CN107042580A - A kind of precast concrete pipe culvert production line and production technology - Google Patents
A kind of precast concrete pipe culvert production line and production technology Download PDFInfo
- Publication number
- CN107042580A CN107042580A CN201710284165.XA CN201710284165A CN107042580A CN 107042580 A CN107042580 A CN 107042580A CN 201710284165 A CN201710284165 A CN 201710284165A CN 107042580 A CN107042580 A CN 107042580A
- Authority
- CN
- China
- Prior art keywords
- pipe culvert
- support
- plate
- walking
- mould
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 53
- 239000011178 precast concrete Substances 0.000 title claims abstract description 31
- 238000005516 engineering process Methods 0.000 title claims abstract description 7
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 69
- 239000010959 steel Substances 0.000 claims abstract description 69
- 230000002787 reinforcement Effects 0.000 claims abstract description 59
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 38
- 238000009826 distribution Methods 0.000 claims abstract description 33
- 238000012545 processing Methods 0.000 claims abstract description 28
- 239000004744 fabric Substances 0.000 claims abstract description 22
- 230000007246 mechanism Effects 0.000 claims description 91
- 239000004567 concrete Substances 0.000 claims description 43
- 238000000034 method Methods 0.000 claims description 19
- 230000033001 locomotion Effects 0.000 claims description 18
- 230000008569 process Effects 0.000 claims description 16
- 230000003028 elevating effect Effects 0.000 claims description 15
- 238000003825 pressing Methods 0.000 claims description 11
- 230000005540 biological transmission Effects 0.000 claims description 10
- 239000000463 material Substances 0.000 claims description 10
- 238000007493 shaping process Methods 0.000 claims description 9
- 238000001816 cooling Methods 0.000 claims description 8
- 238000012423 maintenance Methods 0.000 claims description 8
- 238000000465 moulding Methods 0.000 claims description 7
- 238000005452 bending Methods 0.000 claims description 6
- 238000000926 separation method Methods 0.000 claims description 6
- 238000010438 heat treatment Methods 0.000 claims description 5
- 238000004140 cleaning Methods 0.000 claims description 4
- 238000007667 floating Methods 0.000 claims description 4
- 238000009434 installation Methods 0.000 claims description 4
- 238000009749 continuous casting Methods 0.000 claims description 3
- 230000032798 delamination Effects 0.000 claims description 3
- 230000005484 gravity Effects 0.000 claims description 3
- 210000003205 muscle Anatomy 0.000 claims description 3
- 230000010412 perfusion Effects 0.000 claims description 3
- 239000011241 protective layer Substances 0.000 claims description 3
- 238000005507 spraying Methods 0.000 claims description 3
- 238000010025 steaming Methods 0.000 claims description 3
- 238000007689 inspection Methods 0.000 claims description 2
- 238000003466 welding Methods 0.000 claims description 2
- 238000009417 prefabrication Methods 0.000 abstract description 4
- 230000032258 transport Effects 0.000 description 34
- 238000010276 construction Methods 0.000 description 14
- 238000013461 design Methods 0.000 description 4
- 238000006073 displacement reaction Methods 0.000 description 4
- 230000001360 synchronised effect Effects 0.000 description 4
- 238000012546 transfer Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 239000003795 chemical substances by application Substances 0.000 description 3
- 230000007423 decrease Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000005266 casting Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000001737 promoting effect Effects 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 206010054949 Metaplasia Diseases 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 239000000567 combustion gas Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000007123 defense Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000008278 dynamic mechanism Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000000686 essence Substances 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 230000015689 metaplastic ossification Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008450 motivation Effects 0.000 description 1
- 238000004886 process control Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000010792 warming Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B15/00—General arrangement or layout of plant ; Industrial outlines or plant installations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/56—Reuse, recycling or recovery technologies of vehicles
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Sewage (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
Line is transported the invention provides a kind of precast concrete pipe culvert production line and production technology, including steel processing workshop, steel reinforcement cage supply line, mold attaching/detaching supply line, reinforcing bar set of molds distribution, cloth area, curing line and finished product;Steel reinforcement cage supply line is arranged on the delivery outlet of steel processing workshop, and mold attaching/detaching supply line is arranged parallel to steel reinforcement cage supply line;Reinforcing bar set of molds distribution is arranged parallel to mold attaching/detaching supply line;Cloth area is arranged on reinforcing bar set of molds distribution;Curing line is arranged parallel to reinforcing bar set of molds distribution;The two ends of curing line are provided with traversing ferry bus with reinforcing bar set of molds distribution two ends;Being set up in steel reinforcement cage supply line and the outside of curing line two has overhead traveling crane;The present invention is laid out small, the saving factory building land used that takes up space, and effectively improves the Prefabrication efficiency of pipe culvert, reduces labor strength, reduces production cost, and ensure that the quality conformance and reliability of pipe culvert product.
Description
Technical field
The invention belongs to Urban Underground pipe gallery production and construction field, given birth to more particularly, to a kind of precast concrete pipe culvert
Produce streamline and production technology.
Background technology
Underground pipe gallery is to be used to concentrate laying electric power, communication, radio and television, feedwater, draining, heat in Urban Underground
The public tunnel of the municipal pipelines such as power, combustion gas.Underground pipe gallery construction is promoted to have alleviation traffic congestion, Environment control dirty
Contaminate, ensure safety and improve Disaster Defense Capability, reduce the wasting of resources, the frugally positive role such as upper and underground space.
In the process of construction of underground pipe gallery, compared to cast-in-place construction, when prefabricated concrete box culvert has shortening construction
Between, green construction, prefabrication process control product quality are secure, reduce construction maintenance cost, the low advantage of integrated cost;Due to
The development speed of underground pipe gallery is accelerated, and the production method of current precast concrete pipe culvert, which exists, needs substantial amounts of workman
The problems such as participation is constructed, labor intensity is big, the production cycle is long, it is difficult to meet the construction needs of underground pipe gallery.
The content of the invention
In view of this, the present invention is directed to propose a kind of precast concrete pipe culvert production line and production technology, to fill up
The blank of precast concrete pipe culvert production line balance mode, reduces the input of manpower, while reducing the labor intensity of workman, pole
The big construction needs for improving production efficiency, meeting underground pipe gallery.
To reach above-mentioned purpose, the technical proposal of the invention is realized in this way:
A kind of precast concrete pipe culvert production line, including steel processing workshop, steel reinforcement cage supply line, mold attaching/detaching fortune
Defeated line, reinforcing bar set of molds distribution, cloth area, curing line and finished product transport line;Steel reinforcement cage supply line is arranged on steel processing workshop
Delivery outlet, steel reinforcement cage supply line be provided with steel reinforcement cage transport vehicle, parallel to steel reinforcement cage supply line arrange mold attaching/detaching supply line,
Internal model changer and internal model transport vehicle are provided with mold attaching/detaching supply line, internal model changer is used to dismantle and install in pipe culvert
Mould, internal model transport vehicle is used to transport the pipe culvert internal model after dismounting;Reinforcing bar set of molds distribution is arranged parallel to mold attaching/detaching supply line,
External mold folding equipment is provided with reinforcing bar set of molds distribution, external mold folding equipment is used to dismantling and installing pipe culvert outer mold;In steel
Cloth area is arranged on muscle set of molds distribution, the cloth area is used to precast concrete being cast in pipe culvert mould, concrete with
Steel reinforcement cage formation pipe culvert early-products;Curing line is arranged parallel to reinforcing bar set of molds distribution, the curing line is used for being made at the beginning of pipe culvert
Product carry out steam curing processing;Made at the beginning of realizing pipe culvert by traversing ferry bus with reinforcing bar set of molds distribution two ends at the two ends of curing line
The turnover of product and mould pipe culvert finished product on curing line and reinforcing bar set of molds distribution, traversing ferry bus is matched somebody with somebody along vertical reinforcing bar set of molds
Move and convey pipe culvert early-products or pipe culvert finished product in the direction of line;Steel reinforcement cage supply line, mold attaching/detaching supply line, reinforcing bar set of molds
Distribution, curing line adjacent, parallel arrangement successively;Finished product supply line, finished product transport are arranged on the direction of steel reinforcement cage supply line
Line is provided with pipe culvert transport vehicle;Being set up in steel reinforcement cage supply line and the outside of curing line two has overhead traveling crane, overhead traveling crane be used for pipe culvert finished product and
The transfer and transfer of other instruments;
Further, curing line is provided with Jing Ting areas and steam curing kiln;Jing Ting areas are used for pipe culvert early-products top surface and receive light
Processing, steam curing kiln is steam-cured for being carried out to pipe culvert early-products, and heating zone, flat-temperature zone and cooling are followed successively by steam curing kiln
Area;
Further, lift shake table and concrete spreader are provided with cloth area, concrete spreader is by concrete
It is injected into mould, lift shake table is used for vibrate concrete and mould, makes concrete with mould inner wall contact position without spurting bubble, water
Bubble, until internal concrete is uniform;
Further, curing line one end is provided with step-by-step movement pitch conveying equipment, the pitch conveying equipment, including driving group
Part, driven subassembly, support beam, roller chain, top-pushing mechanism support body and pushing tow quarter bend, the drive component pass through rolling with driven subassembly
Subchain is connected, support beam support roller chain, and two ends are connected on drive component and driven subassembly, and top-pushing mechanism support body is set
Put above support beam and be fixed on ground or other fixtures on, some pushing tow quarter bends being hinged and connected are arranged on top-pushing mechanism
Can slide inside support body and along top-pushing mechanism support body, pushing tow quarter bend provided with dialling chain block, group chain block can be stuck on roller chain and with
Roller chain is moved, and plate frame is provided with pushing tow quarter bend, and plate frame is provided with plate, and plate can provide unilateral thrust, promote top
Small car body on pushing mechanism support body;Wherein, drive component includes drive mechanism support body, motor and drive sprocket, the drive
Motivation framework body includes drive mechanism base and the column being fixed on drive mechanism base, and base is fixed on built-in fitting, energy
Ensure overall stability, motor is fixed on the base of drive mechanism support body, and drive sprocket is fixed on motor
Output end;Wherein, driven subassembly is including follower support body and two from wheel sprocket, and follower support body includes follower bottom
Seat and be fixed on the support base of follower base, follower base be fixed on built-in fitting or other fixtures on;First
Driven sprocket is arranged on by the first follower shaft on the support base of follower support body, and the second driven sprocket is driven by second
Wheel shaft is arranged on drive mechanism support body, between drive sprocket and the second driven sprocket, the first driven sprocket and the second driven chain
Connected respectively by two roller chains between wheel;Wherein, two pushing tow quarter bend junctions are provided with support wheel, and support wheel is arranged on company
On pin axle, connection bearing pin connects two pushing tow quarter bends, and side wall of the support wheel along top-pushing mechanism support body is rolled;Wherein,
Two groups of road wheels are additionally provided with plate frame, road wheel is connected on plate frame by pushing tow bearing pin, and road wheel is in pusher framework
Walking is rolled on the support bottom of body;Wherein, plate includes two support arms, and the first support arm of plate stretches out the top of top-pushing mechanism support body
Portion, second support arm be in top-pushing mechanism support body top surface below, and plate center of gravity in second support arm, be additionally provided with plate frame
Block, block can support the second support arm of plate, be that fulcrum force is provided in plate;It is also possible that plate includes two support arms,
The first support arm of plate stretches out the top of top-pushing mechanism support body, and second support arm is in below top-pushing mechanism support body top surface, in plate
Block is additionally provided with frame, block can support the second support arm of plate, and fulcrum force is provided for the first support arm of plate;Second support arm
Being connected to by an extension spring on plate frame makes second support arm often be connected on block;When forward direction promotes first support arm,
Because second support arm is under the support of block, first support arm provides thrust, promotes the transport trolley on top-pushing mechanism support body;When anti-
To when promoting first support arm, first support arm is rotated down around plate bearing pin, avoids transport trolley;So as to realize the work(of unilateral thrust
Energy;Wherein, the first support arm length of plate is less than second support arm length, and block support second support arm is in horizontality;Wherein,
Two support arms of plate are at right angles or obtuse angle is fixedly connected, and optimal connects for obtuse angle, and plate bearing pin is connected through two support arms
Place is fixed on plate frame, and plate can be rotated on plate bearing pin;
Wherein, travel switch is each equipped with the support beam of drive mechanism support body and follower support body and close
Switch, the traveling situation for limiting and recording pushing tow quarter bend;
Further, the traversing ferry bus, including big vehicle frame and dolly support body, cart is provided with big vehicle frame bottom
Road wheel, big vehicle frame is provided with cart movable motor, and large vehicle walking wheel is defeated by cart power transmission shaft and cart movable motor
Shaft is connected, and cart movable motor rotating drives the movable of big vehicle frame;Dolly support body is arranged on big vehicle frame,
Dolly support body is provided with trolley walking motor, and dolly support body is provided with running gear for trolley component, and trolley walking motor driving is small
Garage walks direction of travel of the mechanism assembly perpendicular to big vehicle frame on big vehicle frame and moved;Jack is provided with dolly support body
Structure, lifting body is used for the positioning and fixation of mould, convenient that mould is fixed on dolly support body and transported with dolly support body
It is dynamic;Wherein, big vehicle frame includes longitudinal and cross beam, and two longeron two ends parallel to each other are respectively equipped with wheel seat board, large vehicle walking
Wheel is arranged on wheel seat board, and four parallel crossbeams connect two longerons, and the dolly support body is arranged on two crossbeams of centre
Between;Wherein, cart position-limit mechanism is additionally provided with the big vehicle frame, the cart position-limit mechanism includes three connecting rods, first
Connecting rod is by hinge on big vehicle frame, and second connecting rod connection first connecting rod and third connecting rod, third connecting rod are arranged on greatly
On the longeron of vehicle frame, and pass perpendicularly through the slotted eye on longeron;Extension spring is additionally provided with first connecting rod, the other end of extension spring is fixed
On big vehicle frame, first connecting rod makes third connecting rod eject to outside big vehicle frame longeron under the pulling force effect of extension spring, and energy
Enough put on the guide pile being arranged on built-in fitting, realize the precise positioning of big vehicle frame;Wherein, it is middle two on big vehicle frame
Track and heightening frame are equipped with crossbeam, and heightening frame is fixed on crossbeam, track is fixed on by pressing plate above heightening frame
On heightening frame;The track is used for Auxiliary support mould or transports the dolly of mould;Wherein, running gear for trolley component includes small
Car power transmission shaft, drive sprocket, driving chain, walking sprocket wheel and walking chain, drive sprocket is connected to small by dolly power transmission shaft
On the output shaft of car movable motor, connected between drive sprocket and walking sprocket wheel by driving chain, walking sprocket wheel is arranged on walking
On chain, walking chain is arranged on the intermediate transverse girder of big vehicle frame;Walking sprocket wheel and walking chain are real by the cooperation of gear
The left and right walking (direction of travel before and after big vehicle frame) on big vehicle frame of existing dolly support body;Wherein, lifting body bag
Lift oil tank and hoisting rack are included, the lift oil tank is fixed on dolly support body, and hoisting rack is arranged on the output end of lift oil tank;
Wherein, the first connecting rod in cart position-limit mechanism is single order bending part, and the bending part of first connecting rod is by hinge in cart
On support body, one end of first connecting rod is articulated with second connecting rod, and the other end of first connecting rod is provided with pulling handle, convenient to rotate first
Connecting rod is rotated by axle of bearing pin, realizes that third connecting rod is ejected in the longeron of big vehicle frame with withdrawing;Wherein, in big vehicle frame
Crossbeam in the middle of body is provided with travel switch, and travel switch limits the limit travel of dolly support body;
Further, the lift shake table, including base, base both sides be respectively provided with one be located at same level,
Be parallel to each other and can synchronization lifting guide rail, be also equipped with several vibrations arranged in pairs on the base between two guide rails
Unit;Each vibration unit includes:Seat under vibrator, it is fixedly connected on above base;The corner of seat upper surface under vibrator
Each to be fixed with a limited post straight up, each limited post is respectively cased with a vibrating spring, and the bottom of vibrating spring abuts vibrator
Lower seat;The vibrator seat of honour, under vibrator directly over seat, is respectively provided with the corner position corresponding with limited post of its lower surface
The vertical and set downward opening stop collar in hole, corresponding limited post and vibrating spring are stretched into the set hole of stop collar, and limited post
Top have gap with set bottom hole face, the top of vibrating spring abuts set bottom hole face;Vibrating motor, is fixedly installed in vibrator
Seat of honour lower surface, and the center between four limited posts;When two guide rails rise to highest order, guide rail is higher than
The upper surface at the vibrator seat of honour;When dropping to lowest order, guide rail is less than the upper surface at the vibrator seat of honour;Every guide rail is pressed with two Duis
Plate be fixed on one same level, be parallel to each other and can synchronization lifting lifting beam body upper surface, the four of the base
Respectively there is an elevating ram straight up at individual angle, and its cylinder body one end is fixed on the upper surface of base, piston rod one end and lifting
The end of beam body is fixed;Seat upper surface is fixed with top higher than the vibrator seat of honour straight up under the vibrator, and less than place
The positioning guide column of guide rail upper surface when extreme higher position;The guide rail two bottom sides have projection, and each pair pressing plate is press respectively against
The two ends bottom projection of one guide rail both sides;Respectively there is an elevating ram straight up at four angles of the base, its
Cylinder body one end is fixed on the upper surface of base, and piston rod one end is fixed with lifting beam body;
The lifting beam body upper surface two ends respectively have one can abut the bolt at guide rail homonymy two ends;The lifting beam body
The lower surface at two ends, which has, respectively a cylindrical hole in a groove, recess sidewall, the piston rod top of elevating ram is inserted
Ring is provided with groove, and with through hole correspondence position, lifting beam body passes through through hole and ring to be connected with piston rod by oil cylinder bearing pin;
The base includes one group of parallel crossbeam and one group of longeron perpendicular with crossbeam;The base lower surface has multiple same
Horizontal plane and the bottom plate fixed with the built-in fitting on ground;Lift shaking platform controls two guide rail synchronizations by elevating ram
Raising and lowering, and then control the contacting dies on guide rail to the vibrator seat of honour, led by the positioning of seat upper surface under vibrator
Post positions mould, mould is not subjected to displacement in vibrator seat of honour vibration processes, makes exciting force more uniform, reach cloth
Material usually, improves the purpose of product quality;When guide rail is in highest order, the mould that guide rail is carried can be in drive device
The surface of vibrations unit is moved under drive, now four elevating ram piston rods synchronously decline, so make lifting beam body and
Guide rail synchronously declines, and then driven mold steadily declines, and the positioning guide column is caught in the hole of mould bottom surface, until guide rail declines
To lowest order, mould lower surface is connected to vibrator seat of honour upper surface, and vibrating motor is started working, and the vibrator seat of honour is in vibration electricity
Start driven mold vibration in the presence of machine, during mold vibration, positioning guide column is caught in the hole of mould bottom surface all the time, is made
Mould and the not occurred level direction displacement of the vibrator seat of honour, so that improving precast concrete pipe culvert in mould is excited the equal of power that shake
Even degree, makes cloth plain, improves product quality.After vibrating motor is stopped, the piston rod of four elevating rams is synchronous
Rise, and then lifting beam body and guide rail is synchronously increased, and then driven mold steadily rises, until when guide rail rises to highest order,
Positioning guide column and mould separating, mould leaves under drive device drive along guide rail enters subsequent processing above vibration unit;
Further, the internal model changer includes column, crossbeam, walking beam, walking mechanism and lifting lift mechanism, horizontal
Beam is fixed on the top of two contour columns, and walking beam is fixed on the lower section of some crossbeams, and walking mechanism is arranged on walking beam
On, walking mechanism can lift lift mechanism and be arranged in front of walking mechanism, lift lift mechanism energy along walking beam walking movement
It is enough to be moved up and down along column direction;It is connected between wherein some walking beams by longeron;In the outside of two walking beams
Provided with rack, wherein, walking mechanism also includes car body, wheel seat and wheel, and wheel seat is fixed on car body top, and wheel is pacified by wheel shaft
On wheel seat, wheel is slidably disposed on walking beam, the walking movement for auxiliary propelling machine;Lift lift mechanism
Including trailing arm, hoist cylinder, trailing arm one end is fixed in trailing arm mounting seat, other end free end, and free end is strengthened provided with trailing arm
Beam, trailing arm buttress brace is used for the structural strength for strengthening trailing arm, and the movable end of hoist cylinder is pacified by a hinge in trailing arm
Fill on seat, the fixing end of hoist cylinder is by a hinge in Vehicular body front, and hoist cylinder realizes the up and down motion of trailing arm;
Anterior in car body passes through the long guide pillar of guide pillar mounting seat fixed installation;Hydraulic station bracket, hydraulic station support are provided with the rear portion of car body
Hydraulic station is installed with frame;
A kind of precast concrete pipe culvert pipeline system production process, applies and produces flowing water in described precast concrete pipe culvert
On line, specific job step is:
S1, making steel reinforcement cage;Steel reinforcement cage is arranged in steel processing workshop by reinforcing bar, steel reinforcement cage is welded, built-in fitting weldering
Connect and fill the shaping that reinforcement cage skeleton is completed after protective layer positioning process;
S2, assemble steel reinforcement cage and mould;Specific process be steel reinforcement cage hang in, fill side form and end mould, dress internal model, fill annex and
Vibrator and mould are arranged;Wherein, by overhead traveling crane by steel reinforcement cage, internal model be hung on reinforcing bar set of molds distribution complete steel reinforcement cage with
Mould is assembled;
S3, pour pipe culvert;Material is stirred operation after batching metering, and concrete is delivered to through pipeline operation
In material distributing machine, moulding by casting then is carried out to the steel reinforcement cage on lift shake table and mould lens, shaping pipe culvert is formed;
S4, pipe culvert maintenance processing;Pipe culvert after shaping forms pipe culvert finished product after top surface receives light, steam curing;
S5, the pipe culvert finished product for having mould after pipe culvert maintenance processing are entered on reinforcing bar set of molds distribution, by de-
The operation of pipe culvert article removal is completed after internal model, de- end mould and side form;Mould after separation entered mold cleaning, spraying releasing agent
Into step S2;Pipe culvert product after separation carried out after product is transported to storage yard operation finished product finishing, natural curing and into
The operation processing that product examine is tested, final finished is dispatched from the factory;
Wherein, S2 includes external mold assembling and internal model assembling;External mold assembling is concretely comprised the following steps:Mould side form is slippaged and bed die
It is fixed;The end mould of mould is positioned with side form and fixed in place by pipe culvert mould external mold folding equipment matched moulds;The specific step of internal model assembling
Suddenly it is followed successively by:Internal model is shifted in place by internal model transport vehicle;Internal model changer provokes internal model, is sent to pipe culvert die inside;
Internal model in place after, internal model changer backs to holding fix, and internal model is fixed;Wherein, S3 processes specific steps are followed successively by:Check and accept
Assemble rear mold;Concrete delamination time perfusion, makes concrete even cloth in mould;Concrete continuous casting complete, lift shake table
Coordinate with the pneumatic vibrator installed on die surface and vibrate to concrete and mould;After the completion of whole vibration mouldings, floating top note
Concrete at material;
Wherein, steam curing is under natural temperature in S4 steps, and heating zone temperature control is in 15 DEG C -20 DEG C/h, during processing
It is a length of 1.5-2 hours;Flat-temperature zone temperature control is in 55 DEG C, handling duration 1.5-2 hours;Cooling area controls 15-20 DEG C/h, processing
Shi Changwei 1.0-1.5 hours;Steam supply valve is closed after the steam-cured time as defined in reaching, mould is moved on to outside steaming kiln after natural cooling
Start the demoulding again;
Relative to prior art, precast concrete pipe culvert production line of the present invention and flow chart have following
Advantage:
The present invention is applied to the production of precast concrete pipe culvert, and streamline is laid out small, the saving factory building land used that takes up space, respectively
Station linking is compact, effectively improves the Prefabrication efficiency of pipe culvert;The prefabricated pipe culvert mode of production of pipeline system can be realized automatically
Metaplasia is produced, and reduces labor strength, reduces production cost, and ensure that the quality conformance and reliability of pipe culvert product;
The step-by-step movement pitch conveyer realizes long range production line or unsuitable driving equipment frame with simplest structure
If station environment (steam curing kiln of such as high temperature) on pipe culvert just finished product transport;The pitch transport conveyor constructions letter
It is single, reasonable in design, and mould accurate positioning, can compatible various model moulds the features such as, labor strength is low, full automation
Degree is high, improves production efficiency, reduces production cost;
The traversing ferry bus is simple in construction, compact to design, realizes that cart drives dolly or so to walk by mother-child relationship (MCR), small
Car left and right on cart is walked, and is realized dual-use, has been run through the head and the tail process of production line;It is particularly suitable for production line work
Industry, automaticity is greatly improved;Meet procedure calls, precise positioning makes that the mould travelling speed of production line is fast, accuracy
It is high.The input of manpower is reduced, production cost is reduced;
The lift shake table greatly improves precast concrete pipe culvert in mould and is excited to shake the uniformity coefficient of power, makes
Cloth is plain, improves product quality;
The internal model changer is simple in construction, easy to operate, can greatly reduce labor intensity, ensures the dismounting of pipe culvert internal model
Security, improves mould assembling, the efficiency of dismounting;
The production craft step of the precast concrete pipe culvert can complete the Prefabrication of pipe culvert with the technique simplified, and pass through
Using pitch type waggon and traversing ferry bus, the blank of the mode of production of the pipeline mode of pipe culvert is compensate for, can not only
Continuous-flow type transport under reliable long range, bad environments environment, moreover it is possible to precise positioning, it is ensured that production efficiency.
Brief description of the drawings
The accompanying drawing for constituting the part of the present invention is used for providing a further understanding of the present invention, schematic reality of the invention
Apply example and its illustrate to be used to explain the present invention, do not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the pipe culvert moulding process flow process figure described in the embodiment of the present invention;
Fig. 2 is the pipe culvert workshop floor plan described in the embodiment of the present invention;
Fig. 3 is the step-by-step movement pitch conveyer schematic diagram described in the embodiment of the present invention;
Fig. 4 is the traversing ferry bus top view described in the embodiment of the present invention;
Fig. 5 is the traversing ferry bus end view described in the embodiment of the present invention;
Fig. 6 is the lift shake table front view described in the embodiment of the present invention;
Fig. 7 is the lift shake table end view described in the embodiment of the present invention;
Fig. 8 is the internal model changer schematic diagram described in the embodiment of the present invention.
Description of reference numerals:
The traversing ferry buses of 1-;2- internal model changers;3- external mold folding equipment;4- lift shake tables;5- concrete distributings
Machine;6- step-by-step movement pitch conveyers;7- steam curing kilns;8- pipe culvert transport vehicles;9- overhead traveling cranes;10- steel reinforcement cage transport vehicles;In 11-
Mould transport vehicle;31- drive mechanism support bodys;32- motors;33- drive sprockets;34- support beams;35- follower support bodys;
The follower shafts of 361- first;The driven sprockets of 371- first;38- roller chains;39- top-pushing mechanism support bodys;310- road wheels;311- is pushed up
Promote axle;312- plate framves;313- plate bearing pins;314- plates;315- pushing tow quarter bends;316- connection bearing pins;317- support wheels;
The big vehicle frames of 41-;42- large vehicle walking wheels;43- cart movable motors;44- cart power transmission shafts;45- dolly support bodys;The small garages of 46-
Walk motor;47- dolly power transmission shafts;48- drive sprockets;49- driving chains;410- walking sprocket wheels;411- walking chains;412- rails
Road;413- pressing plates;414- lift oil tanks;415- hoisting racks;416- cart position-limit mechanisms;417- bearing pins;418- extension springs;419- determines
Position stake;61- bases;62- elevating rams;63- oil cylinder bearing pins;64- lifts beam body;65- guide rails;66- pressing plates;Under 67- vibrators
Seat;68- vibrating springs;The 69- vibrators seat of honour;610- vibrating motors;611- positioning guide columns;81- columns;82- crossbeams;83- rows
Walk beam;84- racks;85- wheel seats;86- trailing arms;87- trailing arm buttress braces;88- hoist cylinders;89- car bodies;810- hydraulic station supports
Frame;811- hydraulic stations.
Embodiment
It should be noted that in the case where not conflicting, the embodiment in the present invention and the feature in embodiment can phases
Mutually combination.
In the description of the invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " on ", " under ",
The orientation or position relationship of the instruction such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " are
Based on orientation shown in the drawings or position relationship, it is for only for ease of the description present invention and simplifies description, rather than indicate or dark
Specific orientation must be had, with specific azimuth configuration and operation by showing the device or element of meaning, therefore it is not intended that right
The limitation of the present invention.In addition, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicating or implying phase
To importance or the implicit quantity for indicating indicated technical characteristic.Thus, the feature for defining " first ", " second " etc. can
To express or implicitly include one or more this feature.In the description of the invention, unless otherwise indicated, " multiple "
It is meant that two or more.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can
To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, Ke Yishi
The connection of two element internals.For the ordinary skill in the art, above-mentioned term can be understood by concrete condition
Concrete meaning in the present invention.
Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
With reference to shown in Fig. 1 and 2, a kind of precast concrete pipe culvert production line, including steel processing workshop, steel reinforcement cage fortune
Defeated line, mold attaching/detaching supply line, reinforcing bar set of molds distribution, cloth area, curing line and finished product transport line;Steel reinforcement cage supply line is set
In the delivery outlet of steel processing workshop, steel reinforcement cage supply line is provided with steel reinforcement cage transport vehicle 10, parallel to steel reinforcement cage supply line cloth
Mold attaching/detaching supply line is put, internal model changer 2 and internal model transport vehicle 11, internal model changer are provided with mold attaching/detaching supply line
2 are used to dismantling and installing pipe culvert internal model, and internal model transport vehicle 11 is used to transport the pipe culvert internal model after dismounting;Parallel to mold attaching/detaching fortune
Defeated line arranges reinforcing bar set of molds distribution, and external mold folding equipment 3 is provided with reinforcing bar set of molds distribution, and external mold folding equipment 3 is used for
Dismounting and installation pipe culvert outer mold;Cloth area is arranged on reinforcing bar set of molds distribution, the cloth area is used for precast concrete
It is cast in pipe culvert mould, concrete and rebar cage formation pipe culvert early-products;Curing line is arranged parallel to reinforcing bar set of molds distribution,
The curing line is used to carry out steam curing processing to pipe culvert early-products;The two ends of curing line lead to reinforcing bar set of molds distribution two ends
Cross traversing ferry bus 1 and realize the turnover of pipe culvert early-products and mould pipe culvert finished product on curing line and reinforcing bar set of molds distribution, it is traversing
Move and convey pipe culvert early-products or pipe culvert finished product in direction of the ferry bus along vertical reinforcing bar set of molds distribution;Steel reinforcement cage is transported
Line, mold attaching/detaching supply line, reinforcing bar set of molds distribution, curing line adjacent, parallel arrangement successively;Perpendicular to steel reinforcement cage supply line
Finished product supply line is arranged on direction, finished product supply line is provided with pipe culvert transport vehicle 8;In steel reinforcement cage supply line and the outside of curing line two
Erection has overhead traveling crane 9, and overhead traveling crane 9 is used for pipe culvert finished product and the transfer and transfer of other instruments;
Wherein, curing line is provided with Jing Ting areas and steam curing kiln 7;Jing Ting areas are used for pipe culvert early-products top surface and received at light
Reason, steam curing kiln 7 is steam-cured for being carried out to pipe culvert early-products, and heating zone, flat-temperature zone and cooling are followed successively by steam curing kiln 7
Area;
Wherein, lift shake table 4 and concrete spreader 5 are provided with cloth area, concrete spreader 5 notes concrete
Enter into mould, lift shake table 4 is used for vibrate concrete and mould, make concrete with mould inner wall contact position without spurting bubble, water
Bubble, until internal concrete is uniform;
With reference to shown in Fig. 3, curing line one end is provided with step-by-step movement pitch conveying equipment, the pitch conveying equipment, including drives
Dynamic component, driven subassembly, support beam 34, roller chain 38, top-pushing mechanism support body 39 and pushing tow quarter bend 315, the drive component with
Driven subassembly is connected by roller chain 38, the support roller chain of support beam 34, and two ends are connected to drive component and driven group
On part, top-pushing mechanism support body 39 is arranged on the top of support beam 34 and is fixed on ground or other fixtures, some to be hinged and connected
Pushing tow quarter bend 315 be arranged on the inside of top-pushing mechanism support body 39 and can be slided along top-pushing mechanism support body 39, set on pushing tow quarter bend 315
Have and dial chain block, dialling chain block can be stuck on roller chain 38 and be moved with roller chain 38, and plate frame 312 is provided with pushing tow quarter bend 315,
Plate frame 312 is provided with plate 314, and plate 314 can provide unilateral thrust, promote the small car body on top-pushing mechanism support body 39;Its
In, drive component includes drive mechanism support body 31, motor 32 and drive sprocket 33, and the drive mechanism support body 31 includes driving
Dynamic mechanism base and the column being fixed on drive mechanism base, base are fixed on built-in fitting, can guarantee that overall stability,
Motor 32 is fixed on the base of drive mechanism support body 31, and drive sprocket 33 is fixed on the output end of motor 32;Its
In, driven subassembly includes follower support body 35 and two from wheel sprocket, follower support body 35 include follower base and
Be fixed on the support base of follower base, follower base be fixed on built-in fitting or other fixtures on;First is driven
Sprocket wheel 371 is arranged on the support base of follower support body 35 by the first follower shaft 361, and the second driven sprocket passes through second
Follower shaft is arranged on drive mechanism support body 31, between the driven sprocket of drive sprocket 33 and second, the first driven sprocket 371 and
Connected respectively by two roller chains 38 between second driven sprocket;Wherein, two junctions of pushing tow quarter bend 315 are provided with support wheel
317, support wheel 317 is arranged on connection bearing pin 316, and connection bearing pin 316 connects two pushing tow quarter bends 315, the support wheel 317
Rolled along the side wall of top-pushing mechanism support body 39;Wherein, two groups of road wheels 310 are additionally provided with plate frame 312, road wheel 310 leads to
Cross pushing tow bearing pin 311 to be connected on plate frame 312, road wheel 310 rolls walking on the support bottom of top-pushing mechanism support body 39;Its
In, plate 314 includes two support arms, and the first support arm of plate 314 stretches out the top of top-pushing mechanism support body 39, and second support arm is in
Below the top surface of top-pushing mechanism support body 39, and plate 314 center of gravity in second support arm, block is additionally provided with plate frame 312, keep off
Block can support the second support arm of plate 314, be to provide fulcrum force in plate 314;It is also possible that plate 314 includes two branch
Arm, the first support arm of plate 314 stretches out the top of top-pushing mechanism support body 39, second support arm be in the top surface of top-pushing mechanism support body 39 with
Under, block is additionally provided with plate frame 312, block can support the second support arm of plate 314, is that the first support arm of plate 314 is carried
For fulcrum force;Second support arm is connected on plate frame 312 by an extension spring makes second support arm often be connected on block;
When forward direction promotes first support arm, because second support arm is under the support of block, first support arm provides thrust, promotes top-pushing mechanism
Transport trolley on support body 39;When reversely promoting first support arm, first support arm is rotated down around plate bearing pin 313, is avoided defeated
Send dolly;So as to realize the function of unilateral thrust;Wherein, the first support arm length of plate 314 is less than second support arm length, block
Second support arm is supported to be in horizontality;Wherein, two support arms of plate 314 are at right angles or obtuse angle is fixedly connected, and optimal is
Obtuse angle is connected, and plate bearing pin 313 is fixed on plate frame 312 through two support arm junctions, and plate 314 can be in plate bearing pin
Rotated on 313;
Wherein, each it is equipped with travel switch in the support beam 34 of drive mechanism support body 31 and follower support body 35
And proximity switch, the traveling situation for limiting and recording pushing tow quarter bend 35;
Such step-by-step movement pitch conveyer realizes long range production line or unsuitable driving equipment with simplest structure
The transport of the first finished product of pipe culvert on the station environment (steam curing kiln of such as high temperature) of erection;The pitch transport conveyor constructions letter
It is single, reasonable in design, and mould accurate positioning, can compatible various model moulds the features such as, labor strength is low, full automation
Degree is high, improves production efficiency, reduces production cost.
With reference to shown in Fig. 4,5, the traversing ferry bus 1, including big vehicle frame 41 and dolly support body 45, in big vehicle frame 41
Bottom is provided with large vehicle walking wheel 42, and big vehicle frame 41 is provided with cart movable motor 43, and large vehicle walking wheel 42 is driven by cart
Axle 44 is connected with the output shaft of cart movable motor 43, and the rotating of cart movable motor 43 drives the front and rear shifting of big vehicle frame 41
It is dynamic;Dolly support body 45 is arranged on big vehicle frame 41, is provided with dolly support body 45 on trolley walking motor 46, dolly support body 45
Provided with running gear for trolley component, trolley walking motor 46 drives running gear for trolley component on big vehicle frame 41 perpendicular to big
The direction of travel movement of vehicle frame 41;Lifting body is provided with dolly support body 45, lifting body is used for the positioning of mould with consolidating
It is fixed, it is convenient that mould is fixed on dolly support body 45 and moved with dolly support body 45;Wherein, big vehicle frame 41 includes longeron
And crossbeam, two longeron two ends parallel to each other are respectively equipped with wheel seat board, and large vehicle walking wheel 42 is arranged on wheel seat board, and four are put down
Capable crossbeam connects two longerons, and the dolly support body 45 is arranged between two crossbeams of centre;Wherein, the big vehicle frame
Cart position-limit mechanism 416 is additionally provided with 41, the cart position-limit mechanism 416 includes three connecting rods, and first connecting rod passes through bearing pin 417
It is hinged on big vehicle frame 41, second connecting rod connection first connecting rod and third connecting rod, third connecting rod are arranged on big vehicle frame 41
On longeron, and pass perpendicularly through the slotted eye on longeron;Extension spring 418 is additionally provided with first connecting rod, the other end of extension spring is fixed on greatly
On vehicle frame 41, first connecting rod makes third connecting rod eject to outside the big longeron of vehicle frame 41 under the pulling force effect of extension spring, and energy
Enough put on the guide pile 419 being arranged on built-in fitting, realize the precise positioning of big vehicle frame 41;Wherein, on big vehicle frame 41
Track 412 and heightening frame are equipped with middle two crossbeams, heightening frame is fixed on crossbeam, passes through pressing plate above heightening frame
413 are fixed on track 412 on heightening frame;The track is used for Auxiliary support mould or transports the dolly of mould;Wherein, dolly
Walking mechanism component includes dolly power transmission shaft 47, drive sprocket 48, driving chain 49, walking sprocket wheel 410 and walking chain 411,
Drive sprocket 48 is connected to by dolly power transmission shaft 47 on the output shaft of trolley walking motor 46, drive sprocket 48 and walking sprocket wheel
Connected between 410 by driving chain 49, walking sprocket wheel 410 is arranged on walking chain 411, walking chain 411 is arranged on cart
On the intermediate transverse girder of support body 41;Walking sprocket wheel 410 and walking chain 411 realize dolly support body 45 in cart by the cooperation of gear
Left and right walking is (perpendicular to the front and rear direction of travel of big vehicle frame 41) on support body 41;Wherein, lifting body includes lift oil tank 414
With hoisting rack 415, the lift oil tank 414 is fixed on dolly support body 45, and hoisting rack 415 is arranged on the defeated of lift oil tank 414
Go out end;Wherein, the first connecting rod in cart position-limit mechanism 416 is single order bending part, and the bending part of first connecting rod passes through bearing pin 417
It is hinged on big vehicle frame 41, one end of first connecting rod is articulated with second connecting rod, and the other end of first connecting rod is provided with pulling handle,
It is convenient that to rotate first connecting rod with bearing pin 417 be that axle is rotated, realize third connecting rod ejected in the longeron of big vehicle frame 41 and
Withdraw;Wherein, travel switch, the limit row of travel switch limitation dolly support body 45 are provided with the crossbeam in the middle of big vehicle frame 41
Journey;
Described traversing ferry bus is simple in construction, compact to design, realizes that cart drives dolly or so to walk by mother-child relationship (MCR),
Dolly left and right on cart is walked, and is realized dual-use, has been run through the head and the tail process of production line;It is particularly suitable for production line work
Industry, automaticity is greatly improved;Meet procedure calls, precise positioning makes that the mould travelling speed of production line is fast, accuracy
It is high.The input of manpower is reduced, production cost is reduced.
