EP1103696A2 - Procédé et dispositif pour manipuler des tuyaus dans des appareils de forage - Google Patents

Procédé et dispositif pour manipuler des tuyaus dans des appareils de forage Download PDF

Info

Publication number
EP1103696A2
EP1103696A2 EP00124589A EP00124589A EP1103696A2 EP 1103696 A2 EP1103696 A2 EP 1103696A2 EP 00124589 A EP00124589 A EP 00124589A EP 00124589 A EP00124589 A EP 00124589A EP 1103696 A2 EP1103696 A2 EP 1103696A2
Authority
EP
European Patent Office
Prior art keywords
rod
parking
screwing
platform
rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP00124589A
Other languages
German (de)
English (en)
Other versions
EP1103696B1 (fr
EP1103696A3 (fr
Inventor
Arend Lödden
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bentec Drilling and Oilfield Systems GmbH
Original Assignee
Deutsche Tiefbohr AG
Deutag Deutsche Tiefbohr AG
Bentec Drilling and Oilfield Systems GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Deutsche Tiefbohr AG, Deutag Deutsche Tiefbohr AG, Bentec Drilling and Oilfield Systems GmbH filed Critical Deutsche Tiefbohr AG
Publication of EP1103696A2 publication Critical patent/EP1103696A2/fr
Publication of EP1103696A3 publication Critical patent/EP1103696A3/fr
Application granted granted Critical
Publication of EP1103696B1 publication Critical patent/EP1103696B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
    • E21B19/15Racking of rods in horizontal position; Handling between horizontal and vertical position
    • E21B19/155Handling between horizontal and vertical position
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/20Combined feeding from rack and connecting, e.g. automatically

Definitions

  • the invention relates to a method and an apparatus for Handling pipes such as Poles and rods in Drilling equipment and drilling rigs for drilling wells especially on hydrocarbon deposits.
  • Drilling on hydrocarbon deposits is common sunk discontinuously because after drilling one Pipe length of the drilling process must be interrupted in order to to add further linkage with which the Drilling process can be continued. This is also discontinuous Removal of the drill pipe or the installation and removal of Piping of the borehole (casinge) because the process every time must be interrupted to the appropriate pipes or Boring bars with the drill string or the casing string connect or disconnect.
  • rod trains consisting of put together two or three rods or tubes or again separated into individual rods or tubes, this is also done via the borehole. Therefore, can not be drilled or additional drill pipe or piping must not be pulled.
  • Usual boring bars reach a length of approximately 9 meters, a triple rod train (triple stand) in about 27 meters.
  • the device according to the invention for handling pipes and rod trains in a steel structure with a Parking platform, a working platform, a lifting device, a Drilling drive and having a pipe connection device Drilling rig is particularly characterized in that at the Drilling rig a cable pull, a two-axis crane connected to the cable pull, which is connected to the steel structure and an extension element, which on the outside of the Finger stage is arranged and a passage to the finger stage has, as well as one arranged next to or on the work platform Parking and screwing device for vertical pipes is arranged, the parking and screwing device with the cable can be reached.
  • An advantageous embodiment of the invention provides that the Cable pull from a winch, one or more pulleys, a lifting rope and a lifting aid.
  • the storage and screwing device for pipes has advantageous one or more parking holes and / or parking boards and one or more holding elements and / or guide elements, the are preferably connected to the work platform.
  • This Holding elements or guide elements secure the Rods or pipes in their upper area against that Fall out.
  • Parking and screwing device arranged, especially Inexpensive and flexible screwing device preferably from a hanging crane on which a screwing pliers is hung is.
  • a storage platform is particularly preferred a frame with two opposing sectors, where several fingers are arranged in each of the sectors and that a central web is arranged between the two sectors. It turned out that part of the central web (23) should be foldable and / or pivotable to Sorting or moving rods within the finger platform can.
  • Another particularly preferred embodiment of the invention provides that on the side of the steel structure facing the A gripper is arranged in the center bar or the storage platform. This can consist of two gripper arms that make up the linkage comprise or have only holding elements. This gripper provides a transfer point for the linkage between the finger platform on the one hand and drilling area on the other.
  • the embodiment of the inventive method is advantageous in that the connection in process step e) by means of a Provides screwing pliers, the screwing pliers the upper Linkage connectors of the lower bar and the lower Rod connector of the upper rod encloses and screwed.
  • Manufacturing can be carried out by means of the method according to the invention or preparing one or more rod trains parallel to the Drilling is done using the steel structure of the drilling mast without affecting or delaying the drilling process. Otherwise, only a small additional area is required.
  • the swiveling, folding or sliding front part the middle bar of the monkey board gives a sufficient Free space around the bars or frame trains using the two-axis crane from one sector of the finger stage to the other sector of the finger stage with the help of a lifting aid to make.
  • FIG 1 the side view of a new or existing Drilling rig shows, is in the rear area of the mast 2 additional winch 15 arranged.
  • the Crown bearing 25 are arranged, the lifting rope 12 of the Winch 15 fed to a two-axis crane 5.
  • the two-axis crane 5 Above the Finger stage 4, the two-axis crane 5 can be seen, with the in this example, the linkage 17 from the pick-up position on the Parking boards 18 to the parking space in the finger platform 4 and back can be transported.
  • the two-axis crane serves first Line of rope guidance and consists of four rollers between them the rope 12 is guided so that each point in the finger platform 4th and can be approached in the extension element 24.
  • On the cable 12 is a lifting aid 6 is attached, the connection to a rod 16 or a rod train 17.
  • This Lifting aid can in this embodiment have a Height difference of 30 meters can be driven or moved.
  • the parking boards 18 are part of a parking and Screwing device, which also in this embodiment Parking hole 27 and holding or guiding elements 37, one additional boom 10 and a suspension crane 7 with a Screw pliers 29 and an extension 21 of the work platform receives.
  • rods 16, or, in front area, also entire rod trains 17 can be parked.
  • the rod 16 can be a boring bar or a Trade the collar.
  • Casinge pipes for the borehole piping
  • Extension element 24 extended.
  • This extension protrudes the substructure, i.e. the work platform (8), and permits vertical lifting of the rod train 17 or a rod 16 of the screeds 18.
  • Cross struts are provided.
  • Extension element 24 can be realized.
  • the Extension element 24 is welded to the finger platform 4 or screwed.
  • the lifting aid 6 can be seen.
  • the Lifting aid can be equipped with a compensator to compensate for this Relieve rope.
  • the lifting aid is used in particular to Lifting rope 12 with the rod connector 19 of a rod 16 or to connect a rod train 17.
  • On extension 21 of the Working platform 8 is the overhead crane 7 with the attached Screw pliers 20 shown, with which the individual Screw connector (tool joints) of rods 16 screwed become.
  • Parking boards 18 and a parking hole 27 are located on the floor for example drawn for casinge.
  • Linkage ramp 10 installed to over an air reel like it is usually present in drilling rigs, or the lifting rope 12 pull up individual rods 16.
  • the usual for drilling rigs Linkage ramp 1 is not shown here.
  • the hydraulic winch 15 becomes Pulling up the rods 16 or the linkage 17 used, which is arranged on the mast 2 and with hydraulic hoses a hydraulic drive (not shown) is connected.
  • this additional winch 15 can also be electric or are pneumatically driven.
  • this additional winch 15 can also be electric or are pneumatically driven.
  • FIG. 2 shows the front view of the drilling rig with the handling device according to the invention.
  • the two-axis crane is located in the upper area of mast 2 5, two deflection rollers 13 on the crown bearing 14 and that Lifting rope 12.
  • the winch 15, on the Rope winding device, the lifting rope 12 is drummed.
  • the center bar can not only be folded but also swiveled or can also be arranged displaceably.
  • the front area 31 of the The central web is articulated on the rear part of the central web 23, so that it can be folded up.
  • the finger platform 4 is a gripper 32, the pick-up point represents for the elevator 34 of the power turret 9.
  • the Gripper 32 can be the one required for the next drilling section
  • the rod train 17 can be parked near the borehole while the drilling process with the previous rod train 17 still stops. This in turn can save time because the Elevator 34 of the power turret 9 immediately after the startup can take the next rod train from this stop position. At the same time, the handling process is safer because there is more time for the provision of another linkage train 17 remains.
  • the individual boring bars 16, the additional rod ramp 10 of the drilling rig or an extension 21 of the work platform 8 and fed there can be turned off by the pliers 20 which are attached to the overhead crane 7 is fixed in cooperation with the two-axis crane 5 or of the lifting rope 12 and the lifting aid 6 guided therein Link trains 17 assembled.
  • FIG. 4 shows the top view of the work platform 8.
  • the additional boom 10 with the planks 18 with the three rods 16 are on or under an extension 21 of the work platform 8 to provide sufficient space for the Screwing the individual rods 16 into a rod train 17 to ensure.
  • the three bars shown in this example 16 are in their upper region of guide elements 37 held.
  • the screwing device 20 is in this example on one rotating hanging mast 7 arranged hanging. Nevertheless there is also the possibility of a screwing device 20 slidably or to be pivoted directly on the work platform 8.
  • 33 is a barrier that is similar to a finger 22 is formed, but foldable or in its front part is designed extendable so that it can be opened when a rod train 17 from the area of the finger stage 4 in the Area of the hole or to be moved to the gripper 32.
  • operations such as assembling Frame trains in the area of the extension element 24 or the finger stage 4, it is normally closed, so that Falling out of rod trains in the drilling area effective is avoided.
  • the tubes or rods 16 are on the additional Linkage ramp 10 by means of a lifting rope 12, in which lower area a lifting aid 6 is arranged, pulled up.
  • the Can also be pulled up by means of a on the drilling rig usually arranged air reel can be accomplished.
  • the Lifting rope 12 is at least one pulley 13, which on or is arranged on the crown bearing 14, on an additional Winch 15 wound or unwound.
  • the winch 15 is preferably with connected to a rope winding device, not shown.
  • the two-axis crane 5 is in a pick-up position above one Transfer point parked, which is as vertical as possible above the lifting tube 16 is located. This position prevents that Cross pulling of the rod 16 or the later rod train 17 and improves the safety of the device.
  • the lifting rope 12 is in this position in the area of the Extension element 24 of the finger stage 4. By deflection the lifting rope 12 from the vertical is the takeover of a Tube 16 also at the top of the additional rod ramp 10 possible.
  • the first raised rod 16 is on the screed 18th switched off.
  • Guide elements 37 that hold the rods 16 and against one Secure sideways tilting.
  • the second rod 16 in same way over the additional rod slide 10 pulled up and placed on the planks 18.
  • a Triple rod train Triple Stand
  • a third bar in the same way raised and turned off. This procedure is possible also assembling linkage trains from four or more Poles.
  • the screwing pliers 20 now enclose the upper one Linkage 19 of the lower rod 16 and the lower Linkage connector 19 of the upper rod. Now that can First screwing a double rod train (Double Stand) with the screwing pliers.
  • the double rod train 17 is raised until the lower link connector 19 of the double linkage over the rod connector 19 of the third rod 16, which is still on the planks 18 stands, hovers.
  • the double linkage is lowered until the pin and interlock the sleeve.
  • the Screwing pliers 20 performed the screwing.
  • other connections between the rods 16, e.g. Connections are made by welding.
  • This passage can be approximately 35 cm (approximately 15 inches) wide.
  • the finger platform 4 can be used with a Extension element 24 are constructed in the factory, at existing drilling rigs, the existing finger platform 4 can be modified in that an extension element 24 with this is connected, in any case a passage 38 on outer frame of the finger stage must be created, so that the lifting rope 12 with the lifting aid 6 from the rear existing finger stage 4 into the extension element 24 can reach.
  • the extension element 24 according to the invention equipped finger stage protrudes beyond the substructure, whereby the finger stage 4 is generally self-contained, but that is Threading the assembled linkage 17 between the individual fingers 22 of the finger platform by means of the two-axis crane 5 and the lifting aid 6 guaranteed at all times.
  • the rod trains 17 can the storage platform 4th on the side facing the drilling area, for example via the leave open barrier 43 to be fed into the bore become.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
EP00124589A 1999-11-26 2000-11-10 Procédé et dispositif pour manipuler des tuyaus dans des appareils de forage Expired - Lifetime EP1103696B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE19956840A DE19956840A1 (de) 1999-11-26 1999-11-26 Verfahren und Vorrichtung zur Handhabung von Rohren in Bohrgeräten
DE19956840 1999-11-26

Publications (3)

Publication Number Publication Date
EP1103696A2 true EP1103696A2 (fr) 2001-05-30
EP1103696A3 EP1103696A3 (fr) 2003-07-09
EP1103696B1 EP1103696B1 (fr) 2004-10-27

Family

ID=7930354

Family Applications (1)

Application Number Title Priority Date Filing Date
EP00124589A Expired - Lifetime EP1103696B1 (fr) 1999-11-26 2000-11-10 Procédé et dispositif pour manipuler des tuyaus dans des appareils de forage

Country Status (5)

Country Link
US (1) US6513605B1 (fr)
EP (1) EP1103696B1 (fr)
AT (1) ATE280891T1 (fr)
DE (2) DE19956840A1 (fr)
NO (1) NO315910B1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007043891A1 (fr) * 2005-10-12 2007-04-19 National Oilwell Norway As Dispositif pour plancher de forage
US9303468B2 (en) 2010-11-02 2016-04-05 National Oilwell Varco Norway As Drilling system and a device for assembling and disassembling pipe stands
US9410385B2 (en) 2007-02-23 2016-08-09 Friede Goldman United, Ltd. Simultaneous tubular handling system

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6488093B2 (en) 2000-08-11 2002-12-03 Exxonmobil Upstream Research Company Deep water intervention system
US6821071B2 (en) * 2002-09-25 2004-11-23 Woolslayer Companies, Inc. Automated pipe racking process and apparatus
CN1906375B (zh) * 2003-12-12 2012-08-15 瓦克I/P公司 用于在钻井现场装卸管体部分的系统和方法
WO2005061840A1 (fr) * 2003-12-12 2005-07-07 Varco I/P, Inc. Procede et dispositif de construction hors systeme de longueur de tige
NO322116B1 (no) * 2004-12-01 2006-08-14 Sense Edm As Anordning for a bygge opp og ned rorseksjoner
NO324009B1 (no) * 2005-03-07 2007-07-30 Sense Edm As Anordning for lagring av ror.
US20100150661A1 (en) * 2008-12-12 2010-06-17 Woolslayer Companies, Inc. Open face derrick
US8215888B2 (en) 2009-10-16 2012-07-10 Friede Goldman United, Ltd. Cartridge tubular handling system
US8381480B2 (en) * 2010-06-15 2013-02-26 Dewayne G. Vogt Dual offset derrick
US8961093B2 (en) * 2010-07-23 2015-02-24 National Oilwell Varco, L.P. Drilling rig pipe transfer systems and methods
US8739902B2 (en) 2012-08-07 2014-06-03 Dura Drilling, Inc. High-speed triple string drilling system
US9366128B2 (en) * 2013-05-22 2016-06-14 Baker Hughes Incorporated Automated wellbore equipment feeding system
CA3008397A1 (fr) 2015-11-16 2017-05-26 Schlumberger Canada Limited Systeme de materiel gerbage tubulaire automatise
WO2017087350A1 (fr) 2015-11-16 2017-05-26 Schlumberger Technology Corporation Bras de distribution tubulaire pour appareil de forage
WO2017087595A1 (fr) 2015-11-17 2017-05-26 Schlumberger Technology Corporation Appareil de forage à taux de manœuvre élevé
US11136836B2 (en) 2016-04-29 2021-10-05 Schlumberger Technology Corporation High trip rate drilling rig
WO2017190118A2 (fr) 2016-04-29 2017-11-02 Schlumberger Technology Corporation Bras de distribution tubulaire pour appareil de forage
WO2017190120A1 (fr) 2016-04-29 2017-11-02 Schlumberger Technology Corporation Appareil de forage à grande vitesse de manœuvre
US10597954B2 (en) 2017-10-10 2020-03-24 Schlumberger Technology Corporation Sequencing for pipe handling
NO20191071A1 (en) 2018-09-06 2020-03-09 Cameron Tech Ltd Fingerboard
US11454069B2 (en) 2020-04-21 2022-09-27 Schlumberger Technology Corporation System and method for handling a tubular member
CN114382426A (zh) * 2021-12-16 2022-04-22 四川宏华石油设备有限公司 一种钻修井机及其连续起下钻方法

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2531930A (en) * 1947-12-02 1950-11-28 Moore Corp Lee C Well drilling structure provided with a drill pipe hoist
US2966994A (en) * 1956-03-14 1961-01-03 Kerr Mc Gee Oil Ind Inc Drilling apparatus
US2946464A (en) * 1956-07-11 1960-07-26 William C Guier Apparatus for handling stands of pipe
US3563392A (en) * 1969-05-28 1971-02-16 Wilson John H Pipe racking platforms for drilling rig masts and the like
US3949818A (en) * 1974-09-30 1976-04-13 Western Gear Corporation Hydraulic drilling rig and power swivel
US4077525A (en) * 1974-11-14 1978-03-07 Lamb Industries, Inc. Derrick mounted apparatus for the manipulation of pipe
US4380297A (en) * 1980-02-27 1983-04-19 Ingram Corporation Pipe storage system
JPS60230495A (ja) * 1984-04-27 1985-11-15 石川島播磨重工業株式会社 石油掘削等のパイプハンドリング装置
FR2585066B1 (fr) * 1985-07-19 1988-05-13 Brissonneau & Lotz Procede et installation de rangement vertical de tiges de forage sur une tour de forage
DK517285D0 (da) * 1985-11-08 1985-11-08 Dansk Ind Syndikat Fremgangsmaade og borerig til boring af borehuller
US4744710A (en) * 1986-11-24 1988-05-17 Parco Mast And Substructures Drilling derrick with external pipe storage
US5255751A (en) * 1991-11-07 1993-10-26 Huey Stogner Oilfield make-up and breakout tool for top drive drilling systems
US5503234A (en) * 1994-09-30 1996-04-02 Clanton; Duane 2×4 drilling and hoisting system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
LANDBOHRANLAGE UTB-1 (FORSCHUNG, PLANUNG UND BETRIEB, BAND 18, 1 January 1993 (1993-01-01)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007043891A1 (fr) * 2005-10-12 2007-04-19 National Oilwell Norway As Dispositif pour plancher de forage
EA013031B1 (ru) * 2005-10-12 2010-02-26 Нэшнел Ойлвелл Норвей Ас Конструкция буровой площадки
US7677856B2 (en) 2005-10-12 2010-03-16 National Oilwell Norway As Drill floor device
US9410385B2 (en) 2007-02-23 2016-08-09 Friede Goldman United, Ltd. Simultaneous tubular handling system
US10612323B2 (en) 2007-02-23 2020-04-07 Friede & Goldman United B.V. Simultaneous tubular handling system
US9303468B2 (en) 2010-11-02 2016-04-05 National Oilwell Varco Norway As Drilling system and a device for assembling and disassembling pipe stands

Also Published As

Publication number Publication date
EP1103696B1 (fr) 2004-10-27
ATE280891T1 (de) 2004-11-15
EP1103696A3 (fr) 2003-07-09
DE19956840A1 (de) 2001-06-07
DE50008402D1 (de) 2004-12-02
US6513605B1 (en) 2003-02-04
NO20005961L (no) 2001-05-28
NO20005961D0 (no) 2000-11-24
NO315910B1 (no) 2003-11-10

Similar Documents

Publication Publication Date Title
EP1103696B1 (fr) Procédé et dispositif pour manipuler des tuyaus dans des appareils de forage
EP1108110B1 (fr) Dispositif de forage et procede de forage d'un puits
DE60318840T2 (de) Höhenverstellbares rohraufnahme- und ablagegerät
DE2615086C2 (de) Vorrichtung zum Handhaben von Futterrohren
DE1223776B (de) Bohrvorrichtung fuer ein kontinuierliches und automatisches Niederbringen und Herausheben des Bohrrohrstranges bei Tiefbohrungen
EP0501140A1 (fr) Echafaudage de montage déplaçable dans une cage d'ascenseur pour monter l'équipement de cage
DE1926293B2 (de) Abstelleinrichtung zum senkrechten lagern von bohrrohr- und schwerstangenzuegen
DE202005004969U1 (de) Vorrichtung zum Einbringen von Bohrungen in einen Hang
DE3013697C2 (fr)
EP3214258B1 (fr) Appareil pour travaux de construction et procédé de montage d'un mât
DE2630136A1 (de) Verfahren zur weitergabe von bohrstangenelementen, bohrturm und bohrturmeinheit zur durchfuehrung des verfahrens
DE2001060C3 (de) Stellungsanzeigeeinrichtung für den Abstellkopfeines in einem Bohrturm angeordneten Abstellgerätes für Rohrzüge
DE202004001258U1 (de) Vorrichtung zum Herstellen von Tiefbohrungen in geologischen Strukturen
DE69825528T2 (de) Vorrichtung zur Handhabung von Bohrstangen
DE3425428C2 (de) Fahrzeug zum Transportieren vorgefertigter Gebäudeteile
EP1272732B1 (fr) Appareil pour le transport et la manipulation de tubes et de tiges de forage
DE2048631B2 (fr)
DE976018C (de) Turmdrehkran mit einem um eine waagerechte Achse des Kranwagens aufrichtbaren Turm
DE2161426A1 (de) Automatische Vorrichtung zur Verschiebung der Bohrstangen eines schwimmenden Bohrturms
DE2433015B2 (de) Hebevorrichtung mit einem vertikal festlegbaren mast
DE4445165C2 (de) Verfahren und Stockbaum zum Errichten von Gittermasten
DE102005014230B4 (de) Vorrichtung zum Einbringen von Bohrungen in einen Hang
EP0275902B1 (fr) Dispositif pour attirer des fûts ou choses semblables
DE3445910A1 (de) Bauhilfsmaschine
DE19962298C2 (de) Einpressvorrichtung für Rohre und Bohrgestänge

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: BENTEC GMBH DRILLING & OILFIELD SYSTEMS

17P Request for examination filed

Effective date: 20030226

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Extension state: AL LT LV MK RO SI

RIC1 Information provided on ipc code assigned before grant

Ipc: 7E 21B 19/14 B

Ipc: 7E 21B 19/20 A

17Q First examination report despatched

Effective date: 20031017

AKX Designation fees paid

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20041027

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20041027

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20041027

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20041027

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20041027

Ref country code: GB

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20041027

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20041027

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20041027

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20041027

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20041110

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20041110

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20041130

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20041130

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20041130

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20041130

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: GERMAN

REF Corresponds to:

Ref document number: 50008402

Country of ref document: DE

Date of ref document: 20041202

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050127

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050127

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050207

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

GBV Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed]

Effective date: 20041027

BERE Be: lapsed

Owner name: BENTEC G.M.B.H. DRILLING & OILFIELD SYSTEMS

Effective date: 20041130

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20050728

EN Fr: translation not filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20060918

Year of fee payment: 7

BERE Be: lapsed

Owner name: *BENTEC G.M.B.H. DRILLING & OILFIELD SYSTEMS

Effective date: 20041130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050327

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080603