CN108081448B - Production process of integrally decorated and electromechanical prefabricated GRC formwork structural column - Google Patents

Production process of integrally decorated and electromechanical prefabricated GRC formwork structural column Download PDF

Info

Publication number
CN108081448B
CN108081448B CN201711304124.9A CN201711304124A CN108081448B CN 108081448 B CN108081448 B CN 108081448B CN 201711304124 A CN201711304124 A CN 201711304124A CN 108081448 B CN108081448 B CN 108081448B
Authority
CN
China
Prior art keywords
grc
concrete
column
formwork
reinforcement cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711304124.9A
Other languages
Chinese (zh)
Other versions
CN108081448A (en
Inventor
姜绍杰
张宗军
姚大伟
陈长林
齐华伟
王真理
杨强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hailong Construction Industry Co Ltd
Original Assignee
Anhui Hailong Construction Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Hailong Construction Industry Co Ltd filed Critical Anhui Hailong Construction Industry Co Ltd
Priority to CN201711304124.9A priority Critical patent/CN108081448B/en
Publication of CN108081448A publication Critical patent/CN108081448A/en
Application granted granted Critical
Publication of CN108081448B publication Critical patent/CN108081448B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/0025Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects with installation or service material, e.g. tubes for electricity or water
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings

Abstract

The invention discloses a production process of a prefabricated GRC formwork structure column integrating decoration and electromechanics, which comprises the following specific steps: cleaning a GRC column mounting base, and mounting a bottom edge sealing template; after the GRC decorative shell is inspected to be qualified, the GRC decorative shell is lifted to the periphery of the reinforcement cage by a crane; plugging a gap between the GRC formwork shell and the bottom edge sealing formwork by using glass sealant, and performing antifouling protection on a steel bar at the top of a steel bar cage by using a plastic film; pouring concrete to the bottom inside the GRC formwork shell by using a blanking conduit to obtain a GRC decorative structure column; and (3) after the GRC decorative structure column is maintained to reach the strength of 75% of the design requirement, removing the formwork and lifting, removing the L-shaped steel anchor ear and the temporary inclined strut, lifting the L-shaped steel anchor ear and the temporary inclined strut to a specified finished product storage area by a crane, completing subsequent maintenance operation, and obtaining a product after the finished product is qualified. The invention has the advantages of low cost, high construction efficiency and the like.

Description

Production process of integrally decorated and electromechanical prefabricated GRC formwork structural column
Technical Field
The invention relates to the field of structural column production, in particular to a production process of a prefabricated GRC formwork structural column integrating decoration and electromechanics.
Background
In recent years, the novel assembly type concrete industrialized building enters a high-speed development period under the positive propulsion of the government by virtue of the characteristics of environmental protection, energy conservation, consumption reduction, high construction efficiency, short construction period, easy guarantee of the quality of factory operation and the like, and a sound standard system is provided in 'guidance suggestion about the vigorous development of the assembly type building' published by the State Council of 2016 and 9 months; innovating assembly type building design; optimizing production of parts; lifting the assembly type construction level; promoting the complete decoration of the building; green building materials are popularized; carrying out general engineering contract; the engineering quality safety is ensured.
At present, the traditional GRC formwork structure column is complex in production process, low in construction efficiency and high in construction cost, the construction site is polluted greatly, the green environmental protection performance is poor, and effective improvement is needed.
Disclosure of Invention
The invention aims to solve the defects of low construction efficiency and high construction cost in the prior art, and provides a production process of a prefabricated GRC formwork structural column integrating decoration and electromechanics to solve the problems.
In order to achieve the purpose, the technical scheme of the invention is as follows: the invention discloses a production process of a prefabricated GRC formwork structure column integrating decoration and electromechanics, which comprises the following specific steps:
cleaning a GRC column mounting base to ensure that the surface of the mounting base is clean and smooth and has no concrete residues, uniformly coating demoulding oil and no accumulated oil on the surface of the GRC column mounting base, using a travelling crane to hoist a finished product reinforcement cage onto the GRC column mounting base, temporarily fixing a reserved hole position on the GRC column mounting base and a reinforcement cage bottom grouting sleeve through a fastening bolt, thoroughly fixing the fastening bolt at the bottom of the mounting base after checking the verticality of the reinforcement cage, mounting an embedded part on the reinforcement cage, checking that a grouting hole, a grout outlet and an exhaust hole position of the finished product reinforcement cage grouting sleeve are communicated, and then mounting a bottom edge sealing template;
step two, after the GRC decorative shell is inspected to be qualified, the GRC decorative shell is lifted to the periphery of a reinforcement cage by a crane, the reinforcement cage is surrounded inside the GRC decorative shell, the thickness of a concrete column reinforcement protective layer is controlled to be 25-35mm, and L-shaped steel hoops and temporary diagonal braces are sequentially arranged, installed and fixed from bottom to top according to a preset interval;
thirdly, plugging a gap between the GRC decorative shell and the bottom edge sealing template by using glass sealant, and performing antifouling protection on the top steel bars of the steel bar cage by using a plastic film;
step four, concrete is transported through an automatic material distribution vehicle, concrete is poured to the bottom inside the GRC decorative shell through a blanking guide pipe, meanwhile, the falling depth is not more than 300mm each time, the concrete is densely distributed through a fine vibrating rod, the compactness of the concrete is guaranteed, after the whole column body is poured, the cut insulation board is pressed into the column top concrete to form a top key groove, then, a retarder is uniformly coated on the column top concrete, after maintenance, a top rough surface is formed through water washing of a high-pressure water gun, and the GRC decorative structure column is obtained;
and fifthly, after the GRC decorative structure column is maintained to reach the strength of 75% of the design requirement, removing the formwork and lifting, removing the L-shaped steel anchor ear and the temporary inclined strut, lifting the L-shaped steel anchor ear and the temporary inclined strut to a designated finished product storage area by a crane, completing subsequent maintenance operation, and obtaining a product after the finished product is qualified.
Preferably, in the first step, the embedded part comprises a hanging ring, an embedded 86 wire box, an electromechanical pipeline and a lug for M16 diagonal bracing.
Preferably, in the fourth step, when the concrete is vibrated by the vibrating rod, the concrete is not excessively vibrated until the surface of the concrete is not remarkably sunk and bubbles are not generated and mortar is spread on the surface, so as to prevent the concrete from bleeding.
Compared with the prior art, the invention has the following advantages:
GRC formwork structure post is a neotype assembled frame structure post production mode, compares with traditional reinforced concrete frame structure post construction:
1. simplifying the working procedures, shortening the construction period and reducing the cost
The GRC formwork decorative structure column can save links of binding reinforcing steel bars and erecting formworks on the traditional construction site; the industrial standing type production process improves the construction efficiency, saves the later on-site decoration link and accelerates the construction progress; industrialized and mechanized construction, simplified field work and worker quantity, reduced comprehensive construction cost,
2. the construction environment is safe and comfortable, and the product quality is easy to ensure
Compared with the traditional construction, the climbing, lifting and open-air operation in the processes of binding the reinforcing steel bars and erecting the template are avoided, the links of high-altitude operation are reduced, and the operation safety and comfort are improved; the floor type steel binding process has the advantages that the operation of workers is convenient and comfortable, the labor intensity of construction is reduced, factory concrete stirring, automatic distributing vehicle conveying and blanking, upright pouring and vibrating construction and advanced finished product maintenance process are realized, and the production quality of prefabricated components of the fabricated building is obviously improved;
3. synchronous decoration and structure, environmental protection and beautiful use
On one hand, the GRC formwork serves as an outer formwork of the structural column in the production stage, and on the other hand, the GRC formwork serves as an outer decoration layer in the later use process, and the decoration and the structure are formed by pouring and vibrating at one time, so that the bonding area and the bonding strength of the decoration layer and the surface of the concrete structural column can be remarkably improved, the combination of the decoration layer and the surface of the concrete structural column is firmer and more durable, the late secondary decoration is avoided, the field wet operation is reduced, the consumption of the formwork and water resources is reduced, the noise pollution is; the GRC material has the characteristics of light weight, high strength, no deformation, impact resistance, moisture resistance, stable fireproof performance, good plasticity, easy repair, high utilization rate and the like, and the GRC formwork is used as the outer decoration of the structural column to replace the traditional marble or veneer coating for decoration, so that the later-stage decoration and use effect is good.
Drawings
FIG. 1 is a schematic view of an apparatus structure in a production process of a container decoration and electromechanical integrated prefabricated GRC formwork structural column of the present invention;
FIG. 2 is a schematic view of a top view of the apparatus used in the process for manufacturing a container-decorated, electromechanical prefabricated GRC formwork structural column of the present invention;
fig. 3 is a schematic view of a partially enlarged structure of equipment in a production process of a container decoration and electromechanical integrated prefabricated GRC formwork structural column.
The reference signs are: GRC decorative structure post 1, steel reinforcement cage 2, grout sleeve 3, GRC decorates shell 4, installation base 5, L shaped steel staple bolt 6, interim bracing 7, bottom banding template 8.
Detailed Description
So that the manner in which the above recited features of the present invention can be understood and readily understood, a more particular description of the invention, briefly summarized above, may be had by reference to embodiments, some of which are illustrated in the appended drawings, wherein:
example 1
Referring to fig. 1-3, the invention discloses a production process of a prefabricated GRC formwork structural column integrating decoration and electromechanics, which comprises the following specific steps:
cleaning a GRC column mounting base 5 to ensure that the surface of the mounting base 5 is clean and smooth and has no concrete residues, uniformly coating demoulding oil and no accumulated oil on the surface of the GRC column mounting base 5, hoisting a finished product reinforcement cage 2 to the GRC column mounting base 5 with the size of 1100mm in length, 1100mm in width and 450mm in height by utilizing a travelling crane, temporarily fixing a reserved hole position on the GRC column mounting base 5 and a grouting sleeve 3 at the bottom of the reinforcement cage 2 by using a fastening bolt, thoroughly fixing the fastening bolt at the bottom of the mounting base 5 after checking the verticality of the reinforcement cage 2, mounting an embedded part on the reinforcement cage 2, checking that a grouting hole, a grout outlet and an exhaust hole position of the grouting sleeve 3 of the finished product reinforcement cage 2 are communicated, and then mounting a bottom edge sealing template 8 with the length of 680mm in width and 200 mm;
step two, after the GRC decorative shell 4 with the thickness of 700mm 4300mm is inspected to be qualified, the GRC decorative shell 4 is lifted to the periphery of the reinforcement cage 2 by a travelling crane, the reinforcement cage 2 is surrounded in the GRC decorative shell 4, the thickness of the reinforcement protective layer of the concrete column 1 is controlled to be 30mm, and the L-shaped steel anchor ears 6 and the temporary inclined struts 7 are sequentially arranged, installed and fixed from bottom to top according to a preset interval;
thirdly, plugging a gap between the GRC decorative shell 4 and the bottom edge sealing template 8 by using glass sealant, and performing antifouling protection on the top steel bars of the steel bar cage 2 by using a plastic film;
step four, concrete is transported through an automatic material distribution vehicle, concrete is poured to the bottom inside the GRC decorative shell 4 through a blanking guide pipe, meanwhile, the falling depth is not more than 300mm each time, and the concrete is tightly distributed through a fine vibrating rod, so that the compactness of the concrete is guaranteed, after the whole column body is poured, the cut insulation board is pressed into the column top concrete to form a top key groove, then the retarder is uniformly coated on the column top concrete, after maintenance, a top rough surface is formed through water washing of a high-pressure water gun, and the GRC decorative structural column 1 is obtained;
and fifthly, after the GRC decorative structure column 1 is maintained to reach the strength of 75% of the design requirement, removing the mold and lifting, removing the L-shaped steel anchor ear 6 and the temporary inclined strut 7, lifting the L-shaped steel anchor ear and the temporary inclined strut to a specified finished product storage area by a crane, completing subsequent maintenance operation, and obtaining a product after the finished product is qualified.
Preferably, in the first step, the embedded part comprises a hanging ring, an embedded 86 wire box, an electromechanical pipeline and a lug for M16 diagonal bracing.
Preferably, in the fourth step, when the concrete is vibrated by the vibrating rod, the concrete is not excessively vibrated until the surface of the concrete is not remarkably sunk and bubbles are not generated and mortar is spread on the surface, so as to prevent the concrete from bleeding.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are merely illustrative of the principles of the invention, but that various changes and modifications may be made without departing from the spirit and scope of the invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (3)

1. The utility model provides a collection dress decorations, electromechanical prefabricated GRC formwork structure post production technology as an organic whole which characterized in that: the method comprises the following specific steps:
cleaning a GRC column mounting base (5), ensuring that the surface of the mounting base (5) is clean and smooth and has no concrete residues, uniformly coating mould oil and no accumulated oil on the surface of the GRC column mounting base (5), hoisting a finished product reinforcement cage (2) onto the GRC column mounting base (5) by utilizing a travelling crane, temporarily fixing a reserved hole position on the GRC column mounting base (5) and a grouting sleeve (3) at the bottom of the reinforcement cage (2) through a fastening bolt, thoroughly fixing the fastening bolt at the bottom of the mounting base (5) after checking the verticality of the reinforcement cage (2), mounting an embedded part on the reinforcement cage (2), checking that a grouting hole, a grout outlet and an exhaust hole position of the finished product reinforcement cage (2) grouting sleeve (3) are communicated, and then mounting a bottom edge sealing template (8);
step two, after the GRC decorative shell (4) is inspected to be qualified, the GRC decorative shell (4) is lifted to the periphery of the reinforcement cage (2) by a travelling crane, the reinforcement cage (2) is surrounded in the GRC decorative shell (4), the thickness of a reinforcement protection layer of the concrete column (1) is controlled to be 25-35mm, and L-shaped steel hoops (6) and temporary inclined struts (7) are sequentially arranged, installed and fixed from bottom to top according to preset intervals;
thirdly, plugging a gap between the GRC decorative shell (4) and the bottom edge sealing template (8) by using glass sealant, and performing antifouling protection on the steel bar at the top of the steel bar cage (2) by using a plastic film;
step four, concrete is transported through an automatic material distribution vehicle, concrete is poured to the bottom inside the GRC decorative shell (4) through a blanking guide pipe, meanwhile, the falling depth is not more than 300mm each time, the concrete is compacted through a fine vibrating rod, the concrete is uniformly distributed, the compactness of the concrete is guaranteed, after the whole column body is poured, the cut insulation board is pressed into the column top concrete to form a top key groove, then the retarder is uniformly coated on the column top concrete, after maintenance, a top rough surface is formed through water washing of a high-pressure water gun, and the GRC decorative structural column (1) is obtained;
and fifthly, after the GRC decorative structure column (1) is maintained to reach the strength of 75% of the design requirement, removing the formwork and lifting, removing the L-shaped steel anchor ear (6) and the temporary inclined strut (7), lifting the L-shaped steel anchor ear and the temporary inclined strut to a designated finished product storage area by a crane, completing subsequent maintenance operation, and obtaining a product after the finished product is qualified.
2. The process of claim 1 for producing a prefabricated GRC formwork structural column integrated with decoration and mechanics, wherein: in the first step, the embedded part comprises a hanging ring (3), an embedded 86 wire box, an electromechanical pipeline and a lug for M16 diagonal bracing.
3. The process of claim 1 for producing a prefabricated GRC formwork structural column integrated with decoration and mechanics, wherein: in the fourth step, when the concrete is vibrated by the vibrating rod, the concrete surface does not obviously sink and bubble does not appear any more until mortar is spread on the surface, and excessive vibration cannot be carried out so as to prevent the concrete from bleeding.
CN201711304124.9A 2017-12-11 2017-12-11 Production process of integrally decorated and electromechanical prefabricated GRC formwork structural column Active CN108081448B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711304124.9A CN108081448B (en) 2017-12-11 2017-12-11 Production process of integrally decorated and electromechanical prefabricated GRC formwork structural column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711304124.9A CN108081448B (en) 2017-12-11 2017-12-11 Production process of integrally decorated and electromechanical prefabricated GRC formwork structural column

Publications (2)

Publication Number Publication Date
CN108081448A CN108081448A (en) 2018-05-29
CN108081448B true CN108081448B (en) 2020-11-10

Family

ID=62174541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711304124.9A Active CN108081448B (en) 2017-12-11 2017-12-11 Production process of integrally decorated and electromechanical prefabricated GRC formwork structural column

Country Status (1)

Country Link
CN (1) CN108081448B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109531774A (en) * 2018-11-01 2019-03-29 山东海龙建筑科技有限公司 Electromechanical integration clear-water concrete beam column production and construction method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587661B (en) * 2012-03-22 2014-03-26 广东中城建设集团有限公司 Method for constructing tall-section structural column of reinforced concrete frame
JP6570896B2 (en) * 2015-06-27 2019-09-04 株式会社安藤・間 Steel concrete structure
CN105133778B (en) * 2015-08-26 2017-07-28 深圳海龙建筑科技有限公司 Crack resistence GRC is combined prefabricated components and preparation method thereof
CN107100069A (en) * 2017-06-12 2017-08-29 广西路建工程集团有限公司 A kind of concrete cylindrical pier capping beam and binder inverted construction method
CN107313554A (en) * 2017-08-10 2017-11-03 滨州学院 A kind of reinforced column constructing device of free removal template

Also Published As

Publication number Publication date
CN108081448A (en) 2018-05-29

Similar Documents

Publication Publication Date Title
CN103470067B (en) Transformation and construction method used for facing bare concrete of existing building outer wall
CN101818539B (en) Assembled integral building and construction method thereof
CN201738600U (en) Assembled integrated type building
CN105133755B (en) A kind of construction method and shear wall structure of reinforcement welding rack composite shear wall
CN204609154U (en) The hollow stair system of a kind of prefabricated assembling type reinforced concrete
CN104947846B (en) A kind of prefabricated integral frame light filling lining and preparation method thereof
CN103556819B (en) A kind of construction method of reserved constructional column hole on beam slab
CN109025268A (en) Kitchen and toilet concrete flanging construction method
CN105672664A (en) Integral heat insulation wallboard building system
CN105507470A (en) Periphery-overlapped integral fabricated floor and construction method thereof
CN205024949U (en) Take steel bar truss gypsum board of heat preservation, novel -in -place mould
CN204357111U (en) A kind of insulation compound exempts from demoulding exterior sheathing
CN203834771U (en) Prefabricated light floor cover plate and industrial building floor plate structure
CN108081448B (en) Production process of integrally decorated and electromechanical prefabricated GRC formwork structural column
CN101748893B (en) Method for manufacturing high-rise building balcony boards
CN111809951A (en) Prefabricated assembled water pool and assembling method
CN106150191A (en) A kind of full ground form assembled light bounding wall system and construction method
CN206554360U (en) A kind of assembled porcelain earthenware brick for building and the house built using the porcelain earthenware brick
CN208578056U (en) A kind of assembling concrete cushion cap template
CN204609298U (en) Turnover plate type entirety hangs sky stair template
CN209924259U (en) Decorate compound enclosure panel of integration
CN208056632U (en) A kind of easy device for fast pouring stair step
CN104295102A (en) Construction method for steel molding plate fireproof wall
CN205918017U (en) With prefabricated staircase of guardrail integration, prefabricated air conditioner board
CN204252406U (en) A kind of small-sized section bar large area laying structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant