DE9207959U1 - Element formwork for the production of working + expansion joints in concrete + reinforced concrete construction - Google Patents

Element formwork for the production of working + expansion joints in concrete + reinforced concrete construction

Info

Publication number
DE9207959U1
DE9207959U1 DE9207959U DE9207959U DE9207959U1 DE 9207959 U1 DE9207959 U1 DE 9207959U1 DE 9207959 U DE9207959 U DE 9207959U DE 9207959 U DE9207959 U DE 9207959U DE 9207959 U1 DE9207959 U1 DE 9207959U1
Authority
DE
Germany
Prior art keywords
concrete
formwork
working
production
expansion joints
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE9207959U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
REICHART HERBERT 8954 BIESSENHOFEN DE
Original Assignee
REICHART HERBERT 8954 BIESSENHOFEN DE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by REICHART HERBERT 8954 BIESSENHOFEN DE filed Critical REICHART HERBERT 8954 BIESSENHOFEN DE
Priority to DE9207959U priority Critical patent/DE9207959U1/en
Publication of DE9207959U1 publication Critical patent/DE9207959U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • E04G11/085End form panels for walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

B) BESCHREIBUNGB) DESCRIPTION

Titel:Title:

Elementschalung zur Herstellung von Arbeits- und Dehnfugen im Beton und Stahlbetonbau.
Stand der Technik:
Element formwork for the production of working and expansion joints in concrete and reinforced concrete construction.
State of the art:

Bei der Herstellung von Arbeitsfugen in Betonwänden oder Platten wird üblicherweise ein auf die jeweilige Wandstärke zugeschnittenes starkes Brett, an der vorgesehenen Stelle der Arbeitsfuge, zwischen die äußere und innere Wandschalung eingestellt, und mit Drängbrettern etc. gegen den auftretenden Betondruck gesichert. Eine Durchführung der Bewehrungsstähle durch oben genanntes Brett ist nur mit hohem Aufwand möglich, welcher beim Ausschalen meist die Zerstörung des Brettes zur Folge hat.
Problem:
When creating construction joints in concrete walls or slabs, a strong board cut to the respective wall thickness is usually placed between the outer and inner wall formwork at the intended location of the construction joint and secured against the concrete pressure using pressure boards, etc. It is only possible to pass the reinforcing steel through the above-mentioned board with great effort, which usually results in the board being destroyed when the formwork is removed.
Problem:

Der im Schutzanspruch 1-4 angegebenen Erfindung liegt das Problem zugrunde, ein Schalungselement herzustellen, welches universell für verschiedene Wandstärken und praktisch unbegrenzt oft einsetzbar ist. Weiterhin soll an der Arbeitsfuge eine Nut entstehen und eine Durchführung der Bewehrungsstähle möglich sein.The invention specified in claims 1-4 is based on the problem of producing a formwork element that is universally applicable for different wall thicknesses and can be used practically unlimitedly. Furthermore, a groove should be created at the construction joint and it should be possible to pass through the reinforcing steel.

Diese Probleme werden mit den in den Schutzansprüchen 1-4 beschriebenen Merkmalen gelöst.
Erreichte Vorteile:
These problems are solved with the features described in claims 1-4.
Benefits achieved:

Mit der Erfindung lassen sich problemlos Arbeits- und Dehnfugen im Beton- und Stahlbetonbau herstellen. Das Schalelement ist universell für verschiedene Wand- oder Plattenstärken einsetzbar. Es ist gegenüber herkömmlichen Ausführungen mehrfach, praktisch unbegrenzt oft, einsetzbar. Die Durchführung der Bewehrungsstähle an der Arbeitsfuge ist problemlos möglich. Die Kosten für vorgefertigte Bewehrungsanschlüsse entfallen.The invention makes it easy to create construction and expansion joints in concrete and reinforced concrete construction. The formwork element can be used universally for different wall or slab thicknesses. It can be used multiple times, practically unlimitedly, compared to conventional designs. The reinforcing steel can be installed in the construction joint without any problems. The costs for prefabricated reinforcement connections are eliminated.

Weitere Ausgestaltung der Erci.-Beim Herstellen von wasserdichtem Beton wird in der Arbeitsfuge Bodenplatte - Wand meist ein Fugenblech oder ein Elastomerefugenband eingebaut. In diesem Fall kann das Schalelement im unteren Bereich mit einer Auskerbung für das Fugenband versehen werden, und in die trapezförmige Nut ein auf voller Wandhohe durchgehendes Quellfugenband eingeklebt werden.
Darstellung der Erfindung
Further design of the Erci.- When producing waterproof concrete, a joint sheet or an elastomer joint tape is usually installed in the construction joint between the floor slab and the wall. In this case, the formwork element can be provided with a notch for the joint tape in the lower area, and an expansion joint tape can be glued into the trapezoidal groove that runs the full height of the wall.
Description of the invention

Ein Ausführungsbeispiel wird anhand der Figur 1 bis 4 erläutert. Es zeigen
Fig. 1 Schalelement montiert für Wandstärke 24 cm
An embodiment is explained using Figures 1 to 4. They show
Fig. 1 Formwork element mounted for wall thickness 24 cm

-räumliche Darstellung-Fig. 2 Schalelement zwischen Wandschalungen eingebaut für-spatial representation-Fig. 2 Formwork element installed between wall formwork for

Wandstärke 30 cm -Draufsicht-Fig. 3 Schalelement wie vor - Ansicht- jedoch Wandstärke 36 cmWall thickness 30 cm - top view - Fig. 3 Formwork element as above - view - but wall thickness 36 cm

Fig. 4 Betonwand nach dem Ausschalen im Bereich der Arbeitsfuge bei wasserdichtem Beton Fig. 4 Concrete wall after stripping in the area of the construction joint with waterproof concrete

Das Schalelement besteht aus einem Stahlblechprofil (1) u-förmig abgekantet ca. 14 cm breit und ca. 2,50 cm lang, je nach bauseits vorhandener Wandschalungshöhe. Zur Aussteifung sind zwei Rohre (6) eingeschweißt, welche auch als Tragegriff dienen.The formwork element consists of a sheet steel profile (1) bent in a U-shape, approx. 14 cm wide and approx. 2.50 cm long, depending on the existing wall formwork height on site. Two tubes (6) are welded in for reinforcement, which also serve as a carrying handle.

In Fig. 1 ist das. Element für eine Wandstärke von 24 cm montiert dargestellt. Am Stahlblechprofil (1) (evtl. alt. Alu) ist rechts und links je ein Kantholz 8/5 cm (2) mit je 3 Grobgewindeschrauben (3) befestigt, welches mit Auskerbungen (4) zum Durchführen der Bewehrungsstäbe (5) versehen ist. Das montierte Element wird wie in Fig. 2 dargestellt am gewünschten Platz der Arbeitsfuge zwischen den Wandschalungstafeln (7) mittels Drängbrett (14) fixiert.In Fig. 1, the element is shown assembled for a wall thickness of 24 cm. On the right and left of the sheet steel profile (1) (possibly old aluminum), an 8/5 cm squared timber (2) is attached with 3 coarse thread screws (3) each, which is provided with notches (4) for the reinforcing bars (5) to pass through. The assembled element is fixed at the desired location of the construction joint between the wall formwork panels (7) using a pressure board (14), as shown in Fig. 2.

In Fig. 2 sieht man die Hüemenciächalung für eine Wandstäke von 30 cm montiert in eingebautem Zustand. Hierfür wird zwischen Kantholz (2) und Blechprofil (1) ein 3 cm starkes Brett (2.1) mit eingebaut. Die Bewehrungseisen (5) können nach der Montage des Schalelements zwischen den beiden Wandschalungstafeln (7) eingeführt werden. Nach Betonieren bzw. Abbinden des Betons werden die Wandschalungen entfernt. Danach löst man die Grobgewindeschrauben (3) und kann die beiden äußeren Kanthölzer (2) abnehmen. Nach leichtem Auseinanderdrücken der Bewehrungsstäbe läßt sich das Stahlblechprofil (1) herausnehmen. Als Ergebnis sieht man It. Fig. 4 den ersten Betonierabschnitt mit trapezförmiger Nut (12) und vorstehenden Bewehrungsstählen (5). Damit die Betonwand bzw. die Arbeitsfuge wasserdicht wird, ist in die Nut (12) ein Quellband (13) einzukleben. Nun können die Wandschalungen (7) zum zweiten Betonierabschnitt montiert werden.In Fig. 2 you can see the roof formwork for a wall thickness of 30 cm installed in the installed state. For this purpose, a 3 cm thick board (2.1) is installed between the squared timber (2) and the sheet metal profile (1). The reinforcing iron (5) can be inserted between the two wall formwork panels (7) after the formwork element has been installed. After the concrete has been poured or the concrete has set, the wall formwork is removed. Then the coarse thread screws (3) are loosened and the two outer squared timbers (2) can be removed. After slightly pushing the reinforcing bars apart, the sheet steel profile (1) can be removed. The result is the first concreting section with a trapezoidal groove (12) and protruding reinforcing steel (5) in Fig. 4. In order to make the concrete wall or the construction joint watertight, an expansion band (13) must be glued into the groove (12). The wall formwork (7) can now be assembled for the second concreting section.

Claims (3)

A) SCHUTZANSPRÜCHEA) CLAIMS FOR PROTECTION 1. Elementschalung zur Herstellung von Arbeits- und Dehnfugen im Beton- und Stahlbetonbau,1. Element formwork for the production of working and expansion joints in concrete and reinforced concrete construction, dadurch gekennzeichnet,characterized, daß sie aus einem u-förmigen Stahlblechprofil (1) und seitlich angeordneten Kanthölzern (2) zusammengesetzt ist.that it is composed of a U-shaped steel sheet profile (1) and squared timbers (2) arranged on the sides. 2. Elementschalung nach Schutzanspruch dadurch gekennzeichnet,2. Element formwork according to the protection claim characterized in daß die seitlichen Kanthölzer (2) mit Auskerbungen (4) zum Durchführen der Bewehrungsstähle versehen sind.that the lateral squared timbers (2) are provided with notches (4) for the passage of the reinforcing steel. 3. Elementschalung nach Schutzanspruch 1+2 dadurch gekennzeichnet,3. Element formwork according to protection claims 1+2, characterized in that daß die seitlichen Kanthölzer (2-2.1-2.2) als maßlich auf die üblichen Wandstärken abgestimmter Satz ausgebildet sind.that the side squared timbers (2-2.1-2.2) are designed as a set dimensionally adapted to the usual wall thicknesses.
DE9207959U 1992-06-13 1992-06-13 Element formwork for the production of working + expansion joints in concrete + reinforced concrete construction Expired - Lifetime DE9207959U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE9207959U DE9207959U1 (en) 1992-06-13 1992-06-13 Element formwork for the production of working + expansion joints in concrete + reinforced concrete construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE9207959U DE9207959U1 (en) 1992-06-13 1992-06-13 Element formwork for the production of working + expansion joints in concrete + reinforced concrete construction

Publications (1)

Publication Number Publication Date
DE9207959U1 true DE9207959U1 (en) 1992-10-08

Family

ID=6880521

Family Applications (1)

Application Number Title Priority Date Filing Date
DE9207959U Expired - Lifetime DE9207959U1 (en) 1992-06-13 1992-06-13 Element formwork for the production of working + expansion joints in concrete + reinforced concrete construction

Country Status (1)

Country Link
DE (1) DE9207959U1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10028509A1 (en) * 2000-06-08 2001-12-20 Manfred Distler Shell unit for molding cast concrete projecting structures has reinforcements on both sides of the shell unit which has a longitudinal projection and/or recess along one side
CN114809591A (en) * 2022-06-14 2022-07-29 中国建筑第七工程局有限公司 Reinforcing construction method for aluminum alloy templates of wall bodies on two sides of long and narrow expansion joint

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10028509A1 (en) * 2000-06-08 2001-12-20 Manfred Distler Shell unit for molding cast concrete projecting structures has reinforcements on both sides of the shell unit which has a longitudinal projection and/or recess along one side
CN114809591A (en) * 2022-06-14 2022-07-29 中国建筑第七工程局有限公司 Reinforcing construction method for aluminum alloy templates of wall bodies on two sides of long and narrow expansion joint

Similar Documents

Publication Publication Date Title
DE2534160A1 (en) FORMWORK FOR CONCRETE
EP0752033B1 (en) Structure consisting of prefabricated components
DE9207959U1 (en) Element formwork for the production of working + expansion joints in concrete + reinforced concrete construction
EP2199477B1 (en) Formwork element
DE4224481A1 (en) Shuttering element for working and expansion joints in plain and reinforced concrete structure - is applicable universally for conventional wall or plate thickness in vertical and horizontal region.
EP0104262B1 (en) Composite self-supporting slab - product - method - device - application
DE2912131C2 (en) garage
DE3406664C2 (en)
DE4242471A1 (en) Combined shuttering for water-tight working and expansion joints in concrete
DE1075696B (en) Cable duct composed of precast reinforced concrete parts in the form of a floor pan and several frame and plate-shaped prefabricated parts
DE9407634U1 (en) Formwork system for lost foundation formwork
DE19800569C2 (en) Formwork system for a reinforcement connection
DE69011526T2 (en) ARRANGEMENT IN A TUNNEL ARCH.
DE2431606A1 (en) Transportable prefabricated reinforced-concrete garage or cell unit - incorporating wall comprising separately fabricated, distinctive externally faced slab subsequently
AT400465B (en) FORMWORK AND METHOD FOR POURING A CONCRETE CONTAINER
EP0560307B1 (en) Shuttering
DE2831914A1 (en) Concrete type edge reinforced floor panel - has protective profile batten let in along one side and connected to reinforcing rod
AT257116B (en) Device for the connection of prefabricated, plate-shaped, reinforced precast concrete parts for the production of a dismountable transformer station
AT18173U1 (en) Swimming pool
DE29612337U1 (en) Precast concrete wall
DE2828701A1 (en) Aerated concrete building door or window lintel - is basically itself of aerated concrete, with longitudinal tension chords
AT261184B (en) Dismountable window formwork
DE9403117U1 (en) Formwork for a recess in the ceiling
DE3417085A1 (en) Reinforcing steel rail
DE7810413U1 (en) SHELLBODY