CN206085314U - Prefabricated component flexible production line - Google Patents

Prefabricated component flexible production line Download PDF

Info

Publication number
CN206085314U
CN206085314U CN201621158299.4U CN201621158299U CN206085314U CN 206085314 U CN206085314 U CN 206085314U CN 201621158299 U CN201621158299 U CN 201621158299U CN 206085314 U CN206085314 U CN 206085314U
Authority
CN
China
Prior art keywords
station
autonomous working
working area
prefabricated components
production line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621158299.4U
Other languages
Chinese (zh)
Inventor
王德山
田俊海
林建峰
张宝昌
刘福杰
苏继亮
张凌峰
李筱霏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN201621158299.4U priority Critical patent/CN206085314U/en
Application granted granted Critical
Publication of CN206085314U publication Critical patent/CN206085314U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The utility model provides a prefabricated component flexible production line for the prefabricated component of shape is predetermine through the production of mould platform, the first autonomous working district and the second autonomous working district that include parallel arrangement on the horizontal direction to and parallel arrangement in the traffic zone between first autonomous working district and the second autonomous working district, first autonomous working district and second autonomous working district all organize including a plurality of stations that can correspond prefabricated component difference flow charts, and adjacent station is organized and is arranged side by side, the traffic zone include with first autonomous working district and second autonomous working district in all stations organize adjacent transportation tracks to and can follow the conveyer that facial make -up mould unloading platform was organized to the station, the conveyer is mobilizable to be set up on the transportation track. The utility model discloses a prefabricated component flexible production line has higher production efficiency to simple structure, saving cost and area are favorable to extensive popularization and application.

Description

Prefabricated components flexible production line
Technical field
This utility model belongs to construction timber production equipment technical field, more particularly to a kind of prefabricated components flexible production Line.
Background technology
At present, the country produces the prefabricated structure of assembled architecture using the circular line of horizontal cyclic pipeline mode mostly Part, circular line is the closed circulation pattern produced by beat, including following station:Manually installed station, pour station, pre- Maintenance station, maintenance station and handling station.
Specifically, first die station is completed to clear up, sprayed and mounting process in manually installed station;Then production line is by die station It is sent to and pours station, touched in die cavity by side of the material distributing machine by concreting in die station, and is vibrated by vibration platen Make concrete be evenly distributed, complete to pour, Vibration Technology;Then die station is conveyed to precuring station, complete manually to catch up with flat, precuring The technique such as shield and plucking of wiping one's face;Then die station and prefabricated components placed on it are conveyed to station is conserved, to the component in die station Conserved;Component is met after design strength, and die station and the component in die station are delivered to into handling station is carried out at form removal Reason, the component after form removal is transported to stockyard by finished product transport vehicle, and the die station after form removal is transported to manually installed station and carries out Come back to after hand sweeping, spraying and mounting process pour that station carries out next round pour work.
However, in circular line, die station is sequentially through the corresponding station of each operation, it is impossible to avoid because of each station used time The phenomenon of difference and " fast etc. slow " of generation;On the other hand, if certain station hinder for some reason need suspend when, whole production line is necessary Stop simultaneously, just can continue to run with until failure stations relieve failure, easily appearance " work holdup " phenomenon, thus circular line Production efficiency it is relatively low.
Chinese invention patent CN105437364A discloses a kind of wallboard flexible production line, and the production line is solid including one group Surely arrange and be contained with die station station support, station support side arrange the walking track parallel to station support group, In the mould car of setting on track of walking, in the equipment along station support group back and forth movement of station support group upper lifting, The processing of wallboard prefabricated component is carried out in die station, station support group top is provided with day rail and moves simultaneously for each equipment Workpiece to needing processing carries out operation;Technical scheme disclosed in the utility model is by arranging the equipment that can be moved Realize the processing that each operation is completed on each station, it is to avoid the time loss that operation is waited in prior art.But Need the extra movable stand and the day rail for installing above-mentioned movable stand for arranging and being used for installing above-mentioned equipment.The opposing party Face, if station is more, inevitably arranges many set equipments, movable stand and day rail, increased cost and occupation of land face Product, is unfavorable for being widely popularized.
In sum, a kind of simple structure, low cost, floor space how to be provided few and with pre- compared with high efficiency Component production line processed becomes the technical barrier that those skilled in the art are badly in need of solving.
Utility model content
This utility model is for the larger skill of above-mentioned prefabricated components production line low production efficiency, high cost and floor space Art problem, proposes a kind of simple structure, cost-effective and floor space and has flexible compared with the prefabricated components of high efficiency raw Producing line.
In order to achieve the above object, the technical solution adopted in the utility model is:A kind of prefabricated components flexible production line, uses In the prefabricated components that preset shape is produced by die station, including the first autonomous working Qu He being arranged in parallel in the horizontal direction Two autonomous working areas, and the traffic zone between the first autonomous working area and the second autonomous working area that is arranged in parallel, first is only Vertical working area and the second autonomous working area include the multiple station groups that can correspond to prefabricated components different work operation, adjacent work Hyte is arranged side by side;Traffic zone includes the transport adjacent with all station groups in the first autonomous working area and the second autonomous working area Track, and the conveying arrangement of die station can be loaded and unloaded from station group, conveying arrangement is movably arranged on conveying track.
Preferably, conveying track includes first track close with the first autonomous working area, and with the second independent work Make the second close track of area, the first track and the second parallel track are arranged;Each station group includes multiple stations, each work Position is mutually perpendicular to conveying track.
Preferably, being disposed with artificial secondary installing station group, artificial inside the first autonomous working area from left to right Once mounting station group and Rigger hyte;It is disposed with from left to right inside second autonomous working area and pours station group, pre- Maintainer hyte and curing kilns group.
Preferably, conveying arrangement include can in artificial once mounting station group, artificial secondary installing station group, pour work The center transport cars of die station are transmitted between hyte, precuring station group, and can be in precuring station group, curing kilns group and handling The stacking machine of die station is transmitted between station group.
Preferably, pouring station group, also to include that the material distributing machine and can carrying out that can carry out casting concrete operation is vibrated close Real concrete carries out the vibration platen of operation.
Preferably, precuring station group includes stretchable maintenance canopy, maintenance canopy bottom is embedded with jet chimney.
Preferably, further including storage area, storage area includes die station storage area, component working area and raw material storing Area, wherein, die station storage area is located at the right side in the second autonomous working area, and component working area is located at the right side in the first autonomous working area Side, raw material storing area is located at the lower section in the first autonomous working area, and is arranged in parallel with the first autonomous working area.
Preferably, component working area includes prefabricated components can be completed to rinse the flushing platform of operation.
Preferably, further including channel region, channel region includes being located at the first autonomous working area and raw material storage area Between first passage, the second channel above the second autonomous working area, and be connected to first passage and second channel The third channel of right-hand member.
Preferably, further including that controllable conveying arrangement transmits the central control room of route.
Compared with prior art, the advantage and good effect of the prefabricated components flexible production line that this utility model is provided exists In:
1st, prefabricated components flexible production line of the present utility model be provided with the first autonomous working area, the second autonomous working area and Traffic zone, by multiple different station groups in the first autonomous working area, the second autonomous working area the phase of prefabricated components production is completed Answer procedures, and by the conveying track and conveying arrangement of traffic zone by die station and prefabricated components placed on it in different works Transmit between the corresponding station group of sequence, therefore, the more station of indivedual man-hours requirements will not take the time of whole production line;And And, because the station in individual station group breaks down the normal operation for also not interfering with remaining station or remaining station group, have Beneficial to the production efficiency for significantly improving whole production line.
2nd, compared to traditional circular line, flexible production line of the present utility model only needs to additionally arrange conveying track And center transport cars are capable of achieving die station and prefabricated components placed on it are transmitted between the corresponding station of each operation, favorably In reduces cost and reduction floor space, and it is adapted to the popularization and application in large, medium and small workshop.
3rd, wallboard class can only be produced relative to the flexible production line mentioned in traditional circular line and prior art Standard prefabricated components, the flexible production line of the application not only can produce the standard prefabricated components of wallboard class, can also batch life All kinds of special-shaped prefabricated components such as balcony, stair, sleeper are produced, wide variety is produced.
Description of the drawings
Fig. 1 is the horizontal layout schematic diagram of this utility model prefabricated components flexible production line.
Above in each figure:11st, the first autonomous working area;111st, artificial once mounting station group;112nd, artificial secondary installing Station group;113rd, Rigger hyte;12nd, the second autonomous working area;121st, station group is poured;1211st, material distributing machine;1212nd, vibrate Platform;122nd, precuring station group;123rd, curing kilns group;2nd, traffic zone;21st, conveying track;211st, the first track;212nd, second Track;221st, center transport cars;222nd, stacking machine;3rd, storage area;31st, die station storage area;32nd, component working area;321st, rinse Platform;33rd, raw material storage area;4th, central control room;5th, channel region;51st, first passage;52nd, second channel;53rd, threeway Road.
Specific embodiment
Below, this utility model is specifically described by exemplary embodiment.It should be appreciated, however, that not having In the case of being further discussed below, the element, structure and features in an embodiment can also be advantageously incorporated into other enforcements In mode.
In description of the present utility model, it should be noted that term "left", "right", " on ", D score " level " etc. indicates Orientation or position relationship be based on the position relationship shown in accompanying drawing 1, be for only for ease of description this utility model and simplification retouch State, rather than indicate or imply indication device or element must have specific orientation, with specific azimuth configuration and operation, Therefore it is not intended that to restriction of the present utility model.Additionally, term " first ", " second " are only used for describing purpose, and can not It is interpreted as indicating or implying relative importance.
Referring to Fig. 1, Fig. 1 is the horizontal layout schematic diagram of this utility model prefabricated components flexible production line.As shown in figure 1, This utility model provides a kind of prefabricated components flexible production line, for producing the prefabricated components of preset shape, bag by die station The the first autonomous working area 11 and the second autonomous working area 12 being arranged in parallel in the horizontal direction is included, and is arranged in parallel in first Traffic zone 2 between autonomous working area 12 of autonomous working area 11 and second, the first autonomous working area 11 and the second autonomous working area 12 include the multiple station groups that can correspond to prefabricated components different work operation, and adjacent stations group is arranged side by side, and traffic zone 2 includes The conveying track 21 adjacent with all station groups in the first autonomous working area 11 and the second autonomous working area 12, and can be from station The conveying arrangement of die station is loaded and unloaded in group, conveying arrangement is movably arranged on conveying track 21.
Prefabricated components flexible production line of the present utility model is by the first autonomous working area 11 of arrangement, the second autonomous working area 12 and traffic zone 2, complete prefabricated components by multiple different station groups in the first autonomous working area 11, the second autonomous working area 12 The corresponding procedures of production, and platform and placed on it prefabricated will be touched by the conveying track 21 and conveying arrangement of traffic zone 2 Component is sequentially sent to the corresponding station group of operation, therefore, the more station of indivedual man-hours requirements will not take whole piece life The time of producing line;Also, because the station in individual station group breaking down remaining station or remaining the station group of also do not interfere with Normal operation, be conducive to significantly improving the production efficiency of whole production line.
Wherein, the preset shape of above-mentioned prefabricated components includes the wallboard class of standard, and balcony, stair, the sleeper of abnormity Deng so as to meet the requirement of various construction, flexible production line of the present utility model production wide variety being made, with stronger The conformability of prefabricated components species change.
With continued reference to Fig. 1, conveying track 21 includes two the first tracks 211 being parallel to each other and the second track 212, first Track 211 is close with the first autonomous working area 11, and the second track 212 is close with the second autonomous working area 12;Each station group is equal Including multiple stations, the multiple stations in each station group are arranged side by side and perpendicular with conveying track 21.Specifically, each work Position includes the continuously arranged base of two rows, and the roller being installed on base, and roller can be along in being fixed on base Heart axle rotates.Conveying arrangement is arranged on conveying track 21, it is possible to along the first track 211 and the second track 212 in difference Move between working group.Conveying arrangement is provided with the driving wheel that can provide power, can drive die station and be placed in die station it is pre- Component processed slides on conveying arrangement from station or slides on station from conveying arrangement, so as to realize in different station The function of die station and prefabricated components is transmitted between the station of group.
Especially illustrate, the distance of the first autonomous working area 11 and the first conveying track 211, and second works independently The distance of the conveying track 212 of area 12 and second, meets the requirement that conveying arrangement loads and unloads die station, you can so that the drive on conveying arrangement Driving wheel realizes that die station and prefabricated components placed on it will be driven to load to conveying arrangement from corresponding station, while also may be used So that the driving wheel on conveying arrangement is realized to drive die station and prefabricated components placed on it that phase is offloaded to from conveying arrangement On the station answered.
Further show in Fig. 1, the first track 211, the second track 212 and the first autonomous working area 11 and second are only Vertical working area 12 is all parallel to each other and equal length, is conducive to improving conveying arrangement transmission and loads and unloads die station and placed on it pre- The work efficiency of component processed.Wherein, the first autonomous working area 11 is disposed with from left to right artificial secondary installing station group 112nd, artificial once mounting station group 111 and Rigger hyte 113, the second autonomous working area 12 is disposed with from left to right pours Build station group 121, precuring station group 122 and curing kilns group 123.
Traffic zone 2 from Fig. 1 it is known that conveying arrangement includes center transport cars 221 and stacking machine 222, wherein, in Centre transport vehicle 221 can in artificial once mounting station group 111, artificial secondary installing station group 112, pour station group 121, precuring Die station and prefabricated components are transmitted between nurse's hyte 122, stacking machine 222 can be in precuring station 122, curing kilns 123 and handling Station group 113 transmits die station and prefabricated components, meanwhile, stacking machine 222 can be with the vertical height of adjustment work platform, can be by mould The platform and prefabricated components pile successively in curing kilns, also can successively take the die station and prefabricated components in curing kilns from curing kilns Under.
The first autonomous working area 11 in referring to Fig. 1, positioned at the artificial secondary installing work of the left end of the first autonomous working area 11 Hyte 112 can complete the installation exercise of the secondary workpiece material of die station;Artificial once mounting station group 111 is located at artificial secondary peace The right side of dress work group 112, can complete the operations such as hand sweeping, spraying and the related embedded part of installation;Rigger hyte 113 is located at first The right-hand member in autonomous working area 11, can complete to tear open side touch, turnover panel and lifting job.
The second autonomous working area 12 in referring to Fig. 1, positioned at the left end of the second autonomous working area 12 pour station group 121 can Casting concrete operation in the die cavity to the side mould model in die station is completed, also includes carrying out casting concrete work to pouring station The material distributing machine 1211 of industry, material distributing machine 1211 can simultaneously pour two stations, be conducive to improving work efficiency, pour station group 121 Each station bottom be fixed with can be to pouring concrete carry out the vibration platen 1212 of vibration compacting operation, it is right to realize The vibration compacting that the concrete prefabricated element for completing enters is poured, so that prefabricated components reach performance requirement;Precuring station group 122 are located at the right side for pouring station 121, can complete manually to catch up with flat, precuring, wipe one's face and plucking operation, wrap in each station The desk-top stretchable precuring canopy of stent is included, under precuring canopy jet chimney is embedded with, can provide full for precuring canopy The temperature and humidity that sufficient precuring is required;Each station positioned at the curing kilns group 123 of the right-hand member of the second autonomous working area 12 is arranged There are curing kilns, curing kilns are multiple structure, and curing kilns group 123 can simultaneously complete the maintenance work of multigroup prefabricated components.
Illustrate as one embodiment, illustrate as one embodiment, artificial secondary installing station group 112 can Including 6 stations;Artificial once mounting station group 111 may include 7 stations;Rigger hyte 113 may include two stations;Pour Building station group 121 may include two stations;Precuring station group 122 may include 9 stations;Curing kilns group 123 may include 6 works Position, curing kilns can be 6 Rotating fields, and curing kilns group 123 can simultaneously complete the maintenance work of 36 groups of prefabricated components;According to different operations Station group the station number that includes of the production corresponding station group of duration rational, make flexible production line reach highest production Efficiency.Curing time can be set to 8 hours, under the whole work efficiency for not affecting the whole flexible production line of concrete, further Ensure that prefabricated components have good strength character.
Further, flexible production line also includes storage area 3, and storage area 3 includes die station storage area 31, component working area 32 With raw material storing area 33, wherein, die station storage area 31 be located at the second autonomous working area 12 right side, the dimension to die station can be completed Repair and store;Component working area 32 is located at the right side in the first autonomous working area 11, can complete the prefabricated components to there is little damage Be rinsed before handling, repairing work, it is temporary after complete lifting job again;Raw material storing area 33 works independently positioned at first The lower section in area 11, and be arranged in parallel with the first autonomous working area 11, touch for opposite side, the original such as bar-mat reinforcement, embedded part and warming plate Material is deposited.Component working area 32 includes prefabricated components can be completed to rinse the flushing platform 321 of operation.
Illustrate as one embodiment, the big I of above-mentioned flushing platform 321 is 3m*4m, to ensure to carry out simultaneously The washing and cleaning operation of multiple prefabricated components, improves the production efficiency of flexible production line, also, rinses the space that platform has abundance, Prefabricated components can be reached and rinse more thorough effect.
For the ease of the side in raw material storage area 33 is touched, the raw material such as bar-mat reinforcement, embedded part and warming plate is transported to respectively Station needed for individual, while for convenience associated transportation work is carried out between each station group and between each station, this The flexible production line of utility model further includes channel region 5, including positioned at the first autonomous working area 111 and raw material storage area First passage 51 between 33, positioned at the second channel 52 of the top of the second autonomous working area 12, and is connected to first passage 51 With the third channel 53 of the right-hand member of second channel 52.First passage 51 and second channel 52 respectively with the first autonomous working area 11, Two autonomous working areas 12 are parallel with traffic zone 2, and third channel 53 is perpendicular with first passage 51 and second channel 52 respectively.
Illustrate as one embodiment, the width of above-mentioned channel region 5 can be 3 meters so that channel region 5 there can be abundance Space transmission raw material transport vehicle traveling.
There is practicality in order to above-mentioned flexible production line is better described, with reference to pre- using the flexible production line production The process of component processed is further illustrated.
The process of flexible production line production prefabricated components of the present utility model is as follows:
First labor cleaning is carried out to the residual concrete slag on die station surface in artificial once mounting station group 111, made Die station surface is neatly clean, completes to clean technique;Then releasing agent is sprayed on die station surface, makes die station surface form one layer Releasing agent oil film, smoothly form removal, completes spraying coating process after being easy to;Finally carry out side film, reinforced mesh and sleeve, electrical box etc. The installation first of related embedded part, completes mounting process.
After the completion of mounting process, die station and side placed on it are touched by center transport cars 221 and related embedded part is from artificial Once mounting station group 111 is transported to station group 121 is poured, according to the concrete amount of prefabricated components, to die station top Mo Mo Casting concrete operation is carried out in the die cavity of type and completes casting craft;It is after the completion of pouring that concrete vibrating is closely knit, complete to vibrate Technique.
If the prefabricated components of production are Side fascia, using center transport cars 221 by die station and relevant group placed on it Part is transported to artificial secondary installing station group 112 from station group 121 is poured, and completes and the phase in artificial once mounting station group 111 Same mounting process.After the completion of secondary installing, then by die station and associated component placed on it from artificial secondary installing station group 112 return to transport back and pour station group 121, carry out it is secondary pour, Vibration Technology.
After concrete vibrating is closely knit, die station and prefabricated components placed on it are transported to precuring by center transport cars 221 Station group 122, according to the technological requirement of wallboard class prefabricated components, to the surface of wallboard flat operation is manually caught up with;Catch up with flat technique After the completion of, precuring canopy is closed, by controlling the temperature in precuring canopy, concrete initial set speed is improved, complete precuring nurse Skill;After the completion of precuring technique, according to the technological requirement of wallboard class prefabricated components, internal, Side fascia class prefabricated components table is completed The brushing process on wipe one's face technique or/and the prefabricated components surface to superimposed sheet class in face.The setting time of above-mentioned precuring technique For 1 hour.
Complete to wipe one's face or/and brushing process after, stacking machine 222 is by die station and prefabricated components placed on it from precuring nurse Hyte 122 is sent to curing kilns group 123, and is stored in curing kilns and carries out steam curing.The time of above-mentioned maintaining process is 8 hours.
After maintenance terminates, die station and prefabricated components placed on it are stored in into handling station 113 by stacking machine 222, by mould The moulds such as the Bian Mo on platform are removed, and carry out tearing side mold technique open;Complete to tear open after the mold technique of side, the die station for being loaded with prefabricated components is overturn Certain angle so that prefabricated components easily can vertically be sling by lifting appliance, complete turnover panel operation;Finally set using lifting It is standby by prefabricated components handling entrucking.
There is little damage or dirty if reaching the prefabricated components of handling station 113, can be by prefabricated components from die station First move to component working area 32 to be rinsed component, repair, will complete to rinse, the prefabricated components of repair technology are temporarily stored in component Working area 32, it is follow-up directly from component working area 32 by prefabricated components handling entrucking.
After the completion of entrucking, prefabricated components are transported to component stockyard;And component be extracted after die station Jing center transport cars 221 transport again to artificial once mounting station group 111 production for carrying out subsequent cycle.
In order to realize the orderly control to whole flexible production line, flexible production line of the present utility model also includes controllable Conveying arrangement transmits the control system of route and whole production line cyclic production, the centrally located control room of manipulation end of control system In computer in 4, the end of control system is located on the station of conveying arrangement and each station group, and manipulation end and end are by letter Breath module is interconnected, it is possible to select to implement manipulation end artificial control or computer control, to realize whole production The orderly function of line.Central control room 4 is located at the right side of traffic zone 2, and positioned at die station storage area 31 and component working area 32 it Between.

Claims (10)

1. a kind of prefabricated components flexible production line, for producing the prefabricated components of preset shape by die station, is included in level side The first autonomous working area (11) being arranged in parallel upwards and the second autonomous working area (12), and be arranged in parallel in the first independent work Make the traffic zone (2) between area (11) and the second autonomous working area (12), it is characterised in that the first autonomous working area (11) and Two autonomous working areas (12) include the multiple station groups that can correspond to prefabricated components different work operation, and adjacent stations group is side by side Arrangement;Traffic zone (2) includes adjacent with all station groups in the first autonomous working area (11) and the second autonomous working area (12) Conveying track (21), and the conveying arrangement of die station can be loaded and unloaded from station group, conveying arrangement is movably arranged at transport rail On road (21).
2. prefabricated components flexible production line according to claim 1, it is characterised in that:Conveying track (21) includes and first Close the first track (211) in autonomous working area (11), and second track close with the second autonomous working area (12) (212), the first track (211) be arranged in parallel with the second track (212);Each station group includes multiple stations, each station It is mutually perpendicular to conveying track (21).
3. prefabricated components flexible production line according to claim 1, it is characterised in that:First autonomous working area (11) is from a left side Artificial secondary installing station group (112), artificial once mounting station group (111) and Rigger hyte are disposed with to the right side (113);Second autonomous working area (12) be disposed with from left to right pour station group (121), precuring station group (122) and Curing kilns group (123).
4. prefabricated components flexible production line according to claim 3, it is characterised in that:Conveying arrangement includes can be artificial one Secondary erector's hyte (111), artificial secondary installing station group (112), pour station group (121), precuring station group (122) it Between transmit the center transport cars (221) of die station, and can be in precuring station group (122), curing kilns group (123) and handling station The stacking machine (222) of die station is transmitted between group (113).
5. prefabricated components flexible production line according to claim 3, it is characterised in that:Pouring station group (121) also includes The material distributing machine (1211) of casting concrete operation can be carried out and vibration compacting concrete can be carried out to carry out the vibration platen of operation (1212)。
6. prefabricated components flexible production line according to claim 3, it is characterised in that:Precuring station group (122) includes Stretchable maintenance canopy, maintenance canopy bottom is embedded with jet chimney.
7. prefabricated components flexible production line according to claim 1, it is characterised in that:Storage area (3) is further included, is stored up Area (3) is deposited including die station storage area (31), component working area (32) and raw material storing area (33), wherein, die station storage area (31) positioned at the right side in the second autonomous working area (12), component working area (32) positioned at the right side in the first autonomous working area (11), Raw material storing area (33) is arranged in parallel positioned at the lower section in the first autonomous working area (11) with the first autonomous working area (11).
8. prefabricated components flexible production line according to claim 7, it is characterised in that:Component working area (32) is including can be right Prefabricated components complete the flushing platform (321) for rinsing operation.
9. prefabricated components flexible production line according to claim 7, it is characterised in that further include channel region (5), leads to Road area (5) includes being located at first passage (51) between the first autonomous working area (11) and raw material storage area (33), positioned at the Second channel (52) above two autonomous working areas (12), and it is connected to first passage (51) and second channel (52) right-hand member Third channel (53).
10. the prefabricated components flexible production line according to any one of claim 1-9, it is characterised in that further include Controllable conveying arrangement transmits the central control room (4) of route.
CN201621158299.4U 2016-10-25 2016-10-25 Prefabricated component flexible production line Active CN206085314U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621158299.4U CN206085314U (en) 2016-10-25 2016-10-25 Prefabricated component flexible production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621158299.4U CN206085314U (en) 2016-10-25 2016-10-25 Prefabricated component flexible production line

Publications (1)

Publication Number Publication Date
CN206085314U true CN206085314U (en) 2017-04-12

Family

ID=58484577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621158299.4U Active CN206085314U (en) 2016-10-25 2016-10-25 Prefabricated component flexible production line

Country Status (1)

Country Link
CN (1) CN206085314U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107363982A (en) * 2017-09-20 2017-11-21 北京星航机电装备有限公司 A kind of concrete prefabricated board assembly line pours traveling automatic control system and control method
CN107740611A (en) * 2017-11-23 2018-02-27 河北雪龙机械制造有限公司 A kind of twin spans two-wire production system of assembling type buildings material
CN108340479A (en) * 2018-01-24 2018-07-31 有利华建筑预制件(深圳)有限公司 Continuous-flow type storage concrete curing system
CN108481543A (en) * 2018-04-27 2018-09-04 有利华建筑预制件(深圳)有限公司 Precast stair production line
CN109129872A (en) * 2018-10-15 2019-01-04 六安远大住宅工业有限公司 Line is deposited in a kind of production of prefabricated components
CN110434979A (en) * 2019-06-24 2019-11-12 江苏元大建筑科技有限公司 Three-dimensional expansible bidirectional flexible PC component production technology
CN110815534A (en) * 2019-09-27 2020-02-21 江苏元大建筑科技有限公司 PC component production line
CN112140322A (en) * 2020-09-07 2020-12-29 中民筑友智能装备科技有限公司 Novel flexible prefabricated component production line
CN115446592A (en) * 2022-09-26 2022-12-09 惠州市和宏电线电缆有限公司 Multifunctional production line and assembly method thereof

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107363982A (en) * 2017-09-20 2017-11-21 北京星航机电装备有限公司 A kind of concrete prefabricated board assembly line pours traveling automatic control system and control method
CN107363982B (en) * 2017-09-20 2019-07-02 北京星航机电装备有限公司 A kind of concrete prefabricated board assembly line pours traveling automatic control system and control method
CN107740611A (en) * 2017-11-23 2018-02-27 河北雪龙机械制造有限公司 A kind of twin spans two-wire production system of assembling type buildings material
CN107740611B (en) * 2017-11-23 2023-08-29 河北雪龙机械制造有限公司 Double-span double-line production system for assembled building materials
CN108340479A (en) * 2018-01-24 2018-07-31 有利华建筑预制件(深圳)有限公司 Continuous-flow type storage concrete curing system
CN108481543A (en) * 2018-04-27 2018-09-04 有利华建筑预制件(深圳)有限公司 Precast stair production line
CN109129872A (en) * 2018-10-15 2019-01-04 六安远大住宅工业有限公司 Line is deposited in a kind of production of prefabricated components
CN109129872B (en) * 2018-10-15 2023-08-22 六安远大住宅工业有限公司 Prefabricated component production line
CN110434979A (en) * 2019-06-24 2019-11-12 江苏元大建筑科技有限公司 Three-dimensional expansible bidirectional flexible PC component production technology
CN110815534A (en) * 2019-09-27 2020-02-21 江苏元大建筑科技有限公司 PC component production line
CN112140322A (en) * 2020-09-07 2020-12-29 中民筑友智能装备科技有限公司 Novel flexible prefabricated component production line
CN115446592A (en) * 2022-09-26 2022-12-09 惠州市和宏电线电缆有限公司 Multifunctional production line and assembly method thereof

Similar Documents

Publication Publication Date Title
CN206085314U (en) Prefabricated component flexible production line
CN104723449B (en) A kind of automatic assembly line of building industrialization concrete prefabricated element
CN104626348B (en) Prefabricated components production line
CN103128847B (en) Double-block type sleeper production line and production process thereof
CN109203215A (en) Concrete prefabricated element production line
WO2020232744A1 (en) Prefabricated component production line having temporary storage function
CN208068545U (en) A kind of three-dimensional production system of prefabricated component
CN109352815A (en) Line is deposited in a kind of prefabricated components production line and the production with the prefabricated components production line
FI124656B (en) Process and manufacturing plant for casting concrete products
CN103029212A (en) Production process of automatic assembly line in factory for pre-fabricating and assembling wall panel of integral shear wall structure
WO2020232745A1 (en) Prefabricated component production line with bench formwork temporary storage unit
CN204382485U (en) Prefabricated components production system
CN110877405A (en) Prefabricated component production line
CN205219401U (en) Wallboard flexible production line
CN105563623A (en) Production method for prefabricated wall boards
CN104493965A (en) Precast concrete curing and distribution device, production system and production method
CN109129872A (en) Line is deposited in a kind of production of prefabricated components
CN208629675U (en) Concrete prefabricated element process units
CN209699477U (en) A kind of component production line
CN110936487A (en) Novel prefabricated part production system
CN109249528A (en) A kind of automatic production line of fixed production precast concrete
CN102359197B (en) Pouring type rigid polyurethane foam heat insulation composite board production line
CN216329074U (en) High-effect production line of precast concrete part
CN109483717A (en) A kind of component production line
CN204250823U (en) Three-dimensional storage rack and use the prefabricated components manufacturing line of this Three-dimensional storage rack