CN209456992U - Low damage unilateral formwork supporting structure under campshed support system - Google Patents
Low damage unilateral formwork supporting structure under campshed support system Download PDFInfo
- Publication number
- CN209456992U CN209456992U CN201822069748.3U CN201822069748U CN209456992U CN 209456992 U CN209456992 U CN 209456992U CN 201822069748 U CN201822069748 U CN 201822069748U CN 209456992 U CN209456992 U CN 209456992U
- Authority
- CN
- China
- Prior art keywords
- formwork
- wall
- support system
- structure under
- low
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本实用新型排桩支护体系下的低损伤单侧支模结构,应用于具有排桩、墙体外模板、墙体内模板、斜撑杆的单侧支模结构,斜撑杆连接并支撑于墙体内模板的远离墙体外模板的一侧,单侧支模结构包括:混凝土层,混凝土层设于排桩和墙体外模板之间;预埋件,预埋件埋设于混凝土层中;拉结件,拉结件的第一端拉结于预埋件,拉结件的第二端拉结于墙体内模板。本实用新型中,通过将拉结件连接在混凝土层中的钢筋网片上,并在墙模板内侧设置适量斜撑杆相结合的方式,可以解决双侧支模占用施工空间较大,操作麻烦以及单侧支模拉结排桩主筋带来的安全隐患等问题。
The low-damage single-side formwork structure under the pile row support system of the utility model is applied to a single-side formwork structure with row piles, wall external formwork, wall internal formwork, and diagonal bracing rods. The diagonal bracing rods are connected and supported On the side of the inner formwork of the wall away from the outer formwork of the wall, the single-sided formwork structure includes: a concrete layer, the concrete layer is arranged between the row of piles and the outer formwork of the wall; embedded parts, the embedded parts are embedded in the concrete layer Middle; tie piece, the first end of the tie piece is tied to the embedded part, and the second end of the tie piece is tied to the formwork in the wall. In the utility model, by connecting the anchors on the steel mesh in the concrete layer, and setting an appropriate amount of diagonal braces on the inside of the wall formwork, it can solve the problem that the construction space occupied by the double-sided formwork is large, the operation is troublesome, and Problems such as potential safety hazards caused by the main reinforcement of single-sided formwork tie-row piles.
Description
技术领域technical field
本实用新型涉及建筑领域,具体涉及一种排桩支护体系下的低损伤单侧支模结构。The utility model relates to the field of construction, in particular to a low-damage single-side support formwork structure under a row pile support system.
背景技术Background technique
本实用新型在采用排桩或双排桩围护体系的基坑中,考虑到经济性或者场地规划,围护桩设计施工完成后与建筑物地下室外墙之间的空间狭小,往往难以满足双侧支模所需的施工空间,若采用常规的单侧支模方式,需要设置大量斜撑,且常规的单侧支模方式需拉结排桩主筋,对支护体系损伤较大,影响基坑安全。In the foundation pit of the utility model adopting row pile or double row pile enclosure system, considering the economy or site planning, the space between the enclosure pile design and construction and the basement exterior wall of the building is narrow, and it is often difficult to meet the double-row pile enclosure system. For the construction space required by the side formwork, if the conventional unilateral formwork method is used, a large number of diagonal braces need to be set up, and the conventional unilateral formwork method needs to tie the main reinforcement of the piles, which will cause great damage to the support system and affect the foundation. Pit safety.
因此,有必要提供一种方案,避免损伤支护体系,保障基坑安全。Therefore, it is necessary to provide a solution to avoid damage to the support system and ensure the safety of the foundation pit.
实用新型内容Utility model content
为了解决现有技术中的单侧支模方式存在的损伤支护体系、影响基坑安全的技术问题,本实用新型提供了一种排桩支护体系下的低损伤单侧支模结构。In order to solve the technical problems of damage to the support system and affecting the safety of the foundation pit existing in the unilateral formwork support system in the prior art, the utility model provides a low-damage unilateral formwork structure under the pile row support system.
