EP1596011A1 - Process and apparatus for producing an immersed tunnel on subsea ground - Google Patents

Process and apparatus for producing an immersed tunnel on subsea ground Download PDF

Info

Publication number
EP1596011A1
EP1596011A1 EP05291012A EP05291012A EP1596011A1 EP 1596011 A1 EP1596011 A1 EP 1596011A1 EP 05291012 A EP05291012 A EP 05291012A EP 05291012 A EP05291012 A EP 05291012A EP 1596011 A1 EP1596011 A1 EP 1596011A1
Authority
EP
European Patent Office
Prior art keywords
tunnel
machine
sections
soil
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP05291012A
Other languages
German (de)
French (fr)
Inventor
Pierre Aristagues
Pierre Longchamp
Philippe Autuori
Patrick Palbras
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bouygues Travaux Publics SAS
Original Assignee
Bouygues Travaux Publics SAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bouygues Travaux Publics SAS filed Critical Bouygues Travaux Publics SAS
Publication of EP1596011A1 publication Critical patent/EP1596011A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/063Tunnels submerged into, or built in, open water
    • E02D29/077Tunnels at least partially built beneath the water-bed characterised by being made by methods involving disturbance thereof all along the location line, e.g. by cut-and-cover or caisson methods
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/063Tunnels submerged into, or built in, open water
    • E02D29/07Tunnels or shuttering therefor preconstructed as a whole or continuously made, and moved into place on the water-bed, e.g. into a preformed trench

Definitions

  • the invention relates to the realization of a submerged tunnel under a body of water.
  • Some techniques are related to the case where the tunnel must be done primarily in the underlying terrain at the bottom of the body of water, as illustrated for example by publications DE 50 882, JP 9 316 901, GB 348 204, EP 0 899 422, JP 09-273382, JP 2,024,489, US 1,441,698, US 4,889,448.
  • a common solution in this case is to use a tunnel boring machine to drill the ground, evacuate material drilled to the rear of the tunnel boring machine and build the tunnel to progress by successive sections, as for the construction of a tunnel through a mountain range.
  • a tunnel thus realized under the bottom of the mass of water has the advantage of offering no obstacle to the traffic but against other disadvantages, requires to make access works all the more long as the tunnel is located at a deep level under the bottom of the sea.
  • the present invention relates to the case where the tunnel must be carried out partially or totally in the water, on underwater or sub-fluvial land, natural or man-made, and in what follows the expression underwater soil will be interpreted as covering all these cases.
  • the publication DE 33 33 850 describes a technique where the tunnel is realized by successive sections which are prefabricated in a waterproof excavation and pushed gradually into the water up to their location service.
  • This technique requires having a site likely to host a dock for the realization of sections, or a launching facility of prefabricated sections on land, and generates genes important for maritime traffic, including the fact that the sections usually have a long length of several tens of meters, even up to a hundred meters and more.
  • An object of the invention is notably to avoid the construction of heavy terrestrial infrastructures (darse or launching facility), to considerably reduce obstacles to navigation, and to reduce costs and construction times.
  • One aspect of the invention is a method characterized in that the current submerged section is constructed underwater (natural, prepared or artificial, whether result from preliminary backfilling or dredging) means of a machine capable of functioning in immersion and that it is made to move in the water, on the underwater soil, to the request, along the planned path for the tunnel, this machine having a pressure-tight work space under pressure Atmosphere suitable for staff and equipment required for the construction and in-situ laying of the section, in what is kept tight the tunnel as and when its construction, in that one ensures between the part of the already completed tunnel and the machine work space a sufficient communication to allow the construction and laying a new section, and in that we use the tunnel, as it was built, to transport to the request in the room the constituent elements of the sections.
  • Each section of tunnel can be built by any appropriate method, such as in particular the assembly of prefabricated parts and in-situ concrete pouring.
  • each stretch like a ring obtained by assembling segments of section by means of a fixed or movable device placed inside the sealed workspace, joints sealing rings being arranged between the segments.
  • the invention also relates to a device for implementation of the method.
  • Figure 1 very schematically represents a tunnel (1) submerged on a floor (2) under a sheet of water (3).
  • This tunnel has two access portions (1a, 1b) open the tunnel in the open air, for example on the banks (4) and (5) of the water table (3), and a main portion immersed (1c). After construction, the tunnel was covered a protective embankment (K) (optional).
  • the immersed portion, and preferably also the access to open air portions and low immersed portions of the tunnel consist of successive sections of which the cross-section is determined according to the use of the tunnel, in a manner known per se.
  • the tunnel is constructed in sections successive ones of an individual length of the order of one meter.
  • FIG. 2 shows six sections T1-T6 already in place and the beginning of setting up a new section.
  • R-shaped trailers in FIG. 7 are installed at the back of the machine and hitched to it. These trailers, in a manner known in the art of earth tunneling machines, support auxiliary equipment necessary for the operation of the machine, the supply logistics of any kind such as for example the filling mortar, the compressed air, electricity, water, ventilation, voussoirs ... etc.
  • This machine capable of functioning in immersion includes a work area (6) and a ballastable chamber (7) and if applicable, a load compartment schematized in L. ballast is intended to compensate locally and temporarily insufficient weight of the tunnel with regard to thrust Archimedes.
  • the work space (6) is peripherally sealed and at the front (in the direction of advancement of the tunnel) and it is connected by a waterproof skirt (27) to the tunnel portion already performed.
  • the workspace is designed to house the staff and all that is needed at least for build the current section to achieve.
  • the current stretch of tunnel is a ring consisting of prefabricated sectors (or "voussoirs"), these sectors are provided to the workspace, from the shore and as needed, through the tunnel portion already completed, and the workspace is equipped with appropriate (including erector arms) to grasp the voussoirs and put them in place so as to constitute a annular section.
  • the ring consists of eleven voussoirs V spotted (V1) to (V11) in Figure 5 and a central vertical partition (12) which separates the two tubes of the tunnel.
  • the machine In front of the working chamber (6), the machine comprises a ballastable chamber (20) open towards the bottom and towards the front, and which contains arms (21) pivotally mounted back and forth, and movable on one or horizontal beams (22).
  • a support layer of the tunnel (25) is injected under the section (fig.5) from the machine which is equipped for this purpose (equipment not shown on figures), to compensate for the thickness of the rear skirt (27) of the machine (see figure 7).
  • This injection makes it possible to control the inclination and the guiding the machine in the vertical plane and adjusting the force of support of the front part of the machine on the ground.
  • the sections are eventually linked together, by example by connectors to interlocking, by bolting and / or by bars or cables of temporary prestressing or definitive (31), schematized by points in Figure 6.
  • the tunnel normally intended to connect two banks has two access portions which preferably are also carried out by means of the machine.

Abstract

The method involves constructing a submerged tunnel (1) on a submarine ground by utilizing a machine. The machine is advanced in the water on the ground, upon request, along the way planned for the tunnel. The tunnel is maintained watertight along its entire construction. Communication is established between a constructed part of the tunnel and a workspace of the machine for permitting installation of a new section of the tunnel. An independent claim is also included for a device for implementing a submerged tunnel constructing method.

Description

L'invention concerne la réalisation d'un tunnel immergé sous une étendue d'eau.The invention relates to the realization of a submerged tunnel under a body of water.

De nombreuses techniques ont été proposées pour réaliser un tunnel sous une étendue d'eau, généralement une étendue d'eau marine.Many techniques have been proposed to achieve a tunnel under a body of water, usually an expanse of marine water.

Certaines techniques sont relatives au cas où le tunnel doit être réalisé essentiellement dans le terrain sous-jacent au fond de l'étendue d'eau, comme illustré par exemple par les publications DE 50 882, JP 9 316 901, GB 348 204, EP 0 899 422, JP 09-273382, JP 2 024 489, US 1 441 698, US 4 889 448.Some techniques are related to the case where the tunnel must be done primarily in the underlying terrain at the bottom of the body of water, as illustrated for example by publications DE 50 882, JP 9 316 901, GB 348 204, EP 0 899 422, JP 09-273382, JP 2,024,489, US 1,441,698, US 4,889,448.

De fait, une solution répandue dans ce cas consiste à utiliser un tunnelier pour forer le terrain, évacuer la matière forée vers l'arrière du tunnelier et construire le tunnel à l'avancement par sections successives, comme pour la construction d'un tunnel au travers d'un massif montagneux.In fact, a common solution in this case is to use a tunnel boring machine to drill the ground, evacuate material drilled to the rear of the tunnel boring machine and build the tunnel to progress by successive sections, as for the construction of a tunnel through a mountain range.

Un tunnel ainsi réalisé sous le fond de la masse d'eau présente l'avantage de n'offrir aucune entrave au trafic maritime mais par contre, entre autres inconvénients, nécessite de réaliser des ouvrages d'accès d'autant plus longs que le tunnel est situé à un niveau profond sous le fond de la mer.A tunnel thus realized under the bottom of the mass of water has the advantage of offering no obstacle to the traffic but against other disadvantages, requires to make access works all the more long as the tunnel is located at a deep level under the bottom of the sea.

La présente invention est relative au cas où le tunnel doit être réalisé partiellement ou totalement dans l'eau, sur un sol sous-marin ou sous-fluvial, naturel ou artificiel, et dans ce qui suit l'expression sol sous-marin sera interprétée comme couvrant tous ces cas. The present invention relates to the case where the tunnel must be carried out partially or totally in the water, on underwater or sub-fluvial land, natural or man-made, and in what follows the expression underwater soil will be interpreted as covering all these cases.

La publication DE 33 33 850 décrit une technique où le tunnel est réalisé par tronçons successifs qui sont préfabriqués dans une fouille étanche et poussés progressivement dans l'eau jusqu'à leur emplacement de service.The publication DE 33 33 850 describes a technique where the tunnel is realized by successive sections which are prefabricated in a waterproof excavation and pushed gradually into the water up to their location service.

Une autre technique courante consiste à construire en surface (à terre ou sur un navire) des tronçons de tunnel annulaires, à les amener jusqu'au lieu de pose, puis à les échouer sur le sol sous-marin dans leur position finale et à les assembler.Another common technique is to build in surface (on land or on a ship) tunnel sections rings, to bring them to the installation site, then to fail on the underwater ground in their final position and to to assemble them.

Cette technique nécessite de disposer d'un site susceptible d'accueillir une darse pour la réalisation des tronçons, ou encore une installation de mise à l'eau de tronçons préfabriqués à terre, et engendre des gênes importantes pour le trafic maritime, notamment du fait que les tronçons ont généralement une grande longueur de plusieurs dizaines de mètres, voire jusqu'à cent mètres et plus.This technique requires having a site likely to host a dock for the realization of sections, or a launching facility of prefabricated sections on land, and generates genes important for maritime traffic, including the fact that the sections usually have a long length of several tens of meters, even up to a hundred meters and more.

Un but de l'invention est notamment d'éviter la réalisation d'infrastructures terrestres lourdes (darse ou installation de mise à l'eau), de réduire considérablement les entraves à la navigation, et de diminuer les coûts et délais de construction.An object of the invention is notably to avoid the construction of heavy terrestrial infrastructures (darse or launching facility), to considerably reduce obstacles to navigation, and to reduce costs and construction times.

Un aspect de l'invention consiste en un procédé caractérisé en ce qu'on construit le tronçon immergé courant sur le sol sous-marin (naturel, préparé ou artificiel, qu'il résulte d'un remblaiement ou d'un dragage préliminaires) au moyen d'une machine apte à fonctionner en immersion et que l'on fait avancer dans l'eau, sur le sol sous-marin, à la demande, le long du trajet prévu pour le tunnel, cette machine comportant un espace de travail étanche sous pression atmosphérique apte à abriter le personnel et le matériel requis pour la construction et la pose in-situ du tronçon, en ce que l'on maintient étanche le tunnel au fur et à mesure de sa construction, en ce que l'on assure entre la partie du tunnel déjà réalisée et l'espace de travail de la machine une communication suffisante pour permettre la construction et la pose d'un nouveau tronçon, et en ce qu'on utilise le tunnel, au fur et à mesure de sa construction, pour transporter à la demande jusque dans la chambre les éléments constitutifs des tronçons.One aspect of the invention is a method characterized in that the current submerged section is constructed underwater (natural, prepared or artificial, whether result from preliminary backfilling or dredging) means of a machine capable of functioning in immersion and that it is made to move in the water, on the underwater soil, to the request, along the planned path for the tunnel, this machine having a pressure-tight work space under pressure Atmosphere suitable for staff and equipment required for the construction and in-situ laying of the section, in what is kept tight the tunnel as and when its construction, in that one ensures between the part of the already completed tunnel and the machine work space a sufficient communication to allow the construction and laying a new section, and in that we use the tunnel, as it was built, to transport to the request in the room the constituent elements of the sections.

Le procédé de l'invention, dans sa mise en oeuvre, peut présenter encore une ou plusieurs des caractéristiques avantageuses suivantes, combinées ou non :

  • on construit le tunnel par tronçons courts successifs d'au plus quelques mètres de longueur, de préférence d'une longueur individuelle inférieure à 3 mètres ;
  • on utilise la machine pour préparer partiellement ou totalement le sol sous-marin, à l'avancement, en vue de la pose du tunnel, au moyen d'outils intégrés à ladite machine ;
  • on prépare le sol en nivelant le sol ou une couche rapportée sur le sol ;
  • on réalise par dragage un fond de souille le long du trajet prévu pour la pose, avec s'il y a lieu apport de matériaux d'assise, et on nivelle ce fond ;
  • on réalise un traitement de consolidation ou d'amélioration de la capacité portante du sol à l'avancement à l'aide de moyens intégrés à ladite machine ou depuis l'intérieur du tunnel déjà réalisé ;
  • on déplace par étape la machine sur le sol sous-marin en avant du dernier tronçon posé pour dégager chaque fois l'espace nécessaire à la mise en place du tronçon suivant et à l'injection de son assise définitive ;
  • on fait avancer la machine sur le sol sous-marin par poussée vers l'avant en prenant appui sur la partie de tunnel déjà réalisée ;
  • on exerce cette poussée au moyen de vérins ;
  • on exerce sur la machine une traction de retenue dirigée vers la partie de tunnel déjà réalisée, en tant que de besoin pour faciliter le guidage de la machine, comprimer les joints d'étanchéité transversaux, et assurer la stabilité temporaire des derniers tronçons posés lorsque la poussée frontale hydrostatique sur la machine est insuffisante ;
  • on exerce cette traction au moyen d'un dispositif tracteur relié à la machine par un câble courant dans la partie de tunnel déjà réalisée ;
  • on munit la machine d'un compartiment ballastable pour régler la force d'appui de la machine sur le sol et faciliter son guidage dans le plan vertical ;
  • on dispose les outils de préparation du sol et/ou de traitement de consolidation ou d'amélioration de la portance de sol dans la chambre ballastable ;
  • on utilise la machine pour réaliser également les tronçons d'accès non immergés, partiellement immergés et/ou peu immergés du tunnel.
The method of the invention, in its implementation, may still have one or more of the following advantageous characteristics, combined or not:
  • the tunnel is constructed in successive short sections of not more than a few meters in length, preferably of an individual length of less than 3 meters;
  • the machine is used to partially or totally prepare the underwater soil, in progress, for the installation of the tunnel, by means of tools integrated in said machine;
  • the soil is prepared by leveling the soil or a layer added to the soil;
  • a bottom of soil is dredged along the path provided for laying, with the provision of bedding materials, and this bottom is leveled;
  • a consolidation or improvement treatment of the bearing capacity of the ground is carried out with the aid of means integrated in said machine or from inside the tunnel already made;
  • the machine is moved step by step on the submarine ground in front of the last section laid to free each time the space necessary for the installation of the next section and the injection of its final seat;
  • the machine is advanced on the submarine ground by pushing forward by building on the tunnel part already made;
  • this thrust is exerted by means of jacks;
  • a pulling traction is applied to the machine directed towards the tunnel part already made, as necessary to facilitate the guiding of the machine, to compress the transverse seals, and to ensure the temporary stability of the last sections laid when the hydrostatic frontal thrust on the machine is insufficient;
  • this traction is exerted by means of a tractor device connected to the machine by a running cable in the tunnel part already made;
  • the machine is equipped with a ballastable compartment to adjust the force of support of the machine on the ground and facilitate its guidance in the vertical plane;
  • the soil preparation and / or consolidation treatment or soil lift enhancement tools are disposed in the ballastable chamber;
  • the machine is used to also make the access sections not immersed, partially immersed and / or little immersed tunnel.

Chaque tronçon de tunnel peut être construit par toute méthode appropriée, telle que notamment l'assemblage de parties préfabriquées et le coulage de béton in-situ.Each section of tunnel can be built by any appropriate method, such as in particular the assembly of prefabricated parts and in-situ concrete pouring.

Dans une réalisation particulière, on constitue chaque tronçon comme un anneau obtenu par assemblage de segments de tronçon au moyen d'un dispositif fixe ou mobile placé à l'intérieur de l'espace de travail étanche, des joints d'étanchéité longitudinaux étant disposés entre les segments.In a particular embodiment, each stretch like a ring obtained by assembling segments of section by means of a fixed or movable device placed inside the sealed workspace, joints sealing rings being arranged between the segments.

Selon l'invention, pour compenser localement l'absence ou l'insuffisance éventuelle de pression hydrostatique sur le tunnel ou l'avant de la machine dans les zones d'accès où le tunnel est pas ou peu immergé et renforcer la stabilité individuelle d'un tronçon courant, il est prévu d'assurer la compression des joints d'étanchéité disposés entre les segments de tronçon par une précontrainte transversale de ce tronçon après sa mise en place.According to the invention, to compensate locally for the absence or the possible lack of hydrostatic pressure on the tunnel or the front of the machine in access areas where the tunnel is not or little immersed and enhance stability of a current section, it is planned to ensure the compression of the seals arranged between segment segments by transverse prestressing of this section after its establishment.

L'invention concerne également un dispositif pour la mise en oeuvre du procédé.The invention also relates to a device for implementation of the method.

Ce dispositif comprend :

  • une machine apte à fonctionner en immersion qui comporte un espace de travail étanche intérieurement sous pression atmosphérique apte à abriter le personnel et le matériel requis pour la construction d'un tronçon, cet espace ouvert sur la partie de tunnel déjà réalisée permettant de construire un nouveau tronçon ;
  • des moyens pour assurer l'étanchéité autour de l'ouverture entre l'espace de travail et le dernier tronçon construit et posé ;
  • des moyens pour préparer l'assise du tunnel ;
  • des moyens pour provoquer à la demande un déplacement contrôlé de la machine vers l'avant sur le sol sous-marin afin de dégager l'espace requis pour la construction d'un nouveau tronçon ;
  • des moyens pour assurer l'étanchéité du tunnel au fur et à mesure de sa construction ;
  • des moyens pour contrôler la force d'appui de la machine sur le sol sous-marin et contre le tunnel ;
  • des moyens pour apporter à la machine, au travers du tunnel, les constituants et les énergies nécessaires à la construction des tronçons.
This device comprises:
  • a machine capable of operating in immersion which comprises a sealed work space internally under atmospheric pressure able to house the personnel and the equipment required for the construction of a section, this space open on the part of tunnel already made allowing to build a new section;
  • means for sealing around the opening between the working space and the last section constructed and installed;
  • means for preparing the seat of the tunnel;
  • means for causing on demand controlled movement of the machine forward on the subsea ground to clear the space required for the construction of a new section;
  • means for sealing the tunnel as it is constructed;
  • means for controlling the support force of the machine on the underwater ground and against the tunnel;
  • means for bringing to the machine, through the tunnel, the constituents and energies necessary for the construction of the sections.

Dans des modes de réalisation particuliers, ce dispositif présente avantageusement une ou plusieurs des caractéristiques suivantes, combinées ou non :

  • la machine est équipée de moyens de préparation du sol pour parfaire localement l'état du sol sous-marin, en tant que de besoin pour la cosntruction des tronçons de tunnel ;
  • lesdits moyens de préparation du sol comprennent des moyens de nivellement et/ou des moyens de consolidation du sol, robotisés ou non ;
  • les moyens de nivellement comprennent des outils de réglage du sol initial ou d'une couche déposée préalablement sur ce sol et éventuellement, des moyens de contrôle et/ou de visualisation en cabine de pilotage de l'état de nivellement ;
  • les moyens de nivellement comprennent des outils de nivellement portés par des bras montés à coulisse sur une ou des poutres horizontales ;
  • pour régler la force d'appui de la machine sur le sol sous-marin, la machine comporte un compartiment ballastable,
  • ledit compartiment ballastable est ouvert vers le bas, les moyens de nivellement étant logés ou retractables dans ledit compartiment ballastable et la machine est équipée de moyens permettant d'injecter à la demande de l'air comprimé dans le compartiment ballastable ;
  • le dispositif comprend des moyens pour assurer la force d'appui de la machine sur le tunnel lorsque la charge hydrostatique frontale sur celle-ci est insuffisante ;
  • lesdits moyens sont des moyens de traction qui appliquent à la machine une traction exercée vers l'arrière ;
  • lesdits moyens de traction comprennent un dispositif tracteur situé à distance en arrière de la machine et relié à la machine par un câble qui court dans la partie de tunnel déjà construite ;
  • la machine est équipée de moyens pour exercer sur la machine une poussée afin de la déplacer vers l'avant et maítriser sa trajectoire dans le sens du trajet de pose du tunnel ;
  • ledit espace de travail est équipé de moyens pour manipuler et poser des segments préfabriqués de tronçons en vue de construire un tronçon de tunnel ;
  • la machine est équipée de vérins disposés pour établir une poussée sur la machine en prenant appui sur le dernier tronçon construit ;
  • ledit espace de travail est équipé de moyens pour manipuler des segments préfabriqués de tronçons en vue de construire un tronçon de tunnel ;
  • ledit espace de travail étanche est équipé de moyens pour injecter un matériau de remplissage dans le vide laissé par la machine, lors de sa progression, entre le sol et la sous face des tronçons formant le tunnel ;
  • la machine comprend un compartiment de lestage ;
  • le dispositif comprend des tronçons de tunnel préfabriqués d'une longueur individuelle d'au plus quelques mètres ou des segments de tronçons pour construire de tels tronçons ;
  • le dispositif comprend des tronçons de tunnel préfabriqués d'une longueur individuelle généralement inférieure à 3 mètres environ ou des segments de tronçons pour construire de tels tronçons.
In particular embodiments, this device advantageously has one or more of the following characteristics, combined or not:
  • the machine is equipped with soil preparation means for locally refining the state of the underwater soil, as needed for the construction of the tunnel sections;
  • said soil preparation means comprise leveling means and / or soil consolidation means, robotized or not;
  • the leveling means comprise tools for adjusting the initial soil or a layer previously deposited on the soil and possibly control means and / or visualization in the control cabin of the leveling state;
  • the leveling means comprise leveling tools carried by arms mounted to slide on one or horizontal beams;
  • to adjust the support force of the machine on the underwater ground, the machine has a ballastable compartment,
  • said ballastable compartment is open downwards, the leveling means being housed or retractable in said ballastable compartment and the machine is equipped with means for injecting compressed air into the ballastable compartment at the request;
  • the device comprises means for ensuring the support force of the machine on the tunnel when the frontal hydrostatic load on it is insufficient;
  • said means are traction means which apply to the machine a traction exerted towards the rear;
  • said traction means comprise a tractor device located remotely behind the machine and connected to the machine by a cable running in the already constructed tunnel part;
  • the machine is equipped with means for exerting on the machine a thrust in order to move it forward and control its trajectory in the direction of the laying path of the tunnel;
  • said work space is equipped with means for manipulating and placing prefabricated segments of sections for the purpose of constructing a tunnel section;
  • the machine is equipped with jacks arranged to establish a thrust on the machine by building on the last section built;
  • said work space is provided with means for manipulating prefabricated segments of sections for constructing a tunnel section;
  • said sealed working space is equipped with means for injecting a filler material into the vacuum left by the machine, during its progression, between the ground and the underside of the sections forming the tunnel;
  • the machine comprises a ballast compartment;
  • the device comprises prefabricated tunnel sections of an individual length of at most a few meters or segments of segments for constructing such sections;
  • the device comprises prefabricated tunnel sections of an individual length generally less than about 3 meters or segment segments for constructing such sections.

Ainsi, dans sa réalisation la plus élaborée, l'invention consiste à construire un tunnel sur un sol sous-marin, à l'avancement, à l'aide d'une machine immergée spécifique assurant les fonctions :

  • d'abri (et de support éventuel) pour la réalisation de la coque constituant le futur tunnel, ou de l'enveloppe externe de cette coque ;
  • de déplacement progressif du personnel et du matériel au fur et à mesure de l'avancement du tunnel ;
  • de base de travail pour les travaux annexes éventuels (réglage assise, dragage, bourrage sous radier, remblaiement, protection, traitement de sol,...)
  • d'étanchéité provisoire entre la partie de tunnel déjà construite et corps de la machine elle-même.
Thus, in its most elaborate embodiment, the invention consists in constructing a tunnel on a submarine ground, in progress, with the aid of a specific submerged machine providing the functions:
  • shelter (and possible support) for the realization of the hull constituting the future tunnel, or the outer envelope of this hull;
  • progressive movement of personnel and equipment as the tunnel progresses;
  • basis of work for possible ancillary works (seat adjustment, dredging, underfloor tamping, backfilling, protection, soil treatment, ...)
  • Temporary sealing between the tunnel part already built and the body of the machine itself.

La structure du tunnel peut être différente de celle des tunnels immergés classiques, les contraintes n'étant plus les mêmes :

  • elle peut notamment être tout ou partie constituée d'éléments préfabriqués ou coulés en place, précontraints ou non ;
  • une ou plusieurs files de poteaux ou voiles de séparation peuvent être réalisés de façon à constituer un ou plusieurs files d'appui intermédiaire et/ou,dans le cas de voiles, de séparations étanches à l'air;
  • elle peut, comme les tunnels classiques, être constituée de tronçons reliés entre eux par des joints assurant étanchéité et la flexibilité vis-à-vis des déformations de toutes natures du tunnel.
  • un second voile peut être réalisé en étanchéité ou en rigidification ;
  • elle peut, comme les tunnels classiques, être constituée de tronçons reliés entre eux par des joints assurant étanchéité et la souplesse vis-à-vis des déplacements différentiels.
The structure of the tunnel may be different from that of conventional submerged tunnels, since the constraints are no longer the same:
  • it may in particular be all or part of prefabricated elements or cast in place, prestressed or not;
  • one or more rows of columns or separation webs can be made to form one or more intermediate support rods and / or, in the case of sails, airtight separations;
  • it can, like conventional tunnels, consist of sections interconnected by seals ensuring tightness and flexibility vis-à-vis deformations of all kinds of the tunnel.
  • a second web can be made in sealing or in stiffening;
  • it can, like conventional tunnels, consist of sections interconnected by seals ensuring sealing and flexibility vis-à-vis the differential movements.

On décrira ci-après, schématiquement, un exemple de réalisation de l'invention, en référence aux figures du dessin joint sur lequel :

  • la figure 1 est un schéma en long d'un exemple de tunnel à réaliser selon l'invention ;
  • la figure 2 est une coupe longitudinale d'une partie de tunnel déjà réalisée et de la machine conçue et utilisée selon l'invention pour réaliser le tunnel, et
  • les figures 3 à 5 sont des coupes transversales selon les plans 1-1, 2-2 et 3-3 de la figure 2 ;
  • la figure 6 est une coupe transversale d'un tronçon courant d'un tunnel terminé, et
  • la figure 7 est un schéma longitudinal du tunnel en cours de construction sur lequel est représenté le système de traction vers l'arrière.
Hereinafter, schematically, an embodiment of the invention will be described with reference to the figures of the attached drawing in which:
  • FIG. 1 is a schematic diagram of an example of a tunnel to be produced according to the invention;
  • FIG. 2 is a longitudinal section of a tunnel part already made and of the machine designed and used according to the invention for producing the tunnel, and
  • Figures 3 to 5 are cross sections along the planes 1-1, 2-2 and 3-3 of Figure 2;
  • FIG. 6 is a cross section of a current section of a completed tunnel, and
  • Figure 7 is a longitudinal diagram of the tunnel under construction on which is represented the rearward traction system.

La figure 1 représente très schématiquement un tunnel (1) immergé posé sur un sol (2) sous une nappe d'eau (3). Ce tunnel comporte deux portions d'accès (1a, 1b) qui font déboucher le tunnel à l'air libre , par exemple sur les rives (4) et (5) de la nappe d'eau (3), et une portion principale immergée (1c). Après construction, le tunnel a été recouvert d'un remblai de protection (K) (facultatif).Figure 1 very schematically represents a tunnel (1) submerged on a floor (2) under a sheet of water (3). This tunnel has two access portions (1a, 1b) open the tunnel in the open air, for example on the banks (4) and (5) of the water table (3), and a main portion immersed (1c). After construction, the tunnel was covered a protective embankment (K) (optional).

La portion immergée, et de préférence également les portions d'accès à l'air libre et les portions peu immergées du tunnel sont constituées de tronçons successifs dont la section droite est déterminée en fonction de l'usage du tunnel, de façon en soi connue.The immersed portion, and preferably also the access to open air portions and low immersed portions of the tunnel consist of successive sections of which the cross-section is determined according to the use of the tunnel, in a manner known per se.

Pour l'exemple, on a représenté sur les coupes transversales des figures 2 à 6, la section courante d'un tunnel double à deux fois deux voies à profil transversal en forme de lunette.For the example, we have shown on the cuts transverse lines in FIGS. 2 to 6, the current section of a two-way two-way double tunnel with transverse profile in bezel shape.

Selon l'invention, on construit le tunnel par tronçons successifs d'une longueur individuelle de l'ordre du mètre.According to the invention, the tunnel is constructed in sections successive ones of an individual length of the order of one meter.

Sur la figure 2, on a représenté six tronçons T1-T6 déjà en place et le début de la mise en place d'un nouveau tronçon.FIG. 2 shows six sections T1-T6 already in place and the beginning of setting up a new section.

La machine (M) utilisée selon l'invention n'a été représentée que très schématiquement sur la figure 3 mais de façon suffisante pour l'homme du métier.The machine (M) used according to the invention has not been represented only very schematically in Figure 3 but of sufficiently for the skilled person.

Des remorques schématisées en R sur la figure 7 sont installées à l'arrière de la machine et attelées à celle-ci. Ces remorques, de façon en soi connue dans la technique des tunneliers terrestres, supportent les équipements auxiliaires nécessaires aux fonctionnements de la machine, de la logistique des approvisionnements de toute nature tels que par exemple le mortier de bourrage, l'air comprimé, l'électricité, l'eau, la ventilation, les voussoirs ...etc.R-shaped trailers in FIG. 7 are installed at the back of the machine and hitched to it. These trailers, in a manner known in the art of earth tunneling machines, support auxiliary equipment necessary for the operation of the machine, the supply logistics of any kind such as for example the filling mortar, the compressed air, electricity, water, ventilation, voussoirs ... etc.

Cette machine apte à fonctionner en immersion comprend un espace de travail (6) et une chambre ballastable (7) et s'il y a lieu un compartiment de lestage schématisé en L. Ce lestage est destiné à compenser localement et temporairement une insuffisance de poids du tunnel au regard de la poussée d'Archimède.This machine capable of functioning in immersion includes a work area (6) and a ballastable chamber (7) and if applicable, a load compartment schematized in L. ballast is intended to compensate locally and temporarily insufficient weight of the tunnel with regard to thrust Archimedes.

L'espace de travail (6) est étanche périphériquement et à l'avant (dans le sens d'avancement du tunnel) et il est relié par une jupe étanche (27) à la portion de tunnel déjà réalisée. L'espace de travail est conçu pour loger le personnel et tout ce qui est nécessaire au moins pour construire le tronçon courant à réaliser.The work space (6) is peripherally sealed and at the front (in the direction of advancement of the tunnel) and it is connected by a waterproof skirt (27) to the tunnel portion already performed. The workspace is designed to house the staff and all that is needed at least for build the current section to achieve.

Par exemple, le tronçon courant de tunnel est un anneau constitué de secteurs préfabriqués (ou « voussoirs »), ces secteurs sont fournis à l'espace de travail, depuis la rive et en tant que de besoin, au travers de la portion de tunnel déjà réalisée, et l'espace de travail est équipé de moyens appropriés (bras érecteurs notamment) pour saisir les voussoirs et les mettre en place de façon à constituer un tronçon annulaire.For example, the current stretch of tunnel is a ring consisting of prefabricated sectors (or "voussoirs"), these sectors are provided to the workspace, from the shore and as needed, through the tunnel portion already completed, and the workspace is equipped with appropriate (including erector arms) to grasp the voussoirs and put them in place so as to constitute a annular section.

Ces moyens peuvent être analogues à ceux utilisés dans les tunneliers terrestres conçus pour réaliser et poser les voussoirs constitutifs d'un anneau de tunnel dans un massif foré.These means may be similar to those used in earth tunneling machines designed to make and install the voussoirs constituting a tunnel ring in a massif drilled.

On s'est donc contenté sur la figure 2 de schématiser ces moyens de construction et de pose par un bras pivotant transversal (8) monté à coulisse sur un support longitudinal (8') et conçu pour saisir un segment de tronçon et le poser à sa place de service.So we were content in Figure 2 to schematize these means of construction and installation by a pivoting arm transverse (8) slidably mounted on a longitudinal support (8 ') and designed to grab a segment segment and put it on his place of service.

Pour la clarté de la figure, on n'a pas représenté le stock des voussoirs en attente d'être appréhendées et posés.For the sake of clarity, we did not represent the stock of voussoirs waiting to be apprehended and posed.

On a représenté seulement, en coupe sur la figure 2, l'un des voussoirs V de l'anneau T7.Only shown in section in Figure 2, one of the voussoirs V of the ring T7.

Dans la réalisation représentée à titre d'exemple, l'anneau est constitué de onze voussoirs V repérés (V1) à (V11) sur la figure 5 et d'une cloison verticale centrale (12) qui sépare les deux tubes du tunnel.In the embodiment shown by way of example, the ring consists of eleven voussoirs V spotted (V1) to (V11) in Figure 5 and a central vertical partition (12) which separates the two tubes of the tunnel.

Des joints d'étanchéité (non représentés) assurent de façon en soi connue dans la technique de construction par voussoirs des tunnels terrestres l'étanchéité entre les voussoirs et entre les tronçons.Seals (not shown) ensure way in itself known in the technique of construction by voussoirs of terrestrial tunnels sealing between voussoirs and between sections.

L'espace de travail (6) est équipé de vérins P destinés :

  • à pousser la machine vers l'avant pour dégager l'espace nécessaire à la pose d'un tronçon annulaire de tunnel ;
  • à l'orienter et la guider sur le sol ;
  • à exercer une force de précontrainte longitudinale sur les parois du tunnel en vue de maintenir comprimé les joints entre anneaux et de contribuer à la stabilité longitudinale des derniers anneaux posés.
The work space (6) is equipped with P jacks for:
  • pushing the machine forward to clear the space needed to install an annular tunnel section;
  • to orient it and guide it on the ground;
  • to exert a longitudinal prestressing force on the walls of the tunnel in order to maintain compressed the joints between rings and to contribute to the longitudinal stability of the last rings set.

Ces vérins prennent appui d'une part sur une cloison frontale (14) qui constitue un bouclier devant l'espace de travail et, d'autre part sur le dernier tronçon posé. De fait pour poser un nouveau segment de tronçon, on maintient les vérins en pression sur les segments de tronçon précédents à l'exception de celui qui se trouve derrière le nouveau segment à poser, comme on le voit sur la figure 2 où le vérin P1 a été rétracté pour la pose du segment V.These cylinders are supported on the one hand on a partition frontal (14) which constitutes a shield in front of the space of work and, on the other hand, on the last section laid. Fact to install a new segment segment, we maintain the pressure cylinders on the segment segments preceding the exception of the one behind the new segment to pose, as seen in Figure 2 where the cylinder P1 has been retracted for the installation of the V segment.

En pratique, comme on le voit sur la figure 4, il y a de préférence au moins deux vérins par segment de tronçon.In practice, as seen in Figure 4, there is preferably at least two jacks per segment of section.

Devant la chambre de travail (6), la machine comporte une chambre ballastable (20) ouverte vers le bas et vers l'avant, et qui contient des bras (21) montés pivotant d'arrière en avant et latéralement, et déplaçables sur une ou des poutres horizontales (22).In front of the working chamber (6), the machine comprises a ballastable chamber (20) open towards the bottom and towards the front, and which contains arms (21) pivotally mounted back and forth, and movable on one or horizontal beams (22).

Ces bras portent des outils de nivellement (23). These arms carry leveling tools (23).

Les plus souvent, comme on le voit le mieux sur la figure 6, après avoir préparé un fond (2) de souille, par exemple par dragage depuis la surface, on dépose une couche d'assise excédentaire (24) sur ce fond et on utilise les outils de nivellement de la machine pour chasser vers l'avant et latéralement la partie superficielle excédentaire (24a) de cette couche comme on le voit sur la figure 2, en réglant ainsi le fond de forme.Most often, as we see best on the FIG. 6, after having prepared a bottom (2) of soil, by example by dredging from the surface, lay a layer excess seat (24) on this bottom and use the leveling tools of the machine to chase forwards and laterally the excess surface portion (24a) of this layer as seen in Figure 2, by adjusting thus the bottom of form.

Après la pose d'un tronçon et simultanément à l'avancement de la machine, une couche d'appui du tunnel (25) est injectée sous le tronçon (fig.5) à partir de la machine qui est équipée à cet effet (équipement non représenté sur les figures), pour compenser l'épaisseur de la jupe arrière (27) de la machine (voir figure 7).After laying a section and simultaneously to the progress of the machine, a support layer of the tunnel (25) is injected under the section (fig.5) from the machine which is equipped for this purpose (equipment not shown on figures), to compensate for the thickness of the rear skirt (27) of the machine (see figure 7).

Dans la chambre de travail (6) est prévu un dispositif (26) pour injecter de l'air comprimé dans la chambre ballastable, au dessus de l'eau qui s'y trouve.In the working chamber (6) there is provided a device (26) for injecting compressed air into the chamber ballastable, above the water that is there.

Cette injection permet de contrôler l'inclinaison et le guidage de la machine dans le plan vertical et de régler la force d'appui de la partie avant de la machine sur le sol.This injection makes it possible to control the inclination and the guiding the machine in the vertical plane and adjusting the force of support of the front part of the machine on the ground.

Pour assurer la pression de la machine sur le tunnel et la compression des joints d'étanchéité disposés entre les tronçons de tunnel, à défaut d'une poussée hydrostatique suffisante sur le front de la machine (dans le cas de faible profondeur de tunnel et , en tout cas, dans les zones d'accès, où le tunnel n'est pas ou faiblement immergé), on exerce une traction sur la machine en direction du tunnel, au moyen d'un dispositif à vérin ou à treuil (28) disposé dans le tunnel ou sur la rive de départ et relié à la machine, par exemple par des câbles (29).To ensure the pressure of the machine on the tunnel and the compression of the seals arranged between the tunnel sections, in the absence of a hydrostatic thrust sufficient on the front of the machine (in the case of weak tunnel depth and, in any case, in where the tunnel is not immersed or weakly submerged), pulls the machine towards the tunnel, the means of a jack or winch device (28) arranged in the tunnel or on the departure bank and connected to the machine, by example by cables (29).

Ces moyens n'ont été que schématisés sur la figure 7. These means have only been shown schematically in FIG.

Lorsque la charge hydrostatique sur le tronçon est insuffisante, on met en place une précontrainte transversale des tronçons, Schématisés par des câbles (30) sur la figure 6.When the hydrostatic load on the section is insufficient, we put in place a transverse prestressing sections, schematized by cables (30) in the figure 6.

Les tronçons sont éventuellement liés entre eux, par exemple par des connecteurs à emboítement, par boulonnage et/ou par des barres ou câbles de précontrainte temporaire ou définitive (31), schématisés par des points sur la figure 6.The sections are eventually linked together, by example by connectors to interlocking, by bolting and / or by bars or cables of temporary prestressing or definitive (31), schematized by points in Figure 6.

Le tunnel, normalement destiné à relier deux rives comporte deux portions d'accès qui, de préférence sont également réalisées au moyen de la machine.The tunnel, normally intended to connect two banks has two access portions which preferably are also carried out by means of the machine.

L'invention n'est pas limitée aux exemples qui ont été décrits.The invention is not limited to the examples which have been described.

Claims (35)

