CN208717952U - A kind of reserved passage construction device of basement post-pouring zone - Google Patents

A kind of reserved passage construction device of basement post-pouring zone Download PDF

Info

Publication number
CN208717952U
CN208717952U CN201821195483.5U CN201821195483U CN208717952U CN 208717952 U CN208717952 U CN 208717952U CN 201821195483 U CN201821195483 U CN 201821195483U CN 208717952 U CN208717952 U CN 208717952U
Authority
CN
China
Prior art keywords
basement
steel
construction
steel pipe
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821195483.5U
Other languages
Chinese (zh)
Inventor
蓝明红
杨静
祝国梁
陈景镇
巫立宁
林光定
颜艺芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Bureau Construction and Development Co Ltd
Original Assignee
China Construction Fourth Bureau Fourth Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Fourth Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau Fourth Construction Engineering Co Ltd
Priority to CN201821195483.5U priority Critical patent/CN208717952U/en
Application granted granted Critical
Publication of CN208717952U publication Critical patent/CN208717952U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of basement post-pouring zones to reserve passage construction device, including the supporting frame being mounted below basement post-pouring zone, support frame as described above body is set up by supporting steel pipe, advance and transfer positioned at the supporting steel pipe of reserved channel two sides encrypt setting, one group of I-steel is erected at the top of supporting frame, then it is laid with one group of square steel on I-steel, template is laid on square steel.Several closure construction regions are connected into integral passage by reserved channel by the utility model, after reserved channel is formed, the carpenters such as basement template, steel pipe teams and groups material can directly be transported with agricultural vehicle in channel, facilitate rubbish cleaning, guarantee civilized construction, and the constructions such as building material, plastering cement mortar, putty coating, heating and ventilation project material and fire engineering material of basement transport can be unblocked in basement, to save the cost of materials handling and waste transportation, construction benefit is improved.

Description

A kind of reserved passage construction device of basement post-pouring zone
Technical field
The utility model relates to a kind of basement post-pouring zones to reserve passage construction device, belong to technical field of building construction.
Background technique
Post-cast strip, which usually has, shrinks post-cast strip and pouring after settlement etc., and that shrinks post-cast strip concrete pours the two sides Ying Qi Concreting carries out after at least two moon;The concreting of pouring after settlement should generally be completed one month in main body masonry Afterwards, it is determined after and providing settlement observation data to designing unit by designing unit.Alter-pouring strips mould plate is independently to prop up the system torn open, by Late poured band support template is removed in basement material transport, the cleaning of basement rubbish and the interspersed construction of basement etc., is poured after causing Band uses secondary demoulding and returns back to top, simultaneously because operator's technology is different, causes the template fissure of displacement so that concrete component formation Effect is poor, settles uneven generation crack, and violate construction project related specifications and design requirement.Post-cast strip is not if removed support System, the civilized constructions such as the transhipment of basement transport of materials, rubbish cleaning, interspersed construction can not carry out, while also influence basement Other partitioned project constructions.Simultaneously as late poured band support system leads to the transhipment of basement transport of materials, rubbish cleaning, interts Construction etc. can not construct, and underground chamber region is made to be divided into several closure construction regions, can bring the inconvenience of construction channel, assembly and disassembly Cumbersome, the problems such as there are security risks.
Utility model content
That the purpose of the utility model is to provide a kind of structures is simple, easy for construction, reusable, can provide construction The basement post-pouring zone of efficiency reserves passage construction device, to overcome deficiency in the prior art.
The technical solution of the utility model includes: a kind of basement post-pouring zone reserves passage construction device, including it is mounted on underground Supporting frame below the post-cast strip of room, support frame as described above body are set up by supporting steel pipe, the support positioned at reserved channel two sides The advance and transfer of steel pipe encrypt setting, one group of I-steel are erected at the top of supporting frame, then on I-steel upper berth If one group of square steel, is laid with template on square steel.
Further, it is provided with jacking at the top of the supporting steel pipe of the reserved channel position, I-steel rides upon on jacking.
Due to the adoption of the above technical scheme, if utility model has the advantages that the utility model will by reserved channel A dry closure construction region connects into integral passage, after reserved channel is formed, the carpenters such as basement template, steel pipe teams and groups material Can in channel directly with agricultural vehicle transport, facilitate rubbish cleaning, guarantee civilized construction, and the building material of basement, smear The constructions such as buck cement mortar, putty coating, heating and ventilation project material and fire engineering material transport can be unblocked in basement, To save the cost of materials handling and waste transportation, construction benefit is improved, largely saved cost and saves the duration, And feasible scheme is provided for the interspersed construction of project.
Detailed description of the invention
Fig. 1 is the top view of the structural schematic diagram of supporting frame;
Fig. 2 is the top view of the structural schematic diagram of supporting frame and I-steel;
Fig. 3 is the side view of supporting frame;
Fig. 4 is the main view of supporting frame.
Description of symbols: 1- supporting steel pipe, 2- reserve channel, 3- basement post-pouring zone, 4- I-steel, 5- square steel, 6- Template, 7- steel plate for sealing water, 8- jacking.
Specific embodiment
It is right with reference to the accompanying drawings and examples in order to keep the purpose of this utility model, technical solution and advantage clearer The utility model is described in further detail.
The embodiments of the present invention: basement post-pouring zone reserves structural schematic diagram such as Fig. 1~4 institute of passage construction device Show, the supporting frame including being mounted on 3 lower section of basement post-pouring zone, support frame as described above body is set up by supporting steel pipe 1, is located at The advance and transfer of the supporting steel pipe 1 of reserved 2 two sides of channel encrypt setting, and one group of I-shaped is erected at the top of supporting frame Then steel 4 is laid with one group of square steel 5 on I-steel 4, template 6 is laid on square steel 5.The supporting steel of 2 position of reserved channel Jacking 8 is provided at the top of pipe 1, I-steel 4 rides upon on jacking 8.
When being constructed using the reserved passage construction device of above-mentioned basement post-pouring zone, implement according to the following steps:
Step 1, supporting frame installation: installing supporting frame below basement post-pouring zone 3 first, whole frame body according to The advance a=1.00m of supporting steel pipe 1, transfer b=1.00m, step pitch h=1.50m are set up, then to reserved 2 position of channel Unwrapping wire is carried out, then the advance of reserved channel 2 steel pipe 1 supported on both sides and transfer are encrypted as 0.5m, reserves the branch of 2 position of channel The advance a=1.00m of steel pipe 1, transfer b=1.00m are supportted, bar height of sweeping the floor in support frame as described above body is 0.15m;
Step 2 is located at reserved 2 position of channel at the top of supporting frame and sets up one group after supporting frame is installed Then I-steel 4 is laid with one group of square steel 5 on I-steel 4, template 6 is laid on square steel 5, can finally be poured in template 6 Basement post-pouring zone 3 is provided with steel plate for sealing water 7 between basement post-pouring zone 3 and the concrete of two sides;
Step 3 when after 3 concreting of basement post-pouring zone is complete and reaching demoulding condition, removes reserved 2, channel It sets the supporting steel pipe 1 at place, forms reserved channel 2, the basement bottom board for finally reserving 2 position of channel carries out steel plate or template It is laid with.
Several closure construction regions are connected into integral passage by reserved channel 2 by the utility model, reserve 2 shape of channel After, the carpenters such as basement template, steel pipe teams and groups material can in channel directly with agricultural vehicle transport, facilitate rubbish cleaning, Guarantee civilized construction, and the building material of basement, plastering cement mortar, putty coating, heating and ventilation project material and fire-fighting work The constructions such as journey material transport can be unblocked in basement, to save the cost of materials handling and waste transportation, raising is applied Work efficiency benefit has largely saved cost and has saved the duration, and provides feasible scheme for the interspersed construction of project.

Claims (2)

1. a kind of basement post-pouring zone reserves passage construction device, including the support frame being mounted below basement post-pouring zone (3) Body, it is characterised in that: support frame as described above body is set up by supporting steel pipe (1), is located at the supporting steel pipe of reserved channel (2) two sides (1) advance and transfer encrypts setting, and one group of I-steel (4) is erected at the top of supporting frame, on I-steel (4) upper berth If one group of square steel (5), template (6) are laid on square steel (5).
2. basement post-pouring zone according to claim 1 reserves passage construction device, it is characterised in that: the reserved channel (2) it is provided with jacking (8) at the top of the supporting steel pipe (1) of position, I-steel (4) rides upon on jacking (8).
CN201821195483.5U 2018-07-26 2018-07-26 A kind of reserved passage construction device of basement post-pouring zone Active CN208717952U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821195483.5U CN208717952U (en) 2018-07-26 2018-07-26 A kind of reserved passage construction device of basement post-pouring zone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821195483.5U CN208717952U (en) 2018-07-26 2018-07-26 A kind of reserved passage construction device of basement post-pouring zone

Publications (1)

Publication Number Publication Date
CN208717952U true CN208717952U (en) 2019-04-09

Family

ID=65974882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821195483.5U Active CN208717952U (en) 2018-07-26 2018-07-26 A kind of reserved passage construction device of basement post-pouring zone

Country Status (1)

Country Link
CN (1) CN208717952U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678009A (en) * 2018-07-26 2018-10-19 中建四局第四建筑工程有限公司 A kind of basement post-pouring zone reserved passageway construction method and device
CN110805063A (en) * 2019-10-22 2020-02-18 浙江二十冶建设有限公司 Building bottom plate construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678009A (en) * 2018-07-26 2018-10-19 中建四局第四建筑工程有限公司 A kind of basement post-pouring zone reserved passageway construction method and device
CN110805063A (en) * 2019-10-22 2020-02-18 浙江二十冶建设有限公司 Building bottom plate construction method

Similar Documents

Publication Publication Date Title
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN201280725Y (en) Post-casting construction precast slab for basement of buildings
CN101818539A (en) Assembled integral building and construction method thereof
CN105862873A (en) Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit
CN103806656A (en) Construction method of cast-in-place concrete flat slab built-in thin-wall hollow box body
CN105350581A (en) Advanced sealing structure for basement top slab settlement post-cast strips
CN103806647A (en) Assembly and disassembly process for large-span concrete bidirectional dense rib beam formwork case
CN211646494U (en) Waterproof construction of underground garage foundation slab
CN103410173A (en) Construction method for vertical post pouring belt plugging of underground structural outer wall
CN208717952U (en) A kind of reserved passage construction device of basement post-pouring zone
CN109930625A (en) A kind of tower crane and its construction method
CN110593321B (en) Construction method of basement outer wall post-cast strip advanced sealing prefabricated clamping groove formwork-free system
CN209942071U (en) Flashing joint structure for steel skeleton light plate roof and parapet wall
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN204551694U (en) A kind of pre-buried type balcony floor drain
CN103334771A (en) Concrete pouring method of side wall and joint of middle plate and vault by means of underground excavation reverse construction method
CN103410172A (en) Construction method for post pouring belt plugging of underground structural roof plate
CN110847466A (en) Splicing and reinforcing construction method for prefabricated laminated slab
CN109137984A (en) Assembled integral mixes prefabricated pipe gallery
CN205399499U (en) Waterproofing membrane basic unit
CN105421780B (en) A kind of construction method of prefabricated concrete structure
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN211285715U (en) Basement lateral wall post-cast strip block structure
CN110552546B (en) Method for building underground parking lot waterproof facility by using tower crane
CN204645093U (en) Poured band of outer wall of basement advanced processing constructs

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 361000 unit 801, No. 889, fanghubei Second Road, Heshan street, Huli District, Xiamen City, Fujian Province

Patentee after: China Construction Fourth Engineering Bureau Construction Development Co., Ltd

Address before: No. 158, Wen Ping Road, Siming District, Xiamen, Fujian Province

Patentee before: Zhongjian four Bureau fourth Construction Engineering Co., Ltd.

CP03 Change of name, title or address