CN107650258A - A kind of bidirectional circulating structure prefabricated components production line and control method - Google Patents

A kind of bidirectional circulating structure prefabricated components production line and control method Download PDF

Info

Publication number
CN107650258A
CN107650258A CN201711062888.1A CN201711062888A CN107650258A CN 107650258 A CN107650258 A CN 107650258A CN 201711062888 A CN201711062888 A CN 201711062888A CN 107650258 A CN107650258 A CN 107650258A
Authority
CN
China
Prior art keywords
die station
prefabricated components
area
mould
production line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711062888.1A
Other languages
Chinese (zh)
Inventor
方爱斌
吴杰
朱敏涛
李玲玉
卞成辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiangong Construction Material Co Ltd
Original Assignee
Shanghai Jiangong Construction Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiangong Construction Material Co Ltd filed Critical Shanghai Jiangong Construction Material Co Ltd
Priority to CN201711062888.1A priority Critical patent/CN107650258A/en
Publication of CN107650258A publication Critical patent/CN107650258A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/08Producing shaped prefabricated articles from the material by vibrating or jolting
    • B28B1/087Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould
    • B28B1/0873Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould the mould being placed on vibrating or jolting supports, e.g. moulding tables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/02Feeding the unshaped material to moulds or apparatus for producing shaped articles
    • B28B13/0215Feeding the moulding material in measured quantities from a container or silo
    • B28B13/026Feeding the moulding material in measured quantities from a container or silo by using a movable hopper transferring the moulding material to the moulding cavities
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B17/00Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a kind of bidirectional circulating structure prefabricated components production line, the production line includes concealed work inspection area, concrete distributing area, die station vibrating area, die station conserves area, demoulding lifting area, die station clearing zone, die station, die station rolling support device, die station ferry device, ferry-boat track and control system, also including for carrying out the reinforcing bar distributing trolley of handling and steel reinforcement cage colligation to mould according to mould position line and for determining the position line of die station and built-in fitting and spraying the chalker of releasing agent, the die station rolling support device is laid in the both sides of die station, the reinforcing bar distributing trolley, chalker, die station rolling support device, die station ferry device, concrete spreader, the control signal input of die station vibrating device is connected with the control signal output of control system.The present invention ensures the continuity of production, shortens the time of die station turnover, improves production efficiency.

Description

A kind of bidirectional circulating structure prefabricated components production line and control method
Technical field
The invention belongs to prefabricated components production technical field, is produced more particularly to a kind of bidirectional circulating structure prefabricated components Line and control method.
Background technology
Assembled architecture industrialization is global megatrend and main trend, while is also the urgent of China's reform and development It is required that.In China, building materials industry and building had turned into the basic industry and pillar industry of national economy already.At present, prefabricated components are given birth to Production pattern mainly has two kinds, i.e., fixed die station production system, wherein mechanized production system, mechanized production system principal mode It is two kinds of annular closed type and long line method.The characteristics of fixed die station production system be die station fix, based on manual operation, it is automatic Change degree is low;Annular closed type mechanized production system is mainly characterized by station and automation equipment is fixed, die station is by production ring Section movement.As country greatly develops the main trend of prefabricated components, traditional sea of faces's mode of production will progressively be automated production Mode is substituted.
Because concrete prefabricated element volume is big, weight weight, the production of existing prefabricated components generally is fixed, i.e., From mould installion, steel reinforcement cage and installation of embedded parts, concreting vibrate, be stripped the production processes such as steam or water curing be all The same position in workshop, so production will take very big space, and whole operation process is complicated, and particularly mould is pacified Dress, concrete transportation, concreting vibrate and the process such as component product transport need to take considerable time and manually, power consumption.
The content of the invention
For deficiency of the prior art, the present invention provides a kind of bidirectional circulating structure prefabricated components production line and controlling party Method, solves the problems, such as prefabricated components low production efficiency, cost is high into producing.
To achieve the above object, the technical solution adopted in the present invention is:
A kind of bidirectional circulating structure prefabricated components production line, the production line include concealed work inspection area, concrete distributing area, mould Platform vibrating area, die station maintenance area, the demoulding lifting area, die station clearing zone, die station, die station rolling support device, die station ferry device, Ferry-boat track and control system, in addition to for carrying out the reinforcing bar cloth of handling and steel reinforcement cage colligation to mould according to mould position line Trolley and for determining the position line of die station and built-in fitting and spraying the chalker of releasing agent, die station rolling support dress The both sides for being laid in die station are put, on ferry-boat track, the die station bottom fills die station ferry device provided with die station rolling support Put, be provided in the concrete distributing area into die station in the concrete spreader of casting concrete, die station vibrating area It is laid with die station vibrating device, die station maintenance is provided with three-dimensional curing kilns, the reinforcing bar distributing trolley, chalker, die station in area Rolling support device, die station ferry device, concrete spreader, the control signal input of die station vibrating device are with control The control signal output connection of system.
Also include prefabricated components mould handling apparatus.
Also include rotary wind type floating device.
A kind of control method of bidirectional circulating structure prefabricated components production line, the control method comprise the following steps:
Step 1:Element type is determined, specifies die station producing region;
Step 2:Master drawing sideline size snap the line, drilling in the die station of die station clearing zone are turned over according to component, ensure that mould can be accurate Installation positioning;
Step 3:Mould is lifted by crane by reinforcing bar distributing trolley, the handling of mould is carried out and in specified die station according to the position line of mould Carry out the assembly of mould;
Step 4:After the completion of mould assembly, the colligation of steel reinforcement cage, steel reinforcement cage are carried out with reinforcing bar distributing trolley handling framework of steel reinforcement In process of binding and carry out the installation of built-in fitting;
Step 5:After the completion of reinforcing bar colligation, die station is circulated and starts concrete spreader to concrete distributing area, controller, is started Concrete pours;
Step 6:When concreting to object height, stop pouring for concrete, die station is circulated to die station vibrating area, control Device processed starts die station vibrating device and carries out vibratory compaction to die station, using rotary wind type floating device to component upper table after the completion of vibration Face carries out floating;
Step 7:Prefabricated components are transported in the three-dimensional curing kilns in die station maintenance area after the completion of receipts water face work and conserved;
Step 8:When reaching design requirement intensity through laboratory's measure prefabricated components intensity, prefabricated components are circulated to the demoulding and lifted by crane Area, prefabricated components are removed by three-dimensional curing kilns by prefabricated components boom hoisting and carry out form removal processing, and prefabricated components are carried out Lifting, it is hung to specified laydown area and carries out repairing mark stacking maintenance;
Step 9:Empty die station moves to die station clearing zone along ferry-boat track by die station ferry device and cleared up, and then passes through Die station rolling support device is moved to next process, repeat step 1-8.
Prefabricated components include prefabricated panel, precast beam, prefabricated post, prefabricated superimposed sheet, precast stair, prefabricated balcony plate, pre- Air-conditioning plate processed.
The die station rolling support device is used to support die station and make die station move longitudinally, and each die station both sides are each per side Provided with three rollers.
The die station ferry device, which is used to lifting die station, to be laterally moved to designated area, the track of die station ferry device with Laid independently of each other between the track of die station rolling support device.
The concrete spreader has ten feed openings, selects different feed openings to enter according to the size of prefabricated components Row discharging, ensure that each position of component can casting concrete.
The die station is vertically stacked in three-dimensional curing kilns.The concentration maintenance processing of die station is realized, improves the maintenance of component Efficiency.Three-dimensional curing kilns lifting need to be removed by reaching design strength in curing strength, need to be by laboratory to maintaining test block with same condition Pressure testing is carried out, can just form removal lifting processing be carried out to prefabricated components when proof strength reaches design requirement intensity.
Compared with prior art, beneficial effects of the present invention are:
1st, the invention provides a kind of bidirectional circulating structure prefabricated components production line and control method, have on the track of the production line Multiple removable die station, mobile die station are arranged in matrix form, and track includes a plurality of transverse slipway being parallel to each other and for die station The end slipway of ferry device, die station ferry device can slide on transverse slipway, after die station to be moved enters next process, Die station can be moved by die station ferry device axial transport immediately has two vibration dresses to vibration area, concrete vibrating area is poured Put, device does not influence the work that pours of concrete when repairing, so improve the utilization rate of die station, ensure that each equipment is not stopped Have a rest operation, shorten the production time of component, improve production efficiency.
2nd, received in prefabricated components and enter three-dimensional curing kilns maintenance after water is wiped one's face, accelerate the lifting intensity of component, quick form removal Hoisting component, ensure die station by cleaning, the die station circulation operation division of labor is clear and definite, and die station can quickly carry out new round prefabricated components Production.
Brief description of the drawings
Fig. 1 is the top view of bidirectional circulating structure prefabricated components production line of the present invention.
Wherein, the concrete meaning of label is in figure:1st, concealed work inspection area, 2, concrete distributing area, 3, die station vibration Area, 4, die station maintenance area, 5, demoulding lifting area, 6, die station clearing zone, 8, die station, 9, die station rolling support device, 10, die station Ferry device, 11, ferry-boat track.
Embodiment
It is specific below by what is shown in accompanying drawing to make the object, technical solutions and advantages of the present invention of greater clarity Embodiment describes the present invention.However, it should be understood that these descriptions are merely illustrative, and it is not intended to limit the model of the present invention Enclose.In addition, in the following description, the description to known features and technology is eliminated, to avoid unnecessarily obscuring the present invention's Concept.
As shown in figure 1, the present embodiment bidirectional circulating structure prefabricated components production line, the production line is examined including concealed work Area 1, concrete distributing area 2, die station vibrating area 3, die station maintenance area 4, demoulding lifting area 5, die station clearing zone 6, die station 8, die station Rolling support device 9, die station ferry device 10, ferry-boat track 11 and control system, in addition to for according to mould position line pair Mould carries out the reinforcing bar distributing trolley of handling and steel reinforcement cage colligation and the position line and sprinkling for determining die station and built-in fitting take off The chalker of mould agent, the die station rolling support device 9 are laid in the both sides of die station 8, and die station ferry device 10 is positioned at ferry-boat On track 11, the bottom of die station 8 is provided with die station rolling support device 9, is provided in the concrete distributing area 2 to mould Die station vibrating device is laid with platform in the concrete spreader of casting concrete, die station vibrating area 3, die station maintenance is set in area 4 There are three-dimensional curing kilns, the reinforcing bar distributing trolley, chalker, die station rolling support device 9, die station ferry device 10, coagulation Native material distributing machine, the control signal input of die station vibrating device are connected with the control signal output of control system.
Preferably, the present embodiment also includes prefabricated components mould handling apparatus.
Preferably, the present embodiment also includes rotary wind type floating device.
A kind of control method of bidirectional circulating structure prefabricated components production line of the present embodiment, the control method include following step Suddenly:
Step 1:Element type is determined, specifies die station producing region;
Step 2:Master drawing sideline size snap the line, drilling in the die station of die station clearing zone 6 are turned over according to component, ensure that mould can be accurate Installation positioning;
Step 3:Mould is lifted by crane by reinforcing bar distributing trolley, the handling of mould is carried out and in specified die station according to the position line of mould Carry out the assembly of mould;
Step 4:After the completion of mould assembly, the colligation of steel reinforcement cage, steel reinforcement cage are carried out with reinforcing bar distributing trolley handling framework of steel reinforcement In process of binding and carry out the installation of built-in fitting;
Step 5:After the completion of reinforcing bar colligation, die station is circulated and starts concrete spreader to concrete distributing area, controller, is started Concrete pours;
Step 6:When concreting to object height, stop pouring for concrete, die station is circulated to die station vibrating area, control Device processed starts die station vibrating device and carries out vibratory compaction to die station, using rotary wind type floating device to component upper table after the completion of vibration Face carries out floating;
Step 7:Prefabricated components are transported in the three-dimensional curing kilns in die station maintenance area after the completion of receipts water face work and conserved;
Step 8:When reaching design requirement intensity through laboratory's measure prefabricated components intensity, prefabricated components are circulated to the demoulding and lifted by crane Area, prefabricated components are removed by three-dimensional curing kilns by prefabricated components boom hoisting and carry out form removal processing, and prefabricated components are carried out Lifting, it is hung to specified laydown area and carries out repairing mark stacking maintenance;
Step 9:Empty die station moves to die station clearing zone along ferry-boat track by die station ferry device and cleared up, and then passes through Die station rolling support device is moved to next process, repeat step 1-8.
The present embodiment prefabricated components include prefabricated panel, precast beam, prefabricated post, prefabricated superimposed sheet, precast stair, prefabricated sun Platen, prefabricated air-conditioning plate.
Preferably, the present embodiment die station rolling support device is used to support die station and make die station move longitudinally, each Die station both sides are respectively provided with three rollers per side.
As further preferred, the present embodiment die station ferry device, which is used to lifting die station, to be laterally moved to designated area, Laid independently of each other between the track of die station ferry device and the track of die station rolling support device.
As further preferred, the present embodiment concrete spreader has ten feed openings, big according to the size of prefabricated components The different feed opening of small selection carries out discharging, ensures that each position of component can casting concrete.
As still more preferably, the present embodiment die station is vertically stacked in three-dimensional curing kilns.
Although above-described embodiment makes specific descriptions to the present invention, come for one of ordinary skill in the art Say, it is understood that can be modified within the spirit and scope for not departing from the present invention based on present disclosure Or improve, these modification and improvement are all within the spirit and scope of the present invention.

Claims (9)

1. a kind of bidirectional circulating structure prefabricated components production line, it is characterised in that the production line includes concealed work inspection area (1), concrete distributing area(2), die station vibrating area(3), die station maintenance area(4), the demoulding lifting area(5), die station clearing zone(6)、 Die station(8), die station rolling support device(9), die station ferry device(10), ferry-boat track(11)And control system, in addition to use In the reinforcing bar distributing trolley for carrying out handling and steel reinforcement cage colligation to mould according to mould position line and for determining die station and pre-buried The position line of part and the chalker for spraying releasing agent, the die station rolling support device(9)It is laid in die station(8)Both sides, Die station ferry device(10)Positioned at ferry-boat track(11)On, the die station(8)Bottom is provided with die station rolling support device(9), The concrete distributing area(2)In be provided for the concrete spreader of casting concrete, die station vibrating area into die station(3)In It is laid with die station vibrating device, die station maintenance area(4)In be provided with three-dimensional curing kilns, the reinforcing bar distributing trolley, chalker, mould Platform rolling support device(9), die station ferry device(10), concrete spreader, the control signal input of die station vibrating device It is connected with the control signal output of control system.
2. bidirectional circulating structure prefabricated components production line according to claim 1, it is characterised in that also including prefabricated components Mould handling apparatus.
3. bidirectional circulating structure prefabricated components production line according to claim 1, it is characterised in that also smeared including rotary wind type Leveling device.
4. a kind of control method of bidirectional circulating structure prefabricated components production line, it is characterised in that the control method includes following Step:
Step 1:Element type is determined, specifies die station producing region;
Step 2:Master drawing sideline size is turned in die station clearing zone according to component(6)Die station on snap the line, drilling, ensure that mould can be accurate Really installation positioning;
Step 3:Mould is lifted by crane by reinforcing bar distributing trolley, the handling of mould is carried out and in specified die station according to the position line of mould Carry out the assembly of mould;
Step 4:After the completion of mould assembly, the colligation of steel reinforcement cage, steel reinforcement cage are carried out with reinforcing bar distributing trolley handling framework of steel reinforcement In process of binding and carry out the installation of built-in fitting;
Step 5:After the completion of reinforcing bar colligation, die station is circulated and starts concrete spreader to concrete distributing area, controller, is started Concrete pours;
Step 6:When concreting to object height, stop pouring for concrete, die station is circulated to die station vibrating area, control Device processed starts die station vibrating device and carries out vibratory compaction to die station, using rotary wind type floating device to component upper table after the completion of vibration Face carries out floating;
Step 7:Prefabricated components are transported in the three-dimensional curing kilns in die station maintenance area after the completion of receipts water face work and conserved;
Step 8:When reaching design requirement intensity through laboratory's measure prefabricated components intensity, prefabricated components are circulated to the demoulding and lifted by crane Area, prefabricated components are removed by three-dimensional curing kilns by prefabricated components boom hoisting and carry out form removal processing, and prefabricated components are carried out Lifting, it is hung to specified laydown area and carries out repairing mark stacking maintenance;
Step 9:Empty die station moves to die station clearing zone along ferry-boat track by die station ferry device and cleared up, and then passes through Die station rolling support device is moved to next process, repeat step 1-8.
5. the control method of bidirectional circulating structure prefabricated components production line according to claim 4, it is characterised in that prefabricated Component includes prefabricated panel, precast beam, prefabricated post, prefabricated superimposed sheet, precast stair, prefabricated balcony plate, prefabricated air-conditioning plate.
6. the control method of bidirectional circulating structure prefabricated components production line according to claim 4, it is characterised in that described Die station rolling support device is used to support die station and make die station move longitudinally, and each die station both sides are respectively provided with three rollings per side Wheel.
7. the control method of bidirectional circulating structure prefabricated components production line according to claim 4, it is characterised in that described Die station ferry device is laterally moved to designated area, track and the die station rolling support of die station ferry device for lifting die station Laid independently of each other between the track of device.
8. the control method of bidirectional circulating structure prefabricated components production line according to claim 4, it is characterised in that described Concrete spreader has ten feed openings, selects different feed openings to carry out discharging according to the size of prefabricated components, ensures The each position of component can casting concrete.
9. the control method of bidirectional circulating structure prefabricated components production line according to claim 4, it is characterised in that described Die station is vertically stacked in three-dimensional curing kilns.
CN201711062888.1A 2017-11-02 2017-11-02 A kind of bidirectional circulating structure prefabricated components production line and control method Pending CN107650258A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711062888.1A CN107650258A (en) 2017-11-02 2017-11-02 A kind of bidirectional circulating structure prefabricated components production line and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711062888.1A CN107650258A (en) 2017-11-02 2017-11-02 A kind of bidirectional circulating structure prefabricated components production line and control method

Publications (1)

Publication Number Publication Date
CN107650258A true CN107650258A (en) 2018-02-02

Family

ID=61096482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711062888.1A Pending CN107650258A (en) 2017-11-02 2017-11-02 A kind of bidirectional circulating structure prefabricated components production line and control method

Country Status (1)

Country Link
CN (1) CN107650258A (en)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108058266A (en) * 2018-02-08 2018-05-22 建华建材(中国)有限公司 Prefabricated components integrated production line
CN108312323A (en) * 2018-04-27 2018-07-24 有利华建筑预制件(深圳)有限公司 A kind of layout structure of Prefabricated construction panel production line
CN108481543A (en) * 2018-04-27 2018-09-04 有利华建筑预制件(深圳)有限公司 Precast stair production line
CN108726967A (en) * 2018-07-20 2018-11-02 浙江新邦远大绿色建筑产业有限公司 A kind of production technology of PC components
CN108748642A (en) * 2018-06-08 2018-11-06 安徽中宝建材科技有限公司 A kind of assembled architecture Component Flexible production line
CN108908681A (en) * 2018-06-12 2018-11-30 浙江精功科技股份有限公司 A kind of PC concrete prefabricated element production line control system
CN109129872A (en) * 2018-10-15 2019-01-04 六安远大住宅工业有限公司 Line is deposited in a kind of production of prefabricated components
CN109352815A (en) * 2018-11-21 2019-02-19 长沙远大住宅工业(江苏)有限公司 Line is deposited in a kind of prefabricated components production line and the production with the prefabricated components production line
CN109352816A (en) * 2018-12-04 2019-02-19 杭州江润科技有限公司 Small-sized prefabricated member system and construction method
CN109382905A (en) * 2018-10-24 2019-02-26 江苏智信达建筑科技有限公司 A kind of production line of precast concrete
CN109483717A (en) * 2018-11-21 2019-03-19 远大住宅工业(上海)有限公司 A kind of component production line
CN109968521A (en) * 2019-04-24 2019-07-05 成都城投城建科技有限公司 A kind of packaged type bridges prefabricated components production method and industrial production line
CN110039635A (en) * 2019-04-15 2019-07-23 南通现代建筑产业发展有限公司 PC component production technology
CN110228134A (en) * 2019-06-20 2019-09-13 中国二十二冶集团有限公司 Interior wall board member production line double-cycle process method for arranging
CN110434979A (en) * 2019-06-24 2019-11-12 江苏元大建筑科技有限公司 Three-dimensional expansible bidirectional flexible PC component production technology
CN111015920A (en) * 2019-11-09 2020-04-17 颍上晶宫绿建节能建筑有限责任公司 Concrete pouring mechanism and method
CN111186009A (en) * 2019-11-29 2020-05-22 广西建工集团建筑产业投资有限公司 Preparation method of PC prefabricated part double-circulation production line
CN111203972A (en) * 2020-01-19 2020-05-29 安徽省交通控股集团有限公司 Automatic production line for pile plate type structural bridge deck
CN112123554A (en) * 2020-09-21 2020-12-25 嘉和住工(沈阳)预制构件制造有限公司 An automated production line for PC components
CN113021612A (en) * 2021-03-31 2021-06-25 中筑云环保科技(山东)股份有限公司 Prestressed steel pipe laminated slab production line and production method
CN113043446A (en) * 2020-09-07 2021-06-29 中民筑友智能装备科技有限公司 Three-dimensional PC component production line
CN113400449A (en) * 2021-07-30 2021-09-17 湖南新鼎住宅工业有限公司 Intelligent concrete prefabricated part self-vibration type steel table die and production line
CN113442279A (en) * 2021-07-09 2021-09-28 四川东泉机械设备制造有限公司 Continuous circulating pouring method for concrete member
CN113580358A (en) * 2021-08-24 2021-11-02 德州海天机电科技有限公司 A circulation production line for producing hollow floor of prestressing force
CN114012882A (en) * 2021-11-16 2022-02-08 中铁建设集团建筑发展有限公司 Three-dimensional intensive PC component production system and process thereof
CN114012880A (en) * 2021-10-13 2022-02-08 上海建工集团股份有限公司 Flexible production method of hybrid three-dimensional prefabricated part
CN114012883A (en) * 2021-11-25 2022-02-08 上海建工建材科技集团股份有限公司 Three-dimensional mobile PC component digital production system and production method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205219397U (en) * 2015-10-27 2016-05-11 沈阳卫德住宅工业化科技有限公司 Ferry -boat formula precast concrete of central authorities component production line
CN107175759A (en) * 2017-07-14 2017-09-19 广东省建筑机械厂有限公司 The production line of building beam column concrete prefabricated element
CN107263697A (en) * 2017-06-22 2017-10-20 上海建工材料工程有限公司 A kind of intelligent production line of two-way expansible prefabricated components and control method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205219397U (en) * 2015-10-27 2016-05-11 沈阳卫德住宅工业化科技有限公司 Ferry -boat formula precast concrete of central authorities component production line
CN107263697A (en) * 2017-06-22 2017-10-20 上海建工材料工程有限公司 A kind of intelligent production line of two-way expansible prefabricated components and control method
CN107175759A (en) * 2017-07-14 2017-09-19 广东省建筑机械厂有限公司 The production line of building beam column concrete prefabricated element

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108058266A (en) * 2018-02-08 2018-05-22 建华建材(中国)有限公司 Prefabricated components integrated production line
CN108312323A (en) * 2018-04-27 2018-07-24 有利华建筑预制件(深圳)有限公司 A kind of layout structure of Prefabricated construction panel production line
CN108481543A (en) * 2018-04-27 2018-09-04 有利华建筑预制件(深圳)有限公司 Precast stair production line
CN108748642A (en) * 2018-06-08 2018-11-06 安徽中宝建材科技有限公司 A kind of assembled architecture Component Flexible production line
CN108908681A (en) * 2018-06-12 2018-11-30 浙江精功科技股份有限公司 A kind of PC concrete prefabricated element production line control system
CN108726967A (en) * 2018-07-20 2018-11-02 浙江新邦远大绿色建筑产业有限公司 A kind of production technology of PC components
CN109129872A (en) * 2018-10-15 2019-01-04 六安远大住宅工业有限公司 Line is deposited in a kind of production of prefabricated components
CN109129872B (en) * 2018-10-15 2023-08-22 六安远大住宅工业有限公司 Prefabricated component production line
CN109382905B (en) * 2018-10-24 2021-04-20 江苏智信达建筑科技有限公司 Production line of precast concrete member
CN109382905A (en) * 2018-10-24 2019-02-26 江苏智信达建筑科技有限公司 A kind of production line of precast concrete
CN109483717A (en) * 2018-11-21 2019-03-19 远大住宅工业(上海)有限公司 A kind of component production line
CN109352815B (en) * 2018-11-21 2024-01-30 长沙远大住宅工业(江苏)有限公司 Prefabricated component production line and production line with same
CN109352815A (en) * 2018-11-21 2019-02-19 长沙远大住宅工业(江苏)有限公司 Line is deposited in a kind of prefabricated components production line and the production with the prefabricated components production line
CN109352816A (en) * 2018-12-04 2019-02-19 杭州江润科技有限公司 Small-sized prefabricated member system and construction method
CN109352816B (en) * 2018-12-04 2020-09-22 杭州江润科技有限公司 Small prefabricated part system and construction method
CN110039635A (en) * 2019-04-15 2019-07-23 南通现代建筑产业发展有限公司 PC component production technology
CN109968521A (en) * 2019-04-24 2019-07-05 成都城投城建科技有限公司 A kind of packaged type bridges prefabricated components production method and industrial production line
CN110228134A (en) * 2019-06-20 2019-09-13 中国二十二冶集团有限公司 Interior wall board member production line double-cycle process method for arranging
CN110434979A (en) * 2019-06-24 2019-11-12 江苏元大建筑科技有限公司 Three-dimensional expansible bidirectional flexible PC component production technology
CN111015920A (en) * 2019-11-09 2020-04-17 颍上晶宫绿建节能建筑有限责任公司 Concrete pouring mechanism and method
CN111186009A (en) * 2019-11-29 2020-05-22 广西建工集团建筑产业投资有限公司 Preparation method of PC prefabricated part double-circulation production line
CN111203972A (en) * 2020-01-19 2020-05-29 安徽省交通控股集团有限公司 Automatic production line for pile plate type structural bridge deck
CN113043446A (en) * 2020-09-07 2021-06-29 中民筑友智能装备科技有限公司 Three-dimensional PC component production line
CN112123554A (en) * 2020-09-21 2020-12-25 嘉和住工(沈阳)预制构件制造有限公司 An automated production line for PC components
CN113021612A (en) * 2021-03-31 2021-06-25 中筑云环保科技(山东)股份有限公司 Prestressed steel pipe laminated slab production line and production method
CN113442279A (en) * 2021-07-09 2021-09-28 四川东泉机械设备制造有限公司 Continuous circulating pouring method for concrete member
CN113400449A (en) * 2021-07-30 2021-09-17 湖南新鼎住宅工业有限公司 Intelligent concrete prefabricated part self-vibration type steel table die and production line
CN113400449B (en) * 2021-07-30 2025-01-10 湖南新鼎住宅工业有限公司 Intelligent precast concrete component self-vibrating steel table formwork and production line
CN113580358A (en) * 2021-08-24 2021-11-02 德州海天机电科技有限公司 A circulation production line for producing hollow floor of prestressing force
CN114012880A (en) * 2021-10-13 2022-02-08 上海建工集团股份有限公司 Flexible production method of hybrid three-dimensional prefabricated part
CN114012882A (en) * 2021-11-16 2022-02-08 中铁建设集团建筑发展有限公司 Three-dimensional intensive PC component production system and process thereof
CN114012883A (en) * 2021-11-25 2022-02-08 上海建工建材科技集团股份有限公司 Three-dimensional mobile PC component digital production system and production method
CN114012883B (en) * 2021-11-25 2023-03-07 上海建工建材科技集团股份有限公司 Three-dimensional mobile PC component digital production system and production method

Similar Documents

Publication Publication Date Title
CN107650258A (en) A kind of bidirectional circulating structure prefabricated components production line and control method
CN107263697B (en) Bidirectional expandable prefabricated part intelligent production line and control method
CN108381746B (en) Construction method of sliding type pedestal prefabricated box girder
CN106639317B (en) A kind of complete building technology of prefabrication
CN111452208B (en) Section beam prefabricating assembly line adopting stub matching method
CN101985856B (en) Removal-free prefabricated reinforced concrete template with cross holes inside and manufacturing method thereof
CN101525873B (en) Pier hydraulic leveling inner-climbing climbing form and concrete pouring method thereby
CN111745809A (en) An automated prefabricated light-weight T-beam system and method
CN102398305B (en) Method for producing precast concrete piles
CN111409185A (en) A mobile integrated device and production process for producing precast concrete slabs
CN101337399A (en) Whole-course full-automatic quick production line of wall board
CN104786367A (en) Pipe joint prefabricating workshop
CN102555053A (en) Porous foaming concrete block production line
CN205735469U (en) PCCP tube core vertical forming method automation production flow line
CN108193712A (en) Factory construction device and method for components of superposed assembly type pipe gallery structure system
CN108071124A (en) Prefabricated assembled subway station prefabricated components construction method
CN111844352A (en) Construction process for prefabricating mechanical high-efficiency guardrail
CN104675112A (en) Steel stair formwork and constructing method for once pouring forming of building staircase
CN202401753U (en) Sliding die device
CN103128846A (en) Automatic mechanical production line device of waste residue cement foam battens or building blocks
CN215920863U (en) High-speed railway precast box girder production line
CN107345439A (en) A kind of making of precast stair component and installation method
CN203795311U (en) Multi-leg high pier and slip form construction device
CN111618992B (en) A concrete pile production system
CN106142337B (en) A kind of mechanical-moulded dry concrete bottom plate with ribbing and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180202

RJ01 Rejection of invention patent application after publication