Procédé pour réaliser un tunnel partiellement ou totalement immergé sur un sol sous- marin, naturel ou artificiel, dans lequel on réalise le tunnel par tronçons de tunnel successifs, caractérisé en ce qu'on construit un tronçon immergé courant sur le sol sous-marin au moyen d'une machine apte à fonctionner en immersion que l'on fait avancer dans l'eau sur le sol sous-marin, à la demande, le long du trajet prévu pour le tunnel, cette machine comportant un espace de travail étanche, sous pression atmosphérique, apte à abriter le personnel et le matériel requis pour la construction et la pose in-situ du tronçon, en ce que l'on maintient étanche le tunnel au fur et à mesure de sa construction, en ce que l'on assure entre la partie du tunnel déjà réalisée et l'espace de travail de la machine une communication suffisante pour permettre la construction et la pose d'un nouveau tronçon, et en ce qu'on utilise le tunnel, au fur et à mesure de sa construction, pour transporter à la demande jusque dans la machine les éléments constitutifs des tronçons.Method for producing a tunnel partially or totally immersed on a subsea ground, natural or artificial, in which the tunnel is produced by successive tunnel sections, characterized in that a submerged section running on the submarine ground is constructed at means of a machine capable of operating in immersion that is advanced in the water on the submarine soil, on demand, along the path provided for the tunnel, this machine having a sealed work space, under atmospheric pressure, able to house the personnel and the equipment required for the construction and the in-situ installation of the section, in that the tunnel is kept watertight as it is constructed, in that it ensures between the part of the tunnel already made and the workspace of the machine sufficient communication to allow the construction and laying of a new section, and in that the tunnel is used, as and when it is built , for tra nsporter on demand into the machine the constituent elements of the sections. Procédé selon la revendication 1 dans lequel on construit le tunnel par tronçons courts successifs, de préférence d'une longueur inférieur à trois mètres.Process according to claim 1 in which one builds the tunnel in successive short sections, preferably one length less than three meters. Procédé selon la revendication 1 ou 2 dans lequel on prépare le sol sous-marin en réalisant par dragage un fond de souille le long du trajet prévu pour la pose, et ensuite en nivelant ce fond.A process according to claim 1 or 2 wherein prepares the underwater soil by dredging a bottom of soil along the intended path for laying, and then leveling this bottom. Procédé selon la revendication 3 dans lequel on apporte des matériaux d'assise pour préparer le sol sous-marin. Process according to Claim 3, in which seating materials to prepare the underwater soil. Procédé selon la revendication 3 dans lequel on utilise la machine pour préparer partiellement ou totalement le sol sous-marin, à l'avancement, en vue de la pose du tunnel, au moyen d'outils intégrés à ladite machine.A process according to claim 3 in which use is the machine to partially or totally prepare the soil submarine, to the progress, with a view to laying the tunnel, to means of tools integrated in said machine. Procédé selon l'une des revendications 1 à 5 dans lequel on réalise un traitement de consolidation du sol ou d'amélioration de la portance du sol, à l'avancement, à l'aide de moyens intégrés à ladite machine ou depuis l'intérieur du tunnel déjà réalisé.Method according to one of claims 1 to 5 wherein a soil consolidation treatment is carried out or improvement of the lift of the soil, the progress, by means integrated into the machine or from inside the tunnel already realized. Procédé selon l'une des revendications précédentes dans lequel on fait avancer la machine sur le sol sous-marin par poussée en prenant appui sur le tunnel déjà réalisé.Method according to one of the preceding claims in which the machine is propelled on the underwater ground by push by taking support on the tunnel already made. Procédé selon la revendication 7 dans lequel on exerce cette poussée au moyen de vérins.Process according to claim 7, in which this thrust by means of jacks. Procédé selon l'une des revendications précédentes dans lequel on exerce sur la machine une traction de retenue dirigée vers la partie de tunnel déjà réalisée, en tant que de besoin, pour faciliter le guidage de la machine, comprimer les joints d'étanchéités transversaux, et assurer la stabilité temporaire des derniers tronçons posés, lorsque la poussée frontale hydrostatique sur la machine est insuffisante.Method according to one of the preceding claims in which is exerted on the machine a traction traction directed to the already realized tunnel part, as necessary, to facilitate the guiding of the machine, to compress transverse sealing joints, and ensure the temporary stability of the last sections laid, when the hydrostatic front thrust on the machine is insufficient. Procédé selon la revendication 9 dans lequel on exerce cette traction au moyen d'un dispositif tracteur relié à la machine par un câble courant dans la partie de tunnel déjà réalisée.A process according to claim 9 in which one exercises this traction by means of a tractor device connected to the machine by cable running in the tunnel part already performed. Procédé selon l'une des revendications précédentes dans lequel on munit la machine d'un compartiment ballastable, pour régler la force d'appui de la machine sur le sol et faciliter son guidage dans le plan vertical. Method according to one of the preceding claims in which the machine is equipped with a ballastable compartment, to adjust the force of support of the machine on the ground and facilitate its guidance in the vertical plane. Procédé selon la revendication 11 dans lequel on dispose des outils de nivellement et/ou de traitement de consolidation ou d'amélioration de la portance du sol dans la chambre ballastable.A method according to claim 11 wherein is disposed leveling and / or treatment tools consolidation or improvement of soil lift in the ballastable room. Procédé selon l'une des revendications 1 à 12 dans lequel on réalise chaque tronçon in-situ par assemblage de segments de tronçons au moyen d'un dispositif fixe ou mobile placé à l'intérieur de l'espace de travail étanche, des joints d'étanchéité longitudinaux étant disposés entre les segments.Method according to one of claims 1 to 12 wherein each in-situ section is made by assembling segments of sections by means of a fixed or movable device placed at inside the sealed workspace, joints sealing rings being arranged between the segments. Procédé selon la revendication 13 dans lequel, on renforce la stabilité individuelle d'un tronçon courant et on assure la compression des joints d'étanchéité disposés entre les segments du tronçon par une précontrainte transversale de ce tronçon après sa mise en place.The method of claim 13 wherein, strengthens the individual stability of a current stretch and ensures the compression of the seals arranged between segments of the section by transverse prestressing of this stretch after its establishment. Procédé selon l'une des revendications 1 à 14 dans lequel on déplace par étape la machine sur le sol sous-marin en avant du dernier tronçon posé pour dégager chaque fois l'espace nécessaire à la mise en place du tronçon suivant et à l'injection de son assise définitive.Process according to one of Claims 1 to 14 in which is moved step by step on the underwater ground in front of the last stretch laid to clear each time the space needed to set up the next section and to the injection of its final seat. Procédé selon l'une des revendications 1 à 15 dans lequel on utilise la machine pour réaliser des tronçons d'accès non immergés, partiellement immergés et/ou peu immergés du tunnel.Method according to one of claims 1 to 15 wherein the machine is used to make non-accessible access sections immersed, partially submerged and / or immersed in the tunnel. Dispositif pour la mise en oeuvre d'un procédé selon l'une des revendications 1 à 16 caractérisé en ce qu'il comprend : une machine (M) apte à fonctionner en immersion et qui comporte un espace de travail (6) étanche, intérieurement sous pression atmosphérique, apte à abriter le personnel et le matériel requis pour la construction d'un tronçon, cet espace ouvert sur la partie du tunnel déjà réalisé permettant de construire un nouveau tronçon; des moyens (27) pour assurer l'étanchéité autour de l'ouverture entre l'espace de travail et le dernier tronçon construit; des moyens (21-23) pour préparer l'assise du tunnel; des moyens (P) pour provoquer à la demande un déplacement contrôlé de la machine vers l'avant sur le sol sous-marin afin de dégager l'espace requis pour la construction d'un nouveau tronçon ; des moyens (28, 29) pour contrôler la force d'appui de la machine sur le sol sous-marin et contre le tunnel; des moyens (R) pour apporter à la machine, au travers du tunnel, les constituants et énergies nécessaires à la construction des tronçons. Device for carrying out a process according to one of Claims 1 to 16, characterized in that it comprises: a machine (M) capable of operating in immersion and which comprises a sealed working space (6) internally under atmospheric pressure, able to house the personnel and the material required for the construction of a section, this open space on the part tunnel already built to build a new section; means (27) for sealing around the opening between the work space and the last constructed section; means (21-23) for preparing the seating of the tunnel; means (P) for causing on demand a controlled movement of the machine forward on the subsea ground to clear the space required for the construction of a new section; means (28, 29) for controlling the machine support force on the subsea ground and against the tunnel; means (R) for supplying to the machine, through the tunnel, the constituents and energies necessary for the construction of the sections. Dispositif selon la revendication 17 dans lequel ladite machine est équipée de moyens de préparation du sol (21-23) pour parfaire localement l'état du sol sous-marin, en vue de la construction des tronçons de tunnel.Apparatus according to claim 17 wherein said machine is equipped with soil preparation means (21-23) to improve locally the state of the submarine soil, with a view to the construction of the tunnel sections. Dispositif selon la revendication 18 dans lequel lesdits moyens de préparation du sol comprennent des moyens de nivellement (21-23) et/ou des moyens de consolidation de sol, moyens robotisés ou non.Apparatus according to claim 18 wherein said means of soil preparation include means of leveling (21-23) and / or soil consolidation means, robotic means or not. Dispositif selon la revendication 19 dans lequel les moyens de nivellement comprennent des outils (23) de réglage du sol initial ou d'une couche déposée préalablement sur ce sol.Device according to claim 19 in which the leveling means include adjusting tools (23) initial soil or a layer previously deposited on it ground. Dispositif selon la revendication 19 ou 20, dans lequel la machine comprend des moyens de contrôle et/ou de visualisation de l'état de nivellement. Device according to claim 19 or 20, wherein the machine comprises means of control and / or visualization of the leveling state. Dispositif selon l'une des revendications 19 à 21 dans 5 lequel les moyens de nivellement comprennent des outils de nivellement (23) portés par des bras (21) montés à coulisse sur une ou des poutres horizontales (22).Device according to one of claims 19 to 21 in 5 which the leveling means comprise tools for leveling (23) carried by sliding arms (21) on one or more horizontal beams (22). Dispositif selon l'une des revendications 17 à 22 dans lequel la machine comporte un compartiment ballastable (7) pour régler la force d'appui de la machine sur le sol sous-marin.Device according to one of Claims 17 to 22 in the machine comprises a ballastable compartment (7) to adjust the force of support of the machine on the underwater ground. Dispositif selon la revendication 23 et dans lequel ledit compartiment ballastable (7) est ouvert vers le bas et vers l'avant, les moyens de nivellement (21-23)) étant logés ou rétractables dans ledit compartiment ballastable et la machine étant équipée de moyens (26) permettant d'injecter à la demande de l'air comprimé dans le compartiment ballastable.Device according to claim 23 and wherein said ballastable compartment (7) is open down and towards the front, the leveling means (21-23) being housed or retractable in said ballastable compartment and the machine being equipped with means (26) for injecting the demand for compressed air in the compartment ballasted. Dispositif selon l'une des revendications 17 à 24 et dont les moyens pour assurer la force d'appui de la machine sur le tunnel lorsque la charge hydrostatique frontale sur celle-ci est insuffisante.Device according to one of claims 17 to 24 and the means to ensure the support force of the machine on the tunnel when the frontal hydrostatic load on it is insufficient. Dispositif selon la revendication 25 dans lequel les dits moyens de traction comprennent un dispositif tracteur (28) situé en arrière de la machine et relié à la machine par un câble (29) qui court dans la partie de tunnel déjà construite.Device according to claim 25 wherein the said traction means comprise a tractor device (28) located behind the machine and connected to the machine by a cable (29) running in the tunnel part already built. Dispositif selon l'une des revendications 17 à 26 et qui comprend des moyens (P) pour exercer sur la machine une poussée afin de la déplacer vers l'avant et maítriser sa trajectoire dans le sens du trajet de pose du tunnel.Device according to one of claims 17 to 26 and which includes means (P) for exerting on the machine a push in order to move it forward and control its trajectory in the direction of the laying path of the tunnel. Dispositif selon la revendication 27 dont la machine est équipée de vérins (P) disposés pour établir une poussée sur la machine en prenant appui sur le dernier tronçon construit. Device according to claim 27, the machine of which is equipped with cylinders (P) arranged to establish a thrust on the machine taking support on the last section built. Dispositif selon l'une des revendications 17 à 28 dans lequel ledit espace de travail (6) est équipé de moyens pour manipuler des segments préfabriqués (V) de tronçon en vue de construire un tronçon de tunnel.Device according to one of Claims 17 to 28 in which said work space (6) is equipped with means for manipulate prefabricated segment segments (V) in order to build a tunnel section. Dispositif selon l'une des revendications 17 à 29 ou 30 dans lequel ledit espace de travail étanche est équipé de moyens pour injecter un matériau de remplissage (25) dans le vide laissé par la machine, lors de sa progression, entre le sol (2) et la sous-face des tronçons formant le tunnel.Device according to one of Claims 17 to 29 or 30 wherein said sealed work space is equipped with means for injecting a filling material (25) into the emptiness left by the machine, as it progresses, between ground (2) and the underside of the sections forming the tunnel. Dispositif selon l'une des revendications 17 à 30 qui comprend des moyens de précontrainte transversale (30) des tronçons de tunnel.Device according to one of claims 17 to 30 which comprises transverse prestressing means (30) tunnel sections. Dispositif selon l'une des revendicartions 17 à 31 qui comprend des moyens de précontrainte longitudinale (31) des tronçons de tunnel.Device according to one of the claims 17 to 31 which comprises longitudinal prestressing means (31) tunnel sections. Dispositif selon l'une des revendications 17 à 32 et dans lequel la machine comprend un compartiment de lestage (L).Device according to one of claims 17 to 32 and in which the machine comprises a ballast compartment (L). Dispositif selon l'une des revendications 17 à 33 et qui comprend des tronçons de tunnel préfabriqués d'une longueur individuelle d'au plus quelques mètres ou des segments de tronçons pour construire de tels tronçons.Device according to one of claims 17 to 33 and which includes prefabricated tunnel sections of one length individual at most a few meters or segments of sections to build such sections. Dispositif selon la revendication 34 et qui comprend des tronçons de tunnel préfabriqués d'une longueur individuelle généralement inférieure à 3 mètres environ ou des segments de tronçons pour construire de tels tronçons.Device according to claim 34 and which comprises prefabricated tunnel sections of individual length typically less than about 3 meters or segments of sections to build such sections.
EP05291012A 2004-05-12 2005-05-11 Process and apparatus for producing an immersed tunnel on subsea ground Withdrawn EP1596011A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR0405129A FR2870269B1 (en) 2004-05-12 2004-05-12 METHOD AND DEVICE FOR REALIZING AN IMMERSION TUNNEL ON A FLOOR UNDER A WATER TABLE
FR0405129 2004-05-12

Publications (1)

Publication Number Publication Date
EP1596011A1 true EP1596011A1 (en) 2005-11-16

Family

ID=34942269

Family Applications (1)

Application Number Title Priority Date Filing Date
EP05291012A Withdrawn EP1596011A1 (en) 2004-05-12 2005-05-11 Process and apparatus for producing an immersed tunnel on subsea ground

Country Status (16)

Country Link
US (1) US7766579B2 (en)
EP (1) EP1596011A1 (en)
JP (1) JP4687713B2 (en)
KR (1) KR101323395B1 (en)
CN (1) CN1696415B (en)
AU (1) AU2005243406B2 (en)
BR (1) BRPI0511038A (en)
CA (1) CA2566733C (en)
EG (1) EG24837A (en)
FR (1) FR2870269B1 (en)
HK (1) HK1079830A1 (en)
IE (1) IE20050293A1 (en)
MX (1) MXPA06013171A (en)
RU (1) RU2368733C2 (en)
UA (1) UA89955C2 (en)
WO (1) WO2005111317A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3450633A1 (en) * 2017-08-31 2019-03-06 CCCC Highway Consultants Co., Ltd Post-grouting method for immersed tube joint base

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102345298B (en) * 2011-11-11 2014-02-19 上海市隧道工程轨道交通设计研究院 Reusable fabricated end seal structure for immersed tube tunnel
CN102720211B (en) * 2012-05-29 2014-10-15 中交一航局第二工程有限公司 Wedge type bottom-end deviation fine-rectifying system for immersed pipe and rectifying process of wedge type bottom-end deviation fine-rectifying system
CN102704508B (en) * 2012-05-29 2014-06-25 中交一航局第二工程有限公司 Immersed tube bottom end fork truck type deviation correcting fine adjusting system and regulating process of system
CN103122642B (en) * 2013-01-30 2014-10-29 上海市政工程设计研究总院(集团)有限公司 Construction method of vertical post support change
EP2887474A1 (en) * 2013-12-20 2015-06-24 Openhydro IP Limited A method of managing a hydroelectric turbine array
RU2576692C1 (en) * 2015-01-28 2016-03-10 Александр Сергеевич Стукалов Method for building tunnel bridge in underwater channel for overcoming shallow obstacles
JP6449041B2 (en) * 2015-02-12 2019-01-09 鹿島建設株式会社 Submarine tunnel construction method and onshore tunnel construction method
JP6449040B2 (en) * 2015-02-12 2019-01-09 鹿島建設株式会社 Connection structure between submerged boxes, submarine tunnel construction method
CN106677242A (en) * 2017-01-18 2017-05-17 王燏斌 Engineering ship for underwater tunnel and construction method of engineering ship
CN109183850B (en) * 2018-09-20 2019-10-08 杜地 A kind of sea tunnel
CN109898558B (en) * 2019-03-12 2021-05-04 南京市市政设计研究院有限责任公司 Flushing and sinking device and flushing and sinking method for immersed tube
CN110174227A (en) * 2019-06-26 2019-08-27 广西大学 Submerged floating tunnel bridge response to forced vibration device and method under earthquake and coupling wave with current
CN113107521B (en) 2021-05-26 2022-03-11 山东大学 Assembly type ocean tunnel structure with escape device and application method thereof
CN113638447B (en) * 2021-08-31 2022-09-06 中铁二十局集团第一工程有限公司 Construction method of main body structure of underpass type lake area section tunnel
WO2023209744A1 (en) 2022-04-26 2023-11-02 Mario Burigo Submerged tunnels

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE50882C (en) * L. BEECHER in Detroit, Jefferson Avenue Nr. 437, Michigan, V. St. A Process for the construction of tunnels by means of a wedge-shaped end wall
DE2036953A1 (en) * 1970-07-25 1972-02-03 Berger, Hermann, Prof Dr Ing , 7000 Stuttgart Vaihingen Dozer blade construction
US4889448A (en) * 1989-03-07 1989-12-26 Bell Noel G Tunnel construction
JPH09316901A (en) * 1996-05-31 1997-12-09 Kumagai Gumi Co Ltd Excavation method

Family Cites Families (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US618955A (en) * 1899-02-07 gahagan
US413383A (en) * 1889-10-22 Method of constructing tunnels
US715768A (en) * 1900-09-11 1902-12-16 Herbert F Dunham Method of constructing and laying subaqueous tunnels.
US888790A (en) * 1906-05-26 1908-05-26 Benjamin Douglas Method and apparatus for constructing subaqueous tunnels.
US1098961A (en) * 1913-09-19 1914-06-02 Sylvenus D Mosher Tunnel-head.
US1441698A (en) * 1922-04-13 1923-01-09 Frederick L Cranford Tunnel construction
GB348204A (en) 1930-02-14 1931-05-14 Ernest William Moir An improved method of driving headings and tunnels in waterbearing strata
US3785160A (en) * 1969-07-15 1974-01-15 Taylor Diving & Salvage Co Method and apparatus for working on submerged pipeline means
US3656309A (en) * 1970-08-28 1972-04-18 John H Bultema Pipe laying method and apparatus
FR2443009A1 (en) * 1978-06-29 1980-06-27 Tim Tech Ind Minieres METHOD FOR LAYING SUBMERSIBLE PIPES AND RELATED DEVICE
DE3333850C1 (en) * 1983-09-20 1984-12-20 Dyckerhoff & Widmann AG, 8000 München Method of producing a subaqueous tunnel
JPS6140996A (en) * 1984-08-01 1986-02-27 大成建設株式会社 Method of construction of water-bottom tunnel, etc.
JPS6187099A (en) * 1984-10-03 1986-05-02 大成建設株式会社 Construction of flat tunnel
US4657435A (en) * 1985-12-27 1987-04-14 Chang Ming Y Underwater tunnel construction
JPS63151795A (en) * 1986-12-12 1988-06-24 株式会社小松製作所 Method of construction of tunnel
JPH01239298A (en) * 1988-03-17 1989-09-25 Shinkouzou Gijutsu Kk Construction of waterbottom tunnel
JP2599617B2 (en) * 1988-07-13 1997-04-09 東京電力株式会社 Underwater tunnel construction method
JP2632722B2 (en) * 1988-12-28 1997-07-23 神介 中村 How to build a submarine tunnel
JP2574081B2 (en) * 1991-07-03 1997-01-22 正二 湯山 Drug packaging device
JPH0730569B2 (en) * 1993-01-19 1995-04-05 株式会社機動技研 Vertical shaft water sealing device for underwater propulsion method and underwater propulsion method
JP2598751B2 (en) * 1994-01-20 1997-04-09 西武ポリマ化成株式会社 Submerged box for submerged tunnel and its installation method
JPH09273382A (en) 1996-04-08 1997-10-21 Taisei Corp Jacking machine for underwater tunnel
CN1080355C (en) * 1996-09-02 2002-03-06 阎瑞明 Segmental prefabricating negative pressure sealing submarine tunnel prefabricated components and construction method thereof
EP0899422B1 (en) 1997-09-02 2003-11-12 Riccardo Dr. Bernasconi Method of constructing a tunnel
JP2002266373A (en) * 2001-03-08 2002-09-18 Taisei Corp Tunnel excavator and device for earth removal and recycling
JP4531298B2 (en) * 2001-06-26 2010-08-25 ジャパントンネルシステムズ株式会社 Underwater shield shield machine
JP2003003481A (en) 2001-06-26 2003-01-08 Hitachi Zosen Corp Immersing caisson submersing method
CN2530980Y (en) * 2002-03-28 2003-01-15 天津大学 Box type base submarine tunnel structure
JP4116381B2 (en) * 2002-09-20 2008-07-09 大豊建設株式会社 Shield tunnel and shield excavator

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE50882C (en) * L. BEECHER in Detroit, Jefferson Avenue Nr. 437, Michigan, V. St. A Process for the construction of tunnels by means of a wedge-shaped end wall
DE2036953A1 (en) * 1970-07-25 1972-02-03 Berger, Hermann, Prof Dr Ing , 7000 Stuttgart Vaihingen Dozer blade construction
US4889448A (en) * 1989-03-07 1989-12-26 Bell Noel G Tunnel construction
JPH09316901A (en) * 1996-05-31 1997-12-09 Kumagai Gumi Co Ltd Excavation method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN vol. 1998, no. 04 31 March 1998 (1998-03-31) *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3450633A1 (en) * 2017-08-31 2019-03-06 CCCC Highway Consultants Co., Ltd Post-grouting method for immersed tube joint base
EP3450633B1 (en) * 2017-08-31 2021-03-24 CCCC Highway Consultants Co., Ltd Post-grouting method for immersed tube joint base

Also Published As

Publication number Publication date
JP2007537375A (en) 2007-12-20
UA89955C2 (en) 2010-03-25
AU2005243406B2 (en) 2010-09-09
CA2566733A1 (en) 2005-11-24
US20070248416A1 (en) 2007-10-25
CN1696415A (en) 2005-11-16
MXPA06013171A (en) 2007-05-16
IE20050293A1 (en) 2005-12-14
CA2566733C (en) 2013-01-08
BRPI0511038A (en) 2007-11-27
KR20070041684A (en) 2007-04-19
KR101323395B1 (en) 2013-10-29
RU2006143765A (en) 2008-06-20
HK1079830A1 (en) 2006-04-13
AU2005243406A1 (en) 2005-11-24
JP4687713B2 (en) 2011-05-25
FR2870269B1 (en) 2006-08-11
EG24837A (en) 2010-10-07
WO2005111317A1 (en) 2005-11-24
US7766579B2 (en) 2010-08-03
FR2870269A1 (en) 2005-11-18
CN1696415B (en) 2011-08-17
RU2368733C2 (en) 2009-09-27

Similar Documents

Publication Publication Date Title
EP1596011A1 (en) Process and apparatus for producing an immersed tunnel on subsea ground
EP0006812B1 (en) Method and apparatus for laying submerged pipes
US9523445B2 (en) Self-propelled underwater vehicles and systems for underground laying a continuous elongated member in a bed of a body of water
FR2588297A1 (en) DEVICE FOR UNDERWATER DRILLING OF FOUNDATIONS
EP0007825B1 (en) Underwater drilling method and apparatus relating thereto
WO1995018895A1 (en) Device for filling a trench in the sea bed to cover a pipe placed therein
GB2193517A (en) Traveling trench shore
JP3512012B2 (en) How to excavate
CN112779967B (en) Construction method for sea-land connecting section of sewage sea area discharge pipe
CN111778982B (en) Earth subsection excavation method and device applied to subway deep foundation pit engineering
JP7303756B2 (en) Open shield machine and tunnel construction method
FR2850984A1 (en) New traffic lane creating process for roadway or railway track, involves interrupting existing lane and eliminating embankment to displace pre-fabricated structure horizontally and vertically to bring structure in service position
JP3190949B2 (en) Method of burying and excavating box in excavated soil and excavator
JP3487201B2 (en) Construction method of underwater tunnel and underwater excavator
FR2739405A1 (en) Under=pinning method for existing structure exposed by river bed
EP1596010A1 (en) Method, device and bridge structure for making an underpass
JPH0813539A (en) Underwater walking type dredging method and dredger
JPH09144475A (en) Excavator
NO171578B (en) PROCEDURE AND APPARATUS FOR CURRENT GROWING AND PIPING IN ARCTIC AREAS
FR2646191A1 (en) Method for installing a pipeline by pulling under the level of the seabed, and installation for implementing it
JP3517226B2 (en) Open shield machine
BE370060A (en)
FR2778506A1 (en) Method, infrastructure and machine for laying services in bed of water course to link distant geographic locations
KR20160052236A (en) Pipeline construction method and tunneling machine
JP2002332627A (en) Pollution prevention device of bottom longer body burying machine

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR LV MK YU

RIN1 Information on inventor provided before grant (corrected)

Inventor name: PALBRAS, PATRICK

Inventor name: AUTUORI, PHILIPPE

Inventor name: LONGCHAMP, PIERRE

Inventor name: ARISTAGUES, PIERRE

RIN1 Information on inventor provided before grant (corrected)

Inventor name: PALBRAS, PATRICK

Inventor name: AUTUORI, PHILIPPE

Inventor name: LONGCHAMP, PIERRE

Inventor name: ARISTAGHES, PIERRE

17P Request for examination filed

Effective date: 20060515

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

AXX Extension fees paid

Extension state: LV

Payment date: 20060515

Extension state: HR

Payment date: 20060515

17Q First examination report despatched

Effective date: 20060926

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20171215