CN104295102A - Construction method for steel molding plate fireproof wall - Google Patents
Construction method for steel molding plate fireproof wall Download PDFInfo
- Publication number
- CN104295102A CN104295102A CN201410590780.XA CN201410590780A CN104295102A CN 104295102 A CN104295102 A CN 104295102A CN 201410590780 A CN201410590780 A CN 201410590780A CN 104295102 A CN104295102 A CN 104295102A
- Authority
- CN
- China
- Prior art keywords
- concrete
- steel form
- fire wall
- steel
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 54
- 239000010959 steel Substances 0.000 title claims abstract description 54
- 238000010276 construction Methods 0.000 title claims abstract description 37
- 238000000465 moulding Methods 0.000 title abstract 8
- 238000000034 method Methods 0.000 claims abstract description 9
- 238000009434 installation Methods 0.000 claims abstract description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 7
- 238000005498 polishing Methods 0.000 claims description 6
- 238000012545 processing Methods 0.000 claims description 6
- 239000004570 mortar (masonry) Substances 0.000 claims description 4
- 208000027418 Wounds and injury Diseases 0.000 claims description 3
- 230000006378 damage Effects 0.000 claims description 3
- 238000013461 design Methods 0.000 claims description 3
- 235000011194 food seasoning agent Nutrition 0.000 claims description 3
- 208000014674 injury Diseases 0.000 claims description 3
- 238000007689 inspection Methods 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 claims description 3
- 239000003550 marker Substances 0.000 claims description 3
- 210000003205 muscle Anatomy 0.000 claims description 3
- 230000002265 prevention Effects 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 3
- 239000002344 surface layer Substances 0.000 claims description 3
- 210000002435 tendon Anatomy 0.000 claims description 3
- 238000012360 testing method Methods 0.000 claims description 3
- 239000003643 water by type Substances 0.000 claims description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 abstract 2
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000009415 formwork Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000001680 brushing effect Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Building Environments (AREA)
Abstract
The invention relates to a construction method for a steel molding plate fireproof wall and belongs to the technical field of construction methods. The construction method for the steel molding plate fireproof wall includes the following steps that (1) a fireproof wall foundation is formed through pouring operation, reinforcing steel bars of the fireproof wall are machined and anchored in the fireproof wall foundation, fireproof wall foundation concrete is poured after the reinforcing steel bars are verified to be qualified by a supervisor, a photoelectric planometer is adopted in the concrete leveling process, the surface flatness of the foundation concrete is strictly controlled, the error is smaller than 2 mm, and the requirements for levelness and perpendicularity of steel molding plate installation are met. The construction method for the steel molding plate fireproof wall has the following advantages that the manufacturing accuracy of a steel molding plate is high, the width of the steel molding plate is large, joints generated in the steel molding plate splicing process are reduced, the joints are tight, and the phenomena of concrete running and leakage are avoided.
Description
?
Technical field
The present invention relates to the construction method of steel form fire wall, belong to construction method technical field.
Background technology
It is high that normal wood template fire wall makes finished product, and the wasting of resources is large, precision and presentation quality poor, the seam of template spelling is many, piece imprecision, and running pulp, spillage phenomenon easily occur.And wooden form strength of parts is relatively low, composite rigidity is relatively little, and reinforce difficulty greatly, template is easily out of shape, and causes concrete pavement uneven.The panel plane integral rigidity that wooden form is combined in addition is told somebody what one's real intentions are, and panel combination becomes formwork load-bearing strength own little, and needs support is reinforced, and is not easy to integral hoisting.Complicated construction technique, technique progress is comparatively slow, and mechanized construction degree is relatively low, and labour intensity is large, and construction efficiency is low.The number of times that wooden form uses is relatively few, and in the process of processing, have certain loss, strength of parts is low, poor durability, and the number of turnover is few.A set of wooden form and reinforced liner can only apply a transformer station, and construction cost increases.
Summary of the invention
The object of the invention is to solve the weak point that above-mentioned prior art exists, provide that a kind of utilization rate is high, cost is low, saving resource, body of wall precision are high, the construction method of the steel form fire wall of appearance looks elegant.
The present invention is achieved by the following technical solutions:
The construction method of steel form fire wall, its special character is to comprise the following steps:
(1) fire wall basis is built
Carry out fire wall steel bar meter, reinforcing bar anchors in fire wall basis, test after adhesion of tendon and muscle after injury lattice through management, build fire wall base concrete, photoelectric measuring level is adopted during concrete leveling, strict control base concrete surface finish, error is less than 2mm, meets levelness and the verticality requirement of steel form installation;
(2) steel form installs
Steel form is with after electric polishing machine polishing, and brush twice template is cured, and prevent concrete from pasting steel form, after causing the demoulding, clear-water concrete affects outward appearance, and at template interface place, plastic sealing strip seals, mortar leakage prevention;
Concrete strength inspection is carried out with Schmidt hammer, reach can carry out next procedure construction during load bearing stength until base concrete intensity, unwrapping wire is carried out by design drawing, when steel form is installed, the line of ink marker that template end opening aims at bullet above basis positions, behind location, each built-up member of template are connected firmly, the levelness of laser level Control architecture, the verticality of transit Control architecture, two-sidedly reinforce, steel form is installed at twice simultaneously, and first time installs 3.1m, second time setting height(from bottom) 3.6m and bearing down on one, concrete is built equally at twice;
Do not re-use conventional steel fastener console mode scaffold, directly use the Special support reinforcing template of steel form field processing and fabricating, and erection construction operating platform, door-type scaffold coordinative construction.
(3) concreting and maintenance
After owner's representative in building site and supervisor's acceptance(check), prepare concreting, strict control concrete proportioning, to ensure in work progress that surface layer is smooth, be strictly on guard against that leakage is shaken, owe to shake or cross to shake, prevent bubble and voids and pits phenomenon, fire wall is built at twice, first time concreting height 3.1m, second time builds height 3.6m and fire wall bears down on one.Adopt the mode of water seasoning, if special messenger waters, guarantee that concrete keeps moistening.
(4) second segment model sheetinstallat concreting.
The construction method of steel form fire wall of the present invention, has the following advantages:
(1) steel form making precision is high, and template plate width is large, decreases the seam of template spelling, and piece is tight, and running pulp, spillage phenomenon can not occur;
(2) steel form rigidity is large, not yielding, and it is convenient to reinforce, and the shaping concrete structure size of template is accurate, closely knit bright and clean;
(3) the panel plane integral rigidity that is combined into of steel form is strong, and panel combination becomes formwork inherently supporting member, more can improve integral rigidity and be convenient to integral hoisting supporting structure also can be made to simplify.Construction technology is simple, and technique progress is fast, and mechanized construction degree is high, and labour intensity is low, accelerates construction speed, improves work efficiency 2 ~ 3 times;
(4) steel form absorption affinity is little, and the demoulding is easy, and concrete negative and positive rounding of angle angle is effective, and surface finish, verticality are good, concrete uniform color, reaches clear water concrete effect;
(5) steel form factory prefabricating processing, material less investment, loss is less, long service life, and strength of parts is high, good endurance, and the number of turnover is many.
accompanying drawing explanation
?fig. 1: the construction method block diagram of steel form fire wall of the present invention.
Detailed description of the invention
Below provide the specific embodiment of the present invention, be used for being described in further detail formation of the present invention.
The construction method of steel form fire wall, comprises the following steps:
(1) fire wall basis is built
Carry out fire wall steel bar meter, reinforcing bar anchors in fire wall basis, test after adhesion of tendon and muscle after injury lattice through management, build fire wall base concrete, photoelectric measuring level is adopted during concrete leveling, strict control base concrete surface finish, error is less than 2mm, meets levelness and the verticality requirement of steel form installation;
(2) steel form installs
Steel form is with after electric polishing machine polishing, and brush twice template is cured, and prevent concrete from pasting steel form, after causing the demoulding, clear-water concrete affects outward appearance, and at template interface place, plastic sealing strip seals, mortar leakage prevention;
Concrete strength inspection is carried out with Schmidt hammer, reach can carry out next procedure construction during load bearing stength until base concrete intensity, unwrapping wire is carried out by design drawing, when steel form is installed, the line of ink marker that template end opening aims at bullet above basis positions, behind location, each built-up member of template are connected firmly, the levelness of laser level Control architecture, the verticality of transit Control architecture, two-sidedly reinforce, steel form is installed at twice simultaneously, and first time installs 3.1m, second time setting height(from bottom) 3.6m and bearing down on one, concrete is built equally at twice;
Do not re-use conventional steel fastener console mode scaffold, directly use the Special support reinforcing template of steel form field processing and fabricating, and erection construction operating platform, door-type scaffold coordinative construction.
(3) concreting and maintenance
After owner's representative in building site and supervisor's acceptance(check), prepare concreting, strict control concrete proportioning, to ensure in work progress that surface layer is smooth, be strictly on guard against that leakage is shaken, owe to shake or cross to shake, prevent bubble and voids and pits phenomenon, fire wall is built at twice, first time concreting height 3.1m, second time builds height 3.6m and fire wall bears down on one.Adopt the mode of water seasoning, if special messenger waters, guarantee that concrete keeps moistening.
(4) second segment model sheetinstallat concreting.
Depositing of template, requires to carry out rational deployment to job site, cooks up large form storage area, and hangs label sign.Template is stacked must be neat, must take anti-skidding, cold-proof, antifreezing measures during the sky construction of rainy day snow.All should remove in time frost, sleet.Formwork hoisting will be assumed unified command of, submit onself to someone's direction, mutually cooperates, and guarantees safety construction.After form removable, clear up mortar in time, brushing release agent, accessory is put in order.Avoid tired operation, stop potential safety hazard.
construction party requirement is answered to ensure template vertical lifting, under respectively there is a frame hole at two ends, template upper side frame frame hole
The pad of ¢ 18.5 circular hole is rushed, for formwork hoisting in the middle of portion's welding one.Below this frame hole, 100mm place adds
[8# channel-section steel, ¢ 18.5 circular hole is beaten on the edge of a wing, channel-section steel one end, ensures to hang down in the pad hole of welding with frame hole below in weldering one
Directly, for Template Location.Another being welded with on these both sides, frame hole strengthens angle.
The R50mm chamfering of construction party requirement body of wall surrounding is answered to be made of one with end mould template.This template also has decorative groove except circular arc place.End mould R50mm chamfering panel is concordant with template decorative groove collar extension.
Speed of perfusion controls within 1m/h.
Template is to the place of drawing, [10# channel-section steel web place beats pulling eye ¢ 16.5 circular hole, and 2.4 meters of long templates do three joints to kerve steel, and 0.3 meter, the short channel-section steel in two ends, there is the channel-section steel of 1 meter centre with single.
The processing of template and reinforcing mode all by designed by construction party requirement, at the scene construction time and by construction party according to field condition additional reinforcement.
Claims (1)
1. the construction method of steel form fire wall, is characterized in that comprising the following steps:
(1) fire wall basis is built
Carry out fire wall steel bar meter, reinforcing bar anchors in fire wall basis, test after adhesion of tendon and muscle after injury lattice through management, build fire wall base concrete, photoelectric measuring level is adopted during concrete leveling, strict control base concrete surface finish, error is less than 2mm, meets levelness and the verticality requirement of steel form installation;
(2) steel form installs
Steel form is with after electric polishing machine polishing, and brush twice template is cured, and prevent concrete from pasting steel form, after causing the demoulding, clear-water concrete affects outward appearance, and at template interface place, plastic sealing strip seals, mortar leakage prevention;
Concrete strength inspection is carried out with Schmidt hammer, reach can carry out next procedure construction during load bearing stength until base concrete intensity, unwrapping wire is carried out by design drawing, when steel form is installed, the line of ink marker that template end opening aims at bullet above basis positions, behind location, each built-up member of template are connected firmly, the levelness of laser level Control architecture, the verticality of transit Control architecture, two-sidedly reinforce, steel form is installed at twice simultaneously, and first time installs 3.1m, second time setting height(from bottom) 3.6m and bearing down on one, concrete is built equally at twice;
Do not re-use conventional steel fastener console mode scaffold, directly use the Special support reinforcing template of steel form field processing and fabricating, and erection construction operating platform, door-type scaffold coordinative construction;
(3) concreting and maintenance
After owner's representative in building site and supervisor's acceptance(check), prepare concreting, strict control concrete proportioning, to ensure in work progress that surface layer is smooth, be strictly on guard against that leakage is shaken, owe to shake or cross to shake, prevent bubble and voids and pits phenomenon, fire wall is built at twice, first time concreting height 3.1m, second time builds height 3.6m and fire wall bears down on one;
Adopt the mode of water seasoning, if special messenger waters, guarantee that concrete keeps moistening;
(4) second segment model sheetinstallat concreting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410590780.XA CN104295102B (en) | 2014-10-29 | 2014-10-29 | The construction method of steel form fire wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410590780.XA CN104295102B (en) | 2014-10-29 | 2014-10-29 | The construction method of steel form fire wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104295102A true CN104295102A (en) | 2015-01-21 |
CN104295102B CN104295102B (en) | 2016-07-06 |
Family
ID=52315025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410590780.XA Active CN104295102B (en) | 2014-10-29 | 2014-10-29 | The construction method of steel form fire wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104295102B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109208891A (en) * | 2018-10-12 | 2019-01-15 | 四川西南新科电力有限公司 | A kind of transformer station's body of wall combined steel and its construction method |
CN112064825A (en) * | 2020-07-24 | 2020-12-11 | 安徽同济建设集团有限责任公司 | Construction method of basement stair firewall |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2373259A (en) * | 2001-02-09 | 2002-09-18 | C A Group Ltd | Firewall |
US20080184643A1 (en) * | 2004-08-24 | 2008-08-07 | Matthew Foster | Acoustical and firewall barrier assembly |
CN101906877A (en) * | 2010-07-20 | 2010-12-08 | 天津二十冶建设有限公司 | Method for construction of concrete wall by steel mould |
CN102767281A (en) * | 2012-07-18 | 2012-11-07 | 山东电力建设第二工程公司 | Construction method and device for concrete fire wall |
-
2014
- 2014-10-29 CN CN201410590780.XA patent/CN104295102B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2373259A (en) * | 2001-02-09 | 2002-09-18 | C A Group Ltd | Firewall |
US20080184643A1 (en) * | 2004-08-24 | 2008-08-07 | Matthew Foster | Acoustical and firewall barrier assembly |
CN101906877A (en) * | 2010-07-20 | 2010-12-08 | 天津二十冶建设有限公司 | Method for construction of concrete wall by steel mould |
CN102767281A (en) * | 2012-07-18 | 2012-11-07 | 山东电力建设第二工程公司 | Construction method and device for concrete fire wall |
Non-Patent Citations (2)
Title |
---|
无: "《变压器基础施工技术》", 《HTTP://WENKU.BAIDU.COM/VIEW/1FB7D2ACB0717FD5360CDC52.HTML?FROM=SEARCH》, 15 May 2013 (2013-05-15) * |
无: "《变电站防火墙施工方案》", 《HTTP://WENKU.BAIDU.COM/LINK?URL=U3WOJADZ8BMT3OADEBLB8_6PZXZDP4NOQQUMVDY5A7HZEPXOLPJGMSU5SMZ8NPCFCYRVIJYCBSRZ0FQ0T-90LX2PKFDA0CK9JBV_ETFAP6Q》, 28 May 2012 (2012-05-28) * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109208891A (en) * | 2018-10-12 | 2019-01-15 | 四川西南新科电力有限公司 | A kind of transformer station's body of wall combined steel and its construction method |
CN112064825A (en) * | 2020-07-24 | 2020-12-11 | 安徽同济建设集团有限责任公司 | Construction method of basement stair firewall |
Also Published As
Publication number | Publication date |
---|---|
CN104295102B (en) | 2016-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201687125U (en) | Precast concrete wallboard | |
CN105755954B (en) | A kind of construction technology of intercommunication clear-water concrete anticollision barrier | |
CN110107085A (en) | Superelevation fair-faced concrete column construction method | |
CN108914965A (en) | The continuous construction method of aluminum alloy mould plate for pipe gallery | |
CN103774561B (en) | The job execution of speedway prefabricated small box girder frock method streamlined | |
CN103088844A (en) | Reinforced concrete inspection well whole prefabricated hoisting construction method | |
CN102877418A (en) | Stentless urban bridge anti-collision guardrail construction method and cradle vehicle and gun carrier thereof | |
CN209799969U (en) | A integrally lift up cantilever formwork device for quick construction shaft lining cutting | |
CN201738494U (en) | Prefabricated composite wall slab with door/window opening | |
CN204492187U (en) | A kind of for the sealing locating device bottom concrete wall template | |
CN109610509A (en) | A kind of the adjustable die system and construction method of pipe gallery automatic control section | |
CN104295102B (en) | The construction method of steel form fire wall | |
CN209040349U (en) | A kind of ring muscle fastening shear wall structure being easily installed | |
CN110886488A (en) | Intelligent integrated high-rise building machine | |
CN205502366U (en) | Evaporate and press whole wallboard of aerated concrete | |
CN109869153A (en) | The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method | |
CN205714221U (en) | A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure | |
CN209603182U (en) | A kind of adjustable die system of pipe gallery automatic control section | |
CN202064636U (en) | Closed stair formwork erecting device | |
CN116674079A (en) | Construction method of prefabricated small box girder | |
CN105275198B (en) | A kind of shear-wall strengthening formwork structure and its construction method | |
CN104453235B (en) | Current conversion station fire wall construction technology | |
CN204418691U (en) | A kind of for cast-in-place vertical member and horizontal member junction concrete blocking apparatus | |
CN102587543B (en) | Building shading cast-in-place concrete lattice wall and construction method thereof | |
CN105421780B (en) | A kind of construction method of prefabricated concrete structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Miao E Inventor after: Zheng Lei Inventor before: Miao E |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170726 Address after: 519000 Guangdong province Zhuhai Jida Ji Shi Road No. 4 Patentee after: Zhuhai Jianan Group Co., Ltd. Address before: 264003 Yantai high tech Zone, China Agricultural University, Shandong (Yantai campus) Patentee before: Miao E |
|
TR01 | Transfer of patent right |