CN106592754A - Method for guaranteeing waterproof construction quality of deep foundation pit basement - Google Patents

Method for guaranteeing waterproof construction quality of deep foundation pit basement Download PDF

Info

Publication number
CN106592754A
CN106592754A CN201611227696.7A CN201611227696A CN106592754A CN 106592754 A CN106592754 A CN 106592754A CN 201611227696 A CN201611227696 A CN 201611227696A CN 106592754 A CN106592754 A CN 106592754A
Authority
CN
China
Prior art keywords
waterproof
backfill
construction
support body
exterior wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611227696.7A
Other languages
Chinese (zh)
Inventor
罗红党
陆启宏
杨艳
李文强
蒋斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Fifth Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Priority to CN201611227696.7A priority Critical patent/CN106592754A/en
Publication of CN106592754A publication Critical patent/CN106592754A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings

Abstract

The invention discloses a method for guaranteeing waterproof construction quality of a deep foundation pit basement. The method is a basement waterproof construction technology without sufficient waterproof working surface. Under the condition of a shorter distance between a deep foundation pit edge and an outer wall structure of a building basement, the waterproof coating and waterproof roll constructions on the outer side of the outer wall are performed after the outer wall of the basement is constructed according to the traditional method, but people cannot enter into a narrow space between the outer wall and the foundation pit wall in such a manner. A construction method without sufficient working surface can be adopted for changing the construction process, so that the problem of insufficient operation surface can be successfully avoided and the waterproof quality and the construction safety can be guaranteed.

Description

A kind of method that ensure that deep basal pit waterproofing for basement quality
Technical field
The invention belongs to technical field of buildings, and in particular to a kind of deep basal pit waterproofing for basement quality of ensure that Method.
Background technology
With China's rapid urban, urban land katatonosis constantly expose, and are to increase building in land red-line It is 3 layers ~ 4 layers increasingly common to the utilization rate design of basement in place, but in basement structure outer contour and land red-line Spacing volume Jing is often less between foundation pit walls, is difficult to construct when external wall structure and waterproof construction.Traditionally under first construction ground Room exterior wall outside waterproof under construction ground again, workman cannot enter in the case of the deficiency of space between foundation pit walls and outer wall of basement Enter narrow space construction, most direct consequence is exactly to cause waterproof roll and water-repellent paint construction quality to ensure, if by force Potential safety hazard may also can be caused into construction, therefore using " one kind makees face for ultra-deep foundation pit basement without enough waterproofers Way " is moved back construct from outside to inside from outdoor backfill, waterproof, outer wall of basement, there is enough operating surfaces, so as to ensure construction quality With construction safety.
The content of the invention
It is an object of the invention to provide a kind of method that ensure that deep basal pit waterproofing for basement quality, for super Deep basal pit basement is without enough work surface working procedures.
What the present invention was realized in:Including outdoor concrete backfill, waterproof construction, external wall construction, specially following step Suddenly:
The first step:Outer fill concrete and exterior wall boundary line are determined on raft plate, exterior wall edge positions are released, outwards offset 0.5 ~ 1cm releases full hall bracing frame vertical rod position, the lateral pressure according to produced by fill concrete as backfill template plate face sideline Go out the vertical rod row of implantation reinforcing bar needed for vertical rod bottom, set up the full hall frame of template and increase corresponding steel pipe, support body checks and accepts after-pouring Concrete is simultaneously conserved, and outer backfill needs to be higher by correspondence exterior wall 28 ~ 35cm of height when pouring, it is ensured that waterproof is overlapped;
Second step:Construction waterproof after backfill form removable, water-repellent paint is brushed as requested in backfill, and water-repellent paint is checked and accepted After the completion of construction waterproof coiled material, waterproof construction according to《Technical code for water proof in underground engineering》GB50108 is performed;
3rd step:Colligation exterior wall reinforcing bar, and check and accept;
4th step:Structure outer inner side one side formwork is installed and checked and accepted, and completes concreting.
Beneficial effects of the present invention:The present invention is for ultra-deep foundation pit basement without enough work surface working procedures, waterproof volume Material is made on outdoor fill concrete rather than on external wall structure face with water-repellent paint;There is provided " frame is multiplex " full hall simultaneously to support Frame, maximally reduces the construction cost of working procedure of the present invention.The present invention adopts new working procedure, but in order to ensure the new work The realization of sequence is made that new adjustment to waterproofing process, water-repellent paint brushing and coiled material is pasted and has been made in outer backfill, and Effect is preferable.The innovation on one side formwork is fixed improves full hall bracing frame, and structure floor bracing frame is used in twice into vertical list In the fixation of side template, cost is successfully reduced.
Description of the drawings:
Fig. 1 is construction flow chart of the present invention;
Fig. 2 is supporting frame schematic diagram during present invention backfill;
Fig. 3 is outer wall template bracing frame schematic diagram of the present invention;
Fig. 4 positions backfill single side formwork template is set up;
Fig. 5 is that outside backfills form removal design sketch;
Fig. 6 is to do waterproof effect figure in outdoor backfill;
Fig. 7 is waterproofing process full-page proof schematic diagram.
Specific embodiment
Below in conjunction with the accompanying drawings the present invention is further illustrated, but the present invention must not be any limitation as by any way, Based on present invention teach that any change for being made or improvement, belong to protection scope of the present invention.
Method of the present invention includes outdoor concrete backfill, waterproof construction, specially external wall construction, following steps:
The first step:Outer fill concrete and exterior wall boundary line are determined on raft plate, exterior wall edge positions are released, outwards offset 0.5 ~ 1cm releases full hall bracing frame vertical rod position, the lateral pressure according to produced by fill concrete as backfill template plate face sideline Go out the vertical rod row of implantation reinforcing bar needed for vertical rod bottom, set up the full hall frame of template and increase corresponding steel pipe, support body checks and accepts after-pouring Concrete is simultaneously conserved, and outer backfill needs to be higher by correspondence exterior wall 28 ~ 35cm of height when pouring, it is ensured that waterproof is overlapped;
Second step:Construction waterproof after backfill form removable, water-repellent paint is brushed as requested in backfill, and water-repellent paint is checked and accepted After the completion of construction waterproof coiled material, waterproof construction according to《Technical code for water proof in underground engineering》GB50108 is performed;
3rd step:Colligation exterior wall reinforcing bar, and check and accept;
4th step:Structure outer inner side one side formwork is installed and checked and accepted, and completes concreting.
Outer backfill needs to be higher by correspondence exterior wall height 30cm when pouring, it is ensured that waterproof is overlapped.
Single side formwork support body realizes that a frame is multiplex in 4th step, by the full hall bracing frame of floor of constructing in advance, by support body point Do not pour support, exterior wall concrete for fill concrete and pour support, floor concrete casting support, the diagonal brace 1 set up leads to Cross rotary buckle to be connected on the column of support body middle part, increase support body anti-overturning energy.
The horizontal continuity bridging 2 increased on first step fullness in the epigastrium and abdomen hall supporting frame and vertical bridging 5 are used to strengthen full hall The globality of bracing frame.
Set up in 3rd step embedded bar 3 be for increase support body skid resistance in lateral concreting, it is to avoid support body to After translate.
The diagonal brace 7 set up is connected and withstands in template with full hall frame steel pipe, once ensures molding and the frame of concreting The overall performance of body.
Temporary support bar 8 withstands on outboard template backfill by being connected on overall support body when outdoor backfill is poured in the first step On, temporary support bar 8 is dismountable after the completion of the backfill construction of outside, it is ensured that can continue second in the case that full hall frame is integrally motionless Step exterior wall returns back to top.
Coiled material is attached to outdoor fill concrete facade by waterproof roll using " viscous in preventing outward " method waterproof 13 in second step, Exterior wall concrete 11 is poured again.

Claims (8)

1. a kind of method that ensure that deep basal pit waterproofing for basement quality, it is characterised in that return including outdoor concrete Fill out, waterproof construction, external wall construction, specially following steps:
The first step:Outer fill concrete and exterior wall boundary line are determined on raft plate, exterior wall edge positions are released, outwards offset 0.5 ~ 1cm releases full hall bracing frame vertical rod position, the lateral pressure according to produced by fill concrete as backfill template plate face sideline Go out the vertical rod row of implantation reinforcing bar needed for vertical rod bottom, set up the full hall frame of template and increase corresponding steel pipe, support body checks and accepts after-pouring Concrete is simultaneously conserved, and outer backfill needs to be higher by correspondence exterior wall 28 ~ 35cm of height when pouring, it is ensured that waterproof is overlapped;
Second step:Construction waterproof after backfill form removable, water-repellent paint is brushed as requested in backfill, and water-repellent paint is checked and accepted After the completion of construction waterproof coiled material, waterproof construction according to《Technical code for water proof in underground engineering》GB50108 is performed;
3rd step:Colligation exterior wall reinforcing bar, and check and accept;
4th step:Structure outer inner side one side formwork is installed and checked and accepted, and completes concreting.
2. method according to claim 1, it is characterised in that backfill outward needs to be higher by correspondence exterior wall height 30cm when pouring, Ensure waterproof overlap joint.
3. method according to claim 1, it is characterised in that single side formwork support body realizes that a frame is multiplex in the 4th step, passes through Construct in advance the full hall bracing frame of floor, support body is respectively used to into fill concrete pours support, exterior wall concrete to pour support, building Board concrete pours support, the diagonal brace set up(1)It is connected on the column of support body middle part by rotary buckle, increases support body anti-overturning Energy.
4. method according to claim 1, it is characterised in that the horizontal continuity increased on first step fullness in the epigastrium and abdomen hall supporting frame Bridging(2)With vertical bridging(5)For strengthening the globality of full hall bracing frame.
5. method according to claim 1, it is characterised in that set up embedded bar in the 3rd step(3)It is to exist to increase support body Skid resistance during lateral concreting, it is to avoid support body is translated backward.
6. method according to claim 3, it is characterised in that the diagonal brace set up(7)It is connected and withstands on mould with full hall frame steel pipe On plate, the overall performance of the molding with support body of concreting is once ensured.
7. method according to claim 1, it is characterised in that temporary support bar when outdoor backfill is poured in the first step(8)It is logical Cross to be connected on overall support body and withstand in outboard template backfill, the temporary support bar after the completion of the backfill construction of outside(8)It is dismountable, Ensure that can continue second step exterior wall in the case that full hall frame is integrally motionless returns back to top.
8. method according to claim 1, it is characterised in that waterproof roll is using " viscous in preventing outward " method waterproof in second step (13), coiled material is attached to into outdoor fill concrete facade, then pour exterior wall concrete(11).
CN201611227696.7A 2016-12-27 2016-12-27 Method for guaranteeing waterproof construction quality of deep foundation pit basement Pending CN106592754A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611227696.7A CN106592754A (en) 2016-12-27 2016-12-27 Method for guaranteeing waterproof construction quality of deep foundation pit basement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611227696.7A CN106592754A (en) 2016-12-27 2016-12-27 Method for guaranteeing waterproof construction quality of deep foundation pit basement

Publications (1)

Publication Number Publication Date
CN106592754A true CN106592754A (en) 2017-04-26

Family

ID=58604437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611227696.7A Pending CN106592754A (en) 2016-12-27 2016-12-27 Method for guaranteeing waterproof construction quality of deep foundation pit basement

Country Status (1)

Country Link
CN (1) CN106592754A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108149718A (en) * 2017-12-27 2018-06-12 中国二十冶集团有限公司 A kind of waterproof construction method
CN113216632A (en) * 2021-06-03 2021-08-06 中国电建集团四川工程有限公司 Basement waterproof construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000186413A (en) * 1998-12-18 2000-07-04 Ps Kunishiro:Kk Outer wall construction method for structure
CN201649623U (en) * 2010-01-28 2010-11-24 浙江八达建设集团有限公司 Large basement shearing wall truss type steel tube unilateral formwork supporting structure
CN104452812A (en) * 2014-12-04 2015-03-25 上海建工五建集团有限公司 Construction method of basement outer wall
CN105862873A (en) * 2016-04-13 2016-08-17 北京建工四建工程建设有限公司 Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000186413A (en) * 1998-12-18 2000-07-04 Ps Kunishiro:Kk Outer wall construction method for structure
CN201649623U (en) * 2010-01-28 2010-11-24 浙江八达建设集团有限公司 Large basement shearing wall truss type steel tube unilateral formwork supporting structure
CN104452812A (en) * 2014-12-04 2015-03-25 上海建工五建集团有限公司 Construction method of basement outer wall
CN105862873A (en) * 2016-04-13 2016-08-17 北京建工四建工程建设有限公司 Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
PRINCE斗士凯歌: "《C塔及裙房单侧支模施工方案》", 《百度文库》 *
张鸿勋等: "《深地下室外墙单侧模板施工技术》", 《建筑施工》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108149718A (en) * 2017-12-27 2018-06-12 中国二十冶集团有限公司 A kind of waterproof construction method
CN113216632A (en) * 2021-06-03 2021-08-06 中国电建集团四川工程有限公司 Basement waterproof construction method

Similar Documents

Publication Publication Date Title
CN101403218B (en) Processing method for basement water-proof concrete construction joint
CN111519665A (en) Gapless filling method for foundation post-cast strip
CN104032771B (en) Attractive joint anti-crack construction method set up by a kind of underground structure
CN110872869A (en) Waterproof construction method for joints of external wall panels
CN103206088B (en) Parts of shear wall structure wall, slab integral pouring construction method
CN104790436A (en) High-rise building basement roof settlement post-pouring joint advanced water stop construction method
CN106592754A (en) Method for guaranteeing waterproof construction quality of deep foundation pit basement
CN215106098U (en) Prefabricated post connection structure
CN104652495A (en) Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
CN106193120B (en) Basement is encorbelmented, and bottom plate is inverse to make structure and construction method
CN205369320U (en) Basement post -cast strip leakage protective system
CN111749326A (en) Reverse construction basement side wall construction joint processing structure and processing method
CN210104811U (en) Basement pile-wall integrated waterproof structure system
CN209456992U (en) Low damage unilateral formwork supporting structure under campshed support system
CN204475379U (en) Shorten the basement post-pouring zone in Dewatering cycle
CN207934055U (en) A kind of prefabricated cushion cap template and prefabricated cushion cap loose tool
CN208039491U (en) Outer wall of basement waterproof construction post-cast strip component
CN210887323U (en) Connect and build engineering underground structure construction joint watertight fittings
CN204703191U (en) A kind of double preformed pile and top board node connecting structure doing structure outer
CN114319454A (en) Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam
CN107345405A (en) Grouting method at concrete raft foundation construction joint
CN106567415A (en) Drain sleeve for preventing basement floating upward and use method
CN207032777U (en) For the template with waterproof layer terrace laying color separation abrasion-proof terrace
CN207891924U (en) The board-like expanded joint structure of basement bottom board groove
CN206015722U (en) Basement is encorbelmented, and base plate is inverse to make structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170426