EP1321262A1 - Anlage zum Herstellen und Transportieren von Mörtel - Google Patents

Anlage zum Herstellen und Transportieren von Mörtel Download PDF

Info

Publication number
EP1321262A1
EP1321262A1 EP02292886A EP02292886A EP1321262A1 EP 1321262 A1 EP1321262 A1 EP 1321262A1 EP 02292886 A EP02292886 A EP 02292886A EP 02292886 A EP02292886 A EP 02292886A EP 1321262 A1 EP1321262 A1 EP 1321262A1
Authority
EP
European Patent Office
Prior art keywords
container
installation according
platform
mortar
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP02292886A
Other languages
English (en)
French (fr)
Other versions
EP1321262B1 (de
Inventor
Patrick De Belloy
Patrice Ravel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ParexGroup SAS
Original Assignee
Lafarge Mortiers SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lafarge Mortiers SA filed Critical Lafarge Mortiers SA
Publication of EP1321262A1 publication Critical patent/EP1321262A1/de
Application granted granted Critical
Publication of EP1321262B1 publication Critical patent/EP1321262B1/de
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C9/00General arrangement or layout of plant
    • B28C9/002Mixing systems, i.e. flow charts or diagrams; Making slurries; Involving methodical aspects; Involving pretreatment of ingredients; Involving packaging
    • B28C9/004Making slurries, e.g. with discharging means for injecting in a well or projecting against a wall
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/71Feed mechanisms
    • B01F35/717Feed mechanisms characterised by the means for feeding the components to the mixer
    • B01F35/7173Feed mechanisms characterised by the means for feeding the components to the mixer using gravity, e.g. from a hopper
    • B01F35/71731Feed mechanisms characterised by the means for feeding the components to the mixer using gravity, e.g. from a hopper using a hopper
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/04Supplying or proportioning the ingredients
    • B28C7/06Supplying the solid ingredients, e.g. by means of endless conveyors or jigging conveyors
    • B28C7/064Supply from sacks; Sack openers

Definitions

  • the subject of the invention is a preparation and transport installation from a mortar to the place of use.
  • the invention is specially adapted for the use of plasters facade but can also be used for the realization of floors, walls, ceilings or slabs, indoors or outdoors.
  • the old technique still used for weak construction sites importance, consists in first of all preparing a mass of dry mortar by mixture with cement of a sand having the desired particle size and of it add water as needed.
  • Such a device comprises a mixer into which the sand and cement or ready-mixed mortar, to mix them with water and the mixture is then poured into a through hopper in a pumping device, for example screw or compressed air, which feeds a projection lance.
  • a pumping device for example screw or compressed air, which feeds a projection lance.
  • the silo pours out, by a hopper, to the lower part of an inclined conveyor-metering device, which dumps dry plaster in a predosing container closed at its base by a stop device for supplying a mixer conveyor associated with projection means.
  • solid materials not consistent such as sand, gravel or even a ready-to-use mortar, can be delivered in flexible containers often called “big bags", containing, for example, one to two tonnes of product.
  • JP-2001-269558 shows such arrangement in which a flexible container is placed by means of lifting on a support provided at the top of an enclosure reserve in which it empties entirely.
  • the spilled material collects in the bottom of the hopper-shaped enclosure, from which the material is taken up and reassembled by an inclined conveyor which opens out in a mixing and pumping device for the mortar thus produced.
  • Such a device is quite bulky and expensive and, so far, it had not seemed profitable to provide such means on a construction site low or medium importance such as a detached house or a small building for which it seemed preferable to use the methods usual by making the mortar on site or by using a mortar ready to use delivered in 30 kg bags.
  • Another problem is that it is often asked to make facade coatings colored in the mass. For that, we can pre-stain the dry mortar in the factory by mixing an additive or a coloring pigment with the constituents, in particular, in the case where use a ready-to-use mortar. We then deliver bags to the site corresponding to the requested color but, when it is necessary to realize several colors, it is necessary to plan the number of bags necessary for each with the risk of delaying work if the number of bags ordered is not not enough or, conversely, to have unused bags.
  • the invention makes it possible to solve these problems thanks to an installation simple and compact, allowing the use, even for construction sites low or medium importance, flexible containers for the supply of materials or ready-to-use mortar, retaining the possibility of adjustment of the composition making it possible in particular to guarantee the color of the coating.
  • such an installation can be powered by flexible “big bag” containers without the need for important lifting and allows to precisely control the proportions of constituents so as to obtain a great regularity of the shade obtained, by carrying out, if necessary, coloring on site with the mortar.
  • the invention makes it possible to solve such problems thanks to a versatile and autonomous installation, easy and economical to use, able to adapt to a wide variety of circumstances and any importance.
  • the invention therefore relates, in general, to an installation of preparation, transport and installation of a mortar, which can be supplied by means of a flexible container filled with dry matter and consisting of an envelope having an upper part provided with a suspension from a lifting means which supports each container to lift it above a reserve hopper into which it pours the material through a lower container emptying orifice, said hopper having a lower part connected by a means for removing the material to a mixing device associated with a pumping device for pressure supply of a mortar transport line leading to the place of use.
  • each container is extended downward by an elongated sheath having an upper end plugged into the drain port and a lower end that goes down in the reserve hopper up to a mass of reserve material formed in said hopper, so that, during the emptying of the dry matter, this forms, inside the connecting sheath, a continuous column which gradually flows into the mass of material in reserve, as and measurement of its evacuation to the receiving section of the device of mixing.
  • the reserve hopper may have a capacity less than the volume of material dryer transported in a container.
  • the lifting means include a means of progressive lifting of the flexible container, at as the material is emptied, so as to compensate the lengthening of the container envelope while maintaining a difference of substantially constant level between the container drain port and the lower end of the sheath opening into the mass of material contained in the hopper.
  • the container suspension member can advantageously be connected to the lifting means by an elastic member tared determining the lifting of the suspension member as and when measurement of the emptying of the container.
  • the mobile carriage comprises a chassis in the form of a substantially horizontal platform having a central part on which the lifting and lifting means are supported container suspension and a side part on which are mounted the control means, the mixing device having an inlet orifice dry matter, placed in the central part of the platform and an orifice outlet opening into the pumping device mounted on one side of the platform.
  • the reserve hopper is placed on a first lateral part of the platform and the autonomous means on the second side, on the other side of the central part carrying the lifting means, the evacuation orifice of the hopper opening into a material extraction means with a flow rate controlled, associated with a means of conveying the material extracted up to a high end opening above the inlet opening in the receiving section of the mixing device.
  • the mixing includes a tubular sheath extending across the portion center of the platform between two lateral sides thereof, respectively a first side on which is placed a connected inlet orifice by an adapter box at the upper end of the conveying device and a second side on which is placed an outlet opening opening into the pumping device, the latter being fixed on said lateral side of the platform.
  • the dry matter reserve hopper is placed above the tempering and leads directly into the receiving section of the device of mixing.
  • the mixing device comprises a sheath tubular centered in a longitudinal median plane of the platform and having an inlet port placed in the central part of the platform below reserve hopper and an outlet opening into the device pumping, the latter being mounted at a longitudinal end of the platform.
  • the sheath of the mixing includes a first part limiting a reception room of the material and a second part limiting a mixing chamber of the material and articulated around a vertical axis on the first part so as to be able to be folded back into the carriage transport position, releasing the platform a space on which the pumping device can be raised, the latter being articulated around a horizontal axis on the end longitudinal of the platform.
  • the lifting and container suspension include a lifting crane with a boom mounted orientable, around a vertical axis of rotation, on a fixed mast on a central part of the platform and carrying a suspension hook radially movable relative to the axis of rotation of the boom, between a external position for handling containers in an area of storage, and an internal container hanging position above of the reserve hopper.
  • the lifting crane comprises means for adjusting the boom level between a lowered position of taking over a container on a storage area and a raised position for emptying the container in the hopper.
  • this means of adjusting the level of the boom can be ordered according to the variation in weight of the container so as to determine a progressive lifting of the suspension organ as and when measure of the lightening of the container.
  • the container lifting and suspension means include a boom having an inner end hinged about a horizontal axis on the carriage and an outer end provided with a suspension member for a container and means for controlling the pivoting of the boom between a position lowered support by the suspension member of a container placed on a storage area and a raised position for emptying the container.
  • the lifting arrow forms a articulated gantry spanning the platform and comprising a cross horizontal carrying a container hanger and two arms articulated respectively, around aligned horizontal axes, on the two lateral sides of the platform and on which two jacks are supported of the gantry pivoting.
  • the two arms of the gantry can be formed each of two parts mounted sliding on one another and associated with sliding control means for adjusting the length of said arms as a function of a variation in the weight of the container suspended from the crosses.
  • the arrow can pivot between a first position lowered towards a longitudinal end of the container handling platform, a raised position of container emptying and a second position lowered to the other longitudinal end of the platform for transporting the trolley from one place of use to another.
  • the means of lifting the containers and the means of evacuating, mixing and pumping the material are powered by hydraulic motors powered by a central hydraulic driven by a drive motor, the assembly being carried by the mobile cart.
  • the drive motor is a heat engine of so as to realize a completely autonomous installation.
  • the mixing device can be associated with means incorporating a proportion of dye or additive into the mortar.
  • the installation may be provided with means for controlling the respective conveying rates of the material, at the outlet of the hopper reserve, in the mixing device and in the pumping device, which are regulated according to each other by a system of regulation of so as to ensure the continuous production, with a controlled flow, of a mortar of determined composition.
  • the installation according to the invention is specially adapted for flexible container feeding, it can however, by simple and quick modifications, be fueled also, either from a silo associated with a means of evacuation opening directly into the reserve hopper after separation of the lifting means, either by means of a mortar transport member wet type "spinning top" the mortar being poured directly at the entrance of the pumping device, after separation of the mixing device.
  • Figure 1 there is shown schematically a first mode of realization of the invention, applied to a site of low or medium importance such as the construction of a single house A.
  • the installation according to the invention can be supplied in flexible containers filled with a large quantity, for example from 500 kg to 2 tonnes of dry matter such than a ready-to-use mortar.
  • Such an installation therefore generally comprises a means 2 for handling a container C which pours into an enclosure of reserve 3 connected by an evacuation means 4 to a mixing device 5 opening into a pumping device 6 associated with means such as a spray lance D, for the application of wet mortar by a operator, for example on the facade of a house A.
  • the invention makes it possible to produce a particularly compact arrangement in which all means necessary for the preparation and installation of the mortar, are grouped together on a mobile carriage B which can thus be easily moved from one place of use to another without worrying about the importance of the site.
  • this mobile carriage essentially comprises a frame 1 forming a horizontal platform substantially rectangular in shape and resting on the ground by one or two axles, respectively one or two rear axles 11 which support the main part of the load and, at the front, a steerable “jockey” wheel 12 which is articulated around a vertical axis and can be oriented by a drawbar 13.
  • the chassis 1 is advantageously held by crutches 14 of adjustable level, which are raised when the carriage moves.
  • Such containers generally have, when full, a roughly square shape, which makes it easier to place them next to the other, on soil S, as shown in Figures 1 and 3.
  • the mobile carriage B brought in tow on site is therefore placed and oriented so that it can move along or in front of this row of containers.
  • Each container consists of a flexible envelope 7 in the form large bag provided, at its upper part, with hanging means such as straps 71 and the lower part of which forms a substantially flat bottom 72 provided, in its central part, with a drain orifice 70.
  • the bottom 72 of the envelope 7 of the container is extended by an elongated sheath 73 having an upper end plugged into drain port 70 and a lower end going down inside a reserve enclosure 3 up to the level of its part lower hopper-shaped 3.
  • This elongated sheath 73 is equipped with a closure means removable not shown in the drawing and which can be constituted, simply, a link that can be opened by hand.
  • the material M contained in the casing 7 pours out through the lower orifice 70 and the sheath 73 and forms a mass M 2 which rises, in the lower part 31 of the hopper 3, including the lower end of the sheath 73. Therefore, if the flow stops by itself as long as this mass M 2 is not discharged, the sheath 73 being filled with a column M 1 of material.
  • the reserve enclosure 3 forms a hopper mounted on a lateral part 16 of the chassis 1 of the carriage extending on the side of the steering axle 12 by relative to the lifting means which is mounted in the central part 15 of the platform and will be described later.
  • the hopper 3 is centered on the longitudinal axis 10 of the chassis 1 of the carriage and advantageously has a truncated pyramid shape inverted with a square base and limited by four flat faces which converge down to a rectangle-shaped outlet port 32 elongated, placed in a plane inclined to the horizontal.
  • Hopper 3 is, on the other hand, oriented so that the vertical median plane P1 of the orifice 32 makes an angle K with the vertical median plane P of the carriage B.
  • the square base of the hopper 3 is located in a horizontal plane, slightly above the upper face of chassis 1 of the carriage and is preferably closed by a cover 33 consisting of a flat wall at the center of which is formed an introduction orifice 34 centered on an axis vertical 10 placed in the longitudinal median plane P of the carriage.
  • This orifice 34 has a diameter equal to that of the drain sheath 73 a container C, which can thus enter the interior of the hopper 3 when the container C, suspended from the lifting means 2, is centered on the axis 10 of the hopper, in the position shown in Figure 2.
  • the hopper 3 is associated with a seat belt allowing safe access below the container C and constituted, for example, a circular tube 35 fixed by legs on the frame 1 to a short distance, for example ten centimeters, above the cover 33 of the hopper 3.
  • container C is not placed on the tube 35 which is simply a seat belt but remains suspended, permanently by lifting means 2 by straps 71.
  • the lifting means 2 mounted on the carriage B consists of a small crane having a horizontal boom 21 rotatably mounted, around a vertical axis, at the upper part d 'a mast 20 fixed on a base 22 embedded in the central part of the chassis 1 of the carriage.
  • the mast 20 is telescopic and its length can be adjusted by a hydraulic cylinder 24 so as to vary the level of the boom 21 between a low position F 1 indicated in phantom in Figure 2 and a high lifting position F 2 shown in solid lines.
  • the arrow 21 carries a suspension hook 23 fixed on a carriage 25 which can be moved horizontally, for example, under the action of an endless screw driven in rotation by a motor 26 and engaging in a nut carried by the carriage 25.
  • the suspension member 23 can thus move radially, along the arrow 21, between an internal position 23a and an external position 23b.
  • the suspension hook placed in its external position 23b therefore describes a circular path T shown in phantom in Figure 3.
  • the carriage B is placed along the row of container C at a fairly low distance from it, so that, in its path T, the suspension hook 23 passes over several adjacent containers, for example, three containers C in the case of FIG. 3.
  • the orientation of the arrow and the radial position of the hook 23 can be adjusted so as to place the latter above one or other of the containers C 1 covered by the trajectory. After removing these containers, it is possible to put the carriage B back on its wheels and move it longitudinally to cover other containers in the row.
  • the containers are lifted by means of the jack 24 for adjusting the height of the boom 21, which is first placed in the low position F 1 to bring the hook 23 above a container C in the row and hang the suspension straps 71, then raised to its high position F 2 , by lifting the container C.
  • the means for lifting and suspending the container C is arranged so as to maintain a substantially constant level difference between the orifice 70 for emptying the container and the lower end 74 of the sheath 73 which opens into the mass of material M 2 contained in the lower part 31 of the hopper 3. Since the flexible envelope 7 of the container is stretched when the container is full and tends to lengthen when it empties , it is necessary to compensate for this elongation by raising the suspension point 23 of the container as and when emptying 70 to a substantially constant level.
  • the means 24 of adjustment of the level of the jib 21 of the crane 2 which can be a jack hydraulics controlled by a microprocessor depending on the variation, measured by a sensor, of the weight of container C suspended on the hook of the crane.
  • the jib 21 can also be kept at a level constant and act on the length of the suspension member 23.
  • the hook 23 is connected to the carriage 25 by a tared elastic member 27 consisting for example of sliding rods 26 associated with springs or stacks of Belleville washers.
  • the calibration of the springs corresponds to the weight of a full container C.
  • the elastic member 27 is adjusted so that the bottom 72 of the container passes just above the seat belt 35.
  • the suspended container is then connected to the reserve hopper 3 by the sheath 73 which can be opened.
  • the weight of the container C decreases and the hook 23 rises upwards under the action of the calibrated suspension member 27, accompanying the narrowing of the envelope 7 of the container whose flattened shape 7 'is indicated in phantom in figure 2.
  • the lower orifice 70 of the casing 7 remains at a substantially constant level and the sheath 73 is filled with a column of material 71 which flows as this material M 2 is extracted by the evacuation means 4 which will be described later.
  • the drain sheath 73 can have a fairly small diameter, for example, of about 1/4 or 1/5 of that of the bottom 72 of container C when it is full.
  • the reserve hopper 3 can have a reduced volume since it must simply contain a reserve mass M 2 sufficient to serve as a buffer in order to continue feeding the mixing device 5 for the time necessary for replacing d 'a container.
  • the means according to the invention allow, precisely, to quickly carry out such a replacement.
  • the container is then raised so that its bottom 72 is a little above the level of the seat belt 35, taking into account the lengthening of the calibrated springs 27.
  • the dry mortar contained in the casing 7 of the container C pours out by the sheath 73 in the hopper 3 and is taken up by the evacuation device 4 which includes an extraction box 41 connected to the outlet orifice 32 of the hopper 3 and associated with a conveying device 42 consisting of a sheath elongated tubular inside which is threaded a transport screw 45 driven in rotation, about its axis, by a motor 43.
  • the transport screw is of the shaftless type comprising a flat ribbon wound helically around an empty axial space and having a lower end which extends below the outlet orifice 32, in the box.
  • extraction 41 and thus makes it possible to continuously extract the material M 2 contained in the hopper 3 by entraining it in the elongated sheath 42 up to a discharge box 44 placed at a higher level, above the chassis 1 of the carriage , the elongated sheath 42 being inclined upwards between the extraction box 41 and the evacuation box 44, as shown in FIG. 2.
  • This evacuation box 44 is provided, on its underside, with a orifice which is connected to the mixing device 5 by a shaped adapter 45 hopper.
  • the mixing device 5 is specially designed for making a very compact installation of which all the organs can be grouped on a chassis of relatively small dimensions. Indeed, it essentially comprises a tubular enclosure 51 having an axis 50 substantially perpendicular to the longitudinal median plane P of the carriage, and placed across the central part 15 of the chassis 1, next to the base 22 of the crane 2.
  • the tubular enclosure 51 forms a sheath limiting two successive rooms, respectively a reception room 52 and a mixing chamber 53 and provided, at its two opposite ends, respectively of an inlet port 55 connected by a tube to the adapter 45 of the device 4 and opening into the receiving chamber 52 and a outlet orifice 56 of the mixing chamber 53, connected by a tube to a pumping device 6.
  • a conveying member with mixing driven in rotation by a motor 57 and comprising a first part in the form of a conveyor screw, at the level of the reception 52 and a second part with blades, at the level of the room mixing 53.
  • the device 4 for evacuating the material M 2 is placed at an angle on the chassis 1 so that the evacuation box 43 extended by the adapter 45 can be connected to the tube 55 of entry into the sheath 51.
  • the dry mortar poured into the hopper 3 and taken up by the device evacuation 4 is thus introduced into the receiving chamber 52 of the sheath 51 and driven towards the mixing chamber 53 in which is injected with mixing water.
  • the sheath 51 is provided, in its central part, of an orifice 54 connected to a circuit (not shown) of supply in water which is provided with means for adjusting the flow of water to be mixed with mortar, depending on the rate of advance thereof along the sleeve 51.
  • a mortar wet with the desired consistency which is discharged through the outlet tubing 56 in a reserve chamber 61 of the pumping device 6.
  • the mixing water is supplied by a connected pump to a reservoir mounted on the chassis 1 of the carriage so as to ensure a flow constant water avoiding pressure variations.
  • the pumping device 6 essentially comprises two chambers cylindrical coaxial, respectively, the reserve chamber 61 already mentioned and a pressurization chamber consisting of a sheath tubular removably attached to the chamber 61, in the extension of this one, and inside which is threaded a conveyor screw and compression, driven by a motor 63 and having a part which extends to the interior of the reserve chamber 61 to below the outlet of the outlet pipe 56 for the wet mortar.
  • the sheath of pressurization 62 ends with a convergent 64 on which is connected a flexible pipe 65 provided, at its opposite end, with a mortar projection lance which can be of known type and is not shown in the figure.
  • all of the reserve chamber 61 and the pressurization chamber 62 is rotatably mounted around the vertical axis of the tubing 56 so as to allow the orientation of the device without interrupt the continuity of its supply.
  • the mobile carriage B carries an autonomous system for controlling the operation of all of the means mounted on the chassis 1.
  • all the motor means in particular the motor 26 for adjusting the position of the hook 23, the motor 43 for driving the evacuation device, the motor 57 for driving the transport member and kneading of the mixing device 5 and the motor 63 for driving the screw of the pumping device 6 are hydraulic motors.
  • the lifting cylinder 24 and the stands 14 are hydraulically actuated. All these means are controlled from a hydraulic power station 8 driven by a motor 81, the assembly being placed on a platform 17 formed on the rear side part of the chassis 1, next to the mixing 5 and opposite the reserve hopper 31.
  • the motor 81 which supplies the energy necessary for the operation of all organs is a heat engine, which allows to perform a fully autonomous installation that does not require a electrical connection.
  • the platform 17 also carries a compressor 82 driven by the heat engine 81 and connected to a circuit (not shown) for introducing air in the pumping device 6 to allow the projection of the mortar wet.
  • the platform 17 can also carry a device 84 of known type allowing the incorporation of dye or adjuvant in the wet mortar, preferably through water of mixing.
  • a device 84 of known type allowing the incorporation of dye or adjuvant in the wet mortar, preferably through water of mixing.
  • Such a device can, in particular, be of the type described in the international application published under the number WO 00/05047.
  • the container C being suspended by the hook 23 above the hopper 3, the operator, protected by seat belt 35, introduces the sheath 73 in the hole in the cover 33 and unravels the closing link.
  • the dry mortar pours into the hopper 3 but, when the mass of material M 2 includes the lower end of the sheath 73, the flow stops by itself. We can then start the evacuation device 4 which extracts the mortar from the hopper 3 to reassemble it in the sheath 42. The quantity of mortar extracted, at each instant, by the outlet orifice 32 is replaced by a quantity equivalent coming from the container C passing through the sheath 73. Under normal conditions, the hopper 3 is practically full.
  • the organ extraction 41 can continue to operate as long as mortar remains in the hopper 3. This therefore constitutes a buffer tank whose volume is determined according to the maximum discharge flow 4 so as to maintain the supply of the discharge device 4 for the time necessary for the replacement of container C.
  • the diameter of the opening 34 for entering the hopper 3 as well as the drain hose 73 of the container is determined so as to allow, in in all circumstances, the passage of a sufficient flow of mortar to compensate for the quantity extracted by the outlet orifice 32.
  • the flow rate mortar flow can therefore only be controlled by adjusting the speed of the motor 43 of the discharge device 4.
  • the dry mortar thus extracted from the hopper 3 is conveyed to the box evacuation 43 and poured into the mixing device 5.
  • the powder extraction rate controlled by the motor 43, is adjusted so as to always remain greater than that of the device mixing 5 which can thus be fed continuously with a constant flow, so as to produce a homogeneous and regular paste.
  • the evacuation box 44 of the evacuation device 4 constitutes, moreover, a buffer tank which can be filled when the flow rate of the mixing device is lower than that of the evacuation device 4 and which, conversely, feeds the mixing 5 if the upstream flow becomes insufficient, for example in the event of delay in replacing an empty container.
  • the reserve chamber 61 of the pumping also serves as a buffer tank between the mixing device 5 and the pumping device 6 by filling with wet mortar if the projection rate is insufficient and, on the contrary, by supplying the chamber pressurizing 62 if the flow rate supplied by the mixing device 5 is, momentarily, lower than the projected mortar flow.
  • the discharge device 4 is designed to ensure an extraction flow rate greater than the flow rate of the mixing 5 which is itself higher than that of the pumping device 6, by example 25 liters of dough per minute.
  • a control system 85 easy to design and mounted on chassis 1 of the trolley, allows control as a function of each other the relative speeds of all the motors to ensure the continuity of the mortar supply with, in all organs, controlled flow.
  • Buffer tanks provided at each stage of the material circuit ensure regular dosing thereof constant or variable flow and, thus, to obtain a homogeneous paste and regular.
  • This regular dosage of all the constituents of the mortar allows, if necessary, add an adjuvant or coloring agent, for example to achieve on-site coloring while ensuring color retention chosen.
  • an adjuvant or coloring agent for example to achieve on-site coloring while ensuring color retention chosen.
  • the installation is completely autonomous, the chassis 1 which can carry not only all the components necessary for feeding, mixing and spraying the mortar, but also hydraulic unit with its cover, a water tank with its pump, a coloring device and a heat engine to operate all organs if the site is not yet connected to the supply network electric.
  • the mixing device 5 described above has the advantage of a small footprint but could however be replaced by a more conventional mixer.
  • This device could also be placed at a higher level, for example to place axle 11 in the section chassis 1 central unit to better balance the load.
  • the lifting means 2 comprises a tilting boom 21 'in the form of a gantry comprising two arms 21'a, 21'b articulated by a internal end, around a horizontal axis 22 ', on platform 1 of the carriage and connected, at their outer end, by a cross member 20 'in the center of which is mounted a hook 23 'for hanging the containers.
  • Two 25 'cylinders the body of which is articulated on the chassis 1 and the rod on each arm 21 'rotate the gantry 2 between a lowered position of handling of containers on a storage area S and a position emptying record of container C supported.
  • the mixing device 5 consists of a tubular sheath having an inlet port 55 and an outlet port 56 between which the material passes successively through a receiving chamber 52 then a mixing chamber 53 with the introduction of water.
  • the mixing device 5 placed in the central part 15 of the platform 1 was arranged across, between the two lateral sides of the chassis 1, the pumping device 6 being fixed on one side of the frame and the inlet port 55 of the sleeve 51 being placed on the other side.
  • the device mixing which consists, as before, of a tubular sleeve 51 associated with means for conveying the material between an inlet orifice 55 and an outlet 56, is centered on the longitudinal axis 10 of the platform, the inlet orifice 55 being placed in the center thereof and the orifice of outlet 56 at the longitudinal end of the platform.
  • the device of mixing therefore extends over the lateral part 16 of the platform, the means for controlling the control operation 8 being placed, as before, on the second lateral part 17.
  • the reserve hopper 3 is placed above the device 5 and is connected to the inlet tubing 55 so as to lead directly into the receiving section 52 of the mixing 5.
  • the drain sheath 73 is then shorter and the means 4 can be removed, the material flowing from the container being taken care of directly in the receiving section by the organ for conveying the material associated with the tubular sheath 51.
  • the pumping device 6 is fixed on the end longitudinal of part 16 of platform 1, below the orifice of output 56 of the mixing device 5.
  • the arrow 2 ′ can have a variable length, the two arms 21'a, 21'b being made up of two telescopic parts sliding one inside the other and each associated with a 24 'cylinder not shown in detail, which adjusts the level of the suspension 23 'depending on the weight variation of container C, at by means of a regulation system in position and pressure of the cylinders 24 ' comprising a microprocessor associated with a sensor for measuring weight variations of the container suspended from the hook 23 '.
  • a regulation system in position and pressure of the cylinders 24 ' comprising a microprocessor associated with a sensor for measuring weight variations of the container suspended from the hook 23 '.
  • the 24 'cylinders allow completely fold the two arms 21'a, 21'b and the gantry 2 'can be folded back over the control means 8, in the position shown in Figure 7.
  • the sleeve 51 of the mixing device 5 can advantageously be made up of two parts 52, 53 constituting respectively the receiving chamber and the mixing chamber and hinged on each other around a vertical axis so that the part of mixing 53 can be folded down along the receiving part 52 in thus freeing up, at the longitudinal end of the platform 1, a space free on which the pumping device 6 can be raised, the latter being articulated around a horizontal axis 60 on the corresponding longitudinal side of platform 1.
  • the dry matter is supplied by a transportable silo 7 ′ mounted on legs which span the platform 1 so that the orifice outlet 70 'from the silo opens above the reserve hopper 3.
  • the installation can also be supplied with mortar wet prepared in advance and delivered to the site by a truck of the type "Concrete mixer".
  • the pumping 6 must simply be fitted with an extension 66 in which opens the chute of the router, the mortar thus spilled being immediately taken over by the pumping device to be projected by lance D.
  • evacuation devices 4, mixing and pumping 6 can be provided to convey a material dried. If the installation is supplied with ready-to-use mortar, we could therefore, in known manner, transport the dry matter to the lance 65 and introduce the water necessary for leaving it, just before the projection.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Dispersion Chemistry (AREA)
  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)
  • Fertilizers (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
EP02292886A 2001-11-20 2002-11-20 Anlage zum Herstellen und Transportieren von Mörtel Expired - Lifetime EP1321262B1 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR0115014A FR2832349A1 (fr) 2001-11-20 2001-11-20 Installation de preparation et de transport de mortier
FR0115014 2001-11-20

