CN216865262U - Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam - Google Patents

Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam Download PDF

Info

Publication number
CN216865262U
CN216865262U CN202123375575.6U CN202123375575U CN216865262U CN 216865262 U CN216865262 U CN 216865262U CN 202123375575 U CN202123375575 U CN 202123375575U CN 216865262 U CN216865262 U CN 216865262U
Authority
CN
China
Prior art keywords
concrete wall
side wall
construction
water
cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123375575.6U
Other languages
Chinese (zh)
Inventor
毛炜
刘振东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Aerospace Construction Engineering Group Co Ltd
Original Assignee
China Aerospace Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Aerospace Construction Engineering Group Co Ltd filed Critical China Aerospace Construction Engineering Group Co Ltd
Priority to CN202123375575.6U priority Critical patent/CN216865262U/en
Application granted granted Critical
Publication of CN216865262U publication Critical patent/CN216865262U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the field of building construction, and particularly relates to a waterproof structure for a horizontal construction joint of a side wall of a cover-excavation reverse construction method. The groove is filled with the PJ400 water-swelling water-stop glue which protrudes out of the concrete surface by no less than 5mm, the two sides of the groove are symmetrically provided with 8-12mm full-section grouting pipes, the three-way pipe is adopted to lead the outer side of the side wall to be no less than 500mm, and after the construction of the concrete for pouring the side wall is finished and the design strength is reached, a pressure type grouting machine is adopted for grouting, so that the waterproof effect of a construction joint is ensured.

Description

Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam
Technical Field
The utility model relates to the technical field of building construction, in particular to a waterproof structure of a horizontal construction joint of a side wall in a cover-excavation top-down construction method.
Background
In the cover and dig reverse construction process, the side wall structure construction order is executed after every layer of roof and bottom plate structure construction in the underground finishes, so the side wall structure can form twice horizontal construction joint from top to bottom, and wherein the bottom construction joint returns a welding stagnant water steel sheet to set up on pouring, and upper strata horizontal construction joint is because the shoulder bottom of stopping need set up the template and prop up and establish the system, can't weld stagnant water steel sheet, need carry out the stagnant water measure of other modes.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects in the prior art, and provides a waterproof structure for a horizontal construction joint of a side wall of a cover-excavation top-down construction method.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a cover waterproof construction of horizontal construction joint of reverse construction method side wall, includes that the mould builds the concrete wall and stops and shoulder the concrete wall, the mould is built the concrete wall and is located the below of stopping and shoulder the concrete wall, and the mould builds the concrete wall and stops and be provided with upper horizontal construction joint between the shoulder the concrete wall, the bottom of stopping and shoulder the concrete wall reserves the recess, has placed trapezoidal stagnant water adhesive tape in the recess, the pre-buried grout pipe that has in top of mould construction concrete wall.
Preferably, the size of the grooves is 20mm by 10 mm.
Preferably, the bottom of trapezoidal stagnant water adhesive tape is the wave setting for increase stagnant water route length, increase the contact time of the water that gets into horizontal construction joint and water-swelling stagnant water adhesive tape, further strengthen the stagnant water effect of water-swelling stagnant water adhesive tape, and trapezoidal stagnant water adhesive tape is PJ400 type water-swelling stagnant water and glues.
Preferably, the grouting pipe is connected with a three-way pipe, the three-way pipe extends to the outside of the molded concrete wall and is connected with a pressure type grouting machine.
Preferably, the top of the molded concrete wall is welded with a water stop steel plate.
According to the waterproof structure of the horizontal construction joint of the side wall in the cover-excavation reverse construction method, when a template is erected at the middle position of the bottom of a shoulder-stopping concrete wall, a 20 x 10mm batten is longitudinally customized in the middle of the template along the groove of the shoulder-stopping concrete wall, a formwork support system is arranged below the template, the template is disassembled after the strength of concrete reaches the design strength, all battens are chiseled, a PJ400 water-swelling waterproof glue is filled in the groove and protrudes out of the concrete surface by no less than 5mm, 8-12mm full-section grouting pipes are symmetrically arranged on two sides of the groove, a three-way pipe is adopted to lead the outer side of the side wall to be no less than 500mm, and after the construction of the side wall is finished and the design strength is reached, a pressure type grouting machine is adopted to perform grouting, so that the waterproof effect of the construction joint is ensured.
Drawings
Fig. 1 is a schematic structural diagram of a waterproof structure of a horizontal construction joint of a side wall in a cover-excavation top-down method provided by the utility model.
In the figure: 1 mould concrete wall, 2 stop shoulder concrete wall, 3 upper horizontal construction joints, 4 trapezoidal stagnant water adhesive tapes, 5 slip casting pipes, 6 pressure type slip casting machines.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1, a waterproof construction who covers horizontal construction joint of excavation reverse construction method side wall, including mould concrete wall 1 and the shoulder concrete wall 2 of stopping, mould concrete wall 1 is located the below of stopping shoulder concrete wall 2, and mould concrete wall 1 and the shoulder concrete wall 2 of stopping between be provided with upper horizontal construction joint 3, the bottom of stopping shoulder concrete wall 2 is reserved flutedly, trapezoidal stagnant water adhesive tape 4 has been placed in the recess, the pre-buried slip casting pipe 5 that has in top of mould concrete wall 1.
In the present invention, the grooves have a dimension of 20mm by 10mm for mounting the wooden strips.
In the utility model, the bottom of the trapezoid water-stop adhesive tape 4 is arranged in a wave shape, and the trapezoid water-stop adhesive tape 4 is made of PJ400 type water-swelling water-stop adhesive.
In the utility model, a three-way pipe is connected to a grouting pipe 5, extends out of a molded concrete wall 1 and is connected with a pressure type grouting machine 6.
In the utility model, the top of the molded concrete wall 1 is welded with a water stop steel plate.
According to the method, when a template is erected at the middle position of the bottom of a shoulder-stopping concrete wall 2, a 20-10 mm batten is longitudinally customized in the middle of the template along the groove of the shoulder-stopping concrete wall 2, a formwork support system is arranged below the template, the template is dismantled after the concrete strength reaches the design strength, all battens are chiseled, the groove is filled with PJ400 water-swelling waterproof glue and protrudes out of the concrete surface by no less than 5mm, 8-12mm full-section grouting pipes 5 are symmetrically arranged on two sides of the groove, the outer side of the side wall is led to be no less than 500mm by adopting a three-way pipe, and after the side wall is poured, the concrete construction is finished and the design strength is reached, a pressure type grouting machine is adopted for grouting, and the waterproof effect of a construction joint is ensured.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (5)

1. The utility model provides a cover waterproof construction of horizontal construction joint of reverse construction method side wall, includes mould concrete wall (1) and stops and shoulder concrete wall (2), its characterized in that, mould concrete wall (1) are located the below of stopping and shoulder concrete wall (2), and mould concrete wall (1) and stop and be provided with upper horizontal construction joint (3) between shoulder concrete wall (2), the bottom of stopping and reserving the recess in shoulder concrete wall (2), placed trapezoidal stagnant water adhesive tape (4) in the recess, the top of mould concrete wall (1) is pre-buried to have slip casting pipe (5).
2. The waterproof structure of the cover and cut reverse construction method side wall horizontal construction joint as claimed in claim 1, wherein the size of the groove is 20mm 10 mm.
3. The waterproof structure of the horizontal construction joint of the side wall of the cover-and-excavation reverse construction method according to claim 1, wherein the bottom of the trapezoidal water-stop rubber strip (4) is in a wave shape, and the trapezoidal water-stop rubber strip (4) is a PJ400 type water-swelling water-stop rubber.
4. The waterproof structure of the horizontal construction joint of the side wall of the cover and excavation reverse construction method according to claim 1, wherein the grouting pipe (5) is connected with a three-way pipe, the three-way pipe extends out of the molded concrete wall (1) and is connected with a pressure type grouting machine (6).
5. The waterproof structure of the cover and cut reverse construction method side wall horizontal construction joint as claimed in claim 1, wherein the water stop steel plate is welded on the top of the cast concrete wall (1).
CN202123375575.6U 2021-12-29 2021-12-29 Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam Active CN216865262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123375575.6U CN216865262U (en) 2021-12-29 2021-12-29 Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123375575.6U CN216865262U (en) 2021-12-29 2021-12-29 Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam

Publications (1)

Publication Number Publication Date
CN216865262U true CN216865262U (en) 2022-07-01

Family

ID=82149381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123375575.6U Active CN216865262U (en) 2021-12-29 2021-12-29 Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam

Country Status (1)

Country Link
CN (1) CN216865262U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114319454A (en) * 2021-12-29 2022-04-12 中航天建设工程集团有限公司 Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114319454A (en) * 2021-12-29 2022-04-12 中航天建设工程集团有限公司 Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam

Similar Documents

Publication Publication Date Title
CN110761322B (en) Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof
CN203160283U (en) Construction of horizontal construction joints of underground building waterproof outer walls
CN108397200A (en) Formula construction method is done after metro station tunnel linkage segment structure
CN216865262U (en) Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam
CN105064398A (en) One-time overall pouring construction method for nuclear powder single-hole GD gallery
CN209837324U (en) Tooth-groove type waterproof connecting structure for prefabricated wallboard of prefabricated building by vertical joint grouting method
CN106049704B (en) Prefabrication cast-in-place combined type fair-faced concrete outer wall structure and construction method
CN114319454A (en) Waterproof construction of lid excavation reverse construction method side wall horizontal construction seam
CN208152349U (en) A kind of assembled architecture Roof system
CN212294763U (en) Waterproof stubbles structure that connects in bottom plate post-cast strip
CN210797910U (en) Prefabricated plate prefabricated with waterproof structure
CN210238573U (en) A waterproof construction that is used for open cut station main part and attached junction
CN110847466A (en) Splicing and reinforcing construction method for prefabricated laminated slab
CN206667303U (en) Diaphragm wall waterproof structure for deformation seams
CN212742644U (en) Sealing structure of outer wall post-cast strip
CN213979911U (en) Basement outer wall post-cast strip template structure
CN211922707U (en) Special-shaped deformation joint template for bottom plate of underground comprehensive pipe gallery
CN212926569U (en) Connecting structure of prefabricated shear wall with window opening and superposed beam
CN113235646B (en) Construction method for crossing subway station on comprehensive pipe rack
CN205804419U (en) The tenon formula joint waterproofing structure of concrete waist rail embedded structure side wall
CN210887323U (en) Connect and build engineering underground structure construction joint watertight fittings
CN213625699U (en) Basement outer wall waterproof construction structure for reverse construction
CN210622060U (en) Assembled close amalgamation coincide floor
CN208633159U (en) A kind of underground pipe gallery waterproof structure for deformation seams
CN213329123U (en) Steel member pre-buried in composite wall during foundation pit reverse construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant