CN106869172A CN201710213504.5A CN201710213504A CN106869172A CN 106869172 A CN106869172 A CN 106869172A CN 201710213504 A CN201710213504 A CN 201710213504A CN 106869172 A CN106869172 A CN 106869172A
Authority
CN
China
Prior art keywords
prefabricated
side wall
reinforcing bar
construction
superimposed sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710213504.5A
Other languages
Chinese (zh)
Other versions
CN106869172B (en
Inventor
翟世鸿
唐衡
蒋道东
蔡超君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
CCCC Second Harbor Engineering Co
Original Assignee
Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd, CCCC Second Harbor Engineering Co filed Critical Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
Priority to CN201710213504.5A priority Critical patent/CN106869172B/en
Publication of CN106869172A publication Critical patent/CN106869172A/en
Application granted granted Critical
Publication of CN106869172B publication Critical patent/CN106869172B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of in-situ deposited prefabricated split-mounting type subway underground station construction method, in its foundation ditch constructed after the completion of excavation of subway foundation pit supporting, step one, the bottom that baseplate reinforcing bar is placed in foundation ditch, on the baseplate reinforcing bar correspondence bottom column and bottom side wall at be provided with dowel, after-pouring underplate concrete;The construction of step 2, bottom column and bottom side wall;Step 3, the construction of middle plate;Step 4, repeat step two and step 3, complete the superstructure construction of subway underground station, and the top board and the above to subway foundation pit carry out backfill earthing afterwards;Wherein, top board is that reinforcing bar is equipped with superimposed sheet, and top board, its two ends reserved steel bar on request.The present invention realizes the industrial streamlined production of subway underground station structure major part structure.

Description

In-situ deposited prefabricated split-mounting type subway underground station construction method
Technical field
Technical field of