CN208717952U - A kind of reserved passage construction device of basement post-pouring zone - Google Patents
A kind of reserved passage construction device of basement post-pouring zone Download PDFInfo
- Publication number
- CN208717952U CN208717952U CN201821195483.5U CN201821195483U CN208717952U CN 208717952 U CN208717952 U CN 208717952U CN 201821195483 U CN201821195483 U CN 201821195483U CN 208717952 U CN208717952 U CN 208717952U
- Authority
- CN
- China
- Prior art keywords
- basement
- steel
- construction
- steel pipe
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of basement post-pouring zones to reserve passage construction device, including the supporting frame being mounted below basement post-pouring zone, support frame as described above body is set up by supporting steel pipe, advance and transfer positioned at the supporting steel pipe of reserved channel two sides encrypt setting, one group of I-steel is erected at the top of supporting frame, then it is laid with one group of square steel on I-steel, template is laid on square steel.Several closure construction regions are connected into integral passage by reserved channel by the utility model, after reserved channel is formed, the carpenters such as basement template, steel pipe teams and groups material can directly be transported with agricultural vehicle in channel, facilitate rubbish cleaning, guarantee civilized construction, and the constructions such as building material, plastering cement mortar, putty coating, heating and ventilation project material and fire engineering material of basement transport can be unblocked in basement, to save the cost of materials handling and waste transportation, construction benefit is improved.
Description
Technical field
The utility model relates to a kind of basement post-pouring zones to reserve passage construction device, belong to technical field of building construction.
Background technique
Post-cast strip, which usually has, shrinks post-cast strip and pouring after settlement etc., and that shrinks post-cast strip concrete pours the two sides Ying Qi
Concreting carries out after at least two moon;The concreting of pouring after settlement should generally be completed one month in main body masonry
Afterwards, it is determined after and providing settlement observation data to designing unit by designing unit.Alter-pouring strips mould plate is independently to prop up the system torn open, by
Late poured band support template is removed in basement material transport, the cleaning of basement rubbish and the interspersed construction of basement etc., is poured after causing
Band uses secondary demoulding and returns back to top, simultaneously because operator's technology is different, causes the template fissure of displacement so that concrete component formation
Effect is poor, settles uneven generation crack, and violate construction project related specifications and design requirement.Post-cast strip is not if removed support
System, the civilized constructions such as the transhipment of basement transport of materials, rubbish cleaning, interspersed construction can not carry out, while also influence basement
Other partitioned project constructions.Simultaneously as late poured band support system leads to the transhipment of basement transport of materials, rubbish cleaning, interts
Construction etc. can not construct, and underground chamber region is made to be divided into several closure construction regions, can bring the inconvenience of construction channel, assembly and disassembly
Cumbersome, the problems such as there are security risks.
Utility model content
That the purpose of the utility model is to provide a kind of structures is simple, easy for construction, reusable, can provide construction
The basement post-pouring zone of efficiency reserves passage construction device, to overcome deficiency in the prior art.
The technical solution of the utility model includes: a kind of basement post-pouring zone reserves passage construction device, including it is mounted on underground
Supporting frame below the post-cast strip of room, support frame as described above body are set up by supporting steel pipe, the support positioned at reserved channel two sides
The advance and transfer of steel pipe encrypt setting, one group of I-steel are erected at the top of supporting frame, then on I-steel upper berth
If one group of square steel, is laid with template on square steel.
Further, it is provided with jacking at the top of the supporting steel pipe of the reserved channel position, I-steel rides upon on jacking.
Due to the adoption of the above technical scheme, if utility model has the advantages that the utility model will by reserved channel
A dry closure construction region connects into integral passage, after reserved channel is formed, the carpenters such as basement template, steel pipe teams and groups material
Can in channel directly with agricultural vehicle transport, facilitate rubbish cleaning, guarantee civilized construction, and the building material of basement, smear
The constructions such as buck cement mortar, putty coating, heating and ventilation project material and fire engineering material transport can be unblocked in basement,
To save the cost of materials handling and waste transportation, construction benefit is improved, largely saved cost and saves the duration,
And feasible scheme is provided for the interspersed construction of project.
Detailed description of the invention
Fig. 1 is the top view of the structural schematic diagram of supporting frame;
Fig. 2 is the top view of the structural schematic diagram of supporting frame and I-steel;
Fig. 3 is the side view of supporting frame;
Fig. 4 is the main view of supporting frame.
Description of symbols: 1- supporting steel pipe, 2- reserve channel, 3- basement post-pouring zone, 4- I-steel, 5- square steel, 6-
Template, 7- steel plate for sealing water, 8- jacking.
Specific embodiment
It is right with reference to the accompanying drawings and examples in order to keep the purpose of this utility model, technical solution and advantage clearer
The utility model is described in further detail.
The embodiments of the present invention: basement post-pouring zone reserves structural schematic diagram such as Fig. 1~4 institute of passage construction device
Show, the supporting frame including being mounted on 3 lower section of basement post-pouring zone, support frame as described above body is set up by supporting steel pipe 1, is located at
The advance and transfer of the supporting steel pipe 1 of reserved 2 two sides of channel encrypt setting, and one group of I-shaped is erected at the top of supporting frame
Then steel 4 is laid with one group of square steel 5 on I-steel 4, template 6 is laid on square steel 5.The supporting steel of 2 position of reserved channel
Jacking 8 is provided at the top of pipe 1, I-steel 4 rides upon on jacking 8.
When being constructed using the reserved passage construction device of above-mentioned basement post-pouring zone, implement according to the following steps:
Step 1, supporting frame installation: installing supporting frame below basement post-pouring zone 3 first, whole frame body according to
The advance a=1.00m of supporting steel pipe 1, transfer b=1.00m, step pitch h=1.50m are set up, then to reserved 2 position of channel
Unwrapping wire is carried out, then the advance of reserved channel 2 steel pipe 1 supported on both sides and transfer are encrypted as 0.5m, reserves the branch of 2 position of channel
The advance a=1.00m of steel pipe 1, transfer b=1.00m are supportted, bar height of sweeping the floor in support frame as described above body is 0.15m;
Step 2 is located at reserved 2 position of channel at the top of supporting frame and sets up one group after supporting frame is installed
Then I-steel 4 is laid with one group of square steel 5 on I-steel 4, template 6 is laid on square steel 5, can finally be poured in template 6
Basement post-pouring zone 3 is provided with steel plate for sealing water 7 between basement post-pouring zone 3 and the concrete of two sides;
Step 3 when after 3 concreting of basement post-pouring zone is complete and reaching demoulding condition, removes reserved 2, channel
It sets the supporting steel pipe 1 at place, forms reserved channel 2, the basement bottom board for finally reserving 2 position of channel carries out steel plate or template
It is laid with.
Several closure construction regions are connected into integral passage by reserved channel 2 by the utility model, reserve 2 shape of channel
After, the carpenters such as basement template, steel pipe teams and groups material can in channel directly with agricultural vehicle transport, facilitate rubbish cleaning,
Guarantee civilized construction, and the building material of basement, plastering cement mortar, putty coating, heating and ventilation project material and fire-fighting work
The constructions such as journey material transport can be unblocked in basement, to save the cost of materials handling and waste transportation, raising is applied
Work efficiency benefit has largely saved cost and has saved the duration, and provides feasible scheme for the interspersed construction of project.
Claims (2)
1. a kind of basement post-pouring zone reserves passage construction device, including the support frame being mounted below basement post-pouring zone (3)
Body, it is characterised in that: support frame as described above body is set up by supporting steel pipe (1), is located at the supporting steel pipe of reserved channel (2) two sides
(1) advance and transfer encrypts setting, and one group of I-steel (4) is erected at the top of supporting frame, on I-steel (4) upper berth
If one group of square steel (5), template (6) are laid on square steel (5).
2. basement post-pouring zone according to claim 1 reserves passage construction device, it is characterised in that: the reserved channel
(2) it is provided with jacking (8) at the top of the supporting steel pipe (1) of position, I-steel (4) rides upon on jacking (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821195483.5U CN208717952U (en) | 2018-07-26 | 2018-07-26 | A kind of reserved passage construction device of basement post-pouring zone |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821195483.5U CN208717952U (en) | 2018-07-26 | 2018-07-26 | A kind of reserved passage construction device of basement post-pouring zone |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208717952U true CN208717952U (en) | 2019-04-09 |
Family
ID=65974882
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821195483.5U Active CN208717952U (en) | 2018-07-26 | 2018-07-26 | A kind of reserved passage construction device of basement post-pouring zone |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208717952U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108678009A (en) * | 2018-07-26 | 2018-10-19 | 中建四局第四建筑工程有限公司 | A kind of basement post-pouring zone reserved passageway construction method and device |
CN110805063A (en) * | 2019-10-22 | 2020-02-18 | 浙江二十冶建设有限公司 | Building bottom plate construction method |
-
2018
- 2018-07-26 CN CN201821195483.5U patent/CN208717952U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108678009A (en) * | 2018-07-26 | 2018-10-19 | 中建四局第四建筑工程有限公司 | A kind of basement post-pouring zone reserved passageway construction method and device |
CN110805063A (en) * | 2019-10-22 | 2020-02-18 | 浙江二十冶建设有限公司 | Building bottom plate construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631512B (en) | Hang modulus method after-pouring band beam-slab construction method | |
CN201280725Y (en) | Post-casting construction precast slab for basement of buildings | |
CN101818539A (en) | Assembled integral building and construction method thereof | |
CN105862873A (en) | Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit | |
CN103806656A (en) | Construction method of cast-in-place concrete flat slab built-in thin-wall hollow box body | |
CN105350581A (en) | Advanced sealing structure for basement top slab settlement post-cast strips | |
CN103806647A (en) | Assembly and disassembly process for large-span concrete bidirectional dense rib beam formwork case | |
CN211646494U (en) | Waterproof construction of underground garage foundation slab | |
CN103410173A (en) | Construction method for vertical post pouring belt plugging of underground structural outer wall | |
CN208717952U (en) | A kind of reserved passage construction device of basement post-pouring zone | |
CN109930625A (en) | A kind of tower crane and its construction method | |
CN110593321B (en) | Construction method of basement outer wall post-cast strip advanced sealing prefabricated clamping groove formwork-free system | |
CN209942071U (en) | Flashing joint structure for steel skeleton light plate roof and parapet wall | |
CN204690801U (en) | Formwork erecting structure is hung in basement roof ater-casting | |
CN204551694U (en) | A kind of pre-buried type balcony floor drain | |
CN103334771A (en) | Concrete pouring method of side wall and joint of middle plate and vault by means of underground excavation reverse construction method | |
CN103410172A (en) | Construction method for post pouring belt plugging of underground structural roof plate | |
CN110847466A (en) | Splicing and reinforcing construction method for prefabricated laminated slab | |
CN109137984A (en) | Assembled integral mixes prefabricated pipe gallery | |
CN205399499U (en) | Waterproofing membrane basic unit | |
CN105421780B (en) | A kind of construction method of prefabricated concrete structure | |
CN110552378A (en) | Underground space roof subsides post-cast strip and seals structure in advance | |
CN211285715U (en) | Basement lateral wall post-cast strip block structure | |
CN110552546B (en) | Method for building underground parking lot waterproof facility by using tower crane | |
CN204645093U (en) | Poured band of outer wall of basement advanced processing constructs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 361000 unit 801, No. 889, fanghubei Second Road, Heshan street, Huli District, Xiamen City, Fujian Province Patentee after: China Construction Fourth Engineering Bureau Construction Development Co., Ltd Address before: No. 158, Wen Ping Road, Siming District, Xiamen, Fujian Province Patentee before: Zhongjian four Bureau fourth Construction Engineering Co., Ltd. |
|