Publications (2)

Publication Number Publication Date
EP1321262A1 true EP1321262A1 (de) 2003-06-25
EP1321262B1 EP1321262B1 (de) 2008-09-10

Family

ID=8869595

Family Applications (1)

Application Number Title Priority Date Filing Date
EP02292886A Expired - Lifetime EP1321262B1 (de) 2001-11-20 2002-11-20 Anlage zum Herstellen und Transportieren von Mörtel

Country Status (4)

Country Link
EP (1) EP1321262B1 (de)
AT (1) ATE407781T1 (de)
DE (1) DE60228814D1 (de)
FR (1) FR2832349A1 (de)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019180135A1 (de) * 2018-03-21 2019-09-26 Sika Technology Ag System zur bereitstellung von baustoffen
CN111545109A (zh) * 2020-04-23 2020-08-18 王葵花 一种环氧彩砂挤出搅拌装置

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2917324B1 (fr) 2007-06-13 2012-09-28 Weber & Broutin Sa Installation de preparation d'un materiau humide de type beton ou mortier
FR2917325B1 (fr) * 2007-06-13 2012-10-05 Weber & Broutin Sa Conteneur souple en forme de gros sac
US9636843B2 (en) 2008-05-02 2017-05-02 Reinhard Matye Mobile concrete mixing plant
FR3125235B1 (fr) * 2021-07-16 2023-09-08 Saint Gobain Weber France unité de fabrication et de préparation sur le chantier d’un mortier pour la projection
CN118024414A (zh) * 2024-03-22 2024-05-14 生态环境部南京环境科学研究所 一种高效利用磷石膏大掺量制备蒸压加气混凝土材料的装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2511064A1 (fr) * 1981-08-07 1983-02-11 Fbm Fertigputz Gmbh Dispositif pour fabriquer un enduit humide pour chape
FR2649435A1 (fr) * 1989-07-05 1991-01-11 Solbes Roland Machine a projeter les mortiers a chargement par l'arriere
DE19537776A1 (de) * 1995-10-11 1997-04-17 Ferroplast Gmbh Zum Beispiel auf einem Fahrgestell anzuordnende und mittels eines Pkw oder dergleichen verfahrbare Hochleistungs-Maschinenkombination zum Mischen und Fördern von Fließ-Estrichen
JP2000064613A (ja) * 1998-08-25 2000-02-29 Asuku Techno Koji Kk 吹付耐火被覆用セメント供給装置
JP2000202823A (ja) * 1999-01-12 2000-07-25 Tokai Sando Kk 材料混練装置
JP2001269558A (ja) * 2000-01-17 2001-10-02 Tokai Sando Kk 材料混練装置及び材料供給袋
DE20209351U1 (de) * 2002-06-15 2002-09-12 Mathis Technik Vorrichtung zum Handhaben von rieselfähigen Baustoffen

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5413154A (en) * 1993-10-14 1995-05-09 Bulk Tank, Inc. Programmable modular system providing controlled flows of granular materials
DE9413836U1 (de) * 1994-08-26 1995-07-13 Rombold & Gfröhrer GmbH & Co. KG, 71254 Ditzingen Anlage zum Spritzen von Trockenbaustoffen

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2511064A1 (fr) * 1981-08-07 1983-02-11 Fbm Fertigputz Gmbh Dispositif pour fabriquer un enduit humide pour chape
FR2649435A1 (fr) * 1989-07-05 1991-01-11 Solbes Roland Machine a projeter les mortiers a chargement par l'arriere
DE19537776A1 (de) * 1995-10-11 1997-04-17 Ferroplast Gmbh Zum Beispiel auf einem Fahrgestell anzuordnende und mittels eines Pkw oder dergleichen verfahrbare Hochleistungs-Maschinenkombination zum Mischen und Fördern von Fließ-Estrichen
JP2000064613A (ja) * 1998-08-25 2000-02-29 Asuku Techno Koji Kk 吹付耐火被覆用セメント供給装置
JP2000202823A (ja) * 1999-01-12 2000-07-25 Tokai Sando Kk 材料混練装置
JP2001269558A (ja) * 2000-01-17 2001-10-02 Tokai Sando Kk 材料混練装置及び材料供給袋
DE20209351U1 (de) * 2002-06-15 2002-09-12 Mathis Technik Vorrichtung zum Handhaben von rieselfähigen Baustoffen

