CN207633546U - Toilet concrete sealing prefabricated components - Google Patents

Toilet concrete sealing prefabricated components Download PDF

Info

Publication number
CN207633546U
CN207633546U CN201721791570.2U CN201721791570U CN207633546U CN 207633546 U CN207633546 U CN 207633546U CN 201721791570 U CN201721791570 U CN 201721791570U CN 207633546 U CN207633546 U CN 207633546U
Authority
CN
China
Prior art keywords
reinforcing bar
concrete
prefabricated components
anchor
stirrup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721791570.2U
Other languages
Chinese (zh)
Inventor
邢慧娟
陈坤
刘曙辉
张晖
李林阁
谢浩
程伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Juyu Sailing Engineering Technology Consulting Co., Ltd.
Original Assignee
陈坤
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 陈坤 filed Critical 陈坤
Priority to CN201721791570.2U priority Critical patent/CN207633546U/en
Application granted granted Critical
Publication of CN207633546U publication Critical patent/CN207633546U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of toilet concrete sealing prefabricated components by stirrup, lateral stressed reinforcing bar, anchor and position reinforcing bar and coagulation local soil type at, wherein lateral stressed reinforcing bar is laterally distributed on four angles of stirrup, anchor and position reinforcing bar straight down is being equipped on the position of lateral stressed reinforcing bar, the surrounding of the stirrup, lateral stressed reinforcing bar and anchor and position reinforcing bar and internal wrapped up by concrete are filled, and rectangular parallelepiped structure is formed;It is equipped with tongue and groove in the lower section both sides of concrete sealing prefabricated components, for splicing by tongue and groove between cast-in-place concrete.The utility model uses sealing tongue and groove precast concrete, using Bar Anchorage in cast-in-place concrete floor, ensure concrete sealing prefabricated components vertically and horizontally, the larger positioning of difficulty and template construction technique make when not only saving site operation, it ensure that the quality of concrete sealing, effectively solve the leakage problem of toilet, simple in structure, easy for construction, energy conservation and environmental protection.

Description

Toilet concrete sealing prefabricated components
Technical field
The utility model is related to a kind of construction component more particularly to a kind of it is set between toilet wall and floor Sealing counnter attack bank leaks prefabricated components.
Background technology
In residential housing, toilet external wall waterproof problem is the problem in life, and toilet concrete waterstop member exists Construction quality can effectively solve seepage in toilet water problems, since the difficulty of construction of toilet concrete sealing prefabricated components is big, Construction quality is difficult control to conforming to quality requirements.
Once property molding pours the form of construction work of toilet concrete sealing prefabricated components and first to pour build floor secondary again Pour two kinds, the good water-proof effect of one-time-concreting, but construction technology be difficult control in place, be susceptible to offset and spillage;It is secondary Although it is simple to pour construction technology, molding effect is undesirable, and easy tos produce concrete binding site leakage problem.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, provide a kind of prefabricated structure of toilet concrete sealing Part can not only solve the problems, such as that toilet concrete sealing prefabricated components formwork positioning is difficult, but also can guarantee construction quality, have Effect solves the phenomenon that seepage in toilet water problems.
To achieve the above object, the utility model uses following technical scheme:A kind of prefabricated structure of toilet concrete sealing Part is by stirrup, lateral stressed reinforcing bar, anchor and position reinforcing bar and coagulation local soil type at wherein lateral stressed reinforcing bar is laterally distributed in stirrup Four angles on, be equipped with anchor and position reinforcing bar straight down on the position of lateral stressed reinforcing bar, the stirrup, The surrounding and internal wrapped up by concrete of lateral stressed reinforcing bar and anchor and position reinforcing bar are filled, and rectangular parallelepiped structure is formed;Mixed The lower section both sides of solidifying soil sealing prefabricated components are equipped with tongue and groove, for being spliced by tongue and groove between cast-in-place concrete.
The utility model generate advantageous effect be:The utility model uses sealing tongue and groove precast concrete, utilizes Bar Anchorage ensures concrete sealing prefabricated components vertically and horizontally in cast-in-place concrete floor, not only saves scene and applies The larger positioning of working hour difficulty and template construction technique make, and ensure that the quality of concrete sealing, effectively solve toilet Leakage problem, simple in structure, easy for construction, energy conservation and environmental protection.
Description of the drawings
Fig. 1 is the sectional view of the utility model;
Fig. 2 is the vertical view of the utility model;
Fig. 3 is the cross section structure schematic diagram of the installation of the utility model;
Fig. 4 is the structural schematic diagram for lifting steel hoop.
In attached drawing:1, concrete, 2, stirrup, 3, lateral stressed reinforcing bar, 4, anchor and position reinforcing bar, 5, lifting steel hoop, 6, tongue and groove, 7, floorslab concrete component.
Specific implementation mode
Here is that specification and specific implementation is combined to further illustrate the utility model.
The utility model is using index bed toilet as unit, according to the principle that design feature and size make, same type Component be unified into a type, component diagram is drawn, convenient for standardized production, installation and quality control.
As depicted in figs. 1 and 2, the utility model is a kind of toilet concrete sealing prefabricated components, and the component is by coagulation Soil 1, stirrup 2, lateral stressed reinforcing bar 3 and anchor and position reinforcing bar 4 form.Stirrup is wherein equipped with inside concrete sealing prefabricated components 2 and lateral stressed reinforcing bar 3, stirrup 2 is that annular is arranged, and lateral stressed reinforcing bar 3 is horizontally set on four angles of stirrup 2.Mixed Two rows of anchor and position reinforcing bars 4 are arranged below in solidifying soil sealing prefabricated components, and spacer bar upper vertical is embedded in prefabricated components, lower part Keep horizontal, the reinforcing bar of two rows of spacer bars is anchored directly in floor, for positioning and reinforced concrete sealing prefabricated components With floor.
As shown in figure 4, the lifting steel hoop 5 of " Ω " shape is provided on four angles of concrete sealing prefabricated components, Mainly lifting concrete sealing prefabricated components are installed and used.Both sides are equipped with tongue and groove 6 below concrete sealing prefabricated components, pass through Tongue and groove 6 and floorslab concrete component 7 splice, and can increase globality, the adaptation between floor and concrete sealing prefabricated components, Solve periphery leakage.Position correction is carried out after the completion of concrete sealing prefabricated part hanging, has padded the cover to reinforcement in floor face, It is cast-in-place can just floor to be carried out after the assay was approved.
If Fig. 1 and Fig. 3 can also be seen that the reinforcing bar passed through anchor and position reinforcing bar 4 in floorslab concrete component 7, make to mix Solidifying soil sealing prefabricated components are installed on the position marked on floorslab concrete component 7, and check the verticality of anchor and position reinforcing bar 4 And levelness, ensure that deviation does not occur in the positioning of concrete sealing prefabricated components, it will be on the tongue and groove 6 of concrete sealing prefabricated components Edge is floor face absolute altitude, increases the globality just conjunction property between prefabricated components and floorslab concrete component 7, finally carries out floor Pour, the prefabricated anti-bank in toilet is connected with floor by anchor and position reinforcing bar 4.
The utility model just meets place with cast-in-place concrete using fixed form, reinforcing bar binding, C25 concrete prefabricated elements By the way of reserved tongue and groove 6, component conservation intensity reaches 80% use and hangs installation.
The utility model effective solution infiltration phenomenon of toilet, avoids deviation, account mould, concrete formation quality Difference, door opening is fragile when form removal, arrisdefect, and reduction does over again, the amount of reprocessing, and has saved artificial, material, has reduced construction cost;It reduces Construction quality disadvantage achieves preferable economic benefit, improves engineering production efficiency, accelerates construction progress, improve building Quality and performance reduce engineering and complain, achieve good social benefit.
The utility model is the standardization of component and the unitized standardization and sequencing for being doomed site operation, makes construction Become more convenient operation, worker is enable more preferably to understand construction main points and installation method faster.Using index bed toilet as unit, The principle made according to design feature and size.The component of same type is unified into a type, is made and is given birth to of fixed form Production, installation and quality control.After the installation of flange prefabricated components with floor is whole pours, one-pass molding, and health can be solved at all Between percolating water below wall and the common quality defect that gets damp.

Claims (1)

1. a kind of toilet concrete sealing prefabricated components, it is characterised in that:By stirrup, lateral stressed reinforcing bar, anchor and position steel Muscle and coagulation local soil type are at wherein lateral stressed reinforcing bar is laterally distributed on four angles of stirrup, perpendicular to lateral stressed reinforcing bar Position be equipped with anchor and position reinforcing bar straight down, the stirrup, lateral stressed reinforcing bar and anchor and position reinforcing bar four Week and internal wrapped up by concrete are filled, and rectangular parallelepiped structure is formed;It is equipped in the lower section both sides of concrete sealing prefabricated components Tongue and groove, for being spliced by tongue and groove between cast-in-place concrete.
CN201721791570.2U 2017-12-20 2017-12-20 Toilet concrete sealing prefabricated components Active CN207633546U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721791570.2U CN207633546U (en) 2017-12-20 2017-12-20 Toilet concrete sealing prefabricated components

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721791570.2U CN207633546U (en) 2017-12-20 2017-12-20 Toilet concrete sealing prefabricated components

Publications (1)

Publication Number Publication Date
CN207633546U true CN207633546U (en) 2018-07-20

Family

ID=62852829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721791570.2U Active CN207633546U (en) 2017-12-20 2017-12-20 Toilet concrete sealing prefabricated components

Country Status (1)

Country Link
CN (1) CN207633546U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258602A (en) * 2019-06-27 2019-09-20 中铁第四勘察设计院集团有限公司 Prefabricated water-blocking bank segment, the construction method from wall discharge structure and from wall ditch
CN110735485A (en) * 2019-09-16 2020-01-31 浙江绿筑集成科技有限公司 Construction method of precast concrete guide walls
CN110777977A (en) * 2019-11-06 2020-02-11 深圳市正知建筑技术有限公司 Outer wall assembly structure of assembly type building and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258602A (en) * 2019-06-27 2019-09-20 中铁第四勘察设计院集团有限公司 Prefabricated water-blocking bank segment, the construction method from wall discharge structure and from wall ditch
CN110735485A (en) * 2019-09-16 2020-01-31 浙江绿筑集成科技有限公司 Construction method of precast concrete guide walls
CN110777977A (en) * 2019-11-06 2020-02-11 深圳市正知建筑技术有限公司 Outer wall assembly structure of assembly type building and construction method thereof

Similar Documents

Publication Publication Date Title
CN207633546U (en) Toilet concrete sealing prefabricated components
CN206376276U (en) A kind of prefabricated pipe gallery
CN106149937B (en) Assembly concrete beam and its dry type connection method
CN108726348B (en) Horizontal prefabrication, overturning and hoisting method for pipe gallery segments
CN205296388U (en) Apron is sealed to garage wall post -cast strip
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN104712079B (en) The assembled polypropylene fibre sludge ceramsite concrete wall and its construction method connected based on mat surface
CN206220238U (en) Fully-prefabricated assembled structure
CN201891133U (en) Manual assembled type self-waterproof late poured band prefabricated slab of basement outer wall
CN205399497U (en) Basement outer wall post -cast strip concrete precast slab
CN109930625A (en) A kind of tower crane and its construction method
CN103758207B (en) Semi-prefabricated semi-cast-in-place type frame structure of integrated building and construction method thereof
CN201473974U (en) Novel steel plate water stopper
CN209703418U (en) Assembled flood-control wall
CN204676607U (en) Poured band of outer wall of basement plugging structure
CN209989847U (en) Shear force wall post-cast strip prefabricated plate closing device
CN207452889U (en) Artificial digging pile assembled retaining wall
CN208533570U (en) A kind of prefabricated assembled fetal membrane
CN106088758A (en) A kind of double-deck assembled underground granary
CN206053032U (en) A kind of fabricated shear wall vertical connection structure
CN206016002U (en) Assembly concrete beam
CN105421780B (en) A kind of construction method of prefabricated concrete structure
CN210887323U (en) Connect and build engineering underground structure construction joint watertight fittings
CN107620415A (en) A kind of assembling type steel structure cavity board member
CN110397088B (en) Advanced water-stop post-pouring strip structure of river beach working condition basement and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Xing Huijuan

Inventor after: Chen Kun

Inventor after: Liu Shuhui

Inventor after: Zhang Hui

Inventor after: Li Linge

Inventor after: Xie Hao

Inventor after: Cheng Wei

Inventor before: Xing Huijuan

Inventor before: Chen Kun

Inventor before: Liu Shuhui

Inventor before: Zhang Hui

Inventor before: Li Linge

Inventor before: Xie Hao

Inventor before: Cheng Wei

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20190114

Address after: 450000 Zhengzhou Free Trade Experimental Zone, Zhengzhou, Henan Province, No. 302, 3rd floor, Unit 1, 22 Xingrong Street, Zhengzhou District (Zhengdong)

Patentee after: Henan Juyu Sailing Engineering Technology Consulting Co., Ltd.

Address before: 466700 No. 244 Huangji Village, Huangji Township, Huaiyang County, Zhoukou City, Henan Province

Patentee before: Chen Kun

TR01 Transfer of patent right