EP2093179A2 - Vorrichtung zur Anpassung eines Wicklers an die Länge der abzuwickelnden Spulen - Google Patents

Vorrichtung zur Anpassung eines Wicklers an die Länge der abzuwickelnden Spulen Download PDF

Info

Publication number
EP2093179A2
EP2093179A2 EP09152589A EP09152589A EP2093179A2 EP 2093179 A2 EP2093179 A2 EP 2093179A2 EP 09152589 A EP09152589 A EP 09152589A EP 09152589 A EP09152589 A EP 09152589A EP 2093179 A2 EP2093179 A2 EP 2093179A2
Authority
EP
European Patent Office
Prior art keywords
holes
winder
bobbins
bobbin
level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP09152589A
Other languages
English (en)
French (fr)
Other versions
EP2093179A3 (de
EP2093179B1 (de
Inventor
Roberto Badiali
Giuseppe Morini
Michele Simonatto
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Savio Macchine Tessili SpA
Original Assignee
Savio Macchine Tessili SpA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Savio Macchine Tessili SpA filed Critical Savio Macchine Tessili SpA
Publication of EP2093179A2 publication Critical patent/EP2093179A2/de
Publication of EP2093179A3 publication Critical patent/EP2093179A3/de
Application granted granted Critical
Publication of EP2093179B1 publication Critical patent/EP2093179B1/de
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H67/00Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
    • B65H67/06Supplying cores, receptacles, or packages to, or transporting from, winding or depositing stations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/70Other constructional features of yarn-winding machines
    • B65H54/72Framework; Casings; Coverings
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/18Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations ; Arrangements to prevent unwinding of roving from roving bobbins
    • D01H9/187Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations ; Arrangements to prevent unwinding of roving from roving bobbins on individual supports, e.g. pallets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/31Textiles threads or artificial strands of filaments

Definitions

  • the present invention refers to a device for adapting the winder to every new batch of bobbins to be fed to the automatic winder.
  • the transfer between the two processes, of the bobbins full of yarn to the winder and that of their empty tubes to the spinning frame, may occur "in hoppers" or through wheeled boxes, or - in the so-called “spin-winders” - transferring the bobbins directly and separately to winder.
  • winders are used for winding batches of bobbins coming from different spinning frames and they must be easily adapted to receive and process the batches of bobbins coming therefrom. Still generally, such batches of bobbins may have different shapes, generally depending on the type of yarn under process.
  • the choice of the size of the bobbin derives from a compromise between the needs related to the performance of the spinning frame and energy saving. In order to have a high performance of the spinning frame, the ratio between the spinning frame doffing time and the actual spinning time must be reduced, i.e. bobbins with longer winding must be produced.
  • the bobbin In order to reduce the unitary energy consumption the bobbin is required to be small, short and narrow and with lower content of wound yarn, to reduce the size of the balloon, the frictions and dispersions. In cases where energy is costly the bobbins are generally of a smaller size.
  • the current production the length of the bobbins may thus vary in the range between 180 and 280 mm.
  • the winder is generally made up of a plurality winding units aligned and served by a common transport system which bears pegs with full bobbins and unloads pegs with empty bobbins; the single winding units are arranged according to a plurality of transverse paths, in which the processing of the bobbins is performed, served by conveyor belts, in which there are new standby bobbins and a bobbin under process.
  • a common transport system which bears pegs with full bobbins and unloads pegs with empty bobbins
  • the single winding units are arranged according to a plurality of transverse paths, in which the processing of the bobbins is performed, served by conveyor belts, in which there are new standby bobbins and a bobbin under process.
  • the unrolling bobbin, from which the yarn 2 is taken is indicated with 1.
  • the yarn 2 moves through the means 3 for removing and guiding the yarn, through the yarn presence detector 4 and through the yarn tensioner 5 with facing pegs, which press it between them.
  • a yarn splicer 6 supplied by suction mouths, not shown in the figure, which pick up and take the skeins of the yarn to be spliced in case of interruptions thereof, both due to breakages and interventions of the yarn clearer 7, arranged immediately downstream of the yarn splicer.
  • the yarn 2, cleared of its defects, is collected in the package 8, rotated by the actuation roller 9 and supported with the package holder 10.
  • the actuation of the roller 9 is performed at a predetermined and substantially constant speed according to the variation of the dimension of the package being formed; it draws the yarn 2, unwinding it at a high speed of rotation from the bobbin 1, which in turn is immobile on its support peg 11.
  • the overlying package 8 draws the yarn from the bobbin located at the lower part in the winding unit and the yarn wound in turns on its tube 12 to form the bobbin is unwound from it with vortex rotation, in the order of 15000 revolutions per minute.
  • the yarn being unwound acquires, due to the centrifugal force on the yarn itself, a trajectory that is curved and swollen outwards forming the so-called "balloon" 13 upon detachment from the bobbin itself, generating considerable centrifugal stresses which are converted into strains that can cause the yarn to break. Furthermore, such stresses tend to move the bobbin 1 from its correct vertical position.
  • the depositing of the yarn onto the bobbin generally starts in the lower part of the bobbin growing upwards with overlapped layers in a conical manner, with coordinated movements of the spinning frame ring rail.
  • the bobbin thus obtained is tapered and compact, in such a manner to avoid that it disintegrates during the unwinding and so that the yarn is unwound layer by layer from its upper conical part progressively descending downwards.
  • Such restraint members may be fixed and arranged just above the bobbin as described, for example, by patent EP 909.736 on behalf of the same applicant.
  • a balloon restraint device of overturned funnel shape, which axially follows the unwinding development, is described in patent USA 5.553.799 .
  • a cylindrical-bell-shaped balloon restraint device arranged around the bobbin being unwound and divided into two half-bells which open to move the peg 11 with its bobbin and close around the peg during the unwinding is described in patent EP 374.403 .
  • a possible technical solution to the problem lies in intervening on the balloon controller means due to the different length of the yarn section which forms the balloon itself.
  • changing the size of the bobbin under process requires that the axial position of the members provided for restraining the balloon with respect to the shape of the new bobbin be suitably modified, possibly replacing some of its components.
  • Such technical solution is difficult and expensive in its entirety, also due to the fact that such operations must be performed winding unit per winding unit.
  • Patent EP 844.206 on behalf of the same applicant describes a bobbin-bearing peg with a bobbin support having an adjustable height and adaptable to the height of the bobbin to be processed.
  • the present invention is aimed at adapting the winder to receive and operate - with maximum efficiency - bobbins of different sizes produced on different spinning frames, maintaining them in an erect position on their peg and overcoming the drawbacks of the prior art, according to the technical solution based on the requirement to maintain substantially constant the distance between the top of the tube 12 of the bobbin 1 from the overlying guide members of the yarn 3 and from the sequence of the members that process the yarn 2 in its path from the bobbin 1 to the package 8.
  • the present invention in its most general meaning, of device for adapting the winder to the bobbin to be processed, is defined in the first claim. Its variants and preferred embodiments are defined in the dependent claims 2 - 7.
  • the winder As illustrated in figure 2 the winder, and the winding units of which it is made up, is served by a longitudinal conveyor belt 20 located at the rear, which takes - to the winding units - the bobbins 1 full of yarn to be unwound borne by their transport pegs 11, and by a longitudinal conveyor belt 21 on the front of the winder, which unloads the pegs with empty tubes of the spent bobbins or, possibly, with the bobbins with a residue of unwound yarn to be processed separately.
  • a longitudinal conveyor belt 20 located at the rear, which takes - to the winding units - the bobbins 1 full of yarn to be unwound borne by their transport pegs 11, and by a longitudinal conveyor belt 21 on the front of the winder, which unloads the pegs with empty tubes of the spent bobbins or, possibly, with the bobbins with a residue of unwound yarn to be processed separately.
  • the single winding units which are essentially made up of the members illustrated with reference to figure 1 , are arranged according to transverse paths made with short conveyor belts or tracks 23, which connect the two conveyor belts 20 and 21 respectively for supplying the full bobbins 1 and for unloading the empty bobbins 12 on their pegs 11.
  • Said transverse paths attained by means of conveyors 23 are preferably horizontal.
  • Provided therein are one or more positions R for holding the new bobbins awaiting unwinding, an unwinding position L in which the bobbin 1 is shown under process and eventually a short final path for unloading the peg 11 with its empty bobbin 12, i.e. with its tube without the yarn wound thereon.
  • the conveyor belt 23 provides the transverse path and circulates between two return rollers 24 having a motorised actuation, not shown in the figure for the sake of simplicity.
  • the view of figure 2 is entirely analogous to that described in the copending patent application MI2007A134 on behalf of the same applicant.
  • the winder, and the winding units of which it is made up, are supported by a plurality of shoulders or transverse pedestals 30 arranged along its axis, usually with a distance between them equivalent to a winding group comprising 6-10 winding units.
  • Such shoulders 30 are provided with adjustable feet 31, that allow arranging the winder assembly in the correct horizontal position, as well as with a plurality of supports, holes, openings and abutments for accommodating and supporting the winding units and their longitudinal frames for connecting to the main structure made up of a series of shoulders 30.
  • Openings 33,34 for the transit of services in common between the winding units that make up the winder.
  • the opening 33 allows passage to the conveyor belt 20 for supplying full bobbins, that should deliver them to the winding units that require them, and the opening 34 serves for the passage of centralised service pipes, such as for example suction and compressed air services, used by the single winding units from time to time depending on the need.
  • centralised service pipes such as for example suction and compressed air services
  • Holes 36 are made on the lower part of the shoulder 30 to support the longitudinal 20,21 and transverse 23 conveyor devices as well as their frames - commonly referred to as beds - for connecting to the main structure made up of the shoulders 30.
  • bed 37 is arranged in the rear part of the winder and supports the longitudinal belt 20 for supplying new bobbins and the rear roller 24 of the transverse belt 23, while bed 38 is arranged at the front part of the winder and supports the longitudinal belt 21 for unloading the empty bobbins and the front roller 24 of the transverse belt 23.
  • the length of said beds corresponds to the range between the two consecutive shoulders 30.
  • Connection plates 40,41 for respectively connecting to said shoulders 30 were integrally applied - at the shoulders 30 - to said beds 37 and 38, as shown in figure 3B .
  • a series of holes 43,44 were made in such plates 40,41 arranged with a regular pitch according to the vertical direction, with the same dimension and with the same transverse ranges of the holes 36 made in the shoulders 30.
  • the holes 43 of the rear series are used to determine the level of the rear bed 37, while the holes 44 of the front series are used to determine the level of the front bed 38.
  • the described holes may be through holes or threaded.
  • Such holes may be, like shown in figures 3A,B for example, made on two or more pairs of vertical rows offsetting the level of the holes in each pair of rows.
  • the holes of each row of the two pairs are made having a 20 mm pitch and thus it is possible to adjust the level of the bed thereof at 10 mm intervals: also the holes 36 are doubled in such case, as pairs of holes 36, in such a manner to ensure the adjustment at 10 mm intervals without transverse translation of the plates 40,41.
  • the constraint between the holes 36 made in the shoulders 30 and the holes of the plate 40,41 may be made using per se known means 46 - such as for example shown in figures 3A,B - with one or more pairs of screws that are engaged in the threaded holes 36, or with nuts and bolts in cases where said holes were made as through holes.
  • the length of the rows of holes 43,44 corresponds to the allowed adjustment width of the level of the transverse belts 23 on which the bobbins 1 are processed and of the possible adaptation of the winder to the size of the bobbins to be processed, lifting or lowering the plates 40,41 according to the vertical arrows 47.
  • the level of the beds 37, 38 with the conveyor belts thereof may be adjusted to the desired height with respect to the shoulders 30 or with respect to the main structure of the winder.
  • Adjustment of the level of the beds 37,38 is easy and accurate. For example, it can occur as follows, by operating on the beds of one winding group unit at a time. First, the conveyor belts 20,21,23 are loosened by operating on the respective tensioning devices. Support and lifting devices - such as for example mechanical lifting jacks - are inserted beneath the beds 37,38 of the winding group to be height-adjusted, lifting such jacks to support said beds. Screws or bolts 46 that fix the plates 40,41 onto their respective adjacent shoulders 30 are loosened and removed.
  • the mechanical jacks are actuated to move the two beds to the desired level, aligning one of the two pairs of holes 36 made on the shoulders with new pairs of holes 43,44 which determine the new level of the transverse path of the belt 23, at which level the new batch of bobbins is intended to be processed.
  • the screws or bolts 46 that fix - at the new level - the plates 40,41 against their respective shoulders are inserted and fastened.
  • the conveyor belts 20,21,23 are tensioned once again by operating on the respective tensioning devices.
  • the possible level difference that occurs between the conveyors of the spinning frame and of the winder are compensated by means of an adjustable connection ramp at the beginning of the winder in a per se known manner.
  • the method and device for adapting the winder according to the present invention offer considerable advantages, among which at least the following are worth mentioning briefly.
  • the operations for adapting the winder to the new batch are very simple and they are performed per winding groups and not winding unit per winding unit. Use of different pegs on the spinning frame and in the winder is not required, thus avoiding using devices for replacing bobbins and tubes between the two machines.

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
  • Threshing Machine Elements (AREA)
  • Fats And Perfumes (AREA)
  • Peptides Or Proteins (AREA)
EP20090152589 2008-02-20 2009-02-11 Vorrichtung zur Anpassung eines Wicklers an die Länge der abzuwickelnden Spulen Active EP2093179B1 (de)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ITMI20080275 ITMI20080275A1 (it) 2008-02-20 2008-02-20 Dispositivo di adattamento di una roccatrice alla partita delle spole da lavorare

Publications (3)

Publication Number Publication Date
EP2093179A2 true EP2093179A2 (de) 2009-08-26
EP2093179A3 EP2093179A3 (de) 2012-08-08
EP2093179B1 EP2093179B1 (de) 2013-08-07

Family

ID=40291676

Family Applications (1)

Application Number Title Priority Date Filing Date
EP20090152589 Active EP2093179B1 (de) 2008-02-20 2009-02-11 Vorrichtung zur Anpassung eines Wicklers an die Länge der abzuwickelnden Spulen

Country Status (3)

Country Link
EP (1) EP2093179B1 (de)
CN (1) CN101513968B (de)
IT (1) ITMI20080275A1 (de)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110255082A (zh) * 2019-06-04 2019-09-20 青岛宏大纺织机械有限责任公司 自动络筒机管纱输送装置

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107416594A (zh) * 2016-12-12 2017-12-01 江苏海马智能装备有限公司 一种络筒机自动值车装置
DE102017106319A1 (de) * 2017-03-23 2018-09-27 Maschinenfabrik Rieter Ag Spinnereimaschine sowie ein Verfahren zum Betreiben von Hülsentransportvorrichtungen an einer Spinnereimaschine
CN109353880B (zh) * 2018-08-31 2024-04-12 杭州锐冠科技有限公司 一种输送铝型材及筒管纱输送装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0374403A1 (de) 1988-12-23 1990-06-27 W. SCHLAFHORST AG & CO. Einrichtung zum pneumatischen Erfassen und Überkopfabziehen des Fadenendes eines Kopses
US5553799A (en) 1993-02-24 1996-09-10 Murata Kikai Kabushiki Kaisha Auxiliary yarn releasing apparatus
EP0844206A1 (de) 1996-11-22 1998-05-27 SAVIO MACCHINE TESSILI S.p.A. Verbesserte Caddy zum Halten der Spulen und Spulenhülsen in einer aufrechten Position zum Transport und zur Positionierung in Textilmaschinen
EP0909736A2 (de) 1997-10-15 1999-04-21 SAVIO MACCHINE TESSILI S.p.A. Vorrichtung zur Ballonkontrolle und Verfahren zum Garnabwickeln von der Lieferspule in einer automatischen Wickelmaschine

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4634077A (en) * 1982-09-24 1987-01-06 Wilson Christine A Yarn caddy
DE3936518C2 (de) * 1989-11-02 2001-10-11 Rieter Ag Maschf Vorspinnmaschine
JP2894022B2 (ja) * 1991-08-09 1999-05-24 株式会社豊田自動織機製作所 ペッグトレイに装着するボビン頂部の高さを揃える方法及びペッグトレイ
CZ286419B6 (en) * 1995-10-16 2000-04-12 Rieter Ag Maschf Device for removing wound-up bobbins from textile machine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0374403A1 (de) 1988-12-23 1990-06-27 W. SCHLAFHORST AG & CO. Einrichtung zum pneumatischen Erfassen und Überkopfabziehen des Fadenendes eines Kopses
US5553799A (en) 1993-02-24 1996-09-10 Murata Kikai Kabushiki Kaisha Auxiliary yarn releasing apparatus
EP0844206A1 (de) 1996-11-22 1998-05-27 SAVIO MACCHINE TESSILI S.p.A. Verbesserte Caddy zum Halten der Spulen und Spulenhülsen in einer aufrechten Position zum Transport und zur Positionierung in Textilmaschinen
EP0909736A2 (de) 1997-10-15 1999-04-21 SAVIO MACCHINE TESSILI S.p.A. Vorrichtung zur Ballonkontrolle und Verfahren zum Garnabwickeln von der Lieferspule in einer automatischen Wickelmaschine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110255082A (zh) * 2019-06-04 2019-09-20 青岛宏大纺织机械有限责任公司 自动络筒机管纱输送装置

Also Published As

Publication number Publication date
ITMI20080275A1 (it) 2009-08-21
CN101513968A (zh) 2009-08-26
EP2093179A3 (de) 2012-08-08
EP2093179B1 (de) 2013-08-07
CN101513968B (zh) 2012-11-07

Similar Documents

Publication Publication Date Title
EP2093179B1 (de) Vorrichtung zur Anpassung eines Wicklers an die Länge der abzuwickelnden Spulen
CN111891836B (zh) 一种托盘式络筒机及络筒生产方法
CN1080331C (zh) 在气流纺纱机上纱线生头的方法以及装置
WO2018096427A2 (de) Verfahren und vorrichtung zum betreiben einer spulmaschine
JP6738184B2 (ja) 少なくとも1つのリング精紡機と少なくとも1つの巻取り機とから成る複合システムを運転する方法並びに複合システム
CN101440539B (zh) 用于整理制备通过环锭细纱机喂到自动络筒机的筒管的装置和方法
CN107829173A (zh) 环锭纺纱机以及使用环锭纺纱机的纺纱方法
JPH10168673A (ja) ポット紡績装置において紡績コップを製作する方法
JP2016079038A (ja) 紡績コップのための方向付け装置を備えた巻取りユニット
EP2083102A2 (de) Vorrichtung und Verfahren zum Abnehmen von Spulen von einer Ringspinnmaschine
US11649135B2 (en) Textile machine producing cross-wound packages, comprising a cross-wound package transport apparatus
US6662542B2 (en) Open-end spinning device and process for temporary receiving a yarn
JP2016108156A (ja) 紡績コップを製造しかつさらに処理する方法
CN103625981A (zh) 纱线卷绕单元及纱线卷绕机
CN103305943A (zh) 纺丝卷取设备
CN110158206B (zh) 离心式精纺方法和离心式细纱机
CN111747233B (zh) 用于在纺织机工位产生接纱连接的方法以及纺织机工位
US20170096752A1 (en) Spinning Preparation Machine
JPH03193936A (ja) 精紡機における篠替え方法及び装置
CN107541821A (zh) 粗纱机的筒管交接装置
CN115369530B (zh) 一种将接头纱绕到纱管上的装置
CN1407155A (zh) 用于一台生产交叉卷绕筒子的纺织机的辅助设备
JPH03113027A (ja) 粗糸ボビンの処理装置
US4843809A (en) Method of automatically exchanging spinning bobbin tubes in a spinning machine
EP3748054A1 (de) Kippvorrichtung für eine fadenführung für eine automatische fadenanspinnanordnung

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA RS

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA RS

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: PENELOPE S.P.A.

RIC1 Information provided on ipc code assigned before grant

Ipc: B65H 54/72 20060101ALI20120629BHEP

Ipc: B65H 67/06 20060101AFI20120629BHEP

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: SAVIO MACCHINE TESSILI S.P.A.

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: SAVIO MACCHINE TESSILI S.P.A.

17P Request for examination filed

Effective date: 20130107

AKX Designation fees paid

Designated state(s): CH CZ DE IT LI TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RIC1 Information provided on ipc code assigned before grant

Ipc: D01H 9/18 20060101ALI20130328BHEP

Ipc: B65H 54/72 20060101ALI20130328BHEP

Ipc: B65H 67/06 20060101AFI20130328BHEP

INTG Intention to grant announced

Effective date: 20130419

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): CH CZ DE IT LI TR

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: JACOBACCI AND PARTNERS S.P.A., CH

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602009017760

Country of ref document: DE

Effective date: 20131002

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20140508

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602009017760

Country of ref document: DE

Effective date: 20140508

REG Reference to a national code

Ref country code: CH

Ref legal event code: PCAR

Free format text: NEW ADDRESS: VIA LUGANETTO 3, 6962 LUGANO (CH)

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CZ

Payment date: 20200129

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20200430

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20210217

Year of fee payment: 13

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602009017760

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210211

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210901

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220228

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220228

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20230204

Year of fee payment: 15

Ref country code: IT

Payment date: 20230109

Year of fee payment: 15

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230526