CN104790436A CN201510178513.6A CN201510178513A CN104790436A CN 104790436 A CN104790436 A CN 104790436A CN 201510178513 A CN201510178513 A CN 201510178513A CN 104790436 A CN104790436 A CN 104790436A
Authority
CN
China
Prior art keywords
waterproof
construction
pouring
basement
settlement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510178513.6A
Other languages
Chinese (zh)
Other versions
CN104790436B (en
Inventor
于宝萍
王凤杰
姚小松
吉日木图
于洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201510178513.6A priority Critical patent/CN104790436B/en
Publication of CN104790436A publication Critical patent/CN104790436A/en
Application granted granted Critical
Publication of CN104790436B publication Critical patent/CN104790436B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Abstract

The invention relates to a building engineering construction method, in particular to a high-rise building basement roof settlement post-pouring joint advanced water stop construction method. The construction method includes the steps that the two sides of a post-pouring joint are chiseled and cleaned; a formwork and a supporting system are erected on the lower portion of the post-pouring joint; waterproof coiled materials are laid at positions, on the two sides of the post-pouring joint, of a basement roof; walls are built on the waterproof coiled materials respectively; the upper portions of the walls are covered with reinforced concrete cover plates; an underground body structure waterproof layer is constructed; backfill construction is carried out; post-pouring joint concrete is poured. The construction method has the advantages that a basement roof waterproof layer, a protective layer and outdoor backfill can be integrally constructed and are prevented from being interfered by basement roof post-pouring joint construction, and the construction quality of an underground waterproof structure is guaranteed. Impurities, rainwater and water for construction are effectively prevented from flowing into a basement through the post-pouring joint.

Description

Basement in high rise building top board pouring after settlement advance water stop construction method
Technical field
The present invention relates to building engineering construction method, specifically a kind of basement in high rise building top board pouring after settlement advance water stop construction method.
Background technology
because function needs main tower and annex to be linked to be entirety in large public building and high-rise building design, for reducing between high-rise main tower and low layer podium because of structural internal force that differential settlement causes, or the thermal stresses that large area concreting causes, separate with ater-casting between main tower and annex, make its each self-forming independent monomer, can in construction period sedimentation separately, the adverse effect that differential settlement also can be avoided to produce, can meet again the requirement of building function.Because pouring after settlement concreting must after agent structure completes, settlement stability can carry out, basement roof waterproof can not sequential production, pit backfill can not normally carry out, construction plant does not have work plane, and the leakproof of basement can not be guaranteed, and will bring various unfavorable factor to subsequent construction, have a strong impact on construction normally to carry out, restriction duration progress.
CN201120519897.0 discloses a kind of poured band of outer wall of basement advanced water-stopping structure, is applicable to the construction of the vertical ater-casting of basement in high rise building, and is not suitable for the construction of basement roof ater-casting.
CN201210246324.4 discloses a kind of construction method of basement roof pouring after settlement safeguard measure, and its effect only for the protection of ater-casting, but not relates to the problem of waterproof, backfill in the subsequent construction of ater-casting.
Summary of the invention
The present invention is intended to solve the problems referred to above that prior art exists, and provides a kind of with low cost, easy and simple to handle, can significantly accelerating construction progress, improves the basement in high rise building top board pouring after settlement advance water stop construction method of construction quality.
The technical scheme that the present invention solves the employing of described problem is:
A kind of basement in high rise building top board pouring after settlement advance water stop construction method, carries out in the steps below:
(1) cutter is picked in pouring after settlement both sides to clean out;
(2) pouring after settlement bottom installs template and late poured band support system;
(3) waterproof is done in pouring after settlement both sides;
(4) water after settling and bring both sides to build waterproof by laying bricks or stones to lead wall, lead wall top formwork tie up muscle pouring reinforcement concrete cover plate in waterproof, waterproof leads wall and cover plate, and to smear 1:2.5 cement mortar 20 thick, and R angle is smeared at negative and positive angle place;
(5) construction basement waterproof roofing layer, waterproof edge cover plate top is connected with both sides, ater-casting waterproof, ensures that waterproofing for basement is continuous whole;
(6) basement roof fish tail and waterproof layer is built;
(7) backfill construction;
(8) agent structure bind 14 days after pouring after settlement possess when building condition and build this place's concrete by vertical ater-casting, top, vibration compacting magma receives face;
(9) enter from vertical ater-casting, Construction Later Casting Zone place waterproof is linked to be entirety with the waterproof of constructing in advance.
Adopt the present invention of technique scheme, compared with prior art, its beneficial effect is:
1. can realize not closing ater-casting and advanced water-stopping is constructed, form smooth on-the-spot place, be beneficial to spot plane and arrange;
2. build wall and cast-in-place cover plate by laying bricks or stones, ensure that basement waterproofing is continuous whole;
3. under cover plate, ater-casting is built by vertical ater-casting, can ensure ater-casting concrete pouring quality;
4. the waterproof and basement roof waterproof of leading ater-casting place under wall cover plate are linked to be entirety, make ater-casting discharge water one protective barrier many, complete design concept, avoids ater-casting waterproof to leak because various factors causes, and realizes the advanced waterproof construction in ater-casting.
As preferably, the present invention further technical scheme is:
Described late poured band support system adopts f48*3.0 steel pipe scaffold, and vertical rod is spacing 800mm in length and breadth.
Described waterproof is led wall and is adopted 240 masonries, height 1200mm.
Double-deck f14 reinforcing bar@200 mm is joined in described reinforced concrete cover plate.
Described fish tail and waterproof layer is the thick C20 pea gravel concreten of 100 mm that 80 thick poly-plastic insulation boards are built.
Accompanying drawing explanation
Fig. 1 is the outdoor top board structure schematic diagram of basement of the embodiment of the present invention;
Fig. 2 is the outdoor top board sectional drawing of basement of the embodiment of the present invention;
In figure: late poured band support system 1, waterproof leads wall 2, reinforced concrete cover plate 3, waterproofing course 4, pouring after settlement 5, basement roof 6.
Detailed description of the invention
The present invention is further elaborated for the embodiment provided below in conjunction with accompanying drawing, but embodiment does not form any restriction to the present invention.
See Fig. 1, Fig. 2, a kind of basement in high rise building top board pouring after settlement advance water stop construction method, carries out in the steps below:
(1) cutter is picked in pouring after settlement 5 both sides to clean out.
(2) pouring after settlement 5 bottom installs template and late poured band support system 1; Late poured band support system 1 adopts f48*3.0 steel pipe scaffold, and vertical rod is spacing 800mm in length and breadth.
(3) waterproof is done in pouring after settlement 5 both sides.
(4) water both sides, band 5 top after settling to build waterproof by laying bricks or stones and lead wall 2, lead wall 2 top formwork tie up muscle pouring reinforcement concrete cover plate 3 in waterproof, waterproof leads wall 2 and reinforced concrete cover plate 3, and to smear 1:2.5 cement mortar 20 thick, and circular arc is smeared at negative and positive angle place; Waterproof is led wall 2 and is adopted 240 masonries, height 1200mm; Double-deck f14 reinforcing bar@200 mm is joined in reinforced concrete cover plate 3.
(5) waterproofing course 4 of construction basement roof 6, waterproof edge reinforced concrete cover plate 3 top is connected with pouring after settlement 5 both sides waterproof, ensures that waterproofing for basement is continuous whole;
(6) fish tail and waterproof layer of basement roof 6 is built; Fish tail and waterproof layer is the thick C20 pea gravel concreten of 100 mm that 80 thick poly-plastic insulation boards are built.
(7) backfill construction.
(8) agent structure bind 14 days after pouring after settlement 5 possess when building condition and build this place's concrete by vertical ater-casting, top, vibration compacting magma receives face;
(9) enter from vertical ater-casting, Construction Later Casting Zone place waterproof is linked to be entirety with the waterproof of constructing in advance.
The foregoing is only the better feasible embodiment of the present invention, not thereby limit to interest field of the present invention, the equivalent structure change that all utilizations manual of the present invention and accompanying drawing content are done, be all contained within interest field of the present invention.

Claims (5)

1. a basement in high rise building top board pouring after settlement advance water stop construction method, is characterized in that, carries out in the steps below:
(1) cutter is picked in pouring after settlement both sides to clean out;
(2) pouring after settlement bottom installs template and late poured band support system;
(3) waterproof is done in pouring after settlement both sides;
(4) water after settling and bring both sides to build waterproof by laying bricks or stones to lead wall, lead wall top formwork tie up muscle pouring reinforcement concrete cover plate in waterproof, waterproof leads wall and cover plate, and to smear 1:2.5 cement mortar 20 thick, and R angle is smeared at negative and positive angle place;
(5) construction basement waterproof roofing layer, waterproof edge cover plate top is connected with both sides, ater-casting waterproof, ensures that waterproofing for basement is continuous whole;
(6) basement roof fish tail and waterproof layer is built;
(7) backfill construction;
(8) agent structure bind 14 days after pouring after settlement possess when building condition and build this place's concrete by vertical ater-casting, top, vibration compacting magma receives face;
(9) enter from vertical ater-casting, Construction Later Casting Zone place waterproof is linked to be entirety with the waterproof of constructing in advance.
2. basement in high rise building top board pouring after settlement advance water stop construction method according to claim 1, is characterized in that, described late poured band support system adopts f48*3.0 steel pipe scaffold, and vertical rod is spacing 800mm in length and breadth.
3. basement in high rise building top board pouring after settlement advance water stop construction method according to claim 1, it is characterized in that, described waterproof is led wall and is adopted 240 masonries, height 1200mm.
4. basement in high rise building top board pouring after settlement advance water stop construction method according to claim 1, is characterized in that, joins double-deck f14 reinforcing bar@200 mm in described reinforced concrete cover plate.
5. basement in high rise building top board pouring after settlement advance water stop construction method according to claim 1, is characterized in that, described fish tail and waterproof layer is the thick C20 pea gravel concreten of 100 mm that 80 thick poly-plastic insulation boards are built.
CN201510178513.6A 2015-04-16 2015-04-16 Basement in high rise building top board pouring after settlement advance water stop construction method Active CN104790436B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510178513.6A CN104790436B (en) 2015-04-16 2015-04-16 Basement in high rise building top board pouring after settlement advance water stop construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510178513.6A CN104790436B (en) 2015-04-16 2015-04-16 Basement in high rise building top board pouring after settlement advance water stop construction method

Publications (2)

Publication Number Publication Date
CN104790436A true CN104790436A (en) 2015-07-22
CN104790436B CN104790436B (en) 2017-06-27

Family

ID=53555590

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510178513.6A Active CN104790436B (en) 2015-04-16 2015-04-16 Basement in high rise building top board pouring after settlement advance water stop construction method

Country Status (1)

Country Link
CN (1) CN104790436B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088161A (en) * 2016-06-08 2016-11-09 中国十七冶集团有限公司 A kind of soil that backfills settles the structure watering band
CN106759515A (en) * 2015-11-20 2017-05-31 中建四局第建筑工程有限公司 Post-cast strip carries out the method and structure of waterproof construction with agent structure simultaneously
CN110344426A (en) * 2019-07-12 2019-10-18 无锡市亨利富建设发展有限公司 Sole plate variable cross-section pouring after settlement reinforced mesh support system construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100714435B1 (en) * 2006-09-29 2007-05-04 주식회사 삼안 Apparatus for preventing leakage tunnel coupling part
CN202139608U (en) * 2011-07-05 2012-02-08 十九冶成都建设有限公司 Later casting zone water stopping structure of basement
CN102747750A (en) * 2012-07-17 2012-10-24 天津住宅集团建设工程总承包有限公司 Construction method for post-pouring settlement belt protective measures of basement top plates
CN202706060U (en) * 2012-06-12 2013-01-30 北京市第三建筑工程有限公司 Waterproof structure for base plate deformation joint with width of 50 mm
CN203256815U (en) * 2013-05-03 2013-10-30 孔志坚 Deformation joint of basement bottom slab

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100714435B1 (en) * 2006-09-29 2007-05-04 주식회사 삼안 Apparatus for preventing leakage tunnel coupling part
CN202139608U (en) * 2011-07-05 2012-02-08 十九冶成都建设有限公司 Later casting zone water stopping structure of basement
CN202706060U (en) * 2012-06-12 2013-01-30 北京市第三建筑工程有限公司 Waterproof structure for base plate deformation joint with width of 50 mm
CN102747750A (en) * 2012-07-17 2012-10-24 天津住宅集团建设工程总承包有限公司 Construction method for post-pouring settlement belt protective measures of basement top plates
CN203256815U (en) * 2013-05-03 2013-10-30 孔志坚 Deformation joint of basement bottom slab

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
蒋虎山: "地下室顶板沉降后浇带预封闭施工技术", 《科技与创新》, no. 19, 30 October 2014 (2014-10-30) *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759515A (en) * 2015-11-20 2017-05-31 中建四局第建筑工程有限公司 Post-cast strip carries out the method and structure of waterproof construction with agent structure simultaneously
CN106088161A (en) * 2016-06-08 2016-11-09 中国十七冶集团有限公司 A kind of soil that backfills settles the structure watering band
CN110344426A (en) * 2019-07-12 2019-10-18 无锡市亨利富建设发展有限公司 Sole plate variable cross-section pouring after settlement reinforced mesh support system construction method

Also Published As

Publication number Publication date
CN104790436B (en) 2017-06-27

Similar Documents

Publication Publication Date Title
CN201280725Y (en) Post-casting construction precast slab for basement of buildings
CN201224933Y (en) Frame beam preventing water seepage and crack and wall stuffing structure
CN204343339U (en) A kind of temporary support columns waterproof base plate
CN103206088B (en) Parts of shear wall structure wall, slab integral pouring construction method
CN201738479U (en) Roof expansion joint integrated cover plate waterproof structure
CN206503169U (en) A kind of integral basement tower crane and raft plate seam construction
CN104790436A (en) High-rise building basement roof settlement post-pouring joint advanced water stop construction method
CN204112712U (en) A kind of side root haunch cast-in-place wall model sheetinstallat device
CN103015719B (en) Preliminary work for spudding steel concrete wastewater disposal basin monobloc cast technique
CN104631513A (en) Construction method for closing basement exterior wall post-cast strip
CN202945741U (en) Non-vibrating concrete column of steel tube
CN102535841A (en) Construction technology of prefabricated wall panel
CN202466623U (en) Basement attached lane structure
CN103195190A (en) Recycled concrete brick and insulating layer composite wall with tie reinforcing steel bars and manufacturing method thereof
CN103410173A (en) Construction method for vertical post pouring belt plugging of underground structural outer wall
CN108547450A (en) A kind of self-insulating brick wall construction method for exempting from formwork
CN108005254A (en) A kind of assembled architecture heat preserving exterior wall and its installation method
CN102535847B (en) Method for constructing gypsum self-insulation outer wall block masonry
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
CN204000958U (en) A kind of novel ater-casting place braced structures
CN205243063U (en) Masonry structure is consolidated to prefabricated wallboard
CN206667459U (en) A kind of pre-splicing Standard formula building of prefabrication type reinforced concrete shear wall
CN206457837U (en) A kind of assembled type base for power transmission line iron tower
CN206110423U (en) Water integral reinforced concrete floor slab of seam assembly after reservation
CN105332386A (en) Structure construction method for tower crane foundation serving as basement bottom plate

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Yu Baoping

Inventor after: Lu Yaming

Inventor after: Yu Yang

Inventor after: Wang Fengjie

Inventor after: Yao Xiaosong

Inventor after: Jirimutu

Inventor after: Qu Lifeng

Inventor after: Huang Xueyu

Inventor before: Yu Baoping

Inventor before: Wang Fengjie

Inventor before: Yao Xiaosong

Inventor before: Jirimutu

Inventor before: Yu Yang