CN110228134A - Interior wall board member production line double-cycle process method for arranging - Google Patents

Interior wall board member production line double-cycle process method for arranging Download PDF

Info

Publication number
CN110228134A
CN110228134A CN201910538842.5A CN201910538842A CN110228134A CN 110228134 A CN110228134 A CN 110228134A CN 201910538842 A CN201910538842 A CN 201910538842A CN 110228134 A CN110228134 A CN 110228134A
Authority
CN
China
Prior art keywords
assembly line
arranging
board member
production line
wall board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910538842.5A
Other languages
Chinese (zh)
Inventor
覃晓君
张晓峰
田若喻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201910538842.5A priority Critical patent/CN110228134A/en
Publication of CN110228134A publication Critical patent/CN110228134A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • General Factory Administration (AREA)

Abstract

The present invention relates to a kind of interior wall board member production line double-cycle process method for arranging, assembly line includes the following steps: mold cleaning;Release agent spraying;Side mode scribing line;Side mode installation;Reinforcement installation;Embedded part installation;Casting is vibrated;It strikes off;It stands, precuring;Press polish of plastering is handled;Steam curing;Demoulding;Coarse surface treatment;Storage;Assembly line is using the two independent loops assembly line constructions of interior circulation and outer circulation.Interior wall board member production line double-cycle process method for arranging of the present invention, common process is avoided to arrange assembly line Caton, personnel's work holdup caused by single cycle, the present invention uses inside and outside independent Two-way Cycle streamline round-robin method: making full use of place and resource, production efficiency is increased to twice of regular pipeline.

Description

Interior wall board member production line double-cycle process method for arranging
Technical field
The present invention relates to a kind of construction techniques, in particular to a kind of interior wall board member production line Two-way Cycle Method for arranging technological process.
Background technique
Popularization with country to assembled architecture, PC element precast factory develop rapidly like the mushrooms after rain.Component The reasonability of the technology arrangement of production line directly determines the quality and efficiency of component production.
So far, the arrangement of PC component production line is circulating automatic assembly line, is generally distributed in the production line There are two, three or four lines, endless form is single cycle, as described in Figure 1.
Current line configurations mode all there is the unbalanced technique waiting time, causes the discontinuous of assembly line Property, process portion work holdup state is caused, the efficiency of production and the quality of component are reduced.
Summary of the invention
In view of the deficiency of the prior art, the present invention provides a kind of raising production efficiency, reduces the interior of production cost Wall plate member production line double-cycle process method for arranging.
The technical solution used in the present invention is:
A kind of interior wall board member production line double-cycle process method for arranging,
Assembly line includes the following steps:
Mold cleaning;
Release agent spraying;
Side mode scribing line;
Side mode installation;
Reinforcement installation;
Embedded part installation;
Casting is vibrated;
It strikes off;
It stands, precuring;
Press polish of plastering is handled;
Steam curing;
Demoulding;
Coarse surface treatment;
Storage;
Assembly line is using the two independent loops assembly line constructions of interior circulation and outer circulation.
The present invention compared with the prior art the utility model has the advantages that
Interior wall board member production line double-cycle process method for arranging of the present invention avoids common process from arranging caused by single cycle Assembly line Caton, personnel's work holdup, the present invention use inside and outside independent Two-way Cycle streamline round-robin method: making full use of place and money Production efficiency is increased to twice of regular pipeline by source.
Detailed description of the invention
Fig. 1 is the lining production line process flow circulation route schematic diagram of the prior art;
Fig. 2 is lining production line station layout drawing of the invention;
Fig. 3 is lining production line station flow chart of the invention;
Fig. 4 is lining production line process flow circulation route schematic diagram of the invention;
Fig. 5 is lining production line circulation route schematic diagram of the invention.
Main component symbol description in attached drawing:
In figure:
1, station turning 2, ferry-boat station
3, station 4, spray station are cleared up
5, installation station is touched on scribing line station 6, side
7, reinforcement installation station 8, vibrate cloth station
9, transition station 10, ferry-boat station
11, ferry-boat station 12, transition station
13, vibration smoothes out station 14, smoothes out station manually
15, precuring station 16, troweling station
17, manual troweling station 18, demoulding station.
Specific embodiment
Referring to the drawings and embodiment the present invention will be described in detail:
Attached drawing 2-5 it is found that a kind of interior wall board member production line double-cycle process method for arranging,
Assembly line includes the following steps:
Mold cleaning;
Release agent spraying;
Side mode scribing line;
Side mode installation;
Reinforcement installation;
Embedded part installation;
Casting is vibrated;
It strikes off;
It stands, precuring;
Press polish of plastering is handled;
Steam curing;
Demoulding;
Coarse surface treatment;
Storage;
Assembly line is using the two independent loops assembly line constructions of interior circulation and outer circulation.
Interior wall board member production line double-cycle process method for arranging of the present invention avoids common process from arranging caused by single cycle Assembly line Caton, personnel's work holdup, the present invention use inside and outside independent Two-way Cycle streamline round-robin method: making full use of place and money Production efficiency is increased to twice of regular pipeline by source.
The above described is only a preferred embodiment of the present invention, not making in any form to structure of the invention Limitation.Any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention, Belong within the scope of technical solution of the present invention.

Claims (1)

1. a kind of interior wall board member production line double-cycle process method for arranging, it is characterised in that:
Assembly line includes the following steps:
Mold cleaning;
Release agent spraying;
Side mode scribing line;
Side mode installation;
Reinforcement installation;
Embedded part installation;
Casting is vibrated;
It strikes off;
It stands, precuring;
Press polish of plastering is handled;
Steam curing;
Demoulding;
Coarse surface treatment;
Storage;
Assembly line is using the two independent loops assembly line constructions of interior circulation and outer circulation.
CN201910538842.5A 2019-06-20 2019-06-20 Interior wall board member production line double-cycle process method for arranging Pending CN110228134A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910538842.5A CN110228134A (en) 2019-06-20 2019-06-20 Interior wall board member production line double-cycle process method for arranging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910538842.5A CN110228134A (en) 2019-06-20 2019-06-20 Interior wall board member production line double-cycle process method for arranging

Publications (1)

Publication Number Publication Date
CN110228134A true CN110228134A (en) 2019-09-13

Family

ID=67856378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910538842.5A Pending CN110228134A (en) 2019-06-20 2019-06-20 Interior wall board member production line double-cycle process method for arranging

Country Status (1)

Country Link
CN (1) CN110228134A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT506747B1 (en) * 2008-05-13 2011-01-15 Progress Maschinen & Automation Ag METHOD FOR PRODUCING CONCRETE PREPARATION ELEMENTS WHERE THE MANUFACTURE OF THE COMPONENTS ON PALLET SHAPES IS CARRIED OUT
CN103029212A (en) * 2012-12-26 2013-04-10 中南建设(沈阳)建筑产业有限公司 Production process of automatic assembly line in factory for pre-fabricating and assembling wall panel of integral shear wall structure
CN107650258A (en) * 2017-11-02 2018-02-02 上海建工材料工程有限公司 A kind of bidirectional circulating structure prefabricated components production line and control method
CN109352815A (en) * 2018-11-21 2019-02-19 长沙远大住宅工业(江苏)有限公司 Line is deposited in a kind of prefabricated components production line and the production with the prefabricated components production line
CN109732768A (en) * 2019-02-27 2019-05-10 中清大装配式建筑有限公司 Building prefabricated components forming production line and production technology with central dispatch system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT506747B1 (en) * 2008-05-13 2011-01-15 Progress Maschinen & Automation Ag METHOD FOR PRODUCING CONCRETE PREPARATION ELEMENTS WHERE THE MANUFACTURE OF THE COMPONENTS ON PALLET SHAPES IS CARRIED OUT
CN103029212A (en) * 2012-12-26 2013-04-10 中南建设(沈阳)建筑产业有限公司 Production process of automatic assembly line in factory for pre-fabricating and assembling wall panel of integral shear wall structure
CN107650258A (en) * 2017-11-02 2018-02-02 上海建工材料工程有限公司 A kind of bidirectional circulating structure prefabricated components production line and control method
CN109352815A (en) * 2018-11-21 2019-02-19 长沙远大住宅工业(江苏)有限公司 Line is deposited in a kind of prefabricated components production line and the production with the prefabricated components production line
CN109732768A (en) * 2019-02-27 2019-05-10 中清大装配式建筑有限公司 Building prefabricated components forming production line and production technology with central dispatch system

Similar Documents

Publication Publication Date Title
CN101508144B (en) Concrete casting production technique with energy-saving environmental-protection function
CN102584138B (en) Precast glass fiber reinforced cement (GRC) composite member and manufacturing method thereof
CN104723449A (en) Automatic production line of building industrialization concrete precast members
CN201050122Y (en) Prefabricated wall panel shaped by veneer reverse forging
CN103029212A (en) Production process of automatic assembly line in factory for pre-fabricating and assembling wall panel of integral shear wall structure
CN101585205A (en) Method for producing and mounting moulded concrete anaglyph unit plate
CN108729572A (en) A kind of production line of wall
CN110405932A (en) Double skin wall member production line double-cycle process method for arranging
CN109227921A (en) A kind of prefabricated components production line
CN105133778A (en) Crack-proof GRC composite prefabricated member and manufacture method thereof
CN204163259U (en) The ceiling structure of integrated interior decoration
CN206351146U (en) A kind of continous way automatic flushing device for auto parts
CN110228134A (en) Interior wall board member production line double-cycle process method for arranging
CN207593817U (en) A kind of PC Numerical control production lines manipulator
CN110370447A (en) Overlap board member production line double-cycle process method for arranging
CN110450275A (en) PC component integrated production line double-cycle process method for arranging
CN202450688U (en) Prefabricated glass fiber reinforced plastic composite (GRC) component
CN205189382U (en) Ceramic mosaic external tile determining deviation is spread and is pasted device
CN210121895U (en) Multipurpose prefabricated building component forming production line
CN208578056U (en) A kind of assembling concrete cushion cap template
CN209942032U (en) Environment-friendly hoist and mount formula concrete wallboard enclosure
CN108081448B (en) Production process of integrally decorated and electromechanical prefabricated GRC formwork structural column
CN208379898U (en) Assembled wall body structure
CN208697684U (en) A kind of GFRC non-metal sound barrier production line
CN111702918A (en) Construction method of assembly type concrete member flow machine set

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190913