As shown in Figure 6,7, the lift shake table 4, including base 61, the both sides of base 61 are respectively provided with one positioned at same
Horizontal plane, be parallel to each other and can synchronization lifting guide rail 65, be also equipped with several on the base 61 between two guide rails 65
The vibration unit arranged in pairs;Each vibration unit includes:Seat 67 under vibrator, it is fixedly connected on the top of base 61;Vibration
The corner of the upper surface of seat 67 is respectively fixed with a limited post 613 straight up under device, and each limited post 613 is respectively cased with a vibrating spring
68, the bottom of vibrating spring 68 abuts seat 67 under vibrator;The vibrator seat of honour 69, under vibrator directly over seat 67, under it
The corner on surface is with being respectively provided with vertical and the set downward opening stop collar 612 in hole, corresponding limit on the corresponding position of limited post 613
Position post 613 and vibrating spring 68 are stretched into the set hole of stop collar 612, and there is gap on the top of limited post 613 with set bottom hole face,
The top of vibrating spring 68 abuts set bottom hole face;Vibrating motor 610, is fixedly installed in the lower surface of the vibrator seat of honour 69, and be located at
Center between four limited posts 613;When two guide rails 65 rise to highest order, guide rail 65 is higher than the vibrator seat of honour
69 upper surface;When dropping to lowest order, guide rail 65 is less than the upper surface at the vibrator seat of honour 69;Every guide rail 65 is with two pairs of pressing plates
66 be fixed on one same level, be parallel to each other and can synchronization lifting lifting beam body 64 upper surface, the base 61
Four angles respectively have an elevating ram 62 straight up, its cylinder body one end is fixed on the upper surface of base 61, piston rod one
Hold and fixed with lifting the end of beam body 64;The upper surface of seat 67 is fixed with top higher than on vibrator straight up under the vibrator
Seat 69, and less than the positioning guide column 611 of guide rail upper surface when being in extreme higher position;The two bottom sides of guide rail 65 have protuberance
Point, each pair pressing plate 66 is press respectively against the two ends bottom projection of the both sides of guide rail 65;Four angles of the base 61 respectively have
One elevating ram 62 straight up, its cylinder body one end is fixed on the upper surface of base 61, piston rod one end and lifting beam body
64 fix.
The lifting beam body 64 upper surface two ends respectively have one can abut the bolt 14 at the homonymy two ends of guide rail 65;The liter
The lower surface at drop beam body 64 two ends, which has, respectively a cylindrical hole in a groove, recess sidewall, the work of elevating ram 62
Stopper rod top is inserted in groove, and is provided with ring with through hole correspondence position, and lifting beam body 64 is worn with piston rod by oil cylinder bearing pin 63
Cross through hole and ring connection;The base 61 is mainly made up of one group of parallel crossbeam and one group of longeron perpendicular with crossbeam;Institute
State the lower surface of base 61 have it is multiple same level and with ground built-in fitting fix bottom plate;Lift shaking platform leads to
Cross elevating ram 62 and control the synchronous raising and lowerings of two guide rails 65, and then control contacting dies on guide rail 65 to vibrator
Seat 69, mould is positioned, mould is vibrated with the vibrator seat of honour 69 by the positioning guide column 611 of the upper surface of seat under vibrator 67
During be not subjected to displacement, make exciting force more uniform, reach cloth usually, improve product quality purpose;At guide rail 65
When highest order, the mould that guide rail 65 is carried can move to the surface of vibrations unit under the drive of drive device, this
When four piston rods of elevating ram 62 synchronously decline, and then make lifting beam body 64 and guide rail 65 is synchronous declines, and then driven mold
Steady to decline, the positioning guide column 611 is caught in the hole of mould bottom surface, until guide rail 65 drops to lowest order, mould lower surface
The upper surface of the vibrator seat of honour 69 is connected to, vibrating motor 610 is started working, effect of the vibrator seat of honour 69 in vibrating motor 610
Lower beginning driven mold vibration, during mold vibration, positioning guide column 611 is caught in the hole of mould bottom surface all the time, makes mould
With the not occurred level direction displacement of the vibrator seat of honour 69 so that improving precast concrete pipe culvert in mould is excited the uniform of power that shake
Degree, makes cloth plain, improves product quality.After vibrating motor 610 is stopped, the piston rod of four elevating rams 62 is same
Step rises, and then makes lifting beam body 64 and the synchronous rising of guide rail 65, and then driven mold steadily rises, until guide rail 65 rises to most
When high-order, positioning guide column 611 and mould separating, under mould leaves along guide rail and entered above vibration unit under drive device drive
One process;
With reference to shown in Fig. 8, wherein, the internal model changer 2 include column 81, crossbeam 82, walking beam 83, walking mechanism and
Lift mechanism is lifted, crossbeam 82 is fixed on the top of two contour columns 81, and walking beam 83 is fixed under some crossbeams 82
Side, walking mechanism is arranged on walking beam 83, and walking mechanism can lift lift mechanism and be arranged on along the walking movement of walking beam 83
In front of walking mechanism, lifting lift mechanism can move up and down along the direction of column 81;Between wherein some walking beams 83
It is connected by longeron;Rack 84 is provided with the outside of two walking beams 83, wherein, walking mechanism also includes car body 89, wheel seat
85 and wheel, wheel seat 85 is fixed on the top of car body 89, and wheel is arranged on wheel seat 85 by wheel shaft, and wheel is slidably disposed in
On walking beam 83, the walking movement for auxiliary propelling machine;Lifting lift mechanism includes trailing arm 86, hoist cylinder 88, trailing arm
86 one end are fixed in trailing arm mounting seat, other end free end, and free end is provided with trailing arm buttress brace 87, and trailing arm buttress brace is used to add
The structural strength of strong trailing arm 86, the movable end of hoist cylinder 88 by a hinge in trailing arm mounting seat, hoist cylinder
88 fixing end is anterior in car body 89 by a hinge, and hoist cylinder 88 realizes the up and down motion of trailing arm 86;In car body
89 front portion passes through guide pillar mounting seat and long guide pillar is fixedly mounted;Hydraulic station bracket 810, hydraulic station support are provided with the rear portion of car body 89
Hydraulic station 811 is installed with frame 810;
A kind of precast concrete pipe culvert pipeline system production process, production stage is:
S1, making steel reinforcement cage;Steel reinforcement cage arranges R1, steel reinforcement cage welding R2, pre-buried in steel processing workshop by reinforcing bar
Part welds the shaping that reinforcement cage skeleton is completed after R3 and dress protective layer positioning R4 processes;
S2, assemble steel reinforcement cage and mould;Specific process is that steel reinforcement cage hangs in Z1, dress side form and end mould Z2, dress internal model Z3, dress
Annex and vibrator Z4 and mould arrange Z5;Wherein, steel reinforcement cage, internal model are hung to by overhead traveling crane complete on reinforcing bar set of molds distribution
Into assembling for steel reinforcement cage and mould;
S3, pour pipe culvert;Material C1 is stirred operation C3 after batching metering C2, is conveyed through pipeline operation C4
To concrete spreader 5, moulding by casting H1, shape then are carried out to the steel reinforcement cage on lift shake table 4 and mould lens
Into shaping pipe culvert;
S4, pipe culvert maintenance processing;Pipe culvert after shaping forms pipe culvert finished product after top surface receives light H2, steam curing H3;
S5, the pipe culvert finished product for having mould after pipe culvert maintenance processing are entered on reinforcing bar set of molds distribution, by de-
Pipe culvert article removal H6 operation is completed after internal model H4, de- end mould and side form H5;Mould after separation entered mold cleaning M1, spray
Coating release agent M2 enters step S2;Pipe culvert product after separation carries out finished product finishing after product is transported to stockyard P1 operations
P2, natural curing P3 and product inspection P4 operation processing, final finished are dispatched from the factory P5;
Wherein, assembling steel reinforcement cage and mould S2 includes external mold assembling and internal model assembling;External mold assembling is concretely comprised the following steps:1. will
Mould side form is slippaged to be fixed with bed die;2. the end mould of mould is positioned with side form in place by pipe culvert mould external mold folding equipment matched moulds
It is fixed;Internal model assembling is concretely comprised the following steps:1. internal model is shifted in place by internal model transport vehicle;2. internal model changer provokes internal model,
It is sent to pipe culvert die inside;3. internal model in place after, internal model changer backs to holding fix, and internal model is fixed;
Wherein, pipe culvert S3 processes are poured to concretely comprise the following steps:1. assembling rear mold is checked and accepted;2. concrete delamination time perfusion, makes
Concrete even cloth in mould;3. concrete continuous casting complete, lift shake table and the pneumatic vibrator installed on die surface
Cooperation is vibrated to concrete and mould;4. after the completion of whole vibration mouldings, concrete at floating top material feeding;
Wherein, to prevent temperature rise is too fast from causing concrete expansion damage internal structure in pipe culvert maintenance processing S4 steps,
Under natural temperature, warming temperature control is controlled in 55 DEG C of (1.5-2 in 15 DEG C -20 DEG C/h (1.5-2 hours), constant temperature phase temperature
Hour), temperature-fall period controls 15-20 DEG C/h (about 1.0-1.5 hours), and steam supply valve is closed after reaching the defined steam-cured time, will
Mould starts the demoulding again after moving on to the outer natural cooling of steaming kiln;
This production line workflow with reference to shown in Fig. 2:The steel reinforcement cage being welded is by steel reinforcement cage transport vehicle 10 from steel
Muscle workshop is transported to pipe culvert workshop, is entered reinforcing bar cage hoisting in pipe culvert mould with overhead traveling crane 9, and step-by-step movement pitch conveyer 6 is by mould
Tool is sent to next station, and external mold folding equipment 3 fixes the end mould matched moulds of mould afterwards in place.It is interior subsequently into next station
The internal model cleared up is fitted into mould by mould changer 2, and annex and vibrator are installed to next station.Into next station, mix
Concrete is injected among mould by solidifying soil material distributing machine 5, while the lift shake table 4 below mould coordinates concrete spreader
5 work vibrate to concrete contact with mould inner wall residing for there is no spurting gas and water bubble, and uniformly untill, whole vibration mouldings are complete
Cheng Hou, answers concrete at floating top material feeding.
Mould after the completion of pouring is transported to steam curing area by traversing ferry bus 1, and pipe culvert is through smooth surface and in concrete in static
After stopping, carried out with the introducing steam curing kiln 7 of step-by-step movement pitch conveyer 6 steam-cured without pressing.
The steam-cured mould finished transports next station by the traversing ferry bus 1 at kiln discharge end, will be interior with internal model changer 2
Mould is pulled down to pick out and is placed on internal model transport vehicle 11, and the internal model pulled down is transported to internal model assembling station and waited by internal model transport vehicle 11 pacifies
Dress.Mould has been torn open after internal model, and mould is moved to next station by step-by-step movement pitch conveyer 6, will by external mold folding equipment 3
The external mold of mould is opened.Mould is moved to pipe culvert demoulding station, slings pipe culvert product by overhead traveling crane 9 and special hanger and is put in pipe
Contain on transport vehicle 8, transport pipe culvert storage area and carry out natural curing.The mould for taking out product is sent to next station, and mould enters
Row cleaning and coating release agent, wait steel reinforcement cage to enter mould and carry out subsequent work circulation subsequently into next station.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention
God is with principle, and any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.
Claims (10)
1. a kind of precast concrete pipe culvert production line, it is characterised in that including steel processing workshop, steel reinforcement cage supply line,
Mold attaching/detaching supply line, reinforcing bar set of molds distribution, cloth area, curing line and finished product transport line;Steel reinforcement cage supply line is arranged on steel
The delivery outlet of muscle job shop, steel reinforcement cage supply line is provided with steel reinforcement cage transport vehicle (10), is arranged parallel to steel reinforcement cage supply line
Mold attaching/detaching supply line, is provided with internal model changer (2) and internal model transport vehicle (11) on mold attaching/detaching supply line;Parallel to mould
Tool dismounting supply line arrangement reinforcing bar set of molds distribution, is provided with external mold folding equipment (3) on reinforcing bar set of molds distribution;In reinforcing bar mould
Tool, which is assembled, arranges cloth area on line;Curing line is arranged parallel to reinforcing bar set of molds distribution;The two ends of curing line and reinforcing bar set of molds
Distribution two ends are provided with traversing ferry bus (1);Steel reinforcement cage supply line, mold attaching/detaching supply line, reinforcing bar set of molds distribution, curing line according to
Secondary adjacent, parallel arrangement;Finished product supply line is arranged on the direction of steel reinforcement cage supply line, finished product supply line is provided with pipe culvert
Transport vehicle (8);Being set up in steel reinforcement cage supply line and the outside of curing line two has overhead traveling crane (9).
2. a kind of precast concrete pipe culvert production line as claimed in claim 1, it is characterised in that curing line is provided with quiet
Stop being sequentially provided with heating zone, flat-temperature zone and cooling area in area and steam curing kiln (7), steam curing kiln (7).
3. a kind of precast concrete pipe culvert production line as claimed in claim 1, it is characterised in that provided with liter at cloth area
Drop formula shake table (4) and concrete spreader (5).
4. a kind of precast concrete pipe culvert production line as claimed in claim 1, it is characterised in that curing line one end is provided with
Step-by-step movement pitch conveying equipment, the pitch conveying equipment, including drive component, driven subassembly, support beam (34), roller chain
(38), top-pushing mechanism support body (39) and pushing tow quarter bend (315), the drive component are connected with driven subassembly by roller chain (38)
Connect, support beam (34) support roller chain, and two ends are connected on drive component and driven subassembly, top-pushing mechanism support body (39)
It is arranged on above support beam (34) and fixes, some pushing tow quarter bends (315) being hinged and connected is arranged on top-pushing mechanism support body (39)
Internal and can be slided along top-pushing mechanism support body (39), pushing tow quarter bend (315) is provided with chain block is dialled, and group chain block can be stuck in roller chain
(38) moved on and with roller chain 38, plate frame (312) is provided with pushing tow quarter bend (315), plate frame (312) is provided with plate
(314), plate (314) can provide unilateral thrust, promote the small car body on top-pushing mechanism support body (39);
The drive component includes drive mechanism support body (31), motor (32) and drive sprocket (33), the drive mechanism
Support body (31) includes drive mechanism base and the column being fixed on drive mechanism base, and base is fixed on built-in fitting, drives
Motor (32) is fixed on the base of drive mechanism support body (31), and drive sprocket (33) is fixed on the output of motor (32)
End;
The driven subassembly is including follower support body (35) and two from wheel sprocket, and follower support body (35) includes driven machine
Structure base and the support base for being fixed on follower base, follower base are fixed;First driven sprocket (371) passes through first
Follower shaft (361) is arranged on the support base of follower support body (35), and the second driven sprocket is set by the second follower shaft
Put on drive mechanism support body (31), between drive sprocket (33) and the second driven sprocket, the first driven sprocket (371) and second
Connected respectively by two roller chains (38) between driven sprocket;Wherein, two pushing tow quarter bend (315) junctions are provided with support wheel
(317), support wheel (317) is arranged on connection bearing pin (316), and connection bearing pin (316) connects two pushing tow quarter bends (315), institute
Side wall of the support wheel (317) along top-pushing mechanism support body (39) is stated to roll;
Two groups of road wheels (310) are additionally provided with the plate frame (312), road wheel (310) is connected to by pushing tow bearing pin (311)
On plate frame (312), road wheel (310) rolls walking on the support bottom of top-pushing mechanism support body (39).
5. a kind of precast concrete pipe culvert production line as claimed in claim 4, it is characterised in that plate (314) includes
Two support arms, the first support arm of plate (314) stretches out the top of top-pushing mechanism support body (39), and second support arm is in pusher framework
Below body (39) top surface, and plate (314) center of gravity in second support arm, block, block energy are additionally provided with plate frame (312)
The second support arm of plate (314) is supported, is to provide fulcrum force in plate (314);The first support arm length of plate (314) is less than
Second support arm length, block support second support arm is in horizontality;Wherein, plate 314 two support arms at right angles or obtuse angle
It is fixedly connected, plate bearing pin (313) is fixed on plate frame (312) through two support arm junctions, and plate (314) can be in plate
Rotated on bearing pin (313).
6. a kind of precast concrete pipe culvert production line as claimed in claim 4, it is characterised in that plate (314) includes
Two support arms, the first support arm of plate (314) stretches out the top of top-pushing mechanism support body (39), and second support arm is in pusher framework
Below body (39) top surface, block is additionally provided with plate frame (312), block can support the second support arm of plate (314), be plate
(314) first support arm provides fulcrum force;Second support arm is connected on plate frame (312) by an extension spring makes second
Support arm is often connected on block;The first support arm length of plate (314) is less than at second support arm length, block support second support arm
In horizontality;Wherein, two support arms of plate (314) are at right angles or obtuse angle is fixedly connected, and plate bearing pin (313) passes through two
Support arm junction is fixed on plate frame (312), and plate (314) can be rotated on plate bearing pin (313).
7. a kind of precast concrete pipe culvert production line as claimed in claim 1, it is characterised in that the traversing ferry bus
(1) large vehicle walking wheel (42), cart, including big vehicle frame (41) and dolly support body (45), are provided with big vehicle frame (41) bottom
Support body (41) is provided with cart movable motor (43), and large vehicle walking wheel (42) passes through cart power transmission shaft (44) and cart movable motor
(43) output shaft connection, cart movable motor (43) rotating drives the movable of big vehicle frame (41);Dolly support body
(45) it is arranged on big vehicle frame (41), is provided with dolly support body (45) on trolley walking motor (46), dolly support body (45)
Provided with running gear for trolley component, trolley walking motor (46) drives running gear for trolley component vertical on big vehicle frame (41)
Moved in the direction of travel of big vehicle frame (41);Lifting body is provided with dolly support body (45);
The big vehicle frame (41) includes longitudinal and cross beam, and two longeron two ends parallel to each other are respectively equipped with wheel seat board, cart
Road wheel (42) is arranged on wheel seat board, and four parallel crossbeams connect two longerons, during the dolly support body (45) is arranged on
Between two crossbeams between;Cart position-limit mechanism (416), the cart position-limit mechanism are additionally provided with the big vehicle frame (41)
(416) three connecting rods are included, first connecting rod is hinged on big vehicle frame (41) by bearing pin (417), second connecting rod connection first
Connecting rod and third connecting rod, third connecting rod are arranged on the longeron of big vehicle frame (41), and pass perpendicularly through the slotted eye on longeron;
Extension spring (418) is additionally provided with one connecting rod, the other end of extension spring is fixed on big vehicle frame (41);Wherein, on big vehicle frame (41)
Track (412) and heightening frame are equipped with middle two crossbeams, heightening frame is fixed on crossbeam, passes through pressing plate above heightening frame
(413) track (412) is fixed on heightening frame;
Running gear for trolley component includes dolly power transmission shaft (47), drive sprocket (48), driving chain (49), walking sprocket wheel
(410) and walking chain (411), drive sprocket (48) is connected to the defeated of trolley walking motor (46) by dolly power transmission shaft (47)
On shaft, connected between drive sprocket (48) and walking sprocket wheel (410) by driving chain (49), walking sprocket wheel (410) is arranged on
Walk on chain (411), walking chain (411) is arranged on the intermediate transverse girder of big vehicle frame (41);
Lifting body includes lift oil tank (414) and hoisting rack (415), and the lift oil tank (414) is fixed on dolly support body
(45) on, hoisting rack (415) is arranged on the output end of lift oil tank (414);First connecting rod in cart position-limit mechanism (416) is
Single order bending part, the bending part of first connecting rod is hinged on big vehicle frame (41) by bearing pin (417), one end hinge of first connecting rod
Second connecting rod is connected to, the other end of first connecting rod is provided with pulling handle.
8. a kind of precast concrete pipe culvert production line as claimed in claim 1, it is characterised in that the lift vibration
Platform (4), including base (61), base (61) both sides are respectively provided with one and are located at same level, are parallel to each other and energy synchronization lifting
Guide rail (65), be also equipped with several vibration units arranged in pairs on the base (61) between two guide rails (65);
Each vibration unit includes:Seat (67) under vibrator, it is fixedly connected on above base (61);Under vibrator on seat (67)
The corner on surface is respectively fixed with a limited post (613) straight up, and each limited post (613) is respectively cased with a vibrating spring (68),
The bottom of vibrating spring (68) abuts seat (67) under vibrator;The vibrator seat of honour (69), under vibrator directly over seat (67),
The vertical and set downward opening stop collar in hole (612) is respectively provided with the position corresponding with limited post (613) of the corner of its lower surface,
Corresponding limited post (613) and vibrating spring (68) are stretched into the set hole of stop collar (612), and the top of limited post (613) with
There is gap in set bottom hole face, and the top of vibrating spring (68) abuts set bottom hole face;Vibrating motor (610), is fixedly installed in vibration
The device seat of honour (69) lower surface, and the center between four limited posts (613);Two the guide rail (65) rises to most
When high-order, guide rail (65) is higher than the upper surface of the vibrator seat of honour (69);When dropping to lowest order, guide rail (65) is less than on vibrator
The upper surface of seat (69);Every guide rail (65) be fixed on two pairs of pressing plates (66) one in same level, be parallel to each other and can
Respectively there is an elevating ram straight up at the upper surface of the lifting beam body (64) of synchronization lifting, four angles of the base (61)
(62), its cylinder body one end is fixed on the upper surface of base (61), and piston rod one end and the end of lifting beam body (64) are fixed;It is described
Seat (67) upper surface is fixed with top higher than the vibrator seat of honour (69) straight up under vibrator, and during less than being in extreme higher position
The positioning guide column (611) of guide rail upper surface;Guide rail (65) two bottom sides have projection, and each pair pressing plate (66) is press respectively against
The two ends bottom projection of one guide rail (65) both sides;Respectively there is a lifting straight up at four angles of the base (61)
Oil cylinder (62), its cylinder body one end is fixed on the upper surface of base (61), and piston rod one end is fixed with lifting beam body (64);
Described lifting beam body (64) upper surface two ends respectively have one can abut the bolt (614) at guide rail (65) homonymy two ends;It is described
The lower surface at lifting beam body (64) two ends, which has, respectively a cylindrical hole, elevating ram in a groove, recess sidewall
(62) piston rod top is inserted in groove, and is provided with ring with through hole correspondence position, and lifting beam body (64) passes through oil with piston rod
Cylinder bearing pin (63) is connected through through hole and ring;The base (61) includes one group of parallel crossbeam and one group perpendicular with crossbeam
Longeron;Base (61) lower surface have several same level and with ground built-in fitting fix bottom plate.
9. a kind of precast concrete pipe culvert production line as claimed in claim 1, it is characterised in that the internal model changer
(2) column (81), crossbeam (82), walking beam (83), walking mechanism and lifting lift mechanism are included;Crossbeam (82) is fixed on two
The top of contour column (81), walking beam (83) is fixed on the lower section of some crossbeams (82), and walking mechanism is arranged on walking beam
(83) on, walking mechanism can be along walking beam (83) walking movement;It is connected between two walking beams (83) by longeron;Two
The outside of root walking beam (83) is provided with rack (84);Walking mechanism also includes car body (89), wheel seat (85) and wheel, wheel seat (85)
It is fixed at the top of car body (89), wheel is arranged on wheel seat (85) by wheel shaft, and wheel is slidably disposed in walking beam (83)
On;
Lifting lift mechanism is arranged in front of walking mechanism, and lifting lift mechanism can be transported along above and below the direction of column (81)
It is dynamic;Lifting lift mechanism includes trailing arm (86), hoist cylinder (88), and trailing arm (86) one end is fixed in trailing arm mounting seat, another
Free end is held, free end is provided with trailing arm buttress brace (87), and the movable end of hoist cylinder (88) is hinged in trailing arm mounting seat, lifts
It is anterior that the fixing end of oil cylinder (88) is hinged on car body (89);Anterior in car body (89) is led by guide pillar mounting seat fixed installation length
Post;It is provided with the rear portion of car body (89) on hydraulic station bracket (810), hydraulic station bracket (810) and is installed with hydraulic station (811).
10. a kind of precast concrete pipe culvert pipeline system production technology, is applied in the precast concrete pipe culvert described in claim 1
In production line, it is characterised in that specifically job step is:
S1, making steel reinforcement cage;Steel reinforcement cage arranges (R1), steel reinforcement cage welding (R2), pre-buried in steel processing workshop by reinforcing bar
Part welds the shaping that reinforcement cage skeleton is completed after (R3) and dress protective layer positioning (R4) process;
S2, assemble steel reinforcement cage and mould;Specific process be steel reinforcement cage hang in (Z1), dress side form and end mould (Z2), dress internal model (Z3),
Fill annex and vibrator (Z4) and mould arranges (Z5);
S3, pour pipe culvert;Material (C1) is stirred operation (C3) after batching metering (C2), through pipeline operation (C4)
It is delivered in concrete spreader (5), then the steel reinforcement cage on lift shake table (4) and mould lens is poured into
Type (H1), forms shaping pipe culvert;
S4, pipe culvert maintenance processing;Pipe culvert after shaping forms pipe culvert finished product after top surface receives light (H2), steam curing (H3);
S5, the pipe culvert finished product for having mould after pipe culvert maintenance processing are entered on reinforcing bar set of molds distribution, by taking off internal model
(H4), take off end mould and side form (H5) completes the operation of pipe culvert article removal (H6) afterwards;Mould after separation entered mold cleaning
(M1), spraying releasing agent (M2) enters step (S2);Pipe culvert product after separation is after product is transported to stockyard (P1) operation
The operation processing of finished product finishing (P2), natural curing (P3) and product inspection (P4) is carried out, final finished is dispatched from the factory (P5);
The step (S2) includes external mold assembling and internal model assembling;External mold assembling is concretely comprised the following steps:First mould side form is slippaged
Fixed with bed die, then the end mould of mould is positioned with side form and fixed in place by pipe culvert mould external mold folding equipment matched moulds;Internal model
Assembling is concretely comprised the following steps:First internal model is shifted in place by internal model transport vehicle;Then internal model is provoked using internal model changer, sent
Enter to pipe culvert die inside;Internal model in place after, internal model changer backs to holding fix, and internal model is fixed;
The specific process of the step (S3) is followed successively by:Check and accept assembling rear mold;Concrete delamination time perfusion, makes concrete even in mould
Cloth;The pneumatic vibrator installed on concrete continuous casting complete, lift shake table and die surface coordinate vibrate to concrete with
Mould;After the completion of whole vibration mouldings, concrete at floating top material feeding;
Steam curing (H3) is under natural temperature in (S4) step, and heating zone temperature control is in 15 DEG C -20 DEG C/h, during processing
It is a length of 1.5-2 hours;Flat-temperature zone temperature control is in 55 DEG C, handling duration 1.5-2 hours;Cooling area controls 15-20 DEG C/h, processing
Shi Changwei 1.0-1.5 hours;Steam supply valve is closed after the steam-cured time as defined in reaching, mould is moved on to outside steaming kiln after natural cooling
Start the demoulding again.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710284165.XA CN107042580B (en) | 2017-04-26 | 2017-04-26 | Precast concrete pipe culvert production line and production process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710284165.XA CN107042580B (en) | 2017-04-26 | 2017-04-26 | Precast concrete pipe culvert production line and production process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107042580A true CN107042580A (en) | 2017-08-15 |
CN107042580B CN107042580B (en) | 2022-09-13 |
Family
ID=59546009
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710284165.XA Active CN107042580B (en) | 2017-04-26 | 2017-04-26 | Precast concrete pipe culvert production line and production process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107042580B (en) |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107901208A (en) * | 2017-12-07 | 2018-04-13 | 郑州市第建筑工程集团有限公司 | Prefabricated reinforced concrete section of jurisdiction automatic production line |
CN108472777A (en) * | 2018-03-30 | 2018-08-31 | 深圳市君盈建筑科技有限公司 | Migration formula steel bar meter method |
CN108891882A (en) * | 2018-08-22 | 2018-11-27 | 西安中铁工程装备有限公司 | A kind of step-by-step movement section of jurisdiction translation delivery system and its Transfer method |
CN109159273A (en) * | 2018-10-24 | 2019-01-08 | 中建科技有限公司 | The automatic production method of the comprehensive prefabricated piping lane concrete prefabricated element in underground |
CN109422191A (en) * | 2017-08-21 | 2019-03-05 | 中电普瑞电力工程有限公司 | A kind of automatic hanging apparatus |
CN109422199A (en) * | 2017-09-04 | 2019-03-05 | 中核陕西铀浓缩有限公司 | A kind of UF6Liquefy homogeneous special product container traffic vehicle |
CN109624067A (en) * | 2018-12-26 | 2019-04-16 | 广西宏发重工机械有限公司 | A kind of reinforcing bar delivery device of structuring formwork machine |
CN109986684A (en) * | 2019-04-11 | 2019-07-09 | 中交四航局第二工程有限公司 | The plate device and its system of the streamlined production of king's block are turned round for concrete |
CN110103333A (en) * | 2019-06-13 | 2019-08-09 | 武汉比邻科技发展有限公司 | A kind of production line of batch and production technology of steel core concrete column |
CN110228131A (en) * | 2019-06-27 | 2019-09-13 | 郑州铁路职业技术学院 | A kind of prefabricated case beam curing means |
CN110509422A (en) * | 2019-08-16 | 2019-11-29 | 温州源利智能科技有限公司 | A kind of precast concrete production equipment and production method |
CN110815537A (en) * | 2019-12-13 | 2020-02-21 | 中建科技有限公司深圳分公司 | Window production line wafts |
CN111823378A (en) * | 2020-08-04 | 2020-10-27 | 秦杰 | Automatic maintenance of equipment of putting things in good order of prefabricated part of assembly type structure |
CN111958810A (en) * | 2020-08-18 | 2020-11-20 | 广东联星瑞业水泥制品有限公司 | Flat lantern ring interface cement pipe manufacture equipment |
CN113979039A (en) * | 2021-11-12 | 2022-01-28 | 中交第四航务工程局有限公司 | Reinforcing bar production conveying system |
CN114434594A (en) * | 2022-02-24 | 2022-05-06 | 福建群峰机械有限公司 | Production method of prefabricated part |
WO2022179345A1 (en) * | 2021-09-26 | 2022-09-01 | 中铁九局集团有限公司 | Steam curing system for pre-tensioned prestressed concrete track slab production line |
CN117260956A (en) * | 2023-07-24 | 2023-12-22 | 中铁四局集团有限公司 | Bridge deck production line |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4952129A (en) * | 1987-04-29 | 1990-08-28 | S.C.A.C. Societa Cementi Armati Centrifugati Spa | Plant to manufacture elongated elements of prestressed reinforced concrete |
CN102909563A (en) * | 2012-10-26 | 2013-02-06 | 济南天辰铝机制造有限公司 | Digital control section steel sawing, drilling and welding integrated production line |
CN203876032U (en) * | 2014-04-03 | 2014-10-15 | 深圳海龙建筑制品有限公司 | Automatic prefabricated part production system |
CN105082346A (en) * | 2015-02-09 | 2015-11-25 | 中交第三航务工程局有限公司 | Intelligent flow production line for shield segment prefabrication |
CN105464010A (en) * | 2015-11-18 | 2016-04-06 | 中泰国际高新技术有限公司 | Concrete box culvert construction method and system based on automatic transportation |
CN105773827A (en) * | 2016-05-03 | 2016-07-20 | 国新德 | Three-dimensional production system of prefabricated components |
CN105835216A (en) * | 2016-06-17 | 2016-08-10 | 清苑县同业机械制造有限公司 | Natural curing production line for building blocks and production method for building blocks |
CN105922437A (en) * | 2016-06-29 | 2016-09-07 | 山东电力管道工程公司 | PCCP pipe core vertical molding method automatic production line |
CN206967718U (en) * | 2017-04-26 | 2018-02-06 | 天津中金博奥重工机械有限责任公司 | A kind of precast concrete pipe culvert production line |
-
2017
- 2017-04-26 CN CN201710284165.XA patent/CN107042580B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4952129A (en) * | 1987-04-29 | 1990-08-28 | S.C.A.C. Societa Cementi Armati Centrifugati Spa | Plant to manufacture elongated elements of prestressed reinforced concrete |
CN102909563A (en) * | 2012-10-26 | 2013-02-06 | 济南天辰铝机制造有限公司 | Digital control section steel sawing, drilling and welding integrated production line |
CN203876032U (en) * | 2014-04-03 | 2014-10-15 | 深圳海龙建筑制品有限公司 | Automatic prefabricated part production system |
CN105082346A (en) * | 2015-02-09 | 2015-11-25 | 中交第三航务工程局有限公司 | Intelligent flow production line for shield segment prefabrication |
CN105464010A (en) * | 2015-11-18 | 2016-04-06 | 中泰国际高新技术有限公司 | Concrete box culvert construction method and system based on automatic transportation |
CN105773827A (en) * | 2016-05-03 | 2016-07-20 | 国新德 | Three-dimensional production system of prefabricated components |
CN105835216A (en) * | 2016-06-17 | 2016-08-10 | 清苑县同业机械制造有限公司 | Natural curing production line for building blocks and production method for building blocks |
CN105922437A (en) * | 2016-06-29 | 2016-09-07 | 山东电力管道工程公司 | PCCP pipe core vertical molding method automatic production line |
CN206967718U (en) * | 2017-04-26 | 2018-02-06 | 天津中金博奥重工机械有限责任公司 | A kind of precast concrete pipe culvert production line |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109422191A (en) * | 2017-08-21 | 2019-03-05 | 中电普瑞电力工程有限公司 | A kind of automatic hanging apparatus |
CN109422199A (en) * | 2017-09-04 | 2019-03-05 | 中核陕西铀浓缩有限公司 | A kind of UF6Liquefy homogeneous special product container traffic vehicle |
CN107901208A (en) * | 2017-12-07 | 2018-04-13 | 郑州市第建筑工程集团有限公司 | Prefabricated reinforced concrete section of jurisdiction automatic production line |
CN108472777A (en) * | 2018-03-30 | 2018-08-31 | 深圳市君盈建筑科技有限公司 | Migration formula steel bar meter method |
CN108891882A (en) * | 2018-08-22 | 2018-11-27 | 西安中铁工程装备有限公司 | A kind of step-by-step movement section of jurisdiction translation delivery system and its Transfer method |
CN109159273A (en) * | 2018-10-24 | 2019-01-08 | 中建科技有限公司 | The automatic production method of the comprehensive prefabricated piping lane concrete prefabricated element in underground |
CN109624067A (en) * | 2018-12-26 | 2019-04-16 | 广西宏发重工机械有限公司 | A kind of reinforcing bar delivery device of structuring formwork machine |
CN109986684A (en) * | 2019-04-11 | 2019-07-09 | 中交四航局第二工程有限公司 | The plate device and its system of the streamlined production of king's block are turned round for concrete |
CN110103333A (en) * | 2019-06-13 | 2019-08-09 | 武汉比邻科技发展有限公司 | A kind of production line of batch and production technology of steel core concrete column |
CN110228131A (en) * | 2019-06-27 | 2019-09-13 | 郑州铁路职业技术学院 | A kind of prefabricated case beam curing means |
CN110509422A (en) * | 2019-08-16 | 2019-11-29 | 温州源利智能科技有限公司 | A kind of precast concrete production equipment and production method |
CN110815537A (en) * | 2019-12-13 | 2020-02-21 | 中建科技有限公司深圳分公司 | Window production line wafts |
CN111823378A (en) * | 2020-08-04 | 2020-10-27 | 秦杰 | Automatic maintenance of equipment of putting things in good order of prefabricated part of assembly type structure |
CN111958810A (en) * | 2020-08-18 | 2020-11-20 | 广东联星瑞业水泥制品有限公司 | Flat lantern ring interface cement pipe manufacture equipment |
WO2022179345A1 (en) * | 2021-09-26 | 2022-09-01 | 中铁九局集团有限公司 | Steam curing system for pre-tensioned prestressed concrete track slab production line |
CN113979039A (en) * | 2021-11-12 | 2022-01-28 | 中交第四航务工程局有限公司 | Reinforcing bar production conveying system |
CN114434594A (en) * | 2022-02-24 | 2022-05-06 | 福建群峰机械有限公司 | Production method of prefabricated part |
CN117260956A (en) * | 2023-07-24 | 2023-12-22 | 中铁四局集团有限公司 | Bridge deck production line |
CN117260956B (en) * | 2023-07-24 | 2024-06-04 | 中铁四局集团有限公司 | Bridge deck production line |
Also Published As
Publication number | Publication date |
---|---|
CN107042580B (en) | 2022-09-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107042580A (en) | A kind of precast concrete pipe culvert production line and production technology | |
CN111452208B (en) | Section beam prefabricating assembly line adopting stub matching method | |
CN107059640B (en) | Bridge girder erection machine for prefabricated segmental beam span-by-span construction and construction method thereof | |
CN109267490B (en) | Long guide beam type movable formwork and construction method thereof | |
CN111745809A (en) | Automatic prefabricated light T-beam system and method | |
CN111996916A (en) | Cast-in-place box girder integrated construction equipment and construction method thereof | |
CN111558996A (en) | Circulating plate line for steel mesh cage saddle and preparation process | |
CN109968516A (en) | A kind of PC component integrated manufacturing system (IMS) and its production method | |
CN206967718U (en) | A kind of precast concrete pipe culvert production line | |
CN111702948A (en) | Pouring system and pouring method for automatic prefabricated T beam | |
CN108071124A (en) | Prefabricated assembled subway station prefabricated components construction method | |
CN109355983B (en) | Trackless construction method for urban rail | |
CN213971807U (en) | Concrete prefabricated part transports primary and secondary car | |
CN210151779U (en) | Municipal administration utility tunnel hydraulic template platform truck | |
CN117103434A (en) | Assembled box culvert steel template system and construction method | |
CN209794134U (en) | short line matching section beam circulating flow production line | |
CN113787604B (en) | Prefabricated staircase continuous-flow type production line | |
CN208203298U (en) | A kind of big punching block of rail type side wall | |
CN208430437U (en) | Movable formwork bridge fabrication machine | |
CN214819438U (en) | Self-propelled integral hydraulic formwork equipment for prefabricating T-shaped beam | |
CN206883886U (en) | A kind of box ecological block production line | |
CN212358378U (en) | Lifting trolley for pipe gallery construction | |
CN111591702B (en) | Large circulation system of aerated concrete plate and preparation process | |
CN212578864U (en) | Automatic prefabricated light T beam system | |
CN211590665U (en) | Double-sided laminated concrete prefabricated part production system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230316 Address after: 301739 No.20, Jingbin Avenue, Jingbin Industrial Park, Wuqing District, Tianjin Patentee after: Boao Heavy Industry Equipment Manufacturing (Tianjin) Co.,Ltd. Address before: 301712 No.20, Jingbin Avenue, Jingbin Industrial Park, Wuqing District, Tianjin Patentee before: TIANJIN ZHONGJIN BO MR HEAVY INDUSTRY MACHINERY CO.,LTD. |
|
TR01 | Transfer of patent right |