CN114319454A - Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam - Google Patents

Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam Download PDF

Info

Publication number
CN114319454A
CN114319454A CN202111639515.2A CN202111639515A CN114319454A CN 114319454 A CN114319454 A CN 114319454A CN 202111639515 A CN202111639515 A CN 202111639515A CN 114319454 A CN114319454 A CN 114319454A
Authority
CN
China
Prior art keywords
concrete wall
side wall
construction
water
cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111639515.2A
Other languages
Chinese (zh)
Inventor
毛炜
刘振东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Aerospace Construction Engineering Group Co Ltd
Original Assignee
China Aerospace Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Aerospace Construction Engineering Group Co Ltd filed Critical China Aerospace Construction Engineering Group Co Ltd
Priority to CN202111639515.2A priority Critical patent/CN114319454A/en
Publication of CN114319454A publication Critical patent/CN114319454A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention belongs to the field of building construction, and particularly relates to a waterproof structure for a horizontal construction joint of a side wall of a cover-excavation reverse construction method. The groove is filled with the PJ400 water-swelling water-stop glue which protrudes out of the concrete surface by no less than 5mm, the two sides of the groove are symmetrically provided with 8-12mm full-section grouting pipes, the three-way pipe is adopted to lead the outer side of the side wall to be no less than 500mm, and after the construction of the concrete for pouring the side wall is finished and the design strength is reached, a pressure type grouting machine is adopted for grouting, so that the waterproof effect of a construction joint is ensured.

Description

Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam
Technical Field
The invention relates to the technical field of building construction, in particular to a waterproof structure of a horizontal construction joint of a side wall in a cover-excavation top-down construction method.
Background
In the cover and dig reverse construction process, the side wall structure construction order is executed after every layer of roof and bottom plate structure construction in the underground finishes, so the side wall structure can form twice horizontal construction joint from top to bottom, and wherein the bottom construction joint returns a welding stagnant water steel sheet to set up on pouring, and upper strata horizontal construction joint is because the shoulder bottom of stopping need set up the template and prop up and establish the system, can't weld stagnant water steel sheet, need carry out the stagnant water measure of other modes.
Disclosure of Invention
The invention aims to solve the defects in the prior art, and provides a waterproof structure for a horizontal construction joint of a side wall of a cover-excavation top-down construction method.
In order to achieve the purpose, the invention adopts the following technical scheme:
the utility model provides a cover waterproof construction of horizontal construction joint of reverse construction method side wall, includes that the mould builds the concrete wall and stops and shoulder the concrete wall, the mould is built the concrete wall and is located the below of stopping and shoulder the concrete wall, and the mould builds the concrete wall and stops and be provided with upper horizontal construction joint between the shoulder the concrete wall, the bottom of stopping and shoulder the concrete wall reserves the recess, has placed trapezoidal stagnant water adhesive tape in the recess, the pre-buried grout pipe that has in top of mould construction concrete wall.
Preferably, the size of the grooves is 20mm by 10 mm.
Preferably, the bottom of trapezoidal stagnant water adhesive tape is the wave setting for increase stagnant water route length, increase the contact time of the water that gets into horizontal construction joint and water-swelling stagnant water adhesive tape, further strengthen the stagnant water effect of water-swelling stagnant water adhesive tape, and trapezoidal stagnant water adhesive tape is PJ400 type water-swelling stagnant water and glues.
Preferably, the grouting pipe is connected with a three-way pipe, the three-way pipe extends to the outside of the molded concrete wall and is connected with a pressure type grouting machine.
Preferably, the top of the molded concrete wall is welded with a water stop steel plate.
According to the waterproof structure of the horizontal construction joint of the side wall in the cover-excavation reverse construction method, when a template is erected at the middle position of the bottom of a shoulder-stopping concrete wall, a 20 x 10mm batten is longitudinally customized in the middle of the template along the groove of the shoulder-stopping concrete wall, a formwork support system is arranged below the template, the template is disassembled after the strength of concrete reaches the design strength, all battens are chiseled, a PJ400 water-swelling waterproof glue is filled in the groove and protrudes out of the concrete surface by no less than 5mm, 8-12mm full-section grouting pipes are symmetrically arranged on two sides of the groove, a three-way pipe is adopted to lead the outer side of the side wall to be no less than 500mm, and after the construction of the side wall is finished and the design strength is reached, a pressure type grouting machine is adopted to perform grouting, so that the waterproof effect of the construction joint is ensured.
Drawings
Fig. 1 is a schematic structural diagram of a waterproof structure of a horizontal construction joint of a side wall in a cover-excavation top-down method provided by the invention.
In the figure: 1 mould concrete wall, 2 stop shoulder concrete wall, 3 upper horizontal construction joints, 4 trapezoidal stagnant water adhesive tapes, 5 slip casting pipes, 6 pressure type slip casting machines.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1, a waterproof construction who covers horizontal construction joint of excavation reverse construction method side wall, including mould concrete wall 1 and the shoulder concrete wall 2 of stopping, mould concrete wall 1 is located the below of stopping shoulder concrete wall 2, and mould concrete wall 1 and the shoulder concrete wall 2 of stopping between be provided with upper horizontal construction joint 3, the bottom of stopping shoulder concrete wall 2 is reserved flutedly, trapezoidal stagnant water adhesive tape 4 has been placed in the recess, the pre-buried slip casting pipe 5 that has in top of mould concrete wall 1.
In the invention, the size of the groove is 20mm by 10mm, and the groove is used for installing the wood strips.
In the invention, the bottom of the trapezoidal water stop adhesive tape 4 is arranged in a wave shape, and the trapezoidal water stop adhesive tape 4 is PJ400 type water-swelling water stop adhesive.
In the invention, the grouting pipe 5 is connected with a three-way pipe, the three-way pipe extends out of the molded concrete wall 1 and is connected with a pressure type grouting machine 6.
In the invention, a water stop steel plate is welded on the top of the molded concrete wall 1.
According to the method, when a template is erected at the middle position of the bottom of a shoulder-stopping concrete wall 2, a 20-10 mm batten is longitudinally customized in the middle of the template along the groove of the shoulder-stopping concrete wall 2, a formwork support system is arranged below the template, the template is dismantled after the concrete strength reaches the design strength, all battens are chiseled, the groove is filled with PJ400 water-swelling waterproof glue and protrudes out of the concrete surface by no less than 5mm, 8-12mm full-section grouting pipes 5 are symmetrically arranged on two sides of the groove, the outer side of the side wall is led to be no less than 500mm by adopting a three-way pipe, and after the side wall is poured, the concrete construction is finished and the design strength is reached, a pressure type grouting machine is adopted for grouting, and the waterproof effect of a construction joint is ensured.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (5)

1. The utility model provides a cover waterproof construction of horizontal construction joint of reverse construction method side wall, includes mould concrete wall (1) and stops and shoulder concrete wall (2), its characterized in that, mould concrete wall (1) are located the below of stopping and shoulder concrete wall (2), and mould concrete wall (1) and stop and be provided with upper horizontal construction joint (3) between shoulder concrete wall (2), the bottom of stopping and reserving the recess in shoulder concrete wall (2), placed trapezoidal stagnant water adhesive tape (4) in the recess, the top of mould concrete wall (1) is pre-buried to have slip casting pipe (5).
2. The waterproof structure of the cover and cut reverse construction method side wall horizontal construction joint as claimed in claim 1, wherein the size of the groove is 20mm 10 mm.
3. The waterproof structure of the horizontal construction joint of the side wall of the cover-and-excavation reverse construction method according to claim 1, wherein the bottom of the trapezoidal water-stop rubber strip (4) is in a wave shape, and the trapezoidal water-stop rubber strip (4) is a PJ400 type water-swelling water-stop rubber.
4. The waterproof structure of the horizontal construction joint of the side wall of the cover and excavation reverse construction method according to claim 1, wherein the grouting pipe (5) is connected with a three-way pipe, the three-way pipe extends out of the molded concrete wall (1) and is connected with a pressure type grouting machine (6).
5. The waterproof structure of the cover and cut reverse construction method side wall horizontal construction joint as claimed in claim 1, wherein the water stop steel plate is welded on the top of the cast concrete wall (1).
CN202111639515.2A 2021-12-29 2021-12-29 Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam Pending CN114319454A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111639515.2A CN114319454A (en) 2021-12-29 2021-12-29 Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111639515.2A CN114319454A (en) 2021-12-29 2021-12-29 Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam

Publications (1)

Publication Number Publication Date
CN114319454A true CN114319454A (en) 2022-04-12

Family

ID=81016363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111639515.2A Pending CN114319454A (en) 2021-12-29 2021-12-29 Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam

Country Status (1)

Country Link
CN (1) CN114319454A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115478566A (en) * 2022-11-02 2022-12-16 北京市政建设集团有限责任公司 Waterproof node structure of side wall construction joint is done to lid side of digging

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003301456A (en) * 2002-04-11 2003-10-24 Shimizu Corp Composite underground wall and execution method therefor, and cut-off material expandable with water
CN204298860U (en) * 2014-10-30 2015-04-29 中国建筑第八工程局有限公司 Lid digs the inverse side wall construction joint waterproofing node that does and constructs
CN112376620A (en) * 2020-11-16 2021-02-19 中铁隧道局集团有限公司 Waterproof treatment method for side wall of underground building structure by reverse construction joint
CN216865262U (en) * 2021-12-29 2022-07-01 中航天建设工程集团有限公司 Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003301456A (en) * 2002-04-11 2003-10-24 Shimizu Corp Composite underground wall and execution method therefor, and cut-off material expandable with water
CN204298860U (en) * 2014-10-30 2015-04-29 中国建筑第八工程局有限公司 Lid digs the inverse side wall construction joint waterproofing node that does and constructs
CN112376620A (en) * 2020-11-16 2021-02-19 中铁隧道局集团有限公司 Waterproof treatment method for side wall of underground building structure by reverse construction joint
CN216865262U (en) * 2021-12-29 2022-07-01 中航天建设工程集团有限公司 Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115478566A (en) * 2022-11-02 2022-12-16 北京市政建设集团有限责任公司 Waterproof node structure of side wall construction joint is done to lid side of digging

Similar Documents

Publication Publication Date Title
CN201687102U (en) Assembled integral type shear wall structure system
CN203160283U (en) Construction of horizontal construction joints of underground building waterproof outer walls
CN105862873A (en) Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit
CN110878700A (en) Tunnel waterproof structure and construction method thereof
CN106988440B (en) Waterproof structure for main body and auxiliary interface of subway station and construction method of waterproof structure
CN108397200A (en) Back-fabricated construction method for tunnel connection section structure of subway station
CN110761322A (en) Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof
CN216865262U (en) Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam
CN209837324U (en) Tooth-groove type waterproof connecting structure for prefabricated wallboard of prefabricated building by vertical joint grouting method
CN114319454A (en) Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam
CN106049704B (en) Prefabrication cast-in-place combined type fair-faced concrete outer wall structure and construction method
CN215291040U (en) Parapet flashing angle bead using shaped PC component
CN208152349U (en) A kind of assembled architecture Roof system
CN113529982A (en) Deformation joint waterproof construction method
CN210238573U (en) A waterproof construction that is used for open cut station main part and attached junction
CN210797910U (en) Prefabricated plate prefabricated with waterproof structure
CN110847466A (en) Splicing and reinforcing construction method for prefabricated laminated slab
CN206667303U (en) Diaphragm wall waterproof structure for deformation seams
CN212742644U (en) Sealing structure of outer wall post-cast strip
CN205804419U (en) The tenon formula joint waterproofing structure of concrete waist rail embedded structure side wall
CN211257400U (en) Prefabricated draw-in groove formwork system is exempted from in advance to seal in basement outer wall post-cast strip
CN212926569U (en) Connecting structure of prefabricated shear wall with window opening and superposed beam
CN211922707U (en) Special-shaped deformation joint template for bottom plate of underground comprehensive pipe gallery
CN210887323U (en) Connect and build engineering underground structure construction joint watertight fittings
CN208633159U (en) A kind of underground pipe gallery waterproof structure for deformation seams

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220412

RJ01 Rejection of invention patent application after publication