WO2012080455A1 (fr)

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9637358B2 (en) * 2010-12-17 2017-05-02 Tadano Faun Gmbh Mobile telescopic crane
CN103043541B (zh) * 2012-12-31 2015-09-16 大连理工大学 双箱型伸缩臂结构
CN103754757A (zh) * 2013-08-22 2014-04-30 柳州柳工叉车有限公司 伸缩臂吊钩
JP6223071B2 (ja) * 2013-08-30 2017-11-01 株式会社タダノ クレーン装置のブーム伸縮機構
DE202014004976U1 (de) * 2014-06-16 2014-08-07 Liebherr-Werk Ehingen Gmbh Teleskopausleger und Kran
JP6531505B2 (ja) * 2015-06-11 2019-06-19 株式会社タダノ 伸縮ブームの取付構造
DE102016114837A1 (de) 2016-08-10 2018-02-15 Terex Global Gmbh Teleskopausleger mit Abspannsystem für einen Mobilkran und Abspannverfahren hierfür
CA172264S (en) * 2016-12-21 2017-07-11 John Rene Spronken Crane base
DE102017101113B3 (de) * 2017-01-20 2018-07-12 Terex Global Gmbh Teleskopausleger mit Stangenabspannsystem für einen Mobilkran und Abspannverfahren hierfür
US10662719B2 (en) 2017-01-30 2020-05-26 National Oilwell Varco, L.P. Telescopic deployment mast
CN107686062B (zh) * 2017-08-02 2019-06-11 中建三局集团有限公司 一种可变角度的自升式塔吊
KR101945522B1 (ko) 2017-08-18 2019-02-07 삼성중공업 주식회사 다단 크레인
DE102017127973A1 (de) 2017-11-27 2019-05-29 Liebherr-Werk Ehingen Gmbh Teleskopausleger für einen Kran und Kran mit einem entsprechenden Teleskopausleger
US10746349B2 (en) * 2018-01-15 2020-08-18 Hamaye Co Extendable cage telescopic system
CN108502723B (zh) * 2018-03-30 2019-09-10 山东建筑大学 起重机回转且变幅运动时消除起重臂振动的方法和系统
AU2019282610B2 (en) * 2018-06-05 2023-01-19 The Will-Burt Company Auto-locking telescoping mast
DE102019002039A1 (de) * 2019-03-22 2020-09-24 David Mann Hebevorrichtung
DE102019110505B3 (de) * 2019-03-29 2020-06-18 Liebherr-Werk Ehingen Gmbh Teleskopausleger und Mobilkran
CA3139525A1 (fr) 2019-05-07 2020-11-12 Kore Infrastructure, Llc Production de combustible renouvelable pour la production de vapeur pour l'extraction d'huile lourde
RU2720039C1 (ru) * 2019-07-19 2020-04-23 Федеральное государственное бюджетное образовательное учреждение высшего образования "Тихоокеанский государственный университет" Рабочее оборудование гидравлического экскаватора
CN110371840B (zh) * 2019-08-06 2020-06-02 庄俊 一种长度可调节的吊装支撑梁

Family Cites Families (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3494593A (en) * 1968-01-29 1970-02-10 Schlumberger Technology Corp Portable mast
JPS4728652Y1 (fr) 1969-02-15 1972-08-29
US3610433A (en) * 1970-05-07 1971-10-05 Baker Equipment Eng Co Hydraulically operable extendable boom
DE2103570C3 (de) * 1971-01-26 1974-03-07 Leo Gottwald Kg, 4000 Duesseldorf Teleskopierbarer Kranausleger in Rahmenbauwei se
US3752261A (en) * 1971-06-21 1973-08-14 S Bushnell Multi-stage lift
US3802136A (en) * 1972-01-26 1974-04-09 Gottwald Kg Leo Extendible crane boom formed of telescopic box-shaped sections
AT338849B (de) * 1975-06-10 1977-09-12 Voest Ag Ausmauerungsvorrichtung fur metallurgische gefasse
US4238911A (en) * 1978-09-29 1980-12-16 Frosch Robert A Telescoping columns
FI802255A (fi) 1979-07-25 1981-01-26 Coles Cranes Ltd Bom foer lyftkran
US4327533A (en) * 1980-08-13 1982-05-04 Kidde, Inc. Crane boom extending, retracting and cooperative latching arrangement
US4590720A (en) * 1984-02-06 1986-05-27 Parco Mast And Substructure, Inc. Telescoping derrick
US5101215A (en) * 1985-05-10 1992-03-31 Chu Associates, Inc. Telescoping lightweight antenna tower assembly and the like
US5060427A (en) * 1990-02-01 1991-10-29 Kidde Industries, Inc. Extension and retraction system for four section telescopic boom having simultaneous and equal extension and retraction of the telescopic sections
SE501102C2 (sv) * 1993-04-26 1994-11-14 Hiab Ab Förlängningsbar kranarm
RU2106295C1 (ru) 1996-04-03 1998-03-10 Николай Егорович Храмов Стрела автокрана высокой грузоподъемности
JP4010466B2 (ja) 1997-07-03 2007-11-21 オックスジャッキ株式会社 重量物用ジャッキ装置
DE10022658B4 (de) 1999-06-28 2007-10-04 Terex-Demag Gmbh & Co. Kg Teleskopkran
US7077209B2 (en) 2001-10-30 2006-07-18 Varco/Ip, Inc. Mast for handling a coiled tubing injector
US6726437B2 (en) * 2002-02-08 2004-04-27 Clark Equipment Company Telescoping loader lift arm
GB2387373A (en) 2002-04-12 2003-10-15 Bamford Excavators Ltd Composite boom for a load handling machine
JP4728652B2 (ja) 2005-01-25 2011-07-20 株式会社リコー 三次元cadデータ詳細隠蔽装置、三次元cadデータ詳細隠蔽方法、および三次元cadデータ詳細隠蔽プログラム
US7430890B1 (en) * 2005-06-24 2008-10-07 Vincent P Battaglia Telescoping tower and method of manufacture
JP2007276918A (ja) 2006-04-04 2007-10-25 Nippon Kiki Kogyo Kk エレベータ
US7574832B1 (en) * 2007-01-24 2009-08-18 Lieberman Phillip L Portable telescoping tower assembly
CA2697304A1 (fr) * 2007-09-05 2009-03-12 Palfinger Ag Forme profilee pour bras de grue
US8234823B2 (en) * 2008-07-09 2012-08-07 Mcclure Clifton D Telescoping mast
US8046970B2 (en) * 2009-04-03 2011-11-01 Aluma Tower Company, Inc. Unguyed telescoping tower
CN101955133B (zh) * 2009-07-14 2013-06-05 三一汽车制造有限公司 一种移动式起重机
RU2418735C1 (ru) * 2010-01-12 2011-05-20 Павел Владимирович Корчагин Подъемная крановая система
CA2736718A1 (fr) * 2010-04-09 2011-10-09 Electro Mechanical Industries, Inc. Structure de tour
DE102010020016B4 (de) * 2010-05-10 2021-04-29 Liebherr-Werk Ehingen Gmbh Kran und Verfahren zum Aufrichten des Krans
US9637358B2 (en) * 2010-12-17 2017-05-02 Tadano Faun Gmbh Mobile telescopic crane
US20140059949A1 (en) * 2012-09-06 2014-03-06 Said Lounis Telescopic multi-mast system
US8955264B2 (en) * 2013-04-24 2015-02-17 Solaris Technologies, Inc. Portable tower with improved guiding and lifting systems
US9371662B1 (en) * 2015-03-31 2016-06-21 Us Tower Corporation Variable height telescoping lattice tower

Also Published As

Publication number Publication date
RU2548652C2 (ru) 2015-04-20
US9376292B2 (en) 2016-06-28
RU2013125916A (ru) 2015-01-27
EP2504267A1 (fr) 2012-10-03
JP2013545690A (ja) 2013-12-26
CN103261083B (zh) 2015-04-29
JP5953315B2 (ja) 2016-07-20
US20140158657A1 (en) 2014-06-12
DE202011110230U1 (de) 2013-02-13
JP2013545691A (ja) 2013-12-26
EP2651812A1 (fr) 2013-10-23
WO2012080455A1 (fr) 2012-06-21
WO2012080452A1 (fr) 2012-06-21
US20150008206A1 (en) 2015-01-08
CN103269970A (zh) 2013-08-28
CN103269970B (zh) 2015-04-29
RU2013125915A (ru) 2015-01-27
US9637358B2 (en) 2017-05-02
JP5934717B2 (ja) 2016-06-15
CN103261083A (zh) 2013-08-21
EP2504267B1 (fr) 2013-07-10
RU2547492C2 (ru) 2015-04-10

Similar Documents

Publication Publication Date Title
EP2651812B1 (fr) Grue mobile telescopique
DE102009016033B4 (de) Gittermastkran und Gittermastausleger
EP2976288B1 (fr) Élément de pylône à treillis, potence de pylône à treillis présentant au moins un tel élément de pylône à treillis ainsi que grue présentant au moins une telle potence de pylône à treillis
EP3040303B1 (fr) Grue et element de mat en treillis pour un mat en treillis pour une telle grue
EP3519344B1 (fr) Flèche télescopique dotée d'un système de haubanage pour une grue mobile et procédé de haubanage correspondant
WO1998054081A1 (fr) Grue a fleche telescopique
DE102011016015B4 (de) Gittermastkran und Gittermastausleger
DE102009048846A1 (de) Kran
EP1939135B1 (fr) Grue automotrice
DE102014012661B4 (de) Verfahren zum Betrieb eines Krans und Kran
DE102012002041A1 (de) Arbeitsgerät mit einem Ausleger
EP3793930A1 (fr) Stabilisateur pour la corde de haubanage arrière d'une grue télescopique
DE102012023814B4 (de) Klappspitze für einen Mobilkran und Verfahren zum Verschwenken der Klappspitze
DE102020129454B4 (de) Fahrzeugkran mit einem Auslegersystem
DE102012210112B3 (de) Mobil-Teleskopkran
DE202008009281U1 (de) Kran
DE69810981T2 (de) Technik zum Aufrichten des Mastes für einen Teleskopkran
DE102012210110B3 (de) Verfahren zur Inbetriebnahme eines Mobil-Teleskopkrans sowie Mobil-Teleskopkran
DE102012210109B3 (de) Mobil-Teleskopkran
DE102022117472B4 (de) Hilfsspitze für den Ausleger eines Arbeitsgeräts
DE202004016639U1 (de) Mobilkran
DE202022104596U1 (de) Anschlussabschnitt für einen Zusatzausleger eines Fahrzeugkrans und Fahrzeugkran hiermit
DE102022128653A1 (de) Fahrbarer Kran mit Gittermastausleger, Gittermastausleger sowie Verfahren zur Montage eines solchen
DE102022122282A1 (de) Fahrzeugkran mit einem lösbaren Anbau-Oberwagen und Rüstverfahren hierzu
DE10226319B4 (de) Fahrzeugkran mit ein- und ausfahrbarer Koppeleinrichtung für ein Gegengewicht

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20130524

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20140721

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 699238

Country of ref document: AT

Kind code of ref document: T

Effective date: 20141215

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502011005192

Country of ref document: DE

Effective date: 20150115

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20141203

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150303

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150304

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150403

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150403

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502011005192

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141216

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141231

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141231

26N No opposition filed

Effective date: 20150904

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141216

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20111216

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 6

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141203

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230530

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231220

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20231228

Year of fee payment: 13

Ref country code: FR

Payment date: 20231221

Year of fee payment: 13

Ref country code: DE

Payment date: 20231214

Year of fee payment: 13

Ref country code: AT

Payment date: 20231221

Year of fee payment: 13