CN109483717A - A kind of component production line - Google Patents

A kind of component production line Download PDF

Info

Publication number
CN109483717A
CN109483717A CN201811391285.0A CN201811391285A CN109483717A CN 109483717 A CN109483717 A CN 109483717A CN 201811391285 A CN201811391285 A CN 201811391285A CN 109483717 A CN109483717 A CN 109483717A
Authority
CN
China
Prior art keywords
assembly line
station
line
mould
ferry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811391285.0A
Other languages
Chinese (zh)
Inventor
张剑
陈韶临
谢忠全
谢晖林
段小敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuanda Housing Industry (shanghai) Co Ltd
Original Assignee
Yuanda Housing Industry (shanghai) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuanda Housing Industry (shanghai) Co Ltd filed Critical Yuanda Housing Industry (shanghai) Co Ltd
Priority to CN201811391285.0A priority Critical patent/CN109483717A/en
Publication of CN109483717A publication Critical patent/CN109483717A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of component production lines, it includes the first assembly line, the second assembly line, third assembly line, the 4th assembly line, First mould ferry-boat mechanism, second mould ferry-boat mechanism, third platform mould ferry-boat mechanism and the 4th mould ferry-boat mechanism, one end of first assembly line and one end of third assembly line are connected by First mould ferry-boat mechanism, and the other end of the other end and third assembly line is connected by third platform mould ferry-boat mechanism;One end of 4th assembly line is connected by the 4th mould ferry-boat mechanism with the first assembly line, and the other end is connected by second mould ferry-boat mechanism with the first assembly line;One end of second assembly line is connected by the 4th mould ferry-boat mechanism with third assembly line, and the other end is connected by second mould ferry-boat mechanism with third assembly line.Invention increases two assembly lines, improve the quantity of operation position and the flexibility ratio of production line, are conducive to improve productive temp, and then improving production efficiency.

Description

A kind of component production line
Technical field
The invention belongs to prefabricated components production technical fields, and in particular to a kind of component production line.
Background technique
The characteristics of flow line production mode of prefabricated components is platform mould/steel trolley (namely workbench) as technique is suitable Sequence flows to the corresponding station of each process by the conveyer system of production line;The operator of each station and specific works It is relatively fixed, for example, reinforcing bar is put, concreting, vibrate etc. operation fixed position by relatively-stationary people and equipment Lai Operation.This production technology form can reduce labor intensity, improve production efficiency, save manually, therefore domestic prefabricated structure at present Part manufacturing enterprise mostly uses flow line production mode to produce prefabricated outer wall panel and lining.
The technological process of production of existing sandwich heat preservation Side fascia generally comprises: cleaning mold, oil spout scribing line, installation mold, Installation steel mesh, one-time-concreting vibrated concrete catch up with flat concrete, paving insulation board, installation connecting element, paving steel mesh, secondary pour Build vibrated concrete, catch up with flat, precuring, polish, curing kilns maintenance, demoulding, lifting etc..
It is located among production line currently, the production line of domestic main PC component manufacturing enterprise is commonly maintenance station, produces Station is distributed in the layout type at left and right sides of curing kilns;It conserves station side to be secondary material distributing and share a material distributing machine, separately Side is demoulding station, component working area;Production line is using 9 meters of steel trolleys and the curing kilns to match.
Production Line Configured's mode will lead under the same conditions:
1, demoulding station is Chong Die with component buffer position is both needed to that demoulding station cannot be carried out simultaneously using travelling facility The lifting of lifting and component working area, while lifting mutually conflicts, and is unfavorable for improving production efficiency;
2, cloth shares a material distributing machine twice, and first time cloth cannot carry out simultaneously with second of cloth, while cloth Mutually conflict, is unfavorable for improving production efficiency;
3, it produces station quantity and ferry-boat area (ferry-boat mechanism) is very few, component productive temp is too long, and production process is not flexible;
4, using 9 meters of steel trolleys, the scantling and limited amount system of production.
Summary of the invention
Aiming at the shortcomings in the prior art, in order to improve the production efficiency of prefabricated components production line, the present invention provides one kind Component production line, specific technical solution are as follows.
A kind of component production line, which is characterized in that including the first assembly line, the second assembly line, third assembly line, the 4th stream Waterline, First mould ferry-boat mechanism, second mould ferry-boat mechanism, third platform mould ferry-boat mechanism and the 4th mould ferry-boat mechanism, institute It states and is provided with demoulding station and the first cloth station on the first assembly line, one end of the 4th assembly line is located at the stripper The downstream side of position, the other end are located at the upstream side of the first cloth station;The second cloth is provided on the third assembly line Station and maintenance station, one end of second assembly line are located at the upstream side of the maintenance station, and the other end is located at described the The downstream side of two cloth stations;One end of first assembly line and one end of the third assembly line pass through the First mould Ferry-boat mechanism is connected, and the other end of the other end of first assembly line and the third assembly line passes through the third platform Mould ferry-boat mechanism is connected;One end of 4th assembly line passes through the 4th mould ferry-boat mechanism and first flowing water The other end of line linking, the 4th assembly line is connected by second mould ferry-boat mechanism with first assembly line;Institute The one end for stating the second assembly line is connected by the 4th mould ferry-boat mechanism with the third assembly line, second assembly line The other end be connected by second mould mechanism of ferrying with the third assembly line.Preferably, first assembly line, Two assembly lines, third assembly line, the 4th assembly line are arranged in parallel;First assembly line, third assembly line, First mould Ferry-boat mechanism and third platform mould Ferrying machine are configured to a complete prefabricated components production cycle line, and second assembly line is used for Operation position before arranging first time cloth, the 4th assembly line are used to arrange the operation position before maintenance.
Above-mentioned technical proposal of the invention increases the second assembly line and the 4th assembly line compared with the prior art, and utilizes First assembly line and the 4th flowing water are connected by second mould ferry-boat mechanism and third platform mould ferry-boat mechanism respectively, by third assembly line It is connected with the second assembly line, greatly increases the mobility and production efficiency of production line.For producing the platform mould of prefabricated components (prefabricated components are transferred from platform mould) after carrying out demoulding processing at the demoulding station of the first assembly line, platform mould is in the first assembly line It is upper to pass through third platform mould Ferrying machine after the first cloth station (cloth station is substantially carried out concreting and operation of vibrating) Structure is transferred on the third assembly line, and (secondary material distributing is not after progress cloth at the second cloth station on third assembly line It is the technical process for having to experience), prefabricated structure on platform mould enters maintainer by the processes such as vibrate, smooth out, polishing later It is conserved, is transferred on the first assembly line after maintenance by First mould ferry-boat mechanism, and on the first assembly line in position Demoulding station carries out prefabricated components demoulding, completes a cycle production process of production line.It wherein, can be with cloth on the 4th assembly line The station for needing to be operated before the operation of the first cloth is set, such as: the works such as mold is installed, steel bar arrangement and built-in fitting are pre-buried Position;The station for needing to be operated before maintenance operations after the operation of the second cloth can be arranged on second assembly line, such as: It strikes off, precuring, the stations such as troweling.Compared to existing production line, two assembly lines and two platform mould ferry-boat mechanisms are increased, the Two mould ferry-boat mechanisms and the 4th mould ferry-boat mechanism can be used for platform mould phase on the first, second, third, fourth assembly line simultaneously Mutually transfer;It is particularly conducive to shorten the entire length of production line, and can be set on increased second assembly line, the 4th assembly line Used time longer station is set, the quantity of operation position and the flexibility ratio of production line are improved, is conducive to improve productive temp, in turn Improving production efficiency.Wherein, under (on) trip side refer to assembly line appear on the stage under mould moving direction (on) roam all around the would to;Assembly line is main Including the conveying orientation mechanism that two column are parallel to each other, such as two column idler wheels, driving motor can drive the idler wheel to rotate, when for producing The platform mould (steel trolley) of prefabricated components is placed on assembly line, can be moved along assembly line in the driving leave from office mould of idler wheel.It needs It is noted that driving of the platform mould on assembly line is not limited to idler wheel driving, driving mechanism can also use hydraulic jacking or chain It takes turns dilatory mode to be driven, timing set a distance mobile station mould, mobile cadence time calculates according to the production technology time, according to every kind of structure Part production technology determines that each station executes activity time, automatic running.
Further, it is pre- that mold installation station, steel bar arrangement station and/or built-in fitting are provided on the 4th assembly line Bury station.First assembly line corresponds to the 4th assembly line and is also equipped with mold installation station, steel bar arrangement station and/or built-in fitting Pre-buried station, the first assembly line and the 4th assembly line can carry out aforesaid operations simultaneously.
Further, it is provided on second assembly line and strikes off station, precuring station and/or troweling station.Third stream Waterline is also equipped with corresponding to the second assembly line and strikes off station, precuring station and/or troweling station, the second assembly line and third stream Waterline can carry out aforesaid operations simultaneously.
Further, platform mould cleaning station and scribing line station, described mould cleaning are additionally provided on first assembly line Station and scribing line station are respectively positioned on the upstream side of the 4th assembly line.Prefabricated components demoulding completes backstage mould and successively passes through platform mould It can be transferred on the 4th assembly line after cleaning station and scribing line station processing by the 4th mould ferry-boat mechanism, realize point of platform mould Stream is carried out after mold installation, steel bar arrangement and/or the built-in fitting operation such as pre-buried on the 4th assembly line through second mould ferry-boat Mechanism returns on the first assembly line.First assembly line corresponds to the 4th assembly line and is also equipped with installation station, steel bar arrangement station And/or the pre-buried station of built-in fitting, the first assembly line and the 4th assembly line can carry out aforesaid operations simultaneously.
Further, the component production line further includes the 5th flowing water having positioned at the second cloth station upstream side One end of line, the 5th assembly line is connected by the 5th mould ferry-boat mechanism with the third assembly line, and the other end passes through institute It states third platform mould ferry-boat mechanism to be connected with first assembly line and third assembly line, the 5th assembly line is for arranging second Operation position before cloth operation.Sandwich of layers placement, steel bar arrangement and/or connector installation can be carried out on the 5th assembly line Etc. processes, platform mould on the first assembly line third assembly line or the 5th assembly line can be transferred to by third platform mould mechanism of ferrying On, the platform mould and prefabricated components semi-finished product turned on the 5th assembly line passes through sandwich of layers placement, steel bar arrangement and/or connector After the operation such as installation, being transferred on third assembly line by the 5th mould ferry-boat mechanism can the operation of further progress secondary material distributing; Identical operation can also be carried out by corresponding to the 5th assembly line on third assembly line, and assembly line can be simultaneously on the 5th assembly line and the The operation for carrying out the 5th assembly line, further improves production efficiency, shortens the length of production line.Preferably, the described 5th Assembly line is parallel to the third assembly line setting.
Further, the curing kilns that the component production line uses 12 meters long of platform mould and matches with described mould.Match The curing kilns setting 12 meters of long table moulds and matching, the lengthening of working face is conducive to the arrangement of different size prefabricated components, in curing kilns The prefabricated components quantity of maintenance improves.
Further, the first demoulding station is additionally provided on the third assembly line, the first demoulding station is located at institute State the downstream side of maintenance station.
Further, the second demoulding station is additionally provided on first assembly line, the second demoulding station is located at institute State the upstream side of demoulding station.Demoulding station is for removing rib mold, and treated that platform mould is ferried by First mould for demoulding Mechanism is transferred to the demoulding station of the first assembly line, carries out lifting overturning demoulding using driving in demoulding station, then recycles Prefabricated components are hung to component working area 15 by driving, and component working area 15 is located at the outside of the first assembly line and third assembly line.
The present invention has the advantages that compared with the prior art.
1, demoulding station and component working area can be simultaneously using driving liftings, and assembly line operation is more smooth;
2, material distributing machine is respectively set in two cloth stations, the same time can carry out cloth with second of cloth station for the first time Production efficiency can be improved for needing the wallboard prefabricated components of cloth twice with the obvious advantage in material.
3, the second assembly line and the 4th assembly line are increased, and utilizes second mould ferry-boat mechanism and third platform mould Ferrying machine First assembly line and the 4th flowing water are connected by structure respectively, and third assembly line and the second assembly line are connected, life is greatly increased The mobility and production efficiency of producing line.
4,12 meters of curing kilns long table mould (steel trolley) and matched are configured, it is prefabricated that the lengthening of working face is conducive to different size The arrangement of component, the prefabricated components quantity conserved in curing kilns improve.
Detailed description of the invention
Fig. 1 is the schematic layout pattern of production line in the prior art;
Fig. 2 is the schematic layout pattern of production line of the invention.
In figure: the first assembly line 1, the second assembly line 2, third assembly line 3, the 4th assembly line 4, First mould ferry-boat mechanism 5, second mould ferry-boat mechanism 6, third platform mould ferry-boat mechanism 7, the 4th mould ferry-boat mechanism 8, demoulding station 9, the first cloth work The 10, second cloth station 11 of position, maintenance station 12, the 5th assembly line 13, the 5th mould ferry-boat mechanism 14, component working area 15.
Specific embodiment
Present invention is further described in detail with reference to the accompanying drawing.
Referring to Fig. 1-2, a kind of component production line comprising the first assembly line 1, the second assembly line 2, third assembly line 3, Four assembly lines 4,5, second mould ferry-boat mechanisms 6, First mould ferry-boat mechanism, third platform mould ferry-boat mechanism 7 and the 4th mould ferry-boat Mechanism 8, demoulding station 9 and the first cloth station 10 are provided on the first assembly line 1, and one end of the 4th assembly line 4 is located at demoulding The downstream side of station 9, the other end are located at the upstream side of the first cloth station 10;The second cloth work is provided on third assembly line 3 Position 11 and maintenance station 12, one end of the second assembly line 2 are located at the upstream side of maintenance station 12, and the other end is located at the second cloth work The downstream side of position 11;One end of first assembly line 1 and one end of third assembly line 3 are held in the mouth by First mould ferry-boat mechanism 5 It connects, the other end of the first assembly line 1 and the other end of third assembly line 3 are connected by third platform mould ferry-boat mechanism 7;4th One end of assembly line 4 is connected by the 4th mould mechanism 8 of ferrying with the first assembly line 1, and the other end of the 4th assembly line 4 passes through the Two mould ferry-boat mechanisms 6 are connected with the first assembly line 1;One end of second assembly line 2 passes through the 4th mould ferry-boat mechanism 8 and third Assembly line 3 is connected, and the other end of the second assembly line 2 is connected by second mould ferry-boat mechanism 6 with third assembly line 3.It is first-class Waterline 1, the second assembly line 2, third assembly line 3, the 4th assembly line 4 are arranged in parallel.
Assembly line mainly includes the conveying orientation mechanism that two column are parallel to each other, and such as two column idler wheels, driving motor can drive this Idler wheel rotation, when the platform mould (steel trolley) for producing prefabricated components is placed on assembly line, the driving leave from office mould of idler wheel can To be moved along assembly line.It should be understood that driving of the platform mould on assembly line is not limited to idler wheel driving, driving mechanism can also It is driven in a manner of being drawn using hydraulic jacking or sprocket wheel, timing set a distance mobile station mould, mobile cadence time is according to production technology Time calculates, and determines that each station executes activity time, automatic running according to every kind of component production technology.
Conserve the maintenance that station 12 carries out prefabricated components using curing kilns or pile one form of them.Curing kilns can adopt With conventionally known curing kilns form.
Platform mould ferry-boat mechanism is the mechanism in order to mutually be shifted the platform mould on adjacent assembly line.Platform mould ferry-boat mechanism Hoisting mechanism or ferry-boat trolley can be used, the setting of ferry-boat trolley is on ferry-boat guide rail.
Above-mentioned technical proposal of the invention increases the second assembly line 2 and the 4th assembly line 4, and benefit compared with the prior art With second mould ferry-boat mechanism 6 and third platform mould ferry-boat mechanism 7 respectively by the first assembly line 1 and the 4th flowing water linking 4, by third Assembly line 3 and the linking of the second assembly line 2, greatly increase the mobility and production efficiency of production line.For producing prefabricated structure Prefabricated components (are transferred from platform mould) after carrying out demoulding processing at the demoulding station 9 of the first assembly line 1 by the platform mould of part, and platform mould exists It is ferried after the first cloth station 10 (cloth station is substantially carried out concreting) by third platform mould on first assembly line 1 Mechanism 7 is transferred on third assembly line 3, and (secondary material distributing after cloth is carried out at the second cloth station 11 on third assembly line 3 It is not necessarily meant to the technical process of experience), prefabricated structure on platform mould enters maintenance by the processes such as vibrate, smooth out, polishing later It is conserved, is transferred on the first assembly line 1 after maintenance by First mould ferry-boat mechanism 5, and in the first flowing water in station 12 Demoulding station 9 on line 1 carries out prefabricated components demoulding, completes a cycle production process of production line.Compared to existing life Producing line increases two assembly lines and two platform mould ferry-boat mechanisms, and second mould ferry-boat mechanism and the 4th mould ferry-boat mechanism can It is mutually shifted on the first, second, third, fourth assembly line for platform mould simultaneously;It is particularly conducive to shorten the entirety of production line Length, and used time longer station can be set on increased second assembly line, the 4th assembly line, improve operation position The flexibility ratio of quantity and production line is conducive to improve productive temp, and then improving production efficiency.
It may be provided with mold installation station, steel bar arrangement station and/or the pre-buried station of built-in fitting on 4th assembly line 4.The One assembly line 1 corresponds to the 4th assembly line 4 and is also equipped with mold installation station, steel bar arrangement station and/or the pre-buried work of built-in fitting Position, the first assembly line 1 and the 4th assembly line 4 can carry out aforesaid operations simultaneously.
It is provided on second assembly line 2 and strikes off station, precuring station and/or troweling station.Third assembly line 3 corresponds to the Two assembly lines 2, which are also equipped with, strikes off station, precuring station and/or troweling station, and the second assembly line and third assembly line can be simultaneously Carry out aforesaid operations.
Platform mould cleaning station and scribing line station are additionally provided on first assembly line 1, platform mould clears up station and scribing line station is equal Positioned at the upstream side of the 4th assembly line 4.Prefabricated components demoulding completes backstage mould and successively passes through platform mould cleaning station and scribing line station It can be transferred on the 4th assembly line after processing by the 4th mould ferry-boat mechanism, the shunting of platform mould realized, on the 4th assembly line It carries out returning to the first flowing water by second mould ferry-boat mechanism after mold installation, steel bar arrangement and/or the built-in fitting operation such as pre-buried On line.First assembly line corresponds to the 4th assembly line and is also equipped with installation station, steel bar arrangement station and/or the pre-buried work of built-in fitting Position, the first assembly line and the 4th assembly line can carry out aforesaid operations simultaneously.
Preferably, component production line further includes the 5th assembly line 13 having positioned at 11 upstream side of the second cloth station, and the 5th Assembly line 13 is parallel to the setting of third assembly line 3, and one end of the 5th assembly line 13 passes through the 5th mould ferry-boat mechanism 14 and third Assembly line 3 is connected, and the other end is connected by third platform mould ferry-boat mechanism 7 with the first assembly line 1 and third assembly line 3.The 5th The processes such as sandwich of layers placement, steel bar arrangement and/or connector installation, the Tai Motong on the first assembly line can be carried out on assembly line 5 Crossing third platform mould ferry-boat mechanism can be transferred on third assembly line or the 5th assembly line, turn to platform mould on the 5th assembly line and Prefabricated components semi-finished product pass through the 5th mould and ferry after the operations such as sandwich of layers placement, steel bar arrangement and/or connector installation Mechanism is transferred on third assembly line can the operation of further progress secondary material distributing;Correspond to the 5th assembly line on third assembly line Identical operation can be carried out, assembly line can carry out the operation of the 5th assembly line simultaneously on the 5th assembly line and, further mention High production efficiency, shortens the length of production line.5th assembly line is parallel to the third assembly line setting.
Component production line is using 12 meters of long platform moulds and the curing kilns to match therewith.It configures 12 meters of long table moulds and matches Curing kilns, the lengthening of working face is conducive to the arrangement of different size prefabricated components, and the prefabricated components quantity conserved in curing kilns mentions It is high.
The first demoulding station is additionally provided on third assembly line 3, the first demoulding station is located at the downstream of the maintenance station Side;And/or first be additionally provided with the second demoulding station on assembly line, the second demoulding station is located at the upstream of the demoulding station Side.Demoulding station is for removing rib mold, and treated that platform mould is transferred to by First mould ferry-boat mechanism is first-class for demoulding The demoulding station of waterline carries out lifting overturning demoulding using driving in demoulding station, then driving is recycled to hang prefabricated components To component working area, component working area is located at the outside of the first assembly line and third assembly line.
The embodiment of the present invention is described with above attached drawing, in the absence of conflict, the reality in the present invention The feature applied in example and embodiment can be combined with each other.The invention is not limited to above-mentioned specific embodiment, above-mentioned tool Body embodiment is only schematical, rather than limitation, those skilled in the art under the inspiration of the present invention, Without breaking away from the scope protected by the purposes and claims of the present invention, many forms can be also made, these belong to this Within the protection scope of invention.

Claims (10)

1. a kind of component production line, which is characterized in that including the first assembly line, the second assembly line, third assembly line, the 4th flowing water Line, First mould ferry-boat mechanism, second mould ferry-boat mechanism, third platform mould ferry-boat mechanism and the 4th mould ferry-boat mechanism, it is described Demoulding station and the first cloth station are provided on first assembly line, one end of the 4th assembly line is located at the demoulding station Downstream side, the other end is located at the upstream side of the first cloth station;The second cloth work is provided on the third assembly line Position and maintenance station, one end of second assembly line are located at the upstream side of the maintenance station, and the other end is located at described second The downstream side of cloth station;One end of first assembly line and one end of the third assembly line are put by the First mould It crosses mechanism to be connected, the other end of the other end of first assembly line and the third assembly line passes through the third platform mould Ferry-boat mechanism is connected;One end of 4th assembly line passes through the 4th mould ferry-boat mechanism and first assembly line The other end of linking, the 4th assembly line is connected by second mould ferry-boat mechanism with first assembly line;It is described One end of second assembly line is connected by the 4th mould ferry-boat mechanism with the third assembly line, second assembly line The other end is connected by second mould ferry-boat mechanism with the third assembly line;First assembly line, third assembly line, First mould ferry-boat mechanism and third platform mould Ferrying machine are configured to a complete prefabricated components production cycle line, the second For arranging the operation position before first time cloth, the 4th assembly line is used to arrange the operation position before maintenance waterline.
2. component production line according to claim 1, which is characterized in that first assembly line, the second assembly line, third Assembly line, the 4th assembly line are arranged in parallel.
3. component production line according to claim 1, which is characterized in that be provided with mold installation on the 4th assembly line Station, steel bar arrangement station and/or the pre-buried station of built-in fitting.
4. component production line according to claim 1, which is characterized in that be provided on second assembly line and strike off work Position, precuring station and/or troweling station.
5. component production line according to claim 1, which is characterized in that it is clear to be additionally provided with platform mould on first assembly line Science and engineering position and scribing line station, described mould cleaning station and station of crossing are respectively positioned on the upstream side of the 4th assembly line.
6. component production line according to claim 1, which is characterized in that the component production line further includes having positioned at described 5th assembly line of the second cloth station upstream side, one end of the 5th assembly line by the 5th mould ferry mechanism with it is described The linking of third assembly line, the other end are held in the mouth by third platform mould ferry-boat mechanism and first assembly line and third assembly line It connects, the 5th assembly line is used to arrange the operation position before the operation of the second cloth.
7. component production line according to claim 6, which is characterized in that the 5th assembly line is parallel to the third stream Waterline setting.
8. component production line according to claim 1, which is characterized in that the component production line uses 12 meters long of platform mould With the curing kilns to match with described mould.
9. component production line according to claim 1, which is characterized in that be additionally provided with first on the third assembly line and tear open Die worker position, the first demoulding station are located at the downstream side of the maintenance station.
10. according to claim 1 or component production line described in 9, which is characterized in that be additionally provided on first assembly line Two demoulding stations, the second demoulding station are located at the upstream side of the demoulding station.
CN201811391285.0A 2018-11-21 2018-11-21 A kind of component production line Pending CN109483717A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811391285.0A CN109483717A (en) 2018-11-21 2018-11-21 A kind of component production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811391285.0A CN109483717A (en) 2018-11-21 2018-11-21 A kind of component production line

Publications (1)

Publication Number Publication Date
CN109483717A true CN109483717A (en) 2019-03-19

Family

ID=65697207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811391285.0A Pending CN109483717A (en) 2018-11-21 2018-11-21 A kind of component production line

Country Status (1)

Country Link
CN (1) CN109483717A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110303590A (en) * 2019-08-01 2019-10-08 郴州远大住宅工业有限公司 A kind of prefabricated components production line
CN110405932A (en) * 2019-06-20 2019-11-05 中国二十二冶集团有限公司 Double skin wall member production line double-cycle process method for arranging

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2017049A2 (en) * 2007-07-17 2009-01-21 Progress Maschinen & Automation AG Apparatus for manufacturing prefabricated concrete elements with an assembly line
RU2357036C1 (en) * 2007-11-14 2009-05-27 Федеральное государственное унитарное предприятие Научно-внедренческий центр "Путевые машины" Федерального агентства железнодорожного транспорта Line for assembly of rail lenghts on wooden sleepers
CN203972766U (en) * 2014-05-31 2014-12-03 河北瑞欧消失模科技有限公司 A kind of separate type Lost Form Casting Production Line
CN104626348A (en) * 2014-11-20 2015-05-20 中民筑友有限公司 Prefabricated part production line
CN107650258A (en) * 2017-11-02 2018-02-02 上海建工材料工程有限公司 A kind of bidirectional circulating structure prefabricated components production line and control method
CN209699477U (en) * 2018-11-21 2019-11-29 远大住宅工业(上海)有限公司 A kind of component production line

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2017049A2 (en) * 2007-07-17 2009-01-21 Progress Maschinen & Automation AG Apparatus for manufacturing prefabricated concrete elements with an assembly line
RU2357036C1 (en) * 2007-11-14 2009-05-27 Федеральное государственное унитарное предприятие Научно-внедренческий центр "Путевые машины" Федерального агентства железнодорожного транспорта Line for assembly of rail lenghts on wooden sleepers
CN203972766U (en) * 2014-05-31 2014-12-03 河北瑞欧消失模科技有限公司 A kind of separate type Lost Form Casting Production Line
CN104626348A (en) * 2014-11-20 2015-05-20 中民筑友有限公司 Prefabricated part production line
CN107650258A (en) * 2017-11-02 2018-02-02 上海建工材料工程有限公司 A kind of bidirectional circulating structure prefabricated components production line and control method
CN209699477U (en) * 2018-11-21 2019-11-29 远大住宅工业(上海)有限公司 A kind of component production line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110405932A (en) * 2019-06-20 2019-11-05 中国二十二冶集团有限公司 Double skin wall member production line double-cycle process method for arranging
CN110303590A (en) * 2019-08-01 2019-10-08 郴州远大住宅工业有限公司 A kind of prefabricated components production line

Similar Documents

Publication Publication Date Title
CN209699477U (en) A kind of component production line
CN103128847B (en) Double-block type sleeper production line and production process thereof
CN109333800A (en) A kind of prefabricated components production line
CN102744779B (en) PHC (prestressed concrete pipe pile) pile streamline conveying production line
CN108058266A (en) Prefabricated components integrated production line
CN109352815B (en) Prefabricated component production line and production line with same
CN109227921A (en) A kind of prefabricated components production line
CN107042580A (en) A kind of precast concrete pipe culvert production line and production technology
CN110076897A (en) A kind of prefabricated components production line with platform mould temporary storage location
CN109483717A (en) A kind of component production line
CN105437364B (en) A kind of wallboard flexible production line
CN110053151A (en) A kind of prefabricated components production line with temporary function
CN205219401U (en) Wallboard flexible production line
CN209491933U (en) A kind of prefabricated components production line
CN110385775A (en) PC component produces die station pre-treatment integration apparatus
CN109129872B (en) Prefabricated component production line
CN111186009A (en) Preparation method of PC prefabricated part double-circulation production line
CN104369266B (en) A kind of leakage dropping-board automatic production line and production technology thereof
CN209491931U (en) Line is deposited in a kind of production of prefabricated components
CN209408872U (en) A kind of prefabricated components production line
CN208629675U (en) Concrete prefabricated element process units
CN106945165A (en) A kind of box ecological block production line and production technology
CN107053451B (en) A kind of railway spring supporting block production line and its production technology
CN102729327A (en) Wall plate automatic cyclic production system
CN209599527U (en) A kind of annular concrete component flow production line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination