CN105862873A - Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit - Google Patents

Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit Download PDF

Info

Publication number
CN105862873A
CN105862873A CN201610226325.0A CN201610226325A CN105862873A CN 105862873 A CN105862873 A CN 105862873A CN 201610226325 A CN201610226325 A CN 201610226325A CN 105862873 A CN105862873 A CN 105862873A
Authority
CN
China
Prior art keywords
waterproof
construction
construction method
narrow space
external wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610226325.0A
Other languages
Chinese (zh)
Other versions
CN105862873B (en
Inventor
陈达非
张文亮
刘滨
杨洋
耿春余
董曦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Fourth Construction & Engineering Co Ltd
Original Assignee
Beijing Fourth Construction & Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Fourth Construction & Engineering Co Ltd filed Critical Beijing Fourth Construction & Engineering Co Ltd
Priority to CN201610226325.0A priority Critical patent/CN105862873B/en
Publication of CN105862873A publication Critical patent/CN105862873A/en
Application granted granted Critical
Publication of CN105862873B publication Critical patent/CN105862873B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Electromagnetism (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention provides a construction method of underground water prevention and exterior wall structures of narrow space of a deep foundation pit. The construction method is used for a construction project of a deep foundation pit with narrow space in an urban center, concrete of a reserved trough is poured by single-side formworks arranged outside slope protection piles, a water prevention construction operation surface with outside prevention and inside attachment is formed, and meanwhile, the problem of backfilling of the reserved trough is solved; then construction of an exterior wall structure is carried out by the single-side formworks again; the problem that construction of exterior water prevention of the exterior wall, soil backfilling of the reserved trough, underground water prevention rolls and an underground structure exterior wall cannot be carried out due to insufficient space under the special condition is solved, water prevention construction of the exterior wall of a basement can be smoothly carried out effectively, and leakage is prevented. The construction method is clear in construction sequence and good in construction water prevention effect.

Description

Deep basal pit narrow space underground waterproof and external wall structure construction method
Technical field
The present invention relates to deep basal pit underground waterproof and external wall structure construction field, a kind of deep basal pit underground waterproof under narrow space and external wall structure construction method.
Background technology
At present, under specific condition, the construction of small space deep basal pit underground waterproof mainly faces problems with:
(1), on the premise of the maximization of building area is pursued by construction unit, there is foundation ditch area and occupy the situation of on-the-spot available construction area more than 90% in downtown area and building compact district.This type of situation is usually associated with the existence of ultra-deep foundation pit, the construction deviation of slope protection pile and design and construction face is narrow and small makes underground external wall waterproof construction become the most difficult, slope protection pile constructed after traditionally the construction of Waterproof Construction Technique advanced person behavior external wall structure carry out again existing during the technique of waterproof paving: waterproof construction personnel are unable to reach the problems such as operating surface carries out constructing, cannot set up waterproof operation shelf, waterproof construction quality should not ensure.
(2) construction technology, building solid wall between slope protection pile and outer wall of underground structure by laying bricks or stones solves some problems to a certain extent, but this method neither energy-conserving and environment-protective (solid brick has stepped in superseded material register) lost labor again (taking a lot of work when building by laying bricks or stones with plastering construction construction cost), most important one has a problem in that masonry panel exists certain risk as underground external wall one side template.
(3) even if, the backfilling working of fertile slot part is also a difficult point of later stage work after another problem underground external wall is waterproof and external wall structure has been constructed; first the selection of backfilling material; according to traditional 2:8 dirt; backfill leakiness backfill quality is unreliable; the waterproof effect one of constructional waterproofing (the 2:8 dirt still belong to) the most in a disguised form reducing exterior wall is directly toppled over according to sand; backfill according to normal concrete; owing to pouring excessive height; likely fish tail and waterproof layer or masonry panel are damaged, and then waterproof generation is destroyed.
(4) if being considered as concrete and fertile groove being backfilled in advance, then it is considered as fertile groove concrete one side formwork and installs problem, how to ensure that the flatness of fill concrete surface layer and perpendicularity are this emphasis constructed.
Therefore, a kind of can solve deep basal pit in owing to insufficient space cannot be carried out the problem of external wall waterproof construction, to be solved structure outer formwork construction problem is presently required, needs also exist for solving the method for the problem of backfill in fertile groove.
Summary of the invention
The present invention provides a kind of deep basal pit narrow space underground waterproof and external wall structure construction method, constructing operation inconvenience, waste material and the technical problem artificial, that waterproof quality is the best that small space deep basal pit underground waterproof to be solved and external wall structure construction exist, and fertile groove concrete topping flatness and perpendicularity it is difficult to ensure that technical problem.
The technical solution adopted for the present invention to solve the technical problems is:
This deep basal pit narrow space underground waterproof and external wall structure construction method, construction procedure is as follows:
Step one, first one side mould is installed outside the fertile groove between slope protection pile and structure outer, slope protection pile is upwards spaced punching from foundation ditch bottom surface, bar planting bolt it is implanted in hole, the most elongated at bar planting between slope protection pile angle steel is set, being welded to connect between angle steel and bar planting bolt, interval welding through-wall bolt on angle steel, the through-wall bolt other end is through little punching block and fixes;
Step 2, pours fertile groove concrete in the one side mould inboard installed;
Step 3, when every time fertile groove concrete construction completes height higher than this Rotating fields exterior wall, suspends fertile groove concrete construction, paving waterproof layer and fish tail and waterproof layer successively on fertile groove concrete;
Step 4, carries out this Rotating fields exterior wall and structure roof construction, and the construction of structure outer includes: structure outer reinforcing bar binding, structure outer one side formwork install and structure outer concreting;
Step 5, carries out the outer concrete of last layer slope protection pile and waterproof construction, goes round and begins again and successively construct.
Described step one, makes a call to first hole in slope protection pile at the 350mm of foundation ditch bottom surface, first hole is upwards spaced 650mm~750mm and makes a call to second hole.
Described step one, the bar planting bolt angle implanted in slope protection pile is 30 degree, and the bar planting degree of depth is 200mm~300mm, stretches out slope protection pile 200mm~400mm outside bar planting bolt.
Described step one, the horizontal spacing between through-wall bolt is 700mm~800mm, a length of 600mm~1000mm of through-wall bolt.
Described step one, the lap-joint between angle steel uses welding and the lap of splice not less than 100mm.
Described step 2, the thickness of fertile groove concrete is 500mm~700mm, pours height less than 1400mm every time.
Described step 2, should set up double operation shelf at bed course or floor during fertile groove concreting, operation shelf uses steel pipe and fastener to set up.
Described step 3, waterproof layer is waterproof roll, as the moistest in run into bank protection side slope, when not possessing SBS waterproof coiled material construction condition, selects polyethylene polypropylene fiber waterproof coiled material;Described fish tail and waterproof layer is extruded sheet.
Described step 4, structure outer one side formwork is the unilateral steel joist wooden model strip triangular form support of sizing.
Described step 4, until agent structure intensity meet design require time, remove the prestressed anchor in this layer of slope protection pile and girder steel.
The feature of the present invention and having the beneficial effect that:
The present invention is directed to the project under construction of downtown area narrow field deep basal pit, successively use the mode of twice single side formwork.First single side formwork carries out fertile groove concrete construction; create the outer water-proof sticking basic unit of underground external wall simultaneously; solve waterproof and fish tail and waterproof layer construction no operatton space problem; carry out the construction of the outer wall of underground structure such as the reinforcing bar binding of vertical structure, single side formwork, concreting the most again, preferably solve that deep basal pit small space underground external wall is waterproof, structure construction operation and the problem of exterior wall fertilizer groove backfill construction simultaneously.
Waterproof layer of the present invention and the paving of fish tail and waterproof layer; being different from traditional external wall waterproof paving construction face is the mode outside structure outer; waterproof layer and fish tail and waterproof layer are pasted onto on fertile groove concrete by the present invention; fish tail and waterproof layer is constructed inside waterproof roll, is used for protecting waterproof roll to destroy when not constructed by exterior wall reinforcing bar binding.
Compared with prior art, this construction method it is a technical advantage that:
1, this construction method can ensure the operability of deep basal pit small space waterproof construction simultaneously, fertile groove backfill problem in the case of solving again this, it is applied to the waterproof construction in deep basal pit small space and external wall structure construction, can preferably ensure the construction quality of external wall waterproof coiled material, further strengthen underground external wall integral waterproofing effect.
2, whole construction method construction orderliness understands, construction procedure is clear and definite, application surface is relatively wide, and relatively conventional settling mode can be saved manually, improves efficiency of construction, reduce cost, obtains good waterproof construction effect simultaneously.
Accompanying drawing explanation
The present invention is further described with embodiment below in conjunction with the accompanying drawings.
Fig. 1 is the use condition schematic diagram of the present invention.
Fig. 2 is the top view of fertilizer groove concrete support of the present invention construction.
Fig. 3 is the elevation of fertilizer groove concrete support of the present invention construction.
Fig. 4 is the side view of fertilizer groove concrete support of the present invention construction.
Fig. 5 is that the present invention pastes waterproof layer and the schematic diagram of fish tail and waterproof layer on fertile groove concrete.
Fig. 6 is the schematic diagram carrying out structure outer single side formwork after invention waterproof and protective layer construction.
Reference: 1-slope protection pile, 2-prestressed anchor and girder steel, 3-structure outer, 4-structure roof, 5-sole plate, the little punching block of 6-, 71-bar planting bolt, 72-through-wall bolt, 8-angle steel, 9-waterproof layer and fish tail and waterproof layer, 10-fertilizer groove, 11-fertilizer groove concrete, 12-structure outer one side formwork.
Detailed description of the invention
Embodiment sees shown in Fig. 1-6, this deep basal pit narrow space underground waterproof and external wall structure construction method, and construction procedure is as follows:
See shown in Fig. 1-4, outside step one, the first fertile groove 10 between slope protection pile 1 and structure outer 3, install one side mould.Slope protection pile 1 is made a call at the 350mm of foundation ditch bottom surface first hole, first hole is upwards spaced 700mm and makes a call to second hole.Be implanted into bar planting bolt 71 in hole, bar planting bolt 71 angle implanted in slope protection pile 1 is 30 degree, and the bar planting degree of depth is 200mm, stretches out slope protection pile 200mm~400mm outside bar planting bolt 71.Between slope protection pile 1, the most elongated angle steel 8 that arranges at bar planting, is welded to connect between angle steel 8 and bar planting bolt 71, and the lap-joint between angle steel 8 uses welding and the lap of splice not less than 100mm.Interval welding through-wall bolt 72 on angle steel 8, through-wall bolt 72 other end is through little punching block 6 and fixes.Horizontal spacing between through-wall bolt 72 is 750mm, a length of 600mm~1000mm of through-wall bolt.
Shown in Figure 5, step 2, fertile groove concrete 11 is poured in the one side mould inboard installed.Fertile groove concrete 11 can use C20 P8 concrete, and thickness is 600mm, pours height less than 1400mm every time.Fertile groove concrete 11 should set up double operation shelf at bed course or floor when pouring, operation shelf uses steel pipe and fastener to set up.
Shown in Figure 5, step 3, every time fertile groove concrete 11 construct height higher than this Rotating fields exterior wall 3 time, suspend fertile groove concrete construction, paving waterproof layer and fish tail and waterproof layer 9 successively on fertilizer groove concrete 11.The basic unit of waterproof layer should be firm, and basal plane should be clean, smooth, must not dusting, hollowing, loosening and decortication phenomenon.Waterproof layer should be firmly bonded, seal tight, overlap joint full size, surfacing, must not fold, alice and hollowing.Waterproof layer uses waterproof roll, as the moistest in run into bank protection side slope, when not possessing SBS waterproof coiled material construction condition, selects polyethylene polypropylene fiber waterproof coiled material.Described fish tail and waterproof layer uses extruded sheet.
Shown in Figure 6, step 4, carries out this Rotating fields exterior wall 3 and structure roof 4 is constructed, and the construction of structure outer 3 includes: structure outer reinforcing bar binding, structure outer one side formwork 12 install and structure outer concreting.Structure outer one side formwork 12 is the unilateral steel joist wooden model strip triangular form support of sizing.
Shown in Figure 1, until agent structure intensity meet design require time, remove the prestressed anchor in this layer of slope protection pile 1 and girder steel 2.Must not once remove two-layer and above prestressed anchor and girder steel.
See shown in Fig. 1-6, step 5, carry out the outer concrete of last layer slope protection pile and waterproof construction, go round and begin again and successively construct.

Claims (10)

1. a deep basal pit narrow space underground waterproof and external wall structure construction method, it is characterised in that construction procedure is as follows:
Step one, first fertile groove (10) outside between slope protection pile (1) and structure outer (3) installs one side mould, slope protection pile (1) is upwards spaced punching from foundation ditch bottom surface, bar planting bolt (71) it is implanted in hole, the most elongated at bar planting between slope protection pile (1) angle steel (8) is set, being welded to connect between angle steel (8) and bar planting bolt (71), upper interval welding through-wall bolt (72) of angle steel (8), through-wall bolt (72) other end is through little punching block (6) and fixes;
Step 2, pours fertile groove concrete (11) in the one side mould inboard installed;
Step 3, every time fertile groove concrete (11) construct height higher than this Rotating fields exterior wall (3) time, suspend fertile groove concrete construction, paving waterproof layer and fish tail and waterproof layer (9) successively on fertilizer groove concrete (11);
Step 4, carries out this Rotating fields exterior wall (3) and structure roof (4) construction, and the construction of structure outer (3) including: structure outer reinforcing bar binding, structure outer one side formwork (12) install and structure outer concreting;
Step 5, carries out the outer concrete of last layer slope protection pile and waterproof construction, goes round and begins again and successively construct.
Deep basal pit narrow space underground waterproof the most according to claim 1 and external wall structure construction method, it is characterized in that: described step one, slope protection pile (1) is made a call at the 350mm of foundation ditch bottom surface first hole, first hole is upwards spaced 650mm~750mm and makes a call to second hole.
Deep basal pit narrow space underground waterproof the most according to claim 1 and external wall structure construction method, it is characterized in that: described step one, bar planting bolt (71) angle implanted in slope protection pile (1) is 30 degree, the bar planting degree of depth is 200~300mm, and slope protection pile 200mm~400mm are stretched out in bar planting bolt (71) outside.
Deep basal pit narrow space underground waterproof the most according to claim 1 and external wall structure construction method, it is characterised in that: described step one, the horizontal spacing between through-wall bolt (72) is 700mm~800mm, a length of 600mm~1000mm of through-wall bolt.
Deep basal pit narrow space underground waterproof the most according to claim 1 and external wall structure construction method, it is characterised in that: described step one, the lap-joint between angle steel (8) uses welding and the lap of splice not less than 100mm.
Deep basal pit narrow space underground waterproof the most according to claim 1 and external wall structure construction method, it is characterised in that: described step 2, the thickness of fertile groove concrete (11) is 500mm~700mm, pours height less than 1400mm every time.
Deep basal pit narrow space underground waterproof the most according to claim 1 and external wall structure construction method, it is characterized in that: described step 2, fertile groove concrete (11) should set up double operation shelf at bed course or floor when pouring, operation shelf uses steel pipe and fastener to set up.
Deep basal pit narrow space underground waterproof the most according to claim 1 and external wall structure construction method, it is characterized in that: described step 3, waterproof layer is waterproof roll, as the moistest in run into bank protection side slope, when not possessing SBS waterproof coiled material construction condition, select polyethylene polypropylene fiber waterproof coiled material;Described fish tail and waterproof layer is extruded sheet.
Deep basal pit narrow space underground waterproof the most according to claim 1 and external wall structure construction method, it is characterised in that: described step 4, structure outer one side formwork (12) is the unilateral steel joist wooden model strip triangular form support of sizing.
Deep basal pit narrow space underground waterproof the most according to claim 1 and external wall structure construction method, it is characterised in that: described step 4, until agent structure intensity meet design require time, remove the prestressed anchor in this layer of slope protection pile (1) and girder steel (2).
CN201610226325.0A 2016-04-13 2016-04-13 Deep basal pit narrow space underground waterproof and external wall structure construction method Active CN105862873B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610226325.0A CN105862873B (en) 2016-04-13 2016-04-13 Deep basal pit narrow space underground waterproof and external wall structure construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610226325.0A CN105862873B (en) 2016-04-13 2016-04-13 Deep basal pit narrow space underground waterproof and external wall structure construction method

Publications (2)

Publication Number Publication Date
CN105862873A true CN105862873A (en) 2016-08-17
CN105862873B CN105862873B (en) 2017-11-10

Family

ID=56637212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610226325.0A Active CN105862873B (en) 2016-04-13 2016-04-13 Deep basal pit narrow space underground waterproof and external wall structure construction method

Country Status (1)

Country Link
CN (1) CN105862873B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592754A (en) * 2016-12-27 2017-04-26 中建四局第五建筑工程有限公司 Method for guaranteeing waterproof construction quality of deep foundation pit basement
CN106759843A (en) * 2016-12-27 2017-05-31 宁波二十冶建设有限公司 A kind of outer wall of basement waterproof construction and its construction method
CN107119695A (en) * 2017-06-27 2017-09-01 中国建筑第二工程局有限公司 A kind of operation support body and construction method for cancelling outer wall of basement backfill
CN107130631A (en) * 2017-05-22 2017-09-05 中冶建工集团有限公司 A kind of basement Retaining wall method based on concreting moulding wall
CN108411950A (en) * 2018-03-28 2018-08-17 中铁十局集团第二工程有限公司 A kind of underground waterproof construction method
CN109441099A (en) * 2018-12-05 2019-03-08 中建局集团建设发展有限公司 Basement single side formwork system and the method for utilizing its outer wall of basement of constructing
CN111608185A (en) * 2020-04-28 2020-09-01 中国二十冶集团有限公司 Waterproof construction method for main body structure of narrow space of deep foundation pit
CN112482555A (en) * 2020-11-06 2021-03-12 云南建投第六建设有限公司 Shear wall structure and construction method of shear wall
CN112962663A (en) * 2021-01-07 2021-06-15 司顺生 Construction method for narrow outer enclosure space of deep foundation
CN112982445A (en) * 2021-02-24 2021-06-18 中建八局轨道交通建设有限公司 Backfill method for common-structure fertilizer grooves of underground road with pipe gallery penetrating through underground
CN113622431A (en) * 2021-08-02 2021-11-09 江苏东合南岩土科技股份有限公司 Underground structure with foam light soil isolation wall and construction method thereof
CN113802722A (en) * 2021-09-23 2021-12-17 武汉建工集团股份有限公司 Construction method for recyclable deep foundation pit and outer wall integrated structure
CN113832986A (en) * 2021-10-15 2021-12-24 中国二十二冶集团有限公司 Waterproof construction method for underground outer wall in limited space in foundation pit supported by slope protection piles
CN115059290A (en) * 2022-07-04 2022-09-16 中国建筑第二工程局有限公司 Reverse construction method for underground outer wall of narrow fertilizer groove

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11141126A (en) * 1997-11-05 1999-05-25 Fujita Corp Processing method of driving joining part in reversely driving method
CN103485365A (en) * 2013-09-16 2014-01-01 中冶天工上海十三冶建设有限公司 Installation method of underground concrete wall formwork of row pile supporting structure
CN204000936U (en) * 2014-08-28 2014-12-10 陕西建工第五建设集团有限公司 Outer wall of basement single surface formwork system based on fastener type steel pipe earth anchor truss
CN204357127U (en) * 2014-12-10 2015-05-27 中建三局第一建设工程有限责任公司 The monolateral formwork erecting structure of a kind of ultra-deep pre-buried Screw arbor with nut at both-ends of outer wall of basement narrow space
CN204662499U (en) * 2015-03-09 2015-09-23 江苏南通三建集团有限公司 Concrete of basement exterior wall, waterproof, fertile groove integrated construction structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11141126A (en) * 1997-11-05 1999-05-25 Fujita Corp Processing method of driving joining part in reversely driving method
CN103485365A (en) * 2013-09-16 2014-01-01 中冶天工上海十三冶建设有限公司 Installation method of underground concrete wall formwork of row pile supporting structure
CN204000936U (en) * 2014-08-28 2014-12-10 陕西建工第五建设集团有限公司 Outer wall of basement single surface formwork system based on fastener type steel pipe earth anchor truss
CN204357127U (en) * 2014-12-10 2015-05-27 中建三局第一建设工程有限责任公司 The monolateral formwork erecting structure of a kind of ultra-deep pre-buried Screw arbor with nut at both-ends of outer wall of basement narrow space
CN204662499U (en) * 2015-03-09 2015-09-23 江苏南通三建集团有限公司 Concrete of basement exterior wall, waterproof, fertile groove integrated construction structure

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759843A (en) * 2016-12-27 2017-05-31 宁波二十冶建设有限公司 A kind of outer wall of basement waterproof construction and its construction method
CN106592754A (en) * 2016-12-27 2017-04-26 中建四局第五建筑工程有限公司 Method for guaranteeing waterproof construction quality of deep foundation pit basement
CN107130631A (en) * 2017-05-22 2017-09-05 中冶建工集团有限公司 A kind of basement Retaining wall method based on concreting moulding wall
CN107119695A (en) * 2017-06-27 2017-09-01 中国建筑第二工程局有限公司 A kind of operation support body and construction method for cancelling outer wall of basement backfill
CN108411950A (en) * 2018-03-28 2018-08-17 中铁十局集团第二工程有限公司 A kind of underground waterproof construction method
CN109441099B (en) * 2018-12-05 2024-01-23 中建一局集团建设发展有限公司 Basement unilateral formwork supporting system and method for constructing basement outer wall by utilizing same
CN109441099A (en) * 2018-12-05 2019-03-08 中建局集团建设发展有限公司 Basement single side formwork system and the method for utilizing its outer wall of basement of constructing
CN111608185A (en) * 2020-04-28 2020-09-01 中国二十冶集团有限公司 Waterproof construction method for main body structure of narrow space of deep foundation pit
CN112482555A (en) * 2020-11-06 2021-03-12 云南建投第六建设有限公司 Shear wall structure and construction method of shear wall
CN112962663A (en) * 2021-01-07 2021-06-15 司顺生 Construction method for narrow outer enclosure space of deep foundation
CN112982445A (en) * 2021-02-24 2021-06-18 中建八局轨道交通建设有限公司 Backfill method for common-structure fertilizer grooves of underground road with pipe gallery penetrating through underground
CN113622431A (en) * 2021-08-02 2021-11-09 江苏东合南岩土科技股份有限公司 Underground structure with foam light soil isolation wall and construction method thereof
CN113802722A (en) * 2021-09-23 2021-12-17 武汉建工集团股份有限公司 Construction method for recyclable deep foundation pit and outer wall integrated structure
CN113802722B (en) * 2021-09-23 2022-09-06 武汉建工集团股份有限公司 Construction method for recyclable deep foundation pit and outer wall integrated structure
CN113832986A (en) * 2021-10-15 2021-12-24 中国二十二冶集团有限公司 Waterproof construction method for underground outer wall in limited space in foundation pit supported by slope protection piles
CN115059290A (en) * 2022-07-04 2022-09-16 中国建筑第二工程局有限公司 Reverse construction method for underground outer wall of narrow fertilizer groove

Also Published As

Publication number Publication date
CN105862873B (en) 2017-11-10

Similar Documents

Publication Publication Date Title
CN105862873B (en) Deep basal pit narrow space underground waterproof and external wall structure construction method
CN110607809B (en) Waterproof construction method for basement of building engineering
CN103741714B (en) Underground engineering full sheltered reverse excavation construction method
CN110878700B (en) Tunnel waterproof structure and construction method thereof
CN206319910U (en) Infiltration disposal system is reinforced in a kind of tunnel-liner
CN103410173A (en) Construction method for vertical post pouring belt plugging of underground structural outer wall
CN105350581A (en) Advanced sealing structure for basement top slab settlement post-cast strips
CN105862928A (en) Post-cast strip outer wall in-advance water stopping treatment structure and construction process thereof
CN110593321B (en) Construction method of basement outer wall post-cast strip advanced sealing prefabricated clamping groove formwork-free system
CN104234089B (en) The construction method that a kind of basement guarded drainage combines
CN210104811U (en) Basement pile-wall integrated waterproof structure system
CN212129250U (en) Construction structure for additionally arranging collecting groove on post-cast strip of high-water-level foundation
CN210766835U (en) Foundation beam side vertical face waterproof structure
CN112112295A (en) Reinforcing construction method for post-cast strip of post-sealed outer wall
CN204645093U (en) Poured band of outer wall of basement advanced processing constructs
CN108661087A (en) The waterproof construction and construction method of tower crane in a kind of basement bottom board
CN107326924A (en) Outer wall of underground structure HCMW engineering methods overlap wall and its construction method
CN111608185A (en) Waterproof construction method for main body structure of narrow space of deep foundation pit
CN103628506B (en) Construction method for waterproof positions of foundation platform and pile head
CN110295630A (en) The late poured band structure of multilayer constraint antiseep
CN214614160U (en) Pre-laying anti-sticking waterproof structure of ultra-deep independent foundation
CN206205166U (en) It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure
CN110552546B (en) Method for building underground parking lot waterproof facility by using tower crane
CN209891238U (en) Tower crane foundation
CN211257400U (en) Prefabricated draw-in groove formwork system is exempted from in advance to seal in basement outer wall post-cast strip

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant