EP0168101B1 - Rame ferroviaire pour le renouvellement de voies ferrées, pourvue de moyens de support et de guidage de l'avancement - Google Patents

Rame ferroviaire pour le renouvellement de voies ferrées, pourvue de moyens de support et de guidage de l'avancement Download PDF

Info

Publication number
EP0168101B1
EP0168101B1 EP85201030A EP85201030A EP0168101B1 EP 0168101 B1 EP0168101 B1 EP 0168101B1 EP 85201030 A EP85201030 A EP 85201030A EP 85201030 A EP85201030 A EP 85201030A EP 0168101 B1 EP0168101 B1 EP 0168101B1
Authority
EP
European Patent Office
Prior art keywords
railway
axle
rails
bogie
rail sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
EP85201030A
Other languages
German (de)
English (en)
French (fr)
Other versions
EP0168101A3 (en
EP0168101A2 (fr
Inventor
Enrico Valditerra
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to AT85201030T priority Critical patent/ATE42980T1/de
Publication of EP0168101A2 publication Critical patent/EP0168101A2/fr
Publication of EP0168101A3 publication Critical patent/EP0168101A3/fr
Application granted granted Critical
Publication of EP0168101B1 publication Critical patent/EP0168101B1/fr
Expired legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/05Transporting, laying, removing, or renewing both rails and sleepers

Definitions

  • the present invention relates to a railway train for the renewal of railway tracks, comprising an operational assembly provided with means for removing the old rails, and means for allowing at least one of the axles to advance on the already deprived track of the rails.
  • the aim of the present invention is to improve the known railway trainsets intended for the function described, by providing for them a device for supporting and guiding the advance which allows the trainset to proceed on the railway track already deprived of the rails, by following the correct route, and which is free from the drawbacks of known devices, or which presents them in a more reduced measure.
  • the operational assembly of the railway train according to the invention (which can be preceded, as usual, by storage wagons which transport the new materials to be laid and which are intended to receive the old materials removed , and followed by other vehicles carrying operational means), advances, by one or more axles which precede the axle in question, on the track to be renewed, previously freed from the fasteners, removes the old rails and advances by the axle considered on old sleepers still laid, with the interposition of sections of rails which bear on the sleepers, or else on the rail supports when these are present on the sleepers, and are guided by them, so that the whole results correctly supported and faithfully follows the pre-existing layout.
  • the advancement of each section of rail is carried out when no load is applied to the corresponding axle, respectively on the auxiliary bogie, and consequently there is no danger of difficulties in advancing the sections of rail, nor of displacement of the sleepers.
  • said means allowing at least one of the axles to advance on the already deprived track of the rails also comprise detector means arranged to detect the approach of said auxiliary bogie and said axle at the anterior ends and, respectively, posterior to the travel used on said sections of rail, and means for coordinating the operation of parts of the train, controlled by said detector means and arranged to cause, alternately for said axle and for said auxiliary bogie, the transfer of the load on the other of them and the advancement of its own sections of rail, as well as to cause the blocking of the transverse displacement of the auxiliary bogie only during the periods when it is subjected to the load.
  • the operation of the means for supporting and guiding the advancement of the railway train results in fully automatic operation and does not involve the action or the control of the operators.
  • Figure 1 is a side view on a small scale of the operating assembly according to the invention, formed by two vehicles;
  • Figure 2 shows on a larger scale the means to allow the second axle of the first vehicle to advance on the sleepers deprived of rails.
  • a railway train for the renewal of railways generally comprises an operating assembly according to Figure 1 (predisposed to advance from right to left according to the drawing), subsequent operating means known per se, mounted on wagons not shown, which follow the operational assembly, and a certain number of storage wagons intended to carry the new materials which must be laid and to receive the old materials which have been removed, disposed (in the direction of advancement of the train) in front of the operational assembly shown in Figure 1.
  • the operating assembly according to FIG. 1 comprises two vehicles defined by their chassis 1 and 2, which are reciprocally articulated spherically at 3.
  • the vehicle chassis has a first axle 4 and a second axle 5 (which could be replaced by corresponding bogies), while the chassis of the vehicle 2 rests anteriorly, through the articulation 3, on the chassis 1, and later on its own axle 6 (which could also be replaced by a bogie).
  • the chassis 1 of the first vehicle carries, in its upper part, a transporter 7 connected to a depot 8 for the old removed sleepers, a depot 9 for the new sleepers to be laid, and a service track 10 for a portal transporter (known per se and not shown intended for the handling of materials between depots 8 and 9 and the storage wagons arranged in front of the operating unit 1 - 2.
  • the chassis 1 carries, in its lower part, an engine group II , generally a diesel engine actuating a hydrodynamic power station and an electric generator for the supply of the different operative members of the assembly, a chassis 12 provided with roller clamps 13 arranged (in a manner known per se) to lift and move the old rails which have to be removed, sleepers located below these rails, and an auxiliary bogie 14 (which can be lifted by means of a hydraulic cylinder 15) being part of the means intended to allow the uxverse axle 5 to advance on the old sleepers already deprived of the rails, these means being described in more detail below with reference to FIG. 2.
  • an engine group II generally a diesel engine actuating a hydrodynamic power station and an electric generator for the supply of the different operative members of the assembly
  • a chassis 12 provided with roller clamps 13 arranged (in a manner known per se) to lift and move the old rails which have to be removed, sleepers located below these rails
  • an auxiliary bogie 14 which can be lifted by means of a hydraulic
  • the chassis 2 of the second vehicle carries in its upper part a transporter 16, connected to the transporter 7 of the first vehicle, for the old trayerses removed, a transporter 17, connected to the depot 9 of the first vehicle, for the new sleepers to be installed, a parapetestrade 18 for checking the installation and for possible interventions on the respective mechanisms, an operating cabin 19 and a depot 20 for special sleepers to be placed in particular places, such as at level crossings.
  • the chassis 2 carries, in its lower part, a device 21 for removing the old sleepers which feeds the conveyor 16, a ploughshare 22 for leveling or removing the ballast, a group 23 of, laying new sleepers, a distributor 24 for special sleepers coming from depot 20, and a tracked support 25.
  • This latter assembly which is raised for approaching on the track when axle 6 is active, is lowered (to the position shown) for the work and allows the second vehicle 2 to proceed by relying on the new sleepers laid, still devoid of the rails (or, according to a possible alternative, laterally to said sleepers).
  • the operating assembly described acts by proceeding in continuous movement to the left according to FIG. 1, by rolling by means of the axle 4 on the old unbolted rails, by lifting and removing the old rails by means 12 - 13 while the old sleepers remain placed on the ballast, rolling on these old sleepers (as described below) by means of the axle 5 and the auxiliary bogie 14, removing by means of the removal device 21 the old sleepers that the conveyors 16 and 7 send to depot 8, leveling cu by moving the ballast by means of the ploughshare 22 and associated operating means, and by placing, by means 23 or 24, new sleepers on which the assembly advances by means of the tracked support 25. Subsequent operations (laying new rails, compacting ballast, etc.) are carried out by successive operating means (not shown).
  • the device allowing the second axle 5 of the vehicle 1 to advance on the old sleepers, which in the location of said axle are already deprived of the old rails removed by the means 12 - 13, comprises an auxiliary bogie lifting and lowering by means of a hydraulic cylinder 15.
  • the bogie 14 In the raised position, the bogie 14 does not touch the rails and does not interfere with the running of the railway train, while in the lowered position it can unload from the axle 5 the weight of the chassis 1, absorbed by the bogie 14 via the cylinder 15 subjected to pressure, or else simply bear without load on the rails, when the cylinder 15 is not under pressure.
  • the raising and lowering of the bogie 14 is guided by an appropriate kinematism, for example a parallelogram 35; in addition, the bogie 14 is able to perform a transverse movement which, moreover, can be blocked by a hydraulic cylinder 36.
  • a hydraulic cylinder 36 During the working periods, on the old sleepers, below the bogie 14, are placed short sections of rail 37 which cooperate with the bogie 14 by means of a position detector 38 and which. by means of a system of levers 40, can be moved longitudinally by a hydraulic cylinder 41.
  • sections of rail 42, provided with position detectors 43 and 44 are placed on the old sleepers below the axle 5 and, by means of a system of levers 45, can be moved longitudinally by a hydraulic cylinder 46.
  • This device operates in the following manner.
  • the rail sections 37 and 42 are arranged, respectively, below the axle 5 and below the bogie 14 and bear on the rail-carrying plates of the sleepers located below, which guide them along the route of the track.
  • the support of the rail sections 37 and 42 takes place directly on the upper part of the sleepers.
  • the axle 5 (on which in this phase the weight of the chassis 1 is applied) advances on the rail sections 42, which remain stationary relative to the crosspieces situated below.
  • the cylinder 15 is inactive and therefore the bogie 14 has no load, during this advancement phase, in which the load is applied to the axle 5, the cylinder 41 is active and it advances the sections of rail 37 with respect to the cross members located below and with respect to the bogie 14, which does not present any difficulties since the bogie 14 is not loaded.
  • This advancement of the rail sections 37 relative to the bogie 14 continues until the activity of the cylinder 41 is interrupted by the position detector 44. This also activates the cylinder 15, which then transmits the weight of the chassis 1 to the bogie 14, and consequently unloads the axle 5, and also activates the cylinder 46.
  • the bogie 14 (on which the weight of the chassis 1 now acts) advances on the sections of rail 37, which remain stationary relative to the sleepers located below.
  • the cylinder 46 which has been activated advances the rail sections 42 with respect to the crosspieces situated below and with respect to the axle 5, this which presents no difficulties because the axle 5 is not loaded.
  • This advancement of the rail sections 42 relative to the axle 5, and the advancement phase of the vehicle resting on the bogie 14, continue until the position detectors 43 and 38 interrupt the activity of the cylinder. 46 deactivate the cylinder 15 and activate the cylinder 41; therefore the weight of the chassis 1 begins to load the axle 5.
  • the cylinder 36 is connected so as to allow free the transverse movement of the bogie 14 while the weight of the vehicle acts on the axle 5, and to block this lateral movement when the weight of the vehicles is transferred to the bogie 14.
  • the bogie 14 has the possibility of adapting its own transverse position, as a function of the local curvature of the track layout, during the whole period in which the transverse position of the vehicle is defined by the axle 5, and then maintains unchanged this transverse position during the period in which the bogie 14 supports the load.
  • the advance travel of the rail sections 42 is considerably greater than that of the rail sections 37, and the load is transferred to the bogie 14 only in the period strictly necessary for the movement of the rail sections 42.
  • the length of movement of the rail sections 42 can be 40 cm, and the length of movement of the rail sections 37 can be 20 cm.
  • the device according to the invention has been described in relation to the second axle 5 of a vehicle 1 with two axles 4 and 5, provided with means 12, 13 for removing the old rails arranged between the two axles, and followed by another vehicle 2 with a single axle 6.
  • a similar device can also be advantageously used to support and guide the axle 6 of the second vehicle, instead of the tracked support 25.
  • a device like that which has been described can also be applied to support and guide the first axle 4 of the vehicle 1. In this case, the operation of the machine can be increased by reducing the internal tensions induced in the rails to negligible levels during the removal operation of these rails.
  • the rail sections 37 and 42 could be removed.
  • the rail sections 42 are prepared to be left in use, by fixing them to the plates or to the crosspieces situated below by the normal fixing members, and by connecting them, by means of the usual fishplates, one side to the old track which has not yet been renewed, and the other side to the new rails which have just been installed, thereby establishing 17 continuity necessary for the passage of the railway trains on the track.
  • This operation substantially facilitates the suspension and resumption of activity on the railway renewal train on a track which must remain open to traffic.
  • the device described presents a considerably greater operating safety than that of known devices, even of those more advanced in which below the axle of the vehicle is arranged a roller or track shoe, which is intended to slide on the sleepers under the entire load to which the axle of the vehicle is subjected, and which can, therefore, encounter difficulties, resistances or impediments to advancement, or else it can displace the old sleepers, with the result of upsetting the track on which the skate must slide.
  • railway train according to the invention can have all the characteristics described or even just a part of them, depending on the particular applications for which it is intended. Different modifications can be applied to the details described, and all parts and groups can be replaced by their technical equivalents.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Platform Screen Doors And Railroad Systems (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Steering Controls (AREA)
  • Cleaning Of Streets, Tracks, Or Beaches (AREA)
EP85201030A 1984-07-10 1985-06-28 Rame ferroviaire pour le renouvellement de voies ferrées, pourvue de moyens de support et de guidage de l'avancement Expired EP0168101B1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT85201030T ATE42980T1 (de) 1984-07-10 1985-06-28 Mit mitteln zum abstuetzen und fuehren beim vorruecken versehene eisenbahnwagengarnitur fuer die erneuerung von eisenbahngleisen.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IT67701/84A IT1179730B (it) 1984-07-10 1984-07-10 Convoglio per il rinnovamento di strade ferrate con mezzi di sostegno e di guida dell avanzamento
IT6770184 1984-07-10

Publications (3)

Publication Number Publication Date
EP0168101A2 EP0168101A2 (fr) 1986-01-15
EP0168101A3 EP0168101A3 (en) 1987-01-14
EP0168101B1 true EP0168101B1 (fr) 1989-05-10

Family

ID=11304616

Family Applications (1)

Application Number Title Priority Date Filing Date
EP85201030A Expired EP0168101B1 (fr) 1984-07-10 1985-06-28 Rame ferroviaire pour le renouvellement de voies ferrées, pourvue de moyens de support et de guidage de l'avancement

Country Status (7)

Country Link
US (1) US4643100A (it)
EP (1) EP0168101B1 (it)
JP (1) JPS6168903A (it)
AT (1) ATE42980T1 (it)
CA (1) CA1242932A (it)
DE (1) DE3570099D1 (it)
IT (1) IT1179730B (it)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7895950B2 (en) 2004-08-20 2011-03-01 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT389338B (de) * 1987-02-06 1989-11-27 Plasser Bahnbaumasch Franz Gleisverfahrbare anlage bzw. maschinenkombination zum aufnehmen, transportieren und ablegen bzw. auswechseln von guetern, insbesondere schwellen
US4829907A (en) * 1986-10-13 1989-05-16 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Mobile installation for loading, transporting and unloading as well as exchanging railroad ties
DE3705773A1 (de) * 1987-02-24 1988-09-01 Dyckerhoff & Widmann Ag Verfahren zur justierung, befestigung und/oder bearbeitung von funktionsflaechen eines fahrwegs einer elektromagnetischen schnellbahn
IT1210796B (it) * 1987-06-08 1989-09-20 Enrico Valditerra Convoglio di rinnovamento di strade ferrate con mezzi di sostituzione totale o parziale delle traverse disostegno dei binari
US5048424A (en) * 1990-04-20 1991-09-17 Harsco Corporation Tie replacer and method
AT402952B (de) * 1991-03-26 1997-10-27 Plasser Bahnbaumasch Franz Gleisbaumaschine zum kontrollierten absenken einesgleises
AT400339B (de) * 1991-09-10 1995-12-27 Plasser Bahnbaumasch Franz Maschinenanordnung zur erneuerung eines gleises
CH686144A5 (fr) * 1991-10-30 1996-01-15 Matisa Materiel Ind Sa Train de renouvellement d'une voie ferree.
ATA96796A (de) * 1996-06-04 1997-09-15 Plasser Bahnbaumasch Franz Maschine zum verlegen eines gleises
AT4857U3 (de) * 2001-09-21 2002-06-25 Plasser Bahnbaumasch Franz Maschine zum entfernen von schwellen eines gleises
CN110863394A (zh) * 2019-11-04 2020-03-06 洛阳科博思新材料科技有限公司 一种轨道减振扣件

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US396633A (en) * 1889-01-22 Electric-railway system
CA610841A (en) * 1960-12-20 Societe D'exploitation De Procedes Mecaniques Mecaprodex Track laying vehicle
GB825626A (en) * 1955-02-15 1959-12-16 Schweizerische Lokomotiv Improvements in or relating to rail vehicles
CH426919A (fr) * 1964-04-06 1966-12-31 Donovan Jacobs Joseph Procédé pour déplacer des ensembles de voies et appareil pour la mise en oeuvre de ce procédé
GB2016562B (en) * 1978-03-15 1982-09-22 Canron Inc Renewing railway track
AT362812B (de) * 1978-11-16 1981-06-25 Plasser Bahnbaumasch Franz Fahrbare einrichtung zum aufnehmen und bzw. oder verlegen von gleisweichen oder -kreuzungen
GB2082231A (en) * 1980-07-18 1982-03-03 Pandrol Ltd Apparatus for performing operations on a railway track
CH640904A5 (fr) * 1981-03-18 1984-01-31 Canron Inc Crissier Machine de chantier d'une voie ferree.
CH646480A5 (fr) * 1982-03-12 1984-11-30 Canron Inc Crissier Train de pose d'une nouvelle voie ferree.

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7895950B2 (en) 2004-08-20 2011-03-01 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system

Also Published As

Publication number Publication date
IT8467701A1 (it) 1986-01-10
US4643100A (en) 1987-02-17
IT8467701A0 (it) 1984-07-10
DE3570099D1 (en) 1989-06-15
CA1242932A (en) 1988-10-11
ATE42980T1 (de) 1989-05-15
IT1179730B (it) 1987-09-16
JPS6168903A (ja) 1986-04-09
EP0168101A3 (en) 1987-01-14
EP0168101A2 (fr) 1986-01-15

Similar Documents

Publication Publication Date Title
EP0168101B1 (fr) Rame ferroviaire pour le renouvellement de voies ferrées, pourvue de moyens de support et de guidage de l'avancement
EP0019984B1 (fr) Train de renouvellement d'une voie de chemin de fer
EP0168103B1 (fr) Rame ferroviaire pour le renouvellement de voies ferrées
EP0355240B1 (fr) Train de renouvellement d'une voie de chemin de fer
EP0089076B1 (fr) Train de pose d'une nouvelle voie ferrée
US4211170A (en) Mobile apparatus for the continuous replacement of an old track by a new track
FR2476708A1 (fr) Ensemble mobile pour le nettoyage de la couche de ballast des voies ferrees et procede de nettoyage utilisant un tel ensemble
EP0016664B1 (fr) Dispositif de réglage de l'alignement et de la distance intercalaire de deux abouts de rails
FR2562572A1 (fr) Installation roulante et procede pour la reception et/ou la pose de travees de voie ferree
EP0161117B1 (fr) Engin à avancement continu pour travaux sur voie ferrée
RU2763324C1 (ru) Устройство и способ для укладки шпал на балластную подушку для строительства железной дороги
CH680865A5 (it)
EP0467001B1 (fr) Train de pose des nouvelles voies ferrées et procédé pour la pose de celles-ci utilisant un tel train
FR2497779A1 (fr) Train de chargement et transport, notamment pour le deblaiement de tunnel, et son procede de mise en oeuvre
FR2572432A1 (fr) Chariot sur rails pour le remplacement ou la pose et la depose ainsi que pour le transport de travees de voie ferree.
EP0388573B1 (fr) Train articulé de renouvellement de voies ferrées
CH628378A5 (en) Movable machine for working on railway tracks
FR2666358A1 (fr) Procede et machine de traitement de voie ferree.
EP0350375B1 (fr) Dispositif de transfert d'un ensemble tunnelier à travers une station intermédiaire à deux tronçons de tunnel
EP0461216B1 (fr) Dispositif de propulsion pour une rame pour le renouvellement de voies ferrees
FR2563545A1 (fr) Procede de renouvellement d'appareils de voie ferree et materiel de manutention permettant de mettre en oeuvre ce procede
FR2562573A1 (fr) Dispositif de levage de voie ferree
CS212409B1 (cs) Zařízení pro kontinuální výměnu starých kolejnic za nové
FR2463706A1 (fr) Chariot preneur, porteur et elevateur de wagons de chemins de fer pour engins de manoeuvres
CH585814A5 (en) Track renewal unit - has series of wagons running with front on old and rear on new track containing roller conveyor with crane

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): AT BE CH DE FR GB LI SE

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH DE FR GB LI SE

17P Request for examination filed

Effective date: 19870704

17Q First examination report despatched

Effective date: 19880713

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE FR GB LI SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Effective date: 19890510

Ref country code: GB

Effective date: 19890510

Ref country code: AT

Effective date: 19890510

REF Corresponds to:

Ref document number: 42980

Country of ref document: AT

Date of ref document: 19890515

Kind code of ref document: T

REF Corresponds to:

Ref document number: 3570099

Country of ref document: DE

Date of ref document: 19890615

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Effective date: 19890630

Ref country code: FR

Effective date: 19890630

Ref country code: CH

Effective date: 19890630

Ref country code: BE

Effective date: 19890630

GBV Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed]
BERE Be: lapsed

Owner name: VALDITERRA ENRICO

Effective date: 19890630

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19900301

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
REG Reference to a national code

Ref country code: FR

Ref legal event code: ST