本实用新型提供的排桩支护体系下的低损伤单侧支模结构,应用于具有排桩、墙体外模板、墙体内模板、斜撑杆的单侧支模结构,所述斜撑杆连接并支撑于所述墙体内模板的远离所述墙体外模板的一侧,所述单侧支模结构包括:The low-damage single-side formwork structure under the pile row support system provided by the utility model is applied to a single-side formwork structure with pile rows, external wall formwork, wall internal formwork, and diagonal braces. The rod is connected and supported on the side of the formwork inside the wall away from the formwork outside the wall, and the single-side formwork structure includes:
混凝土层,所述混凝土层设于所述排桩和所述墙体外模板之间;a concrete layer, the concrete layer is arranged between the row of piles and the external formwork of the wall;
预埋件,所述预埋件埋设于所述混凝土层中并连接于所述墙体外模板;Embedded parts, the embedded parts are embedded in the concrete layer and connected to the external formwork of the wall;
拉结件,所述拉结件的第一端穿过所述墙体外模板并拉结于所述预埋件,所述拉结件的第二端拉结于所述墙体内模板。A tie piece, the first end of the tie piece passes through the external formwork of the wall and is tied to the embedded part, and the second end of the tie piece is tied to the formwork inside the wall.
本实用新型中,将预埋件埋设于排桩和墙体外模板之间的混凝土层中,拉结件的第一端拉结于墙体内模板,拉结件的第二端连接于预埋件,从而将墙体内模板向墙体外模板拉结;混凝土层除起到固定预埋件的作用外,还可以为墙体外模板提供支撑。本实用新型通过将拉结件连接在混凝土层中的钢筋网片上,并在墙模板内侧设置适量斜撑杆相结合的方式,可以解决双侧支模占用施工空间较大,操作麻烦以及单侧支模拉结排桩主筋带来的安全隐患等问题。In the utility model, the embedded parts are buried in the concrete layer between the row of piles and the outer formwork of the wall, the first end of the tie is tied to the formwork inside the wall, and the second end of the tie is connected to the prefabricated formwork. Embedded parts, so that the formwork inside the wall is tied to the formwork outside the wall; the concrete layer not only plays the role of fixing the embedded parts, but also provides support for the formwork outside the wall. The utility model can solve the problem of large construction space occupied by double-side formwork, troublesome operation and single-side support by connecting the anchors on the steel mesh in the concrete layer and setting an appropriate amount of diagonal braces on the inside of the wall formwork. Problems such as potential safety hazards brought by the main reinforcement of formwork and tie row piles.
本实用新型排桩支护体系下的低损伤单侧支模结构的进一步改进在于,所述预埋件包括连接板和连接杆,所述连接杆连接于所述连接板的靠近所述墙体内模板的一侧,所述连接杆还连接于所述拉结件的第一端。The further improvement of the low-damage single-side support formwork structure under the pile row support system of the utility model lies in that the embedded part includes a connecting plate and a connecting rod, and the connecting rod is connected to the connecting plate near the wall On one side of the inner template, the connecting rod is also connected to the first end of the tie.
本实用新型排桩支护体系下的低损伤单侧支模结构的更进一步改进在于,所述连接杆垂直连接于所述连接板。The further improvement of the low-damage single-side support formwork structure under the pile row support system of the utility model lies in that the connecting rod is vertically connected to the connecting plate.
本实用新型排桩支护体系下的低损伤单侧支模结构的更进一步改进在于,所述连接板为钢筋网片,所述连接杆为钢筋。The further improvement of the low-damage single-side support formwork structure under the pile row support system of the utility model lies in that the connecting plate is a steel mesh sheet, and the connecting rod is a steel bar.
本实用新型排桩支护体系下的低损伤单侧支模结构的更进一步改进在于,所述墙体外模板为砖胎模,所述连接杆设于所述砖胎模中。The further improvement of the low-damage single-side support formwork structure under the pile row support system of the utility model lies in that the external formwork of the wall is a brick formwork, and the connecting rod is arranged in the brick formwork.
本实用新型排桩支护体系下的低损伤单侧支模结构的进一步改进在于,所述拉结件为止水螺杆。The further improvement of the low-damage single-side support formwork structure under the pile row support system of the utility model lies in that the water-stop screw of the tie member is used.
本实用新型排桩支护体系下的低损伤单侧支模结构的进一步改进在于,所述斜撑杆连接于拉结件的第二端。The further improvement of the low-damage single-side formwork structure under the pile row support system of the utility model lies in that the diagonal brace is connected to the second end of the anchor.
本实用新型排桩支护体系下的低损伤单侧支模结构的进一步改进在于,所述墙体外模板的靠近所述墙体内模板的一侧设有防水层。The further improvement of the low-damage single-side formwork structure under the pile row support system of the present invention lies in that a waterproof layer is provided on the side of the formwork outside the wall that is close to the formwork inside the wall.
附图说明Description of drawings
图1为本实用新型实施例的排桩支护体系下的低损伤单侧支模结构的连接关系示意图。Fig. 1 is a schematic diagram of the connection relationship of the low-damage single-side support formwork structure under the pile row support system of the embodiment of the utility model.
图2为本实用新型实施例中内模板、拉结件和斜撑杆的连接结构示意图。Fig. 2 is a schematic diagram of the connection structure of the inner formwork, tie members and diagonal braces in the embodiment of the utility model.
图3为搭设本实用新型实施例排桩支护体系下的低损伤单侧支模结构的方法的流程图。Fig. 3 is a flow chart of a method for erecting a low-damage single-side formwork structure under a row of pile support system according to an embodiment of the present invention.
具体实施方式Detailed ways
为了解决现有技术中的单侧支模方式存在的损伤支护体系、影响基坑安全的技术问题,本实用新型提供了一种排桩支护体系下的低损伤单侧支模结构。In order to solve the technical problems of damage to the support system and affecting the safety of the foundation pit existing in the unilateral formwork support system in the prior art, the utility model provides a low-damage unilateral formwork structure under the pile row support system.
下面结合附图和具体实施例对本实用新型排桩支护体系下的低损伤单侧支模结构作进一步说明。本领域技术人员可由本说明书所揭露的内容轻易地了解本实用新型的其他优点与功效。The low-damage single-side support formwork structure under the pile row support system of the present invention will be further described below in conjunction with the accompanying drawings and specific embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification.
结合图1和图2所示,本实用新型排桩支护体系下的低损伤单侧支模结构,应用于具有排桩10、墙体外模板20、墙体内模板30、斜撑杆40的单侧支模结构,斜撑杆40连接并支撑于墙体内模板30的远离墙体外模板20的一侧,单侧支模结构包括:混凝土层50,混凝土层50设于排桩10和墙体外模板20之间;预埋件,预埋件埋设于混凝土层50中并连接于墙体外模板20;拉结件70,拉结件70的第一端穿过墙体外模板20并拉结于预埋件,拉结件70的第二端拉结于墙体内模板30。As shown in Figure 1 and Figure 2, the low-damage single-side formwork structure under the pile row support system of the present invention is applied to pile row 10, wall external formwork 20, wall internal formwork 30, and diagonal braces 40 The single-side formwork structure, the diagonal brace 40 is connected and supported on the side of the formwork 30 inside the wall away from the formwork 20 outside the wall, the single-side formwork structure includes: a concrete layer 50, and the concrete layer 50 is arranged on the row of piles 10 and between the external formwork 20 of the wall; the embedded part, the embedded part is embedded in the concrete layer 50 and connected to the external formwork 20 of the wall; the tie piece 70, the first end of the tie piece 70 passes through the formwork outside the wall 20 and tied to the embedded part, and the second end of the tied part 70 is tied to the formwork 30 in the wall.
本实用新型中,将预埋件埋设于排桩10和墙体外模板20之间的混凝土层50中,拉结件70的第一端拉结于墙体内模板30,拉结件70的第二端连接于预埋件,从而将墙体内模板30向墙体外模板20拉结;混凝土层50除起到固定预埋件的作用外,还可以为墙体外模板20提供支撑。本实用新型通过将拉结件70连接在混凝土层50中的预埋件上,并在墙模板内侧设置适量斜撑杆40相结合的方式,可以解决双侧支模占用施工空间较大,操作麻烦以及单侧支模拉结排桩10主筋带来的安全隐患等问题。In the utility model, the embedded part is buried in the concrete layer 50 between the row of piles 10 and the formwork 20 outside the wall, the first end of the tie piece 70 is tied to the formwork 30 inside the wall, and the tie piece 70 The second end is connected to the embedded part, so that the formwork 30 inside the wall is tied to the formwork 20 outside the wall; the concrete layer 50 not only plays the role of fixing the embedded part, but also provides support for the formwork 20 outside the wall. The utility model can solve the problem that the construction space occupied by the double-side formwork is relatively large and the operation is difficult by connecting the anchor 70 to the embedded part in the concrete layer 50 and setting an appropriate amount of diagonal braces 40 on the inside of the wall formwork. Trouble and the potential safety hazards brought by the 10 main reinforcements of the unilateral formwork tie row piles.
预埋件连接于墙体外模板20,拉结件70穿过墙体外模板20连接预埋件,使得拉结件70不必穿过混凝土层50即可连接于预埋件,连接方便。The embedded part is connected to the external formwork 20 of the wall, and the tie member 70 passes through the external formwork 20 to connect the embedded part, so that the tie member 70 can be connected to the embedded part without passing through the concrete layer 50, and the connection is convenient.
进一步地,预埋件包括连接板61和连接杆62,连接杆62连接于连接板61的靠近墙体内模板30的一侧,连接杆62还连接于拉结件70的第一端。Further, the embedded part includes a connecting plate 61 and a connecting rod 62 , the connecting rod 62 is connected to the side of the connecting plate 61 close to the formwork 30 inside the wall, and the connecting rod 62 is also connected to the first end of the anchor 70 .
本实施例中,通过连接杆62连接拉结件70,施工中更易连接。In this embodiment, the tie member 70 is connected through the connecting rod 62, which is easier to connect during construction.
更进一步地,连接杆62垂直连接于连接板61。Furthermore, the connecting rod 62 is vertically connected to the connecting plate 61 .
更进一步地,连接板61为钢筋网片,连接杆62为钢筋。Furthermore, the connecting plate 61 is a reinforced mesh sheet, and the connecting rod 62 is a steel bar.
更进一步地,墙体外模板20为砖胎模,连接杆62设于砖胎模中。Furthermore, the outer formwork 20 of the wall is a brick tire mold, and the connecting rod 62 is arranged in the brick tire mold.
本实施例中,连接杆62设于砖胎模中,不影响墙体后期浇筑。In this embodiment, the connecting rod 62 is arranged in the brick tire mold, which does not affect the later pouring of the wall.
进一步地,拉结件70为止水螺杆。Further, the anchor 70 stops the water screw.
较佳地,止水螺杆一端通过螺帽固定于斜撑杆40,另一端焊接在混凝土层50中的钢筋网片上,避免了因将拉结点设置在排桩10主筋上时需凿开围护桩钢筋保护层而产生的基坑安全风险。Preferably, one end of the water-stop screw is fixed to the diagonal brace 40 through a nut, and the other end is welded to the steel mesh sheet in the concrete layer 50, so as to avoid the need to cut open the enclosure when the tie point is arranged on the main reinforcement of the pile row 10. The safety risk of the foundation pit caused by the protection layer of the protective pile reinforcement.
进一步地,斜撑杆40连接于拉结件70的第二端。Further, the diagonal brace 40 is connected to the second end of the tie member 70 .
本实施例中,底板1预埋有止挡件41,斜撑杆40连接于止挡件41。较佳地,斜撑杆40为槽钢,钢管成对设置,止水螺杆的一端通过螺帽固定于一对钢管的外侧,斜撑杆40连接在钢管上,斜撑杆40水平布置间距与止水螺杆水平布置间距相同。In this embodiment, the bottom plate 1 is pre-embedded with a stopper 41 , and the diagonal struts 40 are connected to the stopper 41 . Preferably, the diagonal braces 40 are channel steel, and the steel pipes are arranged in pairs. One end of the water-stop screw is fixed to the outside of the pair of steel pipes through a nut. The diagonal braces 40 are connected to the steel pipes. The horizontal spacing of the diagonal braces 40 is The horizontal spacing of the water-stop screws is the same.
进一步地,墙体外模板20的靠近墙体内模板30的一侧设有防水层。Further, a waterproof layer is provided on the side of the external formwork 20 close to the internal formwork 30 .
本实用新型排桩支护体系下的低损伤单侧支模结构用于基坑围护,止水螺杆一端固定于斜撑杆40,另一端穿设斜撑杆40并与混凝土层50中钢筋网片固定连接。本实用新型通过将止水螺杆连接在混凝土层50中的钢筋网片上,并在墙模板内侧设置适量斜撑杆40相结合的方式,可以解决双侧支模占用施工空间较大,操作麻烦以及单侧支模拉结排桩10主筋带来的安全隐患等问题。The low-damage single-side formwork structure under the pile row support system of the utility model is used for foundation pit enclosure. One end of the water-stop screw is fixed to the diagonal brace 40, and the other end is pierced with the diagonal brace 40 and connected to the steel bar in the concrete layer 50. The mesh is fixedly connected. In the utility model, by connecting the water-stop screw to the steel mesh in the concrete layer 50, and setting an appropriate amount of diagonal braces 40 on the inside of the wall formwork, it can solve the problems of large construction space occupied by the double-sided formwork, troublesome operation and Issues such as potential safety hazards brought by the 10 main reinforcements of unilateral support formwork tie row piles.
本实用新型排桩支护体系下的低损伤单侧支模结构,根据需要采用单侧支模施工部位的现场实际情况,确认围护桩与地下室外墙之间剩余空间大小,设计砖胎模厚度及混凝土层50范围,采用将止水螺杆连接在混凝土层50中的钢筋网片上,形成可靠的拉结,并在墙模板加固体系中设置适量斜撑杆40,实现了低损伤单侧支模,相比现有的单侧支模结构,本实用新型排桩支护体系下的低损伤单侧支模结构对于围护桩损伤小,操作简单易行,同时避免了围护桩与建筑地下外墙之间施工空间不足时无法双侧支模的问题。The low-damage single-side formwork structure under the pile row support system of the utility model adopts the actual situation of the construction site of the single-side formwork according to the needs, confirms the size of the remaining space between the enclosure piles and the basement outdoor wall, and designs the brick tire formwork The thickness and the concrete layer 50 range, the water-stop screw is connected to the steel mesh in the concrete layer 50 to form a reliable tie, and an appropriate amount of diagonal braces 40 are set in the wall formwork reinforcement system to achieve low-damage unilateral support Compared with the existing single-side formwork structure, the low-damage single-side formwork structure under the pile row support system of the utility model has little damage to the surrounding protection piles, and the operation is simple and easy, and at the same time it avoids the impact of the surrounding protection piles on the building The problem that the formwork cannot be supported on both sides when the construction space between the underground exterior walls is insufficient.
结合图3所示,搭设本实用新型的施工方法,包括步骤:In conjunction with shown in Fig. 3, set up the construction method of the present utility model, comprise steps:
步骤S101:设置排桩10;Step S101: setting row piles 10;
步骤S102:提供预埋件,将预埋件临时连接于排桩10;Step S102: providing embedded parts, and temporarily connecting the embedded parts to the row of piles 10;
步骤S103:设置墙体外模板20,断开预埋件与排桩10之间的连接,将预埋件连接于墙体外模板20;Step S103: setting the external formwork 20 of the wall, disconnecting the embedded parts and the row of piles 10, and connecting the embedded parts to the external formwork 20 of the wall;
步骤S104:于排桩10和墙体外模板20之间浇筑混凝土层50,将预埋件埋设于混凝土层50中;Step S104: pouring the concrete layer 50 between the row of piles 10 and the external formwork 20 of the wall, and embedding the embedded parts in the concrete layer 50;
步骤S105:提供拉结件70,将拉结件70的第一端穿过墙体外模板20并拉结于预埋件;Step S105: providing the tie piece 70, passing the first end of the tie piece 70 through the external formwork 20 of the wall and tie it to the embedded part;
步骤S106:设置墙体内模板30,将拉结件70的第二端拉结于墙体内模板30;Step S106: setting the formwork 30 in the wall, and fastening the second end of the tie member 70 to the formwork 30 in the wall;
步骤S107:提供斜撑杆40,将斜撑杆40连接并支撑于墙体内模板30的远离墙体外模板20的一侧。Step S107 : providing a diagonal brace 40 , connecting and supporting the diagonal brace 40 on the side of the inner wall formwork 30 away from the wall outer formwork 20 .
本实用新型通过在排桩10和墙体外模板20之间设置混凝土层50,于混凝土层50中预埋预埋件,通过预埋件和拉结件70的连接,对模板进行拉结。本实用新型通过将拉结件70连接在混凝土层50中的预埋件上,并在墙模板内侧设置适量斜撑杆40相结合的方式,可以解决双侧支模占用施工空间较大,操作麻烦以及单侧支模拉结排桩10主筋带来的安全隐患等问题。The utility model arranges a concrete layer 50 between the pile row 10 and the external formwork 20 of the wall, embeds the embedded parts in the concrete layer 50, and binds the formwork through the connection of the embedded parts and the tie parts 70. The utility model can solve the problem that the construction space occupied by the double-side formwork is relatively large and the operation is difficult by connecting the anchor 70 to the embedded part in the concrete layer 50 and setting an appropriate amount of diagonal braces 40 on the inside of the wall formwork. Trouble and the potential safety hazards brought by the 10 main reinforcements of the unilateral formwork tie row piles.
预埋件连接于墙体外模板20,拉结件70穿过墙体外模板20连接预埋件,使得拉结件70不必穿过混凝土层50即可连接于预埋件,连接方便。The embedded part is connected to the external formwork 20 of the wall, and the tie member 70 passes through the external formwork 20 to connect the embedded part, so that the tie member 70 can be connected to the embedded part without passing through the concrete layer 50, and the connection is convenient.
进一步地,步骤S103中:墙体外模板为砖胎模,预埋件包括连接板和连接杆,连接杆连接于连接板的靠近墙体内模板的一侧,于砌筑砖胎模的过程中将连接杆穿设于砖胎模中。Further, in step S103: the outer formwork of the wall is a brick tire formwork, and the embedded parts include a connecting plate and a connecting rod, and the connecting rod is connected to the side of the connecting plate close to the inner formwork of the wall, during the process of building the brick tire formwork Put the connecting rod in the brick mold.
步骤S101之前,埋置底板1留置止挡件41,止挡件41可为钢筋、槽钢,浇筑底板1。Before step S101 , the bottom plate 1 is buried and the stopper 41 is left. The stopper 41 can be a steel bar or a channel steel, and the bottom plate 1 is poured.
步骤S102中,在钢筋网片上需提前焊接留置短钢筋,短钢筋留置长度需满足与止水螺杆单面焊接焊缝长度的要求。In step S102, short steel bars need to be welded in advance on the steel mesh, and the length of the short steel bars must meet the requirements of the length of the weld seam welded on one side of the water-stop screw.
步骤S103中,分段砌筑砖胎模,并在砖胎模表面涂刷防水涂料层,完成后用素混凝土浇筑混凝土层50。In step S103, the brick tire mold is built in sections, and a waterproof paint layer is painted on the surface of the brick tire mold, and the concrete layer 50 is poured with plain concrete after completion.
步骤S106之前,安装外墙的竖向钢筋骨架。Before step S106, the vertical reinforcement skeleton of the outer wall is installed.
步骤S106中,铺设竖向模板31,木方32作为小梁竖向布置,与模板紧贴,钢管71作为主梁横向布置,止水螺杆通过螺帽72固定在两根钢管71之间。步骤S107中,斜撑杆40一端支撑在两根钢管71中间,支撑点与止水螺杆和钢管71的连接点错开布置,另一端支撑在底板1留置短钢筋与底板1埋置槽钢形成的止挡件41上,形成完整的斜撑杆40体系。In step S106, the vertical formwork 31 is laid, the wooden beams 32 are arranged vertically as small beams, closely attached to the formwork, the steel pipes 71 are arranged horizontally as the main beam, and the water-stop screw is fixed between the two steel pipes 71 through nuts 72 . In step S107, one end of the diagonal brace 40 is supported between the two steel pipes 71, the support point is arranged in a staggered manner from the connection point between the water-stop screw and the steel pipe 71, and the other end is supported on the bottom plate 1, which is formed by leaving short steel bars and the embedded channel steel in the bottom plate 1. On the stopper 41, a complete diagonal brace 40 system is formed.
步骤S107之后,浇筑外墙混凝土。After step S107, pour concrete for the exterior wall.
本实用新型排桩支护体系下的低损伤单侧支模结构用于与基坑围护桩间距过小的建筑物地下外墙单侧支模施工。The low-damage single-side formwork structure under the pile row support system of the utility model is used for the single-side formwork construction of the underground outer wall of the building whose distance from the surrounding protection piles of the foundation pit is too small.
本实施例中,竖直方向上共设置四道止水螺杆,每道止水螺杆间距通过计算获得,相应的钢管、斜撑杆40在竖直方向上设置道数及间距与止水螺杆相同。In this embodiment, a total of four water-stop screws are arranged in the vertical direction, and the distance between each water-stop screw is obtained by calculation. The number and spacing of the corresponding steel pipes and diagonal braces 40 in the vertical direction are the same as those of the water-stop screws. .
本实施例中,外墙与底板1交界处设置止水钢板。In this embodiment, a waterproof steel plate is provided at the junction of the outer wall and the bottom plate 1 .
本实用新型中,将止水螺杆连接在混凝土层50中的钢筋网片上,避免了因将拉结点设置在排桩10主筋上时需凿开围护桩钢筋保护层而产生的基坑安全风险、建筑垃圾及施工噪音,不仅保证施工安全,而且绿色节能环保。在砖胎模上涂刷防水涂料层,减小了地下室外墙漏水的风险,减少后期防水堵漏、维修的费用,保证了建筑工程的质量。止水螺杆与斜撑杆40相结合的加固方式,减少了斜撑杆40的设置数量,节省材料,提高了施工效率。In the utility model, the water-stop screw is connected to the reinforcement mesh in the concrete layer 50, which avoids the safety of the foundation pit due to the need to dig out the steel reinforcement protection layer of the enclosing piles when the tie points are arranged on the main reinforcement of the pile row 10. Risk, construction waste and construction noise, not only ensure construction safety, but also be green, energy-saving and environmentally friendly. Applying a waterproof paint layer on the brick tire mold reduces the risk of water leakage on the basement exterior wall, reduces the cost of waterproofing, plugging and maintenance in the later stage, and ensures the quality of the construction project. The reinforcement method combining the water-stop screw rod and the diagonal brace 40 reduces the number of diagonal braces 40, saves materials, and improves construction efficiency.
以上仅是本实用新型的较佳实施例而已,并非对本实用新型做任何形式上的限制,虽然本实用新型已以较佳实施例揭露如上,然而并非用以限定本实用新型,任何熟悉本专业的技术人员,在不脱离本实用新型技术方案的范围内,当可利用上述揭示的技术内容作出些许更动或修饰为等同变化的等效实施例,但凡是未脱离本实用新型技术方案的内容,依据本实用新型的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本实用新型技术方案的范围内。The above are only preferred embodiments of the present utility model, and do not limit the utility model in any form. Although the utility model has been disclosed as above with preferred embodiments, it is not intended to limit the utility model. Anyone familiar with this field Those skilled in the art, without departing from the scope of the technical solution of the present utility model, may use the technical content disclosed above to make some changes or be modified into equivalent embodiments with equivalent changes, but all those that do not depart from the technical solution of the present utility model Any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the utility model still belong to the scope of the technical solution of the utility model.
需要说明的是,本说明书所附图式所绘示的结构、比例、大小等,均仅用以配合说明书所揭示的内容,以供熟悉此技术的人士了解与阅读,并非用以限定本实用新型可实施的限定条件,故不具技术上的实质意义,任何结构的修饰、比例关系的改变或大小的调整,在不影响本实用新型所能产生的功效及所能达成的目的下,均应仍落在本实用新型所揭示的技术内容得能涵盖的范围内。It should be noted that the structures, proportions, sizes, etc. shown in the drawings attached to this specification are only used to match the content disclosed in the specification, for those who are familiar with this technology to understand and read, and are not intended to limit the scope of this practical application. The restrictive conditions for the implementation of the new model, so it has no technical substantive significance, any modification of the structure, the change of the proportional relationship or the adjustment of the size, without affecting the effect and the purpose of the utility model, should be Still fall within the scope that the technical content disclosed by the utility model can cover.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822069748.3U CN209456992U (en) | 2018-12-11 | 2018-12-11 | Low damage unilateral formwork supporting structure under campshed support system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822069748.3U CN209456992U (en) | 2018-12-11 | 2018-12-11 | Low damage unilateral formwork supporting structure under campshed support system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209456992U true CN209456992U (en) | 2019-10-01 |
Family
ID=68040223
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201822069748.3U Expired - Fee Related CN209456992U (en) | 2018-12-11 | 2018-12-11 | Low damage unilateral formwork supporting structure under campshed support system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209456992U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109469044A (en) * | 2018-12-11 | 2019-03-15 | 中国建筑第八工程局有限公司 | Low damage unilateral formwork supporting structure and method under campshed support system |
| CN111576444A (en) * | 2020-06-01 | 2020-08-25 | 范春青 | Underground supporting structure of foundation pit and construction process thereof |
-
2018
- 2018-12-11 CN CN201822069748.3U patent/CN209456992U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109469044A (en) * | 2018-12-11 | 2019-03-15 | 中国建筑第八工程局有限公司 | Low damage unilateral formwork supporting structure and method under campshed support system |
| CN111576444A (en) * | 2020-06-01 | 2020-08-25 | 范春青 | Underground supporting structure of foundation pit and construction process thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104631512B (en) | Hang modulus method after-pouring band beam-slab construction method | |
| CN205742213U (en) | Foundation pit supporting construction | |
| CN105714831A (en) | Abnormal-shape double-row pile for supporting foundation pit side wall and construction method of abnormal-shape double-row pile | |
| CN205296584U (en) | Be applied to assembled constructional column of aerated concrete block infilled wall | |
| CN217949734U (en) | Formwork support system serving as single side and top plate of outer wall | |
| CN107893529A (en) | Suitable for deep basal pit outer wall of basement PC template systems and its construction method | |
| CN111395745A (en) | A kind of basement exterior wall single-sided formwork support system and construction method thereof | |
| CN102518148A (en) | Architecture related to triangular bracing structure of underground open cut station and construction method thereof | |
| CN101492918B (en) | Beam column node for base pit engineering of topdown construction method | |
| CN101575859B (en) | Anti-seepage Joint of Underground Diaphragm Wall and Its Construction Method | |
| CN206625428U (en) | Pipe shaft post-cast floor slab closed system | |
| CN104131576B (en) | A construction method of water-stop curtain anti-seepage structure | |
| CN207568169U (en) | Suitable for the deep basal pit outer wall of basement PC template systems under the conditions of null field ground | |
| CN108756895B (en) | A kind of tunnel excavation support construction method | |
| CN210976588U (en) | Template reinforcing system for double shear walls at deformation joint | |
| CN106193120B (en) | Basement is encorbelmented, and bottom plate is inverse to make structure and construction method | |
| CN204326100U (en) | The Preserved node of covered back-digging side wall bar splice | |
| CN112127390A (en) | A construction technology for simple sealing of external wall reserved casing in underground structure area | |
| CN104908150B (en) | A kind of piping shaft making template and the method based on factorial praluction piping shaft | |
| CN109403516B (en) | Construction method of basement exterior wall | |
| CN116516983B (en) | Tide-affected steel-concrete combined inner support for deep foundation pit in river and construction method | |
| CN107916727A (en) | A kind of prefabricated composite wallboard in underground and the waterproofing node structure of cast in place frame column seam crossing | |
| CN109469044A (en) | Low damage unilateral formwork supporting structure and method under campshed support system | |
| CN207143746U (en) | Support beam template system under concrete support trestle plate | |
| CN103898835B (en) | The anti-back of the body of bridge draws load-bearing construction bracket and construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191001 |