EP0570074B1 - Assemblage de plan de travail avec évier - Google Patents
Assemblage de plan de travail avec évier Download PDFInfo
- Publication number
- EP0570074B1 EP0570074B1 EP93201348A EP93201348A EP0570074B1 EP 0570074 B1 EP0570074 B1 EP 0570074B1 EP 93201348 A EP93201348 A EP 93201348A EP 93201348 A EP93201348 A EP 93201348A EP 0570074 B1 EP0570074 B1 EP 0570074B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- sink
- edge
- opening
- rebate
- shaped space
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
- E03C1/12—Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
- E03C1/32—Holders or supports for basins
- E03C1/33—Fastening sinks or basins in an apertured support
Definitions
- the invention relates to a method for embedding a sink in a sideboard, which has a carrier plate and a cover sheet attached to the top thereof, the sideboard being provided with a continuous opening for receiving a sink.
- the invention also relates to such a sideboard.
- a method and a sideboard with the features of the preambles of claims 1 and 4 is known from NL-A-79 03 380.
- three methods can be distinguished with regard to the type of installation and the inclusion of sinks in sideboards.
- an opening is provided in which the cover sheet delimits the opening which is smaller than the sink and in which the cover sheet protrudes inwards relative to the carrier plate.
- the sink is then inserted from below until the top of the sink edge touches the underside of the protruding edge of the cover sheet.
- This method is called the substructure method.
- a continuous opening with a constant cross-section is made in the sideboard and the sink with its protruding edge is placed on the parts of the cover sheet which delimit the opening. This method is called the build method.
- a disadvantage of the substructure method is that the edge that delimits the opening will always be visible.
- a disadvantage of the construction method is that the edge of the sink forms an obstacle on the cover sheet, causing water, which may be on the cover page, cannot be easily wiped away towards the sink.
- the third method does not have these disadvantages.
- the sink is inserted into the sideboard in such a way that the upper surface of the rim of the sink is on the same level as the upper surface of the cover sheet.
- a continuous opening for the sink is made in the sideboard, the upper part of the opening, at the height of the cover sheet and (depending on the thickness of the sink edge) of an adjacent part of the carrier plate having a larger diameter than that Rest of the through opening.
- a support surface for the lower side of the sink rim is created by the support plate, the outline of the sink rim adjoining the edge of the cover sheet. Between the outline of the rim of the sink and that of the cover sheet, a seal or seal is inserted when the sink is inserted. Fixing putty attached.
- the putty is sometimes no longer available after a certain period of use or that its sealing action can no longer exert to a sufficient extent, so that water can penetrate down into the gap between the edge of the cover sheet and the outline of the edge of the sink.
- the carrier plate is made of wood fibers, this material will swell by soaking in the moisture that has seeped downwards, causing the sideboard to lose its tight appearance. For this reason, waterproof multiplex will be used in this known embodiment of the insertion method for the carrier plate. Waterproof multiplex is very expensive compared to wood fiber material.
- a groove-shaped or rabbet-shaped space is milled over the entire length of the carrier plate, for example a fiberboard, during production of the sideboard, which has a greater width than the width of the sink to be inserted.
- This groove or fold-shaped space is then completely filled with a filling compound made of solid polyurethane or polyurethane foam, after which the whole is covered with a cover sheet and then sawn to the desired length.
- a recess is provided in the sideboard, work being carried out in such a way that the cover sheet protrudes from the vertical, straight groove-shaped or rabbet-shaped space of the support plate, so that the rim of the sink will remain at a distance from the wood fiber material in the horizontal direction.
- this only applies if you look at the cross section. In longitudinal section, there will be no groove or rebate-shaped space in the wood fiber board, because the path of the filling mass extends over the entire length of the sideboard.
- a carrier plate namely a wood fiber board
- a continuous recess which represents a spacious groove or rabbet-shaped space.
- a solid or foam-shaped filling compound is applied in the groove-shaped or rabbet-shaped space, the cover sheet is placed on it and an insert fold for the edge of the sink is milled into the cover sheet and the filling compound.
- a groove or fold-shaped space is created before the cover sheet is arranged, which is necessarily in the sideboard factory must happen.
- a lot of filling compound is required due to the lengthwise design of the groove or rebate space and the straight wall of the groove or rebate space.
- the advantage that a fibreboard can be used as a carrier plate is not entirely eliminated, but more or less.
- a disadvantage of the second embodiment according to the Dutch patent application 80 05 488 is that it is possible to keep the dimensions of the groove-shaped or rebate-shaped space within limits, but that the expensive filling compound has a larger surface area than the cross-section the edge of the sink must be provided.
- Both of the last-mentioned known embodiments have the disadvantage of an additional work step, namely the application of the filling compound before the cover sheet is placed on it.
- Such actions can actually only be carried out economically in the sideboard factory.
- the object of the invention is to provide such a method.
- Another object of the invention is to provide a method according to the insertion method for installing a sink in a sideboard, in which the sideboard and sink are built up with a limited number of work steps and with a smaller amount of additives, in which almost impossible is that moisture can get between the cover sheet and the edge of the sink and come into contact with the material of the support plate, so that a moisture-sensitive material, for example a wood fiber board can be used.
- the invention has the task of creating a sideboard which is suitable for the stable reception of a sink according to the insertion method.
- a standard sideboard can be used for the method according to the invention, which, for example, consists only of a carrier plate made of wood fibers and a plastic cover sheet fastened thereon.
- the opening according to the invention can be made by means of simple cutting and milling tools. Only a part of the cover sheet and the wood fiber material have to be removed during the manufacture of the opening with the groove-shaped or rabbet-shaped space, so that no expensive material is wasted here. Due to the recessed position of the carrier plate area, which is directly adjacent to the cover sheet, it is almost impossible that water, which could possibly leak between the cover sheet and the rim of the sink, can get into this area.
- the surface which is located between the first and the second section of the carrier plate and mainly points upwards, contributes to the fact that the putty introduced there remains in place.
- the opening in the sideboard is preferably made such that the third opening section has a diameter which is smaller than the diameter of the first opening section.
- the opening in the sideboard is made such that the vertical dimension of the circumferential wall of the first section of the support plate is greater than the height of the rim of the sink to be mounted minus the height of the cover sheet.
- the invention further provides a sideboard with a sink accommodated therein according to the insertion method, which has a carrier plate and a cover sheet fastened on its top, according to claim 4.
- the edge of the sink can be supported in various ways. If the lower edge of the groove or rebate-shaped space is located within the cross-section of the rim of the sink, if the vertical dimension of the groove or rebate-shaped space is not too large, the rim of the sink can be placed on essentially horizontal surfaces of the space. If the vertical dimension of the groove or rebate-shaped space is larger, the sink rim can be placed on a sealing compound, e.g. Putty to be put on.
- the support member or body which is fastened in the support plate supports the sink edge stably and at a correct height for the insertion method is held.
- the opening in the sideboard preferably forms a body of revolution with a vertical axis.
- the separate support member can be formed by a support profile, for example made of polyethylene, which is provided with fastening means for fastening the support profile in the aforementioned recess in the support plate and with means for supporting the rim of the sink.
- the support profile is preferably provided with a section which closes off the groove-shaped or rebate-shaped space radially inward, which section can also be provided with means for supporting the essentially horizontal groove or rebate surface.
- An insertion method is known from the Dutch patent specification 79.03380, in which an overhanging cover sheet is also present.
- the carrier plate which can also be manufactured as a fibreboard, is provided with a recess with a constant cross-section and the cover sheet with a smaller recess.
- a space that is filled with a plastic sealant is only created between an installation ring for the sink and the rim of the sink and the overhanging part of the cover sheet after assembly.
- the sink is first inserted into the recess until its upper edge is at the same height as the sideboard and then the sealing agent is also introduced from below, from below. Then a separate installation ring is inserted from below and attached to the carrier plate. Before the mounting ring is attached, the sink and sealant must be held at the correct height. Fastening from below has the disadvantage of being difficult to control.
- the sideboard 1 in FIG. 1 has a sink 2.
- the sink is assembled according to the insertion method, which ensures that the upper surface of the sink rim is flush with the upper surface of the sideboard 1 and adjoins it.
- the sideboard 2 shows the manner in which the sink 2 can be mounted according to the invention.
- the vertical section described here is representative of the entire circumference of the opening.
- the sideboard has a carrier plate 4, which can be made from a fibreboard, on the upper side of which a cover sheet 5 made of plastic is glued.
- Such sideboards without already having an opening for a sink, can be obtained from specialist factories.
- An example of such sideboards are those made by Duropal (registered trademark). Furniture factories obtain sideboards from the named factories in order to provide them with suitable openings and to deliver them custom-made to kitchen installation companies.
- a through opening 3 is first made in the sideboard 1.
- the cross section of this opening 3 is large enough to accommodate the tub part of the sink 2. Furthermore, as shown in FIG.
- material is milled from the edge region of the opening in the sideboard 1 with a milling machine. This is done with the aid of a milling cutter 13, of which only the parts relevant to the invention are shown and which is provided with a drive shaft 14 on which milling disks 15 and 18 are arranged, and also a bearing 19 arranged therebetween a support can be made on the inner surface 11 of the opening 3 in the sideboard 2.
- the milling disk 18 is used for a receiving groove 8 (see FIG. 2) for a fastening part Put out 21 of a support profile 20 for the sink 2 (see Fig. 2).
- the milling disk 15 is constructed from a first disk 16 and a second disk 17, the diameter of the second disk 17 being larger than the diameter of the first disk 16.
- the opening of the first section just mentioned in the cover sheet 5 enlarged and enlarged with the disc 17, the opening of the second section just mentioned in the underlying adjacent area of the fiberboard 4.
- the difference in the diameter of the disks 16 and 17 ensures that the cover sheet 5 with an edge part 12 (see FIG. 2) over the circular peripheral wall 9 of the groove-shaped or rebate-shaped space 7 made by the disk 17 in the wood fiber board 4 protrudes.
- the groove-shaped or rabbet-shaped space 7 is further delimited by a circumferential horizontal surface 10 and merges with the inner or lower edge 26 into the inner surface of the through opening. This forms the third opening part mentioned above.
- the support profile 20 is mounted, the fastening part 21 being inserted into the cut-out 8 in a suitable and clamping manner.
- the support member 20 has a vertical body 27 which at its upper end merges into an edge flange 22 which is provided with a support surface 23 on its upper side.
- the edge flange 22 has a support surface 24 with which the edge flange can rest on the horizontal surface 10 of the groove-shaped or rabbet-shaped space 7.
- the circumferential groove-shaped or rabbet-shaped space 7 can be provided with a smaller excess of sealing means 25, for example Polyurethane putty to be filled.
- sealing means 25 for example Polyurethane putty to be filled.
- the edge flange 22 of the support profile 20 ensures that the sealing means 25 cannot flow away.
- the sideboard 1 is ready for receiving the sink 2, the sink edge 6 being supported on the upper surface of the edge flange 22 of the support profile 20 and the contour edge of the sink edge 6 almost connecting almost to the inner edge of the protruding edge part 12 of the cover sheet 5.
- the vertical dimension of the edge flange 22 of the support profile 20 is chosen such that the sink rim 23 is supported at such a height that the upper surfaces of the cover sheet 5 and the sink corner edge 6 are at least almost flush with one another.
- the sideboard 1 can be made suitable for the insertion method in a simple manner and the sink 3 can be mounted comfortably and safely.
- the gap width between the sink edge and the cover sheet 5 is so large in the example described here, both in the horizontal and in the vertical direction, that the risk no longer exists that by Gap infiltrated water could act on the fiberboard so that a fiberboard that is much less expensive than a waterproof multiplex board can be used as a backing board for a sideboard using the sink method.
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Sink And Installation For Waste Water (AREA)
- Accessory Devices And Overall Control Thereof (AREA)
Claims (9)
- Procédé pour l'encastrement d'un évier (2) dans un plan de travail, le plan de travail présentant un plateau de support (4), par exemple un panneau de fibres et aussi une feuille de recouvrement (5) en matière synthétique fixée sur le côté supérieur de celui-ci et où l'évier (2) est disposé à l'aide de moyens d'appui (20) pour le bord de l'évier de façon que la surface supérieure du bord de l'évier (6) soit alignée avec la surface supérieure de la feuille de recouvrement, et dans le plan de travail on réalise tout d'abord une ouverture continue (3) prévue pour la réception d'un évier et en outre, du matériau est enlevé de la zone de bord de l'ouverture, en procédant de telle manière que l'ouverture qui en résulte soit délimitée dans la partie supérieure de celui-ci - en regardant de haut en bas - par un bord s'étendant tout autour de la feuille de recouvrement qui définit un premier tronçon d'ouverture, une paroi (9) s'étendant tout autour décalée vers l'arrière par rapport au bord de la feuille de recouvrement d'un premier tronçon avoisinant du plateau de support, qui définit un deuxième tronçon d'ouverture avec un diamètre qui est plus grand que celui du premier tronçon d'ouverture, caractérisé en ce que par l'enlèvement du matériau additionnel de la zone de bord de l'ouverture on réalise une paroi (11) d'un deuxième tronçon du plateau de support, paroi s'étendant tout autour, située plus loin vers l'intérieur relativement à la paroi s'étendant tout autour du premier tronçon du plateau de support et qui définit un troisième tronçon d'ouverture avec un diamètre qui est plus petit que celui du deuxième tronçon d'ouverture de façon que le premier et le deuxième tronçon du plateau de support forment un espace en forme de rainure ou de feuillure (7) s'étendant tout autour qui est délimité vers le haut par une partie de bord en saillie s'étendant tout autour (12) de la feuille de recouvrement (5) et, après avoir donc réalisé l'ouverture qui en résulte, l'espace en forme de rainure ou de feuillure (7) est rempli d'un moyen d'étanchéité, par exemple d'un mastic polyuréthane, notamment d'un mastic (25) flexible et ensuite, l'évier est mis en place.
- Procédé selon la revendication 1 ou 2, où l'ouverture dans la feuille de recouvrement (5) est réalisée de façon que le troisième tronçon d'ouverture présente un diamètre qui est plus petit que le diamètre du premier tronçon d'ouverture.
- Procédé selon les revendications 1 ou 2, où l'ouverture dans le plan de travail est réalisée de façon que la dimension verticale de la paroi s'étendant tout autour (9) du premier tronçon du plateau de support est plus grande que la hauteur du bord (6) de l'évier (2) à monter, moins la hauteur de la feuille de recouvrement (5).
- Plan de travail (1), avec un évier (2) reçu dans celui-ci selon le procédé d'encastrement et avec un plateau de support (4) et une feuille de recouvrement (5) fixée sur le côté supérieur de celui-ci, le plan de travail étant pourvu d'une ouverture traversante (3) pour la réception de l'évier, et à l'endroit de l'ouverture, dans le tronçon supérieur faisant suite à la feuille de recouvrement, il est réalisé un espace en forme de rainure ou de feuillure (7) qui est recouvert vers le haut par un tronçon de bord (12) de la feuille de recouvrement en saillie par rapport au côté supérieur du plateau de support, s'étendant principalement tout autour et rempli par un mastic d'étanchéité flexible (25), par exemple un mastic polyuréthane, le bord de l'évier étant soutenu au moyen d'un organe d'appui séparé (20) de telle sorte que les côtés supérieurs du bord de l'évier (23) et de la feuille de recouvrement sont presque alignés, l'organe d'appui (20) étant fixé sur le plateau de support (4), caractérisé en ce que l'espace en forme de rainure ou de pli (7) est formé par le plateau de support (4) lui-même et en ce que l'organe d'appui (20) comprend un moyen (22) qui ferme radialement vers l'intérieur l'espace en forme de rainure ou de feuillure (7) de façon que le moyen d'étanchéité (25), après la mise en place de l'évier (2), soit retenu dans celui-ci et en ce que le bord de l'évier (6) soit soutenu sur la face supérieure du moyen de fermeture (22).
- Plan de travail selon la revendication 4, où la partie de bord (12) de la feuille de recouvrement se termine à une distance horizontale extérieure relativement au bord intérieur ou inférieur (26) de l'espace en forme de rainure ou de feuillure (7).
- Plan de travail selon la revendication 4 ou 5, caractérisé en ce que le bord inférieur (26) de l'espace en forme de rainure ou de feuillure (7) se situe à une distance de la surface de la feuille de recouvrement qui est plus grande que l'épaisseur du bord de l'évier (23) à encastrer.
- Plan de travail selon l'une des revendications 4-6, où l'organe d'appui (20) est pourvu de moyens de fixation (21) et où le plan de travail (1) est pourvu d'au moins un évidement (8) disposé en-dessous de l'espace en forme de rainure ou de feuillure (7), dans le plateau de support (4) pour la réception du moyen de fixation (21) de l'organe d'appui.
- Plan de travail selon la revendication 7, où l'évidement (8) est réalisé sous forme de rainure de réception s'étendant tout autour, se trouvant à une certaine distance, relativement à l'espace en forme de rainure ou de feuillure.
- Plan de travail selon l'une des revendications 4-8, où l'espace en forme de rainure ou de feuillure (7) est délimité vers le bas par une surface horizontale (10) du plateau de support (6) et où le tronçon (22) de l'organe d'appui (20) est pourvu de moyens (24) pour prendre appui sur la surface principalement horizontale (10) de l'espace en forme de rainure ou de feuillure.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL9200850 | 1992-05-14 | ||
NL9200850A NL9200850A (nl) | 1992-05-14 | 1992-05-14 | Aanrechtblad. |
DE9301675U DE9301675U1 (de) | 1992-05-14 | 1993-02-06 | Anrichte |
DE9301675U | 1993-02-06 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0570074A1 EP0570074A1 (fr) | 1993-11-18 |
EP0570074B1 true EP0570074B1 (fr) | 1996-11-20 |
Family
ID=25960464
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP93201348A Expired - Lifetime EP0570074B1 (fr) | 1992-05-14 | 1993-05-14 | Assemblage de plan de travail avec évier |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0570074B1 (fr) |
AT (1) | ATE145440T1 (fr) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1184519A3 (fr) * | 2000-08-17 | 2004-07-14 | Carol Voegeli | Evier |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL7903380A (nl) * | 1978-04-29 | 1979-10-31 | Herbold Werner R | Inbouwvoorzieningen in werkplaten, in het bijzonder van wasbakken of dergelijke in werkplaten met een kunststofbekledingslaag. |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3644160A (en) * | 1968-06-26 | 1972-02-22 | Comatico Tiles Inc | Method of making multilayer articles |
DE2856461C3 (de) * | 1978-12-28 | 1981-09-03 | Blanc Gmbh & Co, 7519 Oberderdingen | Einrichtungseinheit aus einer Arbeitsplatte und einem ungefähr plattenförmigen Einbauelement sowie Verfahren zu deren Herstellung |
DE2934215A1 (de) * | 1979-08-24 | 1981-04-09 | Niro-Plan Ag, Zug | Einbauspuele/einbau-kochmulde |
NL8005488A (nl) * | 1980-10-03 | 1982-05-03 | Atag Bv Apparatenfab | Aanrechtblad en werkwijze voor het vervaardigen daarvan. |
GB2244426B (en) * | 1990-05-03 | 1993-06-02 | Castle Neroche | Improvements in or relating to worktop assemblies |
-
1993
- 1993-05-14 AT AT93201348T patent/ATE145440T1/de not_active IP Right Cessation
- 1993-05-14 EP EP93201348A patent/EP0570074B1/fr not_active Expired - Lifetime
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL7903380A (nl) * | 1978-04-29 | 1979-10-31 | Herbold Werner R | Inbouwvoorzieningen in werkplaten, in het bijzonder van wasbakken of dergelijke in werkplaten met een kunststofbekledingslaag. |
Also Published As
Publication number | Publication date |
---|---|
ATE145440T1 (de) | 1996-12-15 |
EP0570074A1 (fr) | 1993-11-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE69912950T3 (de) | Bodenplatte | |
DE69907179T3 (de) | Befestigungssystem und bodenpaneel | |
EP1527240B1 (fr) | Procédé de fabrication de pièces interconnectables et ensemble de pièces avec des éléments de connexion | |
WO2002001018A1 (fr) | Plaque de revetement de sol | |
EP2333195A1 (fr) | Sol fabriqué à partir de panneaux de sol dotés de moyens de liaison distincts et procédé de pose de panneaux de sol | |
CH658484A5 (de) | Aus einem rahmen und wenigstens einem deckel bestehende schachtabdeckung. | |
EP0570074B1 (fr) | Assemblage de plan de travail avec évier | |
DE20008180U1 (de) | Duschwanne | |
DE2625202A1 (de) | Haushaltgeraet mit einem frontseitigen sockelruecksprung | |
DE9301675U1 (de) | Anrichte | |
DE69307314T2 (de) | Verbesserungen an randstreifen für bodenbeläge | |
DE19648361A1 (de) | Wannenträger | |
DE3740629C2 (de) | Wannenträger, insbesondere Duschwannenträger | |
EP0437660A1 (fr) | Bande de bordure en linoléum | |
DE10154767A1 (de) | Fussbodenpaneel | |
DE8507760U1 (de) | Bade- oder Brausewannenträger | |
DE9311445U1 (de) | Transportverpackung für eine Mehrzahl von Sanitärelementen, insbesondere für den Fertigmontageset einer Unterputzarmatur | |
DE3018331A1 (de) | Profiliertes rahmenmaterial | |
DE29602386U1 (de) | Wannenträger, insbesondere Badewannen- und Duschwannenträger | |
EP0673617B1 (fr) | Support de baignoire | |
EP0736643A1 (fr) | Elément isolant pour palier avec isolation phonique des parties de bâtiments | |
DE69100167T2 (de) | Ankersystem. | |
DE9105963U1 (de) | Stapelbare Steige | |
DE29924536U1 (de) | Rechtwinklige Holz- oder Laminatbodenplatte | |
DE9405590U1 (de) | Bodensinkkasten |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH DE DK ES FR LI NL |
|
17P | Request for examination filed |
Effective date: 19931013 |
|
EL | Fr: translation of claims filed | ||
17Q | First examination report despatched |
Effective date: 19950412 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE DK ES FR LI NL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Effective date: 19961120 Ref country code: ES Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY Effective date: 19961120 Ref country code: DK Effective date: 19961120 |
|
REF | Corresponds to: |
Ref document number: 145440 Country of ref document: AT Date of ref document: 19961215 Kind code of ref document: T |
|
REF | Corresponds to: |
Ref document number: 59304511 Country of ref document: DE Date of ref document: 19970102 |
|
EN | Fr: translation not filed | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19970514 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 19970529 Year of fee payment: 5 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 19970530 Year of fee payment: 5 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19970531 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19970531 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 19970531 Year of fee payment: 5 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19980531 |
|
BERE | Be: lapsed |
Owner name: DEKKER ZEVENHUIZEN B.V. Effective date: 19980531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19981201 |
|
NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee |
Effective date: 19981201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19990302 |