CN106592754A - Method for guaranteeing waterproof construction quality of deep foundation pit basement - Google Patents
Method for guaranteeing waterproof construction quality of deep foundation pit basement Download PDFInfo
- Publication number
- CN106592754A CN106592754A CN201611227696.7A CN201611227696A CN106592754A CN 106592754 A CN106592754 A CN 106592754A CN 201611227696 A CN201611227696 A CN 201611227696A CN 106592754 A CN106592754 A CN 106592754A
- Authority
- CN
- China
- Prior art keywords
- waterproof
- backfill
- construction
- support body
- exterior wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/0007—Base structures; Cellars
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
Abstract
The invention discloses a method for guaranteeing waterproof construction quality of a deep foundation pit basement. The method is a basement waterproof construction technology without sufficient waterproof working surface. Under the condition of a shorter distance between a deep foundation pit edge and an outer wall structure of a building basement, the waterproof coating and waterproof roll constructions on the outer side of the outer wall are performed after the outer wall of the basement is constructed according to the traditional method, but people cannot enter into a narrow space between the outer wall and the foundation pit wall in such a manner. A construction method without sufficient working surface can be adopted for changing the construction process, so that the problem of insufficient operation surface can be successfully avoided and the waterproof quality and the construction safety can be guaranteed.
Description
Technical field
The invention belongs to technical field of buildings, and in particular to a kind of deep basal pit waterproofing for basement quality of ensure that
Method.
Background technology
With China's rapid urban, urban land katatonosis constantly expose, and are to increase building in land red-line
It is 3 layers ~ 4 layers increasingly common to the utilization rate design of basement in place, but in basement structure outer contour and land red-line
Spacing volume Jing is often less between foundation pit walls, is difficult to construct when external wall structure and waterproof construction.Traditionally under first construction ground
Room exterior wall outside waterproof under construction ground again, workman cannot enter in the case of the deficiency of space between foundation pit walls and outer wall of basement
Enter narrow space construction, most direct consequence is exactly to cause waterproof roll and water-repellent paint construction quality to ensure, if by force
Potential safety hazard may also can be caused into construction, therefore using " one kind makees face for ultra-deep foundation pit basement without enough waterproofers
Way " is moved back construct from outside to inside from outdoor backfill, waterproof, outer wall of basement, there is enough operating surfaces, so as to ensure construction quality
With construction safety.
The content of the invention
It is an object of the invention to provide a kind of method that ensure that deep basal pit waterproofing for basement quality, for super
Deep basal pit basement is without enough work surface working procedures.
What the present invention was realized in:Including outdoor concrete backfill, waterproof construction, external wall construction, specially following step
Suddenly:
The first step:Outer fill concrete and exterior wall boundary line are determined on raft plate, exterior wall edge positions are released, outwards offset 0.5 ~
1cm releases full hall bracing frame vertical rod position, the lateral pressure according to produced by fill concrete as backfill template plate face sideline
Go out the vertical rod row of implantation reinforcing bar needed for vertical rod bottom, set up the full hall frame of template and increase corresponding steel pipe, support body checks and accepts after-pouring
Concrete is simultaneously conserved, and outer backfill needs to be higher by correspondence exterior wall 28 ~ 35cm of height when pouring, it is ensured that waterproof is overlapped;
Second step:Construction waterproof after backfill form removable, water-repellent paint is brushed as requested in backfill, and water-repellent paint is checked and accepted
After the completion of construction waterproof coiled material, waterproof construction according to《Technical code for water proof in underground engineering》GB50108 is performed;
3rd step:Colligation exterior wall reinforcing bar, and check and accept;
4th step:Structure outer inner side one side formwork is installed and checked and accepted, and completes concreting.
Beneficial effects of the present invention:The present invention is for ultra-deep foundation pit basement without enough work surface working procedures, waterproof volume
Material is made on outdoor fill concrete rather than on external wall structure face with water-repellent paint;There is provided " frame is multiplex " full hall simultaneously to support
Frame, maximally reduces the construction cost of working procedure of the present invention.The present invention adopts new working procedure, but in order to ensure the new work
The realization of sequence is made that new adjustment to waterproofing process, water-repellent paint brushing and coiled material is pasted and has been made in outer backfill, and
Effect is preferable.The innovation on one side formwork is fixed improves full hall bracing frame, and structure floor bracing frame is used in twice into vertical list
In the fixation of side template, cost is successfully reduced.
Description of the drawings:
Fig. 1 is construction flow chart of the present invention;
Fig. 2 is supporting frame schematic diagram during present invention backfill;
Fig. 3 is outer wall template bracing frame schematic diagram of the present invention;
Fig. 4 positions backfill single side formwork template is set up;
Fig. 5 is that outside backfills form removal design sketch;
Fig. 6 is to do waterproof effect figure in outdoor backfill;
Fig. 7 is waterproofing process full-page proof schematic diagram.
Specific embodiment
Below in conjunction with the accompanying drawings the present invention is further illustrated, but the present invention must not be any limitation as by any way,
Based on present invention teach that any change for being made or improvement, belong to protection scope of the present invention.
Method of the present invention includes outdoor concrete backfill, waterproof construction, specially external wall construction, following steps:
The first step:Outer fill concrete and exterior wall boundary line are determined on raft plate, exterior wall edge positions are released, outwards offset 0.5 ~
1cm releases full hall bracing frame vertical rod position, the lateral pressure according to produced by fill concrete as backfill template plate face sideline
Go out the vertical rod row of implantation reinforcing bar needed for vertical rod bottom, set up the full hall frame of template and increase corresponding steel pipe, support body checks and accepts after-pouring
Concrete is simultaneously conserved, and outer backfill needs to be higher by correspondence exterior wall 28 ~ 35cm of height when pouring, it is ensured that waterproof is overlapped;
Second step:Construction waterproof after backfill form removable, water-repellent paint is brushed as requested in backfill, and water-repellent paint is checked and accepted
After the completion of construction waterproof coiled material, waterproof construction according to《Technical code for water proof in underground engineering》GB50108 is performed;
3rd step:Colligation exterior wall reinforcing bar, and check and accept;
4th step:Structure outer inner side one side formwork is installed and checked and accepted, and completes concreting.
Outer backfill needs to be higher by correspondence exterior wall height 30cm when pouring, it is ensured that waterproof is overlapped.
Single side formwork support body realizes that a frame is multiplex in 4th step, by the full hall bracing frame of floor of constructing in advance, by support body point
Do not pour support, exterior wall concrete for fill concrete and pour support, floor concrete casting support, the diagonal brace 1 set up leads to
Cross rotary buckle to be connected on the column of support body middle part, increase support body anti-overturning energy.
The horizontal continuity bridging 2 increased on first step fullness in the epigastrium and abdomen hall supporting frame and vertical bridging 5 are used to strengthen full hall
The globality of bracing frame.
Set up in 3rd step embedded bar 3 be for increase support body skid resistance in lateral concreting, it is to avoid support body to
After translate.
The diagonal brace 7 set up is connected and withstands in template with full hall frame steel pipe, once ensures molding and the frame of concreting
The overall performance of body.
Temporary support bar 8 withstands on outboard template backfill by being connected on overall support body when outdoor backfill is poured in the first step
On, temporary support bar 8 is dismountable after the completion of the backfill construction of outside, it is ensured that can continue second in the case that full hall frame is integrally motionless
Step exterior wall returns back to top.
Coiled material is attached to outdoor fill concrete facade by waterproof roll using " viscous in preventing outward " method waterproof 13 in second step,
Exterior wall concrete 11 is poured again.
Claims (8)
1. a kind of method that ensure that deep basal pit waterproofing for basement quality, it is characterised in that return including outdoor concrete
Fill out, waterproof construction, external wall construction, specially following steps:
The first step:Outer fill concrete and exterior wall boundary line are determined on raft plate, exterior wall edge positions are released, outwards offset 0.5 ~
1cm releases full hall bracing frame vertical rod position, the lateral pressure according to produced by fill concrete as backfill template plate face sideline
Go out the vertical rod row of implantation reinforcing bar needed for vertical rod bottom, set up the full hall frame of template and increase corresponding steel pipe, support body checks and accepts after-pouring
Concrete is simultaneously conserved, and outer backfill needs to be higher by correspondence exterior wall 28 ~ 35cm of height when pouring, it is ensured that waterproof is overlapped;
Second step:Construction waterproof after backfill form removable, water-repellent paint is brushed as requested in backfill, and water-repellent paint is checked and accepted
After the completion of construction waterproof coiled material, waterproof construction according to《Technical code for water proof in underground engineering》GB50108 is performed;
3rd step:Colligation exterior wall reinforcing bar, and check and accept;
4th step:Structure outer inner side one side formwork is installed and checked and accepted, and completes concreting.
2. method according to claim 1, it is characterised in that backfill outward needs to be higher by correspondence exterior wall height 30cm when pouring,
Ensure waterproof overlap joint.
3. method according to claim 1, it is characterised in that single side formwork support body realizes that a frame is multiplex in the 4th step, passes through
Construct in advance the full hall bracing frame of floor, support body is respectively used to into fill concrete pours support, exterior wall concrete to pour support, building
Board concrete pours support, the diagonal brace set up(1)It is connected on the column of support body middle part by rotary buckle, increases support body anti-overturning
Energy.
4. method according to claim 1, it is characterised in that the horizontal continuity increased on first step fullness in the epigastrium and abdomen hall supporting frame
Bridging(2)With vertical bridging(5)For strengthening the globality of full hall bracing frame.
5. method according to claim 1, it is characterised in that set up embedded bar in the 3rd step(3)It is to exist to increase support body
Skid resistance during lateral concreting, it is to avoid support body is translated backward.
6. method according to claim 3, it is characterised in that the diagonal brace set up(7)It is connected and withstands on mould with full hall frame steel pipe
On plate, the overall performance of the molding with support body of concreting is once ensured.
7. method according to claim 1, it is characterised in that temporary support bar when outdoor backfill is poured in the first step(8)It is logical
Cross to be connected on overall support body and withstand in outboard template backfill, the temporary support bar after the completion of the backfill construction of outside(8)It is dismountable,
Ensure that can continue second step exterior wall in the case that full hall frame is integrally motionless returns back to top.
8. method according to claim 1, it is characterised in that waterproof roll is using " viscous in preventing outward " method waterproof in second step
(13), coiled material is attached to into outdoor fill concrete facade, then pour exterior wall concrete(11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611227696.7A CN106592754A (en) | 2016-12-27 | 2016-12-27 | Method for guaranteeing waterproof construction quality of deep foundation pit basement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611227696.7A CN106592754A (en) | 2016-12-27 | 2016-12-27 | Method for guaranteeing waterproof construction quality of deep foundation pit basement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106592754A true CN106592754A (en) | 2017-04-26 |
Family
ID=58604437
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611227696.7A Pending CN106592754A (en) | 2016-12-27 | 2016-12-27 | Method for guaranteeing waterproof construction quality of deep foundation pit basement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106592754A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108149718A (en) * | 2017-12-27 | 2018-06-12 | 中国二十冶集团有限公司 | A kind of waterproof construction method |
CN113216632A (en) * | 2021-06-03 | 2021-08-06 | 中国电建集团四川工程有限公司 | Basement waterproof construction method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000186413A (en) * | 1998-12-18 | 2000-07-04 | Ps Kunishiro:Kk | Outer wall construction method for structure |
CN201649623U (en) * | 2010-01-28 | 2010-11-24 | 浙江八达建设集团有限公司 | Large basement shearing wall truss type steel tube unilateral formwork supporting structure |
CN104452812A (en) * | 2014-12-04 | 2015-03-25 | 上海建工五建集团有限公司 | Construction method of basement outer wall |
CN105862873A (en) * | 2016-04-13 | 2016-08-17 | 北京建工四建工程建设有限公司 | Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit |
-
2016
- 2016-12-27 CN CN201611227696.7A patent/CN106592754A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000186413A (en) * | 1998-12-18 | 2000-07-04 | Ps Kunishiro:Kk | Outer wall construction method for structure |
CN201649623U (en) * | 2010-01-28 | 2010-11-24 | 浙江八达建设集团有限公司 | Large basement shearing wall truss type steel tube unilateral formwork supporting structure |
CN104452812A (en) * | 2014-12-04 | 2015-03-25 | 上海建工五建集团有限公司 | Construction method of basement outer wall |
CN105862873A (en) * | 2016-04-13 | 2016-08-17 | 北京建工四建工程建设有限公司 | Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit |
Non-Patent Citations (2)
Title |
---|
PRINCE斗士凯歌: "《C塔及裙房单侧支模施工方案》", 《百度文库》 * |
张鸿勋等: "《深地下室外墙单侧模板施工技术》", 《建筑施工》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108149718A (en) * | 2017-12-27 | 2018-06-12 | 中国二十冶集团有限公司 | A kind of waterproof construction method |
CN113216632A (en) * | 2021-06-03 | 2021-08-06 | 中国电建集团四川工程有限公司 | Basement waterproof construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101403218B (en) | Processing method for basement water-proof concrete construction joint | |
CN111519665A (en) | Gapless filling method for foundation post-cast strip | |
CN104032771B (en) | Attractive joint anti-crack construction method set up by a kind of underground structure | |
CN110872869A (en) | Waterproof construction method for joints of external wall panels | |
CN103206088B (en) | Parts of shear wall structure wall, slab integral pouring construction method | |
CN104790436A (en) | High-rise building basement roof settlement post-pouring joint advanced water stop construction method | |
CN106592754A (en) | Method for guaranteeing waterproof construction quality of deep foundation pit basement | |
CN215106098U (en) | Prefabricated post connection structure | |
CN104652495A (en) | Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate | |
CN106193120B (en) | Basement is encorbelmented, and bottom plate is inverse to make structure and construction method | |
CN205369320U (en) | Basement post -cast strip leakage protective system | |
CN111749326A (en) | Reverse construction basement side wall construction joint processing structure and processing method | |
CN210104811U (en) | Basement pile-wall integrated waterproof structure system | |
CN209456992U (en) | Low damage unilateral formwork supporting structure under campshed support system | |
CN204475379U (en) | Shorten the basement post-pouring zone in Dewatering cycle | |
CN207934055U (en) | A kind of prefabricated cushion cap template and prefabricated cushion cap loose tool | |
CN208039491U (en) | Outer wall of basement waterproof construction post-cast strip component | |
CN210887323U (en) | Connect and build engineering underground structure construction joint watertight fittings | |
CN204703191U (en) | A kind of double preformed pile and top board node connecting structure doing structure outer | |
CN114319454A (en) | Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam | |
CN107345405A (en) | Grouting method at concrete raft foundation construction joint | |
CN106567415A (en) | Drain sleeve for preventing basement floating upward and use method | |
CN207032777U (en) | For the template with waterproof layer terrace laying color separation abrasion-proof terrace | |
CN207891924U (en) | The board-like expanded joint structure of basement bottom board groove | |
CN206015722U (en) | Basement is encorbelmented, and base plate is inverse to make structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170426 |