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN vol. 2000, no. 05 14 September 2000 (2000-09-14) *
PATENT ABSTRACTS OF JAPAN vol. 2000, no. 10 17 November 2000 (2000-11-17) *
PATENT ABSTRACTS OF JAPAN vol. 2002, no. 02 2 April 2002 (2002-04-02) *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019180135A1 (de) * 2018-03-21 2019-09-26 Sika Technology Ag System zur bereitstellung von baustoffen
CN111867796A (zh) * 2018-03-21 2020-10-30 Sika技术股份公司 提供建筑材料的系统
RU2762840C1 (ru) * 2018-03-21 2021-12-23 Сикэ Текнолоджи Аг Система для получения строительных материалов
US11660781B2 (en) 2018-03-21 2023-05-30 Sika Technology Ag System for providing building materials including a lifting device
CN111545109A (zh) * 2020-04-23 2020-08-18 王葵花 一种环氧彩砂挤出搅拌装置
CN111545109B (zh) * 2020-04-23 2023-02-03 日照淇嘉建筑工程有限公司 一种环氧彩砂挤出搅拌装置

Also Published As

Publication number Publication date
FR2832349A1 (fr) 2003-05-23
ATE407781T1 (de) 2008-09-15
EP1321262B1 (de) 2008-09-10
DE60228814D1 (de) 2008-10-23

Similar Documents

Publication Publication Date Title
EP1321262B1 (de) Anlage zum Herstellen und Transportieren von Mörtel
EP0132202A1 (de) Ortsbewegliche Vorrichtung zur Kaltaufbereitung an der Stelle und zum Aufbringen von bitumenumhüllten Stoffen für Strassendecken
CA2986264A1 (fr) Dispositif de conditionnement de dechets radioactifs
FR2499453A1 (fr) Procede et dispositif pour la preparation de mortiers de grosse et de petite maconnerie
FR2599771A1 (fr) Machine de projection humide de beton
US3866889A (en) Mobile conveyor system
FR2888525A1 (fr) Installation mobile pour la production et la projection d'un produit humide utilise dans le batiment
EP1741533B1 (de) Verfahren zur baustellenseitigen Herstellung von Beton
FR2696431A1 (fr) Dispositif d'extraction et aire de stockage équipée d'un tel dispositif.
EP1456476A1 (de) Verfahren und vorrichtung zur füllung von kavitäten mittels eines mörtels
EP1324865B1 (de) Verfahren zur herstellung von walzverdichtetem beton mit metallfaserbewehrung in kontinuierlichem betrieb und anlage zur durchfürung des verfahrens
EP2014430B1 (de) Anlage zur Herstellung von Feuchtmaterial vom Typ Beton oder Mörtel und seine Verwendung
FR2559016A1 (fr) Machine pour repandre de la matiere
EP1775091A1 (de) Vorrichtung zur Aufbereitung eines Aggregatengemisches und Zement
EP1293608A1 (de) Heckseitige Splittstreuvorrichtung zur Montage an einer Kippmulde eines Kippfahrzeugs
EP0281490A1 (de) Vielzweckvorrichtung zur Herstellung und Verteilung von pulverförmiger Tiernahrung
FR2554759A1 (fr) Dispositif pour la distribution de ciment dans une betonniere
CN218488769U (zh) 一种浆液制备装置
EP2502855B1 (de) Trockenbetonsilo
FR2909394A1 (fr) Dispositif de dosage, de malaxage et de distribution de beton pour la realisation d'une surface plane
FR3016823A1 (fr) Centrale de fabrication d'un materiau de construction
FR2637160A1 (fr) Dispositif de preparation et de distribution a des auges d'aliment semi-liquide pour du betail
EP0988949A1 (de) Anlage zum selektiven Herstellen und Verteilen von Ladungen aus Fertigmörtel und/oder Fertigbeton
FR2854643A1 (fr) Installation mobile de fabrication en continu d'un materiau de revetement, en particulier d'une route.
BE689016A (de)

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LI LU MC NL PT SE SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK RO SI

17P Request for examination filed

Effective date: 20031229

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LI LU MC NL PT SE SK TR

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: LAFARGE MORTIERS SA

111Z Information provided on other rights and legal means of execution

Free format text: ATBEBGCHCYCZDEDKEEESFIFRGBGRIEITLILUMCNLPTSESKTR

Effective date: 20040423

111Z Information provided on other rights and legal means of execution

Free format text: ATBEBGCHCYCZDEDKEEESFIFRGBGRIEITLILUMCNLPTSESKTR

Effective date: 20040423

Free format text: ATBEBGCHCYCZDEDKEEESFIFRGBGRIEITLILUMCNLPTSESKTR

Effective date: 20050318

GRAC Information related to communication of intention to grant a patent modified

Free format text: ORIGINAL CODE: EPIDOSCIGR1

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LI LU MC NL PT SE SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: FRENCH

REF Corresponds to:

Ref document number: 60228814

Country of ref document: DE

Date of ref document: 20081023

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080910

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080910

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20081210

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080910

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20081221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080910

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090210

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080910

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080910

BERE Be: lapsed

Owner name: LAFARGE MORTIERS SA

Effective date: 20081130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081130

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080910

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080910

26N No opposition filed

Effective date: 20090611

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20081210

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080910

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20090731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081130

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090603

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081210

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20081210

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080910

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081120

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080910

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20081211

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081130