CN104234089B - The construction method that a kind of basement guarded drainage combines - Google Patents
The construction method that a kind of basement guarded drainage combines Download PDFInfo
- Publication number
- CN104234089B CN104234089B CN201410412567.XA CN201410412567A CN104234089B CN 104234089 B CN104234089 B CN 104234089B CN 201410412567 A CN201410412567 A CN 201410412567A CN 104234089 B CN104234089 B CN 104234089B
- Authority
- CN
- China
- Prior art keywords
- waterproof
- basement
- sump
- drainage
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 35
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 29
- 230000002209 hydrophobic Effects 0.000 claims abstract description 21
- 239000004567 concrete Substances 0.000 claims abstract description 17
- 239000000463 material Substances 0.000 claims abstract description 16
- 239000010410 layer Substances 0.000 claims description 37
- 239000011449 brick Substances 0.000 claims description 21
- 239000004575 stone Substances 0.000 claims description 15
- 210000002219 Extraembryonic Membranes Anatomy 0.000 claims description 9
- 239000011083 cement mortar Substances 0.000 claims description 9
- 241000251468 Actinopterygii Species 0.000 claims description 8
- 238000001914 filtration Methods 0.000 claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 238000000034 method Methods 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 239000011241 protective layer Substances 0.000 claims description 4
- 239000002689 soil Substances 0.000 claims description 4
- 229920000915 polyvinyl chloride Polymers 0.000 claims description 3
- 238000001035 drying Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 4
- 238000004078 waterproofing Methods 0.000 description 4
- 230000032683 aging Effects 0.000 description 1
- 230000000903 blocking Effects 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
Abstract
The invention discloses the construction method that a kind of basement guarded drainage combines, it includes the waterproof hydrophobic of the waterproof hydrophobic of basement bottom board and basement side wall.The construction method that a kind of basement guarded drainage proposed by the invention combines, by the waterproof coiled material under sole plate, hydrophobic, drainage system and rigid waterproof concrete base plate, successfully the percolating water under sole plate is all drained in sump, in sump, water level reaches certain height, will automatically start draining pump draining, ensure that drying regime and the normal usage function on basement floor, and basement sole plate draining system can be inserted into backfill and ground construction after basement construction completes any time, above work is just carried out after being fully completed and check ne-leakage without basement by the time, improve operating efficiency and duration.
Description
Technical field
The invention belongs to construction guarded drainage field, especially relate to executing of a kind of basement guarded drainage combination
Work method.
Background technology
Outer wall of basement and base plate leakage water are one of common quality defects, at present, and tanking master
To be made up of rigid waterproofing and flexible waterproof layer.One can be produced owing to concrete rigid waterproof layer is difficult to avoid that
Fixed microcrack, and flexible waterproof layer due to overlap joint loosely, damaged and waterproof coiled material and coating waterproofing easy
In aging, the later stage is difficult to keep waterproof effect, the most in fact cannot be formed and real enclose the system of covering, cause
Basement degree of depth building below level of ground water is easy to drainage occur;Traditional waterproof method is all
It is the mode using " blocking up ", it is impossible to permanent solution leakage problem, has had a strong impact on architectural engineering
Quality, uses and manages also to basement normally and bring the biggest inconvenience.
Summary of the invention
The technical problem to be solved is to provide the construction method that a kind of basement guarded drainage combines,
Simple in construction, construction cost is low, and anti-row combines, and can keep good waterproof hydrophobic effect for a long time, simultaneously
Basement sole plate buoyancy and basement side wall water pressure can be reduced, ensure construction engineering quality.
For achieving the above object, the construction method that the present invention a kind of basement guarded drainage combines, it includes
The waterproof hydrophobic and basement side wall of basement bottom board waterproof hydrophobic, its concrete technical scheme is:
One, base plate is waterproof hydrophobic, and it includes following construction procedure:
(1) on blinding layer, lay the most successively: waterproof roll → fish tail and waterproof layer, anti-
Water conservation layer is provided with drainage grade 2%, drainage grade row be provided with to foundation beam limit the direction of water-filtering ditch →
The base of stone drainage layer → paving nonwoven layer → concrete cushion → have rigid self-waterproof function
Plinth base plate;
(2) arranging water-filtering ditch by beam limit and drain into the node of sump, construction order successively is: by basis
600mm → cast foundation beam bed course → build 120 brick fetal membranes by laying bricks or stones is widened on the every limit of the beam earthwork, smears 1:3 water
Cement mortar also arranges circular arc → bottom board bed course at the external corner, inner corner trim of brick fetal membrane, bottom cushion with
Arc chord angle → laying water-proof coiled material → fish tail and waterproof layer is done in beam junction, and is provided with drainage grade 2%,
The gradient is arranged to sump, runs into and arranges two diameter 100mmPVC pipes when Liang Yuliang reports to the leadship after accomplishing a task, at pvc pipe
Zinc-plated filter screen → build 120 beam brick fetal membranes by laying bricks or stones is set along current direction, smears 1:3 cement mortar → rubble
Drainage layer → laying nonwoven layer → concrete cushion, simultaneously cast rigid self-waterproof base plate 7 and base
Plinth beam;
(3) in cast, there is rigid self-waterproof base plate function to complete and sole plate while foundation beam
The construction of the sump being connected, has inlet opening in the side of the described borehole wall that catchments, and on inlet opening
End arranges filter screen, at described sump built with automatics draining pump, is passed through by water by draining pump
The catch-basin connected with outdoor discharged by drainpipe;
Two, side wall is waterproof hydrophobic, and it includes following construction procedure: grade beam bed course is with bottom cushion simultaneously
Construction → waterproof coiled material reserve 300mm with protect wall side outside concrete panel and waterproof be connected → waterproof
Protective layer is also provided with drainage grade 2%, gradient row to the bottom board of sump → simultaneously together with foundation beam and
Exterior wall plate hight 500mm, arranges steel plate water stopper, steel plate water-stopping tape thickness 3mm → cast wall at wallboard
Board concrete → distance exterior wall limit 300mm builds 240mm by laying bricks or stones and protects wall, smears 1:3 cement mortar, negative and positive
Arc chord angle is done at angle, builds sump by laying bricks or stones simultaneously, and the spacing 50 meters of side wall sump and floor sump →
Concentration water inlet pipe diameter 100mm is set on sump limit, and filter screen → setting is set in water inlet certainly
Dynamic draining pump, drains into nearest catch-basin → protection wall lateral surface waterproof coiled material by water, and top is reserved
300mm and waterproof roofing overlap joint → 50mm thickness extruded sheet waterproof coiled material protective layer → back-filling in layers is native,
Rockfill in the middle of basement wall slab with protection wall drainage layer (in the sub-drainage layer that rockfills take over outer backfill soil
Backfill the most highly consistent, prevent protection wall crimp), do waterproof roofing and the waterproof overlap joint of side wall.
The construction method that a kind of basement guarded drainage proposed by the invention combines, by under sole plate
Waterproof coiled material, hydrophobic, drainage system and rigid waterproof concrete base plate, successfully by under sole plate
Percolating water all drain in sump, in sump, water level reaches certain height, will be automatic
Start draining pump draining, it is ensured that the drying regime on basement floor and normal usage function, and underground
Chamber base base plate draining system can be inserted into backfill and ground after basement construction completes any time
Construction, just carries out above work after being fully completed and check ne-leakage without basement by the time, improve work
Make efficiency and duration.
Accompanying drawing explanation
Fig. 1 is building described in the construction method using a kind of basement guarded drainage proposed by the invention to combine
The schematic diagram of the waterproof hydrophobic structure of basement bottom board made;
Fig. 2 is the node schematic diagram of the waterproof hydrophobic foundation beam limit of the basement bottom board shown in Fig. 1 water-filtering ditch;
Fig. 3 is the node schematic diagram at the sump of the basement waterproofing drainage structure shown in Fig. 1;
Fig. 4 is the schematic diagram of the waterproof hydrophobic structure of outer wall of basement.
Detailed description of the invention
Seeing accompanying drawing, the construction method that a kind of basement guarded drainage combines, it includes the anti-of basement bottom board
Water is hydrophobic and basement side wall waterproof hydrophobic, and its concrete technical scheme is:
One, base plate is waterproof hydrophobic, and it includes following construction procedure:
(1) lay the most successively at blinding layer 1: waterproof roll 2 → fish tail and waterproof layer 3,
Fish tail and waterproof layer is provided with drainage grade 2%, and drainage grade row is provided with the direction of water-filtering ditch to foundation beam limit
→ stone drainage layer 4 → paving nonwoven layer 5 → concrete cushion 6 → there is rigid self-waterproof
The sole plate 7 of function;
(2) arranging water-filtering ditch by beam limit and drain into the node of sump, construction order successively is: dig basis
600mm → cast foundation beam bed course 11 → build 120 brick fetal membranes 9 by laying bricks or stones is widened on the every limit of the beam earthwork, smears 1:3
Cement mortar also arranges circular arc → bottom board bed course 1, base plate at 120 brick fetal membrane external corners, inner corner trim
Arc chord angle → laying water-proof coiled material 2 → fish tail and waterproof layer 3, and the row of being provided with are done in bed course and beam junction
The water gradient 2%, the gradient is arranged to sump, runs into and arranges two diameter 100mmPVC pipes when Liang Yuliang reports to the leadship after accomplishing a task
8, at pvc pipe, zinc-plated filter screen → build 120 beam brick fetal membranes 9 by laying bricks or stones is set along current direction, smears 1:3 cement
Mortar → rubble drainage layer 4 → lay nonwoven layer 5 → concrete cushion 6, pour into a mould rigidity simultaneously
Self waterproofing base plate 7 and foundation beam 10;
(3) in cast, there is rigid self-waterproof base plate function 7 to complete and basis while foundation beam 10
The construction of the sump 13 that base plate is connected, has inlet opening 14 in the side of the described borehole wall that catchments, and
Filter screen is set in upper end, inlet opening, at described sump built with automatics draining pump 21, by row
Water is discharged the catch-basin connected with outdoor by water pump by drainpipe 12;
Two, side wall is waterproof hydrophobic, and it includes following construction procedure: grade beam bed course is with bottom cushion simultaneously
Construction → waterproof coiled material 2 reserves 300mm, and wall side is waterproof is connected → prevents with protection outside concrete panel
Water conservation layer 3 is also provided with drainage grade 2%, gradient row to the bottom board 7 of sump → simultaneously together with base
Plinth beam 10 and exterior wall plate hight 500mm15, arrange steel plate water stopper 16, steel plate water-stopping tape thickness at wallboard
3mm → cast R.C. wall board 17 → distance exterior wall limit 300mm builds 240mm by laying bricks or stones and protects wall 18, smears
1:3 cement mortar, negative and positive angle does arc chord angle, builds sump simultaneously by laying bricks or stones, and side wall sump catchments with base plate
The spacing 50 meters of well (because two well constructions are identical, indicate two wells in Figure of description with Fig. 3 simultaneously) →
Concentration water inlet pipe diameter 100mm is set on sump limit, and filter screen → setting is set in water inlet certainly
Dynamic draining pump, drains into nearest catch-basin → protection wall lateral surface waterproof coiled material 2 by water, and top is reserved
300mm and waterproof roofing overlap joint → 50mm thickness extruded sheet waterproof coiled material protective layer 19 → back-filling in layers
Soil, basement wall slab with protection wall in the middle of rockfill sub-drainage layer (in rockfill sub-drainage layer with outer backfill soil
Take over backfill the most highly consistent, prevent protection wall crimp), to do waterproof roofing waterproof with side wall
Overlap joint.
The construction method that a kind of basement guarded drainage proposed by the invention combines, by under sole plate
Waterproof coiled material, hydrophobic, drainage system and rigid waterproof concrete base plate, successfully by under sole plate
Percolating water all drain in sump, in sump, water level reaches certain height, will be automatic
Start draining pump draining, it is ensured that the drying regime on basement floor and normal usage function, and underground
Chamber base base plate draining system can be inserted into backfill and ground after basement construction completes any time
Construction, just carries out above work after being fully completed and check ne-leakage without basement by the time, improve work
Make efficiency and duration.
Claims (1)
1. the construction method that basement guarded drainage combines, it includes the waterproof hydrophobic of the waterproof hydrophobic of basement bottom board and basement side wall, and its concrete technical scheme is:
One, base plate is waterproof hydrophobic, and it includes following construction procedure:
(1) on blinding layer; lay the most successively: waterproof roll → fish tail and waterproof layer; fish tail and waterproof layer is provided with drainage grade 2%, and drainage grade row is provided with the sole plate of the direction → stone drainage layer → paving nonwoven layer → concrete cushion of water-filtering ditch → have rigid self-waterproof function to foundation beam limit;
(2) water-filtering ditch is set by beam limit and drains into the node of sump, construction order successively is: every for foundation beam earthwork limit is widened 600mm → cast foundation beam bed course → build 120 brick fetal membranes by laying bricks or stones, smear 1:3 cement mortar the external corner at brick fetal membrane, circular arc → bottom board bed course is set at inner corner trim, arc chord angle → laying water-proof coiled material → fish tail and waterproof layer is done in bottom cushion and beam junction, and it is provided with drainage grade 2%, the gradient is arranged to sump, run into and two diameter 100mmPVC pipes are set when Liang Yuliang reports to the leadship after accomplishing a task, at pvc pipe, zinc-plated filter screen → build 120 beam brick fetal membranes by laying bricks or stones is set along current direction, smear 1:3 cement mortar → rubble drainage layer → laying nonwoven layer → concrete cushion, cast rigid self-waterproof base plate (7) and foundation beam simultaneously;
(3) there is rigid self-waterproof base plate function in cast and while foundation beam, complete the construction of sump that is connected with sole plate, inlet opening is had in the side of the described borehole wall that catchments, and filter screen is set in upper end, inlet opening, at described sump built with automatics draining pump, by draining pump, water is discharged by drainpipe the catch-basin connected with outdoor;
nullTwo、Side wall waterproof hydrophobic,It includes following construction procedure: grade beam bed course constructs with bottom cushion simultaneously → waterproof coiled material reserves 300mm and be connected with to protect wall side outside concrete panel waterproof → and fish tail and waterproof layer be provided with drainage grade 2%,Gradient row to the bottom board of sump → simultaneously together with foundation beam and exterior wall plate hight 500mm,At wallboard, steel plate water stopper is set,Steel plate water-stopping tape thickness 3mm → cast R.C. wall board → distance exterior wall limit 300mm builds 240mm by laying bricks or stones and protects wall,Smear 1:3 cement mortar,Arc chord angle is done at negative and positive angle,Build sump by laying bricks or stones simultaneously,The spacing 50 meters of side wall sump and floor sump → on sump limit arranges concentration water inlet pipe diameter 100mm,And filter screen → arrange float-controlled drainage pump is set in water inlet,Water is drained into nearest catch-basin → protection wall lateral surface waterproof coiled material,300mm and waterproof roofing overlap joint → 50mm thickness extruded sheet waterproof coiled material protective layer → back-filling in layers soil are reserved in top、Rockfill in the middle of basement wall slab with protection wall drainage layer、Do waterproof roofing and the waterproof overlap joint of side wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410412567.XA CN104234089B (en) | 2014-08-21 | 2014-08-21 | The construction method that a kind of basement guarded drainage combines |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410412567.XA CN104234089B (en) | 2014-08-21 | 2014-08-21 | The construction method that a kind of basement guarded drainage combines |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104234089A CN104234089A (en) | 2014-12-24 |
CN104234089B true CN104234089B (en) | 2016-08-24 |
Family
ID=52222923
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410412567.XA Active CN104234089B (en) | 2014-08-21 | 2014-08-21 | The construction method that a kind of basement guarded drainage combines |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104234089B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104988955B (en) * | 2015-06-11 | 2017-07-07 | 中建一局集团第六建筑有限公司 | The anti-row's convolution waterproof system of ultra-deep basement and construction method |
CN105735366B (en) * | 2016-03-10 | 2019-01-01 | 深圳市深安企业有限公司 | Waterproof construction method based on concrete |
CN106480979B (en) * | 2016-12-20 | 2019-07-09 | 中联建设集团股份有限公司 | A kind of active antiseepage basement shear wall and its construction technology |
CN109322328A (en) * | 2018-11-27 | 2019-02-12 | 上海应用技术大学 | A kind of extremely frigid zones subway station top plate guarded drainage method and system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101298782A (en) * | 2008-06-13 | 2008-11-05 | 朱邃科 | Method and system for basement engineering water proof and water drain |
CN101768976A (en) * | 2009-12-29 | 2010-07-07 | 中建城市建设发展有限公司 | Base pit dewatering and water saving device and construction method thereof |
CN101914927A (en) * | 2010-06-22 | 2010-12-15 | 中国建筑第二工程局有限公司 | Waterproof system for basement bottom board and wall surface and construction method thereof |
CN201695408U (en) * | 2010-02-02 | 2011-01-05 | 中国建筑第四工程局有限公司 | Basement baseplate integrating water-proofing and drainage functions |
CN103741715A (en) * | 2013-12-25 | 2014-04-23 | 中建六局土木工程有限公司 | Novel waterproof hydrophobic construction method for basement |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001241052A (en) * | 2000-02-29 | 2001-09-04 | Hiroshi Saito | Waterproof construction method for basement and waterproof structure of basement |
-
2014
- 2014-08-21 CN CN201410412567.XA patent/CN104234089B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101298782A (en) * | 2008-06-13 | 2008-11-05 | 朱邃科 | Method and system for basement engineering water proof and water drain |
CN101768976A (en) * | 2009-12-29 | 2010-07-07 | 中建城市建设发展有限公司 | Base pit dewatering and water saving device and construction method thereof |
CN201695408U (en) * | 2010-02-02 | 2011-01-05 | 中国建筑第四工程局有限公司 | Basement baseplate integrating water-proofing and drainage functions |
CN101914927A (en) * | 2010-06-22 | 2010-12-15 | 中国建筑第二工程局有限公司 | Waterproof system for basement bottom board and wall surface and construction method thereof |
CN103741715A (en) * | 2013-12-25 | 2014-04-23 | 中建六局土木工程有限公司 | Novel waterproof hydrophobic construction method for basement |
Also Published As
Publication number | Publication date |
---|---|
CN104234089A (en) | 2014-12-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203947484U (en) | A kind of drainage of foundation pit and circulating water utilization system | |
CN102418347B (en) | Drainage construction method for blind drain and sump wells in deep foundation pit | |
CN102535488B (en) | Waterproof construction method for bottom plate of high-water-level basement | |
CN104234089B (en) | The construction method that a kind of basement guarded drainage combines | |
CN103741714A (en) | Construction method for full cover-excavation reverse method of underground engineering | |
CN202416382U (en) | Waterproof structure of basement | |
CN103821181A (en) | Basement bottom plate water drainage layer construction method | |
RU2462560C1 (en) | Underground part of concrete wall with wall drain | |
CN103046565B (en) | Draining method for ultra-deep batholith deep foundation pit | |
CN105862873A (en) | Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit | |
CN203411994U (en) | Support pile basement outer wall structure | |
CN204530732U (en) | A kind of structure of the precipitation based on basement elevator shaft plash | |
CN103410175B (en) | A kind of water seepage control construction method for karst water-rich geological underground structure waterproof construction | |
CN103741715B (en) | The hydrophobic construction method of a kind of basement waterproofing | |
CN110878700B (en) | Tunnel waterproof structure and construction method thereof | |
CN104314090A (en) | Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof | |
CN105544622A (en) | Floating resisting device, and seepage insulation device and drainage path checking device thereof for underground building | |
CN109488371B (en) | Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method | |
CN207331931U (en) | A kind of water seepage prevention floor drain | |
CN201593204U (en) | Water-proof drainage structure of basement external wall water back face | |
CN212104515U (en) | Be used for basement percolating water prevention and cure construction structures | |
CN202440826U (en) | Waterproof system for high-water level basement foundation slabs | |
CN101812846B (en) | Drainage structure of upstream wall of shore type hydropower station workshop and construction method thereof | |
CN204825916U (en) | Highly permeable stratum deep basal pit back cover stagnant water structure | |
CN203654332U (en) | Novel water prevention and dredge construction structure of basement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |