CN105421780B - A kind of construction method of prefabricated concrete structure - Google Patents

A kind of construction method of prefabricated concrete structure Download PDF

Info

Publication number
CN105421780B
CN105421780B CN201510702353.0A CN201510702353A CN105421780B CN 105421780 B CN105421780 B CN 105421780B CN 201510702353 A CN201510702353 A CN 201510702353A CN 105421780 B CN105421780 B CN 105421780B
Authority
CN
China
Prior art keywords
composite beam
profiled sheet
concrete structure
construction method
prefabricated concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510702353.0A
Other languages
Chinese (zh)
Other versions
CN105421780A (en
Inventor
董荣贵
吉剑峰
宋银华
杨亦贵
蔡红兵
陈希
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUOQIANG CONSTRUCTION GROUP CO Ltd
Original Assignee
GUOQIANG CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUOQIANG CONSTRUCTION GROUP CO Ltd filed Critical GUOQIANG CONSTRUCTION GROUP CO Ltd
Priority to CN201510702353.0A priority Critical patent/CN105421780B/en
Publication of CN105421780A publication Critical patent/CN105421780A/en
Application granted granted Critical
Publication of CN105421780B publication Critical patent/CN105421780B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The present invention provides a kind of construction methods of prefabricated concrete structure, belong to technical field of fixed buildings.The construction method that it solves existing concrete structure can not meet the technical problems such as efficient and intensity requirement simultaneously.The construction method of this prefabricated concrete structure includes the following steps:A, composite beam and profiled sheet are prepared;B, composite beam is installed;C, profiled sheet is installed;D, assembling reinforcement and e, concrete construction.The present invention has the concrete structure integral strength obtained after the completion in construction high, and the advantages of can greatly save the construction time in building-site, improve construction efficiency.

Description

A kind of construction method of prefabricated concrete structure
Technical field
The invention belongs to technical field of fixed buildings, are related to a kind of construction method of prefabricated concrete structure.
Background technology
In modern architecture, cast-in-place monoblock type is the earliest form of concrete structure, and mould is first carried out before casting concrete Plate is built, and is being laid with pipeline and reinforcing bar, is being carried out pouring for concrete again after the completion, there is construction periods for the form of construction work It is long, produce industrialization relatively difficult to achieve, the deficiencies of circulation material is more, construction cost is high.
With the prefabricated concrete structure that the development of building construction technology is come into being, i.e., crossbeam and floor are first in work Prepared by factory completes, and only carries out pouring for pillar in building site, then lift crossbeam and floor to pillar by way of lifting, should Although mode efficiency is higher, its globality is weaker, poor seismic behavior, it is high to lifting requirements the problems such as.
Invention content
The purpose of the present invention is there is the above problem in view of the prior art, it is proposed that a kind of prefabricated concrete structure Construction method, present invention solves the technical problem that being that can improve construction efficiency in the case where ensureing integral strength.
Object of the invention can be realized by the following technical scheme:
A kind of construction method of prefabricated concrete structure, which is characterized in that include the following steps:
A, composite beam and profiled sheet are prepared:It is poured on mold according to required size to obtain composite beam in advance in factory, Profiled sheet is obtained according to required size through the stamping process in factory;
B, composite beam is installed:Composite beam is transported to building site, is lifted composite beam on cast-in-place column and to hanging by crane The position of composite beam is corrected after dress, it is to be corrected after the completion of by junction steel plate by the embedded iron parts on cast-in-place column and composite beam It is welded and fixed;
C, profiled sheet is installed:Profiled sheet is transported to building site, is lifted profiled sheet to adjacent two by crane So that adjacent profiled sheet, is connected by the slit opening alignment of adjacent profiled sheet by binding clasp on composite beam;
D, assembling reinforcement:Reinforcing bar is laid between composite beam and on profiled sheet;
E, concrete construction:Cleaning composite beam and profiled sheet and holding moistening of watering, then casting concrete and using shaking Dynamic device vibration compacting, conserves concrete after having poured concrete.
It has poured profiled sheet and the concrete poured on it after concrete and has formed compoboard;By first by composite beam and Profiled sheet is prefabricated inside factory, can save material cost and cost of labor, and cost is relatively low and environmental protection and energy saving;Prefabricated is folded It closes beam and profiled sheet is accurately installed successively, the construction time in building-site can be greatlyd save, to improve construction efficiency; Composite beam and profiled sheet form monolithic concrete structure, the concrete obtained by the construction method after completion concreting Structure integral strength is high, industrialization degree is high and overall economic efficiency is notable;Overlapping that is self-contained in factory, therefore pouring Beam is reliable and stable, thus can guarantee the integral strength after the completion of pouring.
In the construction method of above-mentioned prefabricated concrete structure, unwrapping wire is measured between step a and step b, it will Composite beam and cement mortar, the loosening sundries such as concrete and iron rust on cast-in-place column are cleaned out;It is measured on cast-in-place column with spirit level Mouth absolute altitude, not equal to adjacent cast-in-place column absolute altitude suitable for reading is adjusted correction;With total powerstation in cast-in-place column mark center line suitable for reading; Center line is marked by way of snap the line at the both ends of composite beam to be lifted.Above-mentioned operation is that installation composite beam carries out abundant standard It is standby so that installation composite beam when can efficiently, accurately position composite beam, to improve construction efficiency.
In the construction method of above-mentioned prefabricated concrete structure, in step b, when correcting composite beam position, when folded The site error of conjunction beam slightly stirs composite beam by crowbar when smaller and is allowed to be aligned;When the site error of composite beam is larger, Composite beam is lifted again by crane to be corrected.Effectively composite beam can be installed in place by this method, be also avoided that Composite beam is damaged, ensures the integral strength of concrete structure.
In the construction method of above-mentioned prefabricated concrete structure, unwrapping wire is measured between step b and step c, first The cement mortar overlapped on top surface of the beam, the loosening sundries such as concrete and iron rust are cleaned out, then pass through snap the line on composite beam Mode marks the position line of profiled sheet lay, and in lifting, profiled sheet is put according to the position line.The process is installation Profiled sheet carries out adequate preparation so that installation profiled sheet when can efficiently, accurately position profiled sheet, to improve construction Efficiency.
In the construction method of above-mentioned prefabricated concrete structure, in step c, the end of profiled sheet is on composite beam The lap of splice at least more than 50mm.The support strength for ensureing profiled sheet, to ensure the integral strength of concrete structure.
In the construction method of above-mentioned prefabricated concrete structure, in step c, soft hoist cable or steel wire are used when lifting Rope lifting profiled sheet, and add rubber in the corner of profiled sheet.The step plays protection profiled sheet, avoids profiled sheet There is deformation, to ensure the integral strength of concrete structure.
In the construction method of above-mentioned prefabricated concrete structure, after completing step c, using cement mortar by profiled sheet Slit opening and composite beam between the port that is formed block.The step is avoided that in casting concrete spillage occur.
In the construction method of above-mentioned prefabricated concrete structure, pipe laying, root are carried out between step c and step d According to design drawing in the precalculated position trepanning and cutting of profiled sheet, then tapping and cut place laying wire in profiled sheet Pipeline either water pipe or air pipeline.Trepanning and cutting use plasma cutting machine, avoid making profiled sheet overlay coating At destruction;Raceway for wiring, water pipe and air pipeline are embedded in profiled sheet, avoid pipeline exposed.
Compared with prior art, the construction method of this prefabricated concrete structure has the coagulation obtained after the completion in construction Soil structure integral strength is high, and the advantages of can greatly save the construction time in building-site, improve construction efficiency.
Description of the drawings
Fig. 1 is the construction procedure flow chart in specific implementation mode.
Specific implementation mode
Following is a specific embodiment of the present invention in conjunction with the accompanying drawings, technical scheme of the present invention will be further described, However, the present invention is not limited to these examples.
The present embodiment is as shown in Figure 1, the construction method of prefabricated concrete structure includes the following steps:A, composite beam is prepared And profiled sheet;B, composite beam is installed;C, profiled sheet is installed;D, assembling reinforcement and e, concrete construction, specifically:
In step a, pour on mold according to required size to obtain composite beam in advance in factory, composite beam be divided into girder and Secondary beam.Profiled sheet is obtained according to required size through the stamping process in factory.
Unwrapping wire is measured before carrying out step b, by cement mortar, loosening concrete and the iron on composite beam and cast-in-place column The sundries such as rust are cleaned out;Cast-in-place column absolute altitude suitable for reading is measured with spirit level, is adjusted to what adjacent cast-in-place column absolute altitude suitable for reading did not waited Whole correction;With total powerstation in cast-in-place column mark center line suitable for reading, label is performed;Pass through snap the line at the both ends of composite beam to be lifted Mode mark center line.
In step b, composite beam is transported to building site, composite beam is lifted to cast-in-place column by crane, first hangs girder It is filled on cast-in-place column, then secondary beam is accurately lifted to girder, girder is longitudinally arranged, and secondary beam is horizontal line arrangement;Lifting The position of composite beam is corrected afterwards, when correcting composite beam position, passes through crowbar when the site error of composite beam is smaller Slightly composite beam is stirred to be allowed to be aligned;When the site error of composite beam is larger, lifts composite beam again by crane and carry out school Just.The embedded iron parts on cast-in-place column and composite beam are welded and fixed by junction steel plate after the completion of to be corrected.
Unwrapping wire is measured before carrying out step c, first by cement mortar, loosening concrete and the iron on the top surface of composite beam The sundries such as rust are cleaned out, then mark the position line of profiled sheet lay by way of snap the line on composite beam, in lifting Profiled sheet is put according to the position line.
In step c, profiled sheet is transported to building site, is lifted profiled sheet to adjacent two composite beams by crane So that the slit opening alignment of adjacent profiled sheet, lifts profiled sheet when lifting, and pressing using soft hoist cable or steel wire rope The corner of shape steel plate adds rubber, the lap of splice of the end of profiled sheet on composite beam at least more than 50mm, preferably, The lap of splice of the end of profiled sheet on composite beam can be 55mm, 60mm or 70mm etc.;It will be adjacent by binding clasp Profiled sheet is connected, while being sealed the port formed between the slit opening and composite beam of profiled sheet using cement mortar It is stifled.
Pipe laying is carried out after completing step c, according to design drawing using plasma cutting machine in the pre- of profiled sheet Trepanning and cutting are set in positioning, then in tapping and cut place laying wire pipeline either water pipe or the ventilation duct of profiled sheet Road.
In step d, reinforcing bar is laid between composite beam and on profiled sheet;The reinforcing bar of laying is divided into upper layer and lower layer, under Layer reinforcing bar is located in the groove of profiled sheet, and top bars are located at the top of profiled sheet, and top bars spacing is uniformly bound, on The crotch of layer reinforcing bar is stretched into downwards in the groove of profiled sheet.
In step e, composite beam and profiled sheet are cleaned and holding moistening of watering, then casting concrete and shaken using vibrator Puddling is real, is conserved to concrete after having poured concrete.
It has poured profiled sheet and the concrete poured on it after concrete and has formed compoboard;By first by composite beam and Profiled sheet is prefabricated inside factory, can save material cost and cost of labor, and cost is relatively low and environmental protection and energy saving;Prefabricated is folded It closes beam and profiled sheet is accurately installed successively, the construction time in building-site can be greatlyd save, to improve construction efficiency; Composite beam and profiled sheet form monolithic concrete structure, the concrete obtained by the construction method after completion concreting Structure integral strength is high, industrialization degree is high and overall economic efficiency is notable;Overlapping that is self-contained in factory, therefore pouring Beam is reliable and stable, thus can guarantee the integral strength after the completion of pouring.
Specific embodiment described herein is only an example for the spirit of the invention.Technology belonging to the present invention is led The technical staff in domain can make various modifications or additions to the described embodiments or replace by a similar method In generation, however, it does not deviate from the spirit of the invention or beyond the scope of the appended claims.

Claims (8)

1. a kind of construction method of prefabricated concrete structure, which is characterized in that include the following steps:
A, composite beam and profiled sheet are prepared:It is poured on mold according to required size to obtain composite beam in advance in factory, in work Factory obtains profiled sheet through the stamping process according to required size;
B, composite beam is installed:Composite beam is transported to building site, composite beam is divided into girder and secondary beam, by crane first by main cable and girder It is accurately lifted to girder on cast-in-place column, then by secondary beam, girder is longitudinally arranged, and secondary beam is lateral arrangement, and to hanging The position of composite beam is corrected after dress, it is to be corrected after the completion of by junction steel plate by the embedded iron parts on cast-in-place column and composite beam It is welded and fixed;
C, profiled sheet is installed:Profiled sheet is transported to building site, profiled sheet is lifted to adjacent two by crane and is overlapped So that adjacent profiled sheet, is connected by the slit opening alignment of adjacent profiled sheet by binding clasp on beam;
D, assembling reinforcement:Reinforcing bar is laid between composite beam and on profiled sheet;
E, concrete construction:Cleaning composite beam and profiled sheet and water holding moistening, then casting concrete and use vibrator Vibration compacting conserves concrete after having poured concrete.
2. the construction method of prefabricated concrete structure according to claim 1, which is characterized in that step a and step b it Between measure unwrapping wire, by composite beam and cast-in-place column cement mortar, loosen concrete and iron rust and clean out;It is surveyed with spirit level Fixed cast-in-place column absolute altitude suitable for reading is adjusted correction to what adjacent cast-in-place column absolute altitude suitable for reading did not waited;It is suitable for reading in cast-in-place column with total powerstation Indicate center line;Center line is marked by way of snap the line at the both ends of composite beam to be lifted.
3. the construction method of prefabricated concrete structure according to claim 1 or 2, which is characterized in that in step b, When correcting composite beam position, when the site error of composite beam is smaller slightly stirring composite beam by crowbar is allowed to be aligned;When folded When the site error of conjunction beam is larger, lifts composite beam again by crane and be corrected.
4. the construction method of prefabricated concrete structure according to claim 1, which is characterized in that step b and step c it Between measure unwrapping wire, first by the cement mortar overlapped on top surface of the beam, loosen concrete and iron rust and clean out, then on composite beam The position line that profiled sheet lay is marked by way of snap the line, in lifting, profiled sheet is put according to the position line.
5. the construction method of prefabricated concrete structure according to claim 1 or 4, which is characterized in that in step c, pressure The lap of splice of the end of shape steel plate on composite beam is at least more than 50mm.
6. the construction method of prefabricated concrete structure according to claim 1 or 4, which is characterized in that in step c, hang Profiled sheet is lifted using soft hoist cable or steel wire rope when dress, and adds rubber in the corner of profiled sheet.
7. the construction method of prefabricated concrete structure according to claim 1, which is characterized in that after completing step c, adopt The port formed between the slit opening and composite beam of profiled sheet is blocked with cement mortar.
8. the construction method of prefabricated concrete structure according to claim 1, which is characterized in that step c and step d it Between carry out pipe laying, according to design drawing in the precalculated position trepanning and cutting of profiled sheet, then the trepanning in profiled sheet Place and cut place laying wire pipeline either water pipe or air pipeline.
CN201510702353.0A 2015-10-26 2015-10-26 A kind of construction method of prefabricated concrete structure Active CN105421780B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510702353.0A CN105421780B (en) 2015-10-26 2015-10-26 A kind of construction method of prefabricated concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510702353.0A CN105421780B (en) 2015-10-26 2015-10-26 A kind of construction method of prefabricated concrete structure

Publications (2)

Publication Number Publication Date
CN105421780A CN105421780A (en) 2016-03-23
CN105421780B true CN105421780B (en) 2018-08-17

Family

ID=55500285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510702353.0A Active CN105421780B (en) 2015-10-26 2015-10-26 A kind of construction method of prefabricated concrete structure

Country Status (1)

Country Link
CN (1) CN105421780B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193623B (en) * 2016-07-29 2018-05-08 刘祥锦 A kind of prefabricated concrete structure construction method
TWI687042B (en) * 2019-06-11 2020-03-01 李青枬 Supporting construction method of solar module

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2189625Y (en) * 1993-12-15 1995-02-15 曹凤兰 Preformed frame component of hollow ferro-concrete
CN2390933Y (en) * 1999-06-04 2000-08-09 同济大学 Square steel pipe concrete beam and column jointing gusset
CN1263971A (en) * 2000-02-24 2000-08-23 施民 Technology for building house with centrifugal structural concrete members and frames without brick walls
CN101113604A (en) * 2007-06-22 2008-01-30 东南大学 Full-prefabricated assembled concrete frame construction
KR101767677B1 (en) * 2010-12-27 2017-08-11 주식회사 포스코 Compisite column structure for steel and concrete

Also Published As

Publication number Publication date
CN105421780A (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN101781879B (en) Construction method of single-pylon cable-stayed bridge without dorsal cables
CN106869172A (en) In-situ deposited prefabricated split-mounting type subway underground station construction method
CN107297810A (en) A kind of making of precast wall body component and installation method
CN109025268A (en) Kitchen and toilet concrete flanging construction method
CN109518864A (en) A kind of inversion steel bar girder concrete folding plate and its construction method
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN206667459U (en) A kind of pre-splicing Standard formula building of prefabrication type reinforced concrete shear wall
CN110080454A (en) LPM light filling body Construction of Cast-in-situ Concrete Hollow
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN109707052A (en) Assembled beam and plate connecting node
CN105421780B (en) A kind of construction method of prefabricated concrete structure
CN104975614A (en) Structural steel combined unilateral formwork reinforcement construction method
CN207176731U (en) A kind of prefabricated concrete pipe gallery support
CN207944339U (en) A kind of prefabricated superposed type anti-collision wall for urban viaduct
CN207633546U (en) Toilet concrete sealing prefabricated components
CN106284653A (en) The construction method that a kind of balcony construct capital interspaces in advance
CN210263131U (en) Assembled is from stagnant water underground pipe gallery structure
CN210713517U (en) Assembled superposed beam structure
CN207177027U (en) One kind is inverted steel bar girder concrete folding plate
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN209456992U (en) Low damage unilateral formwork supporting structure under campshed support system
CN208717952U (en) A kind of reserved passage construction device of basement post-pouring zone
CN110847466A (en) Splicing and reinforcing construction method for prefabricated laminated slab
CN203668894U (en) Concrete prefabricated form structure allowing rapid installation
CN203603462U (en) Post-cast strip beam plate formwork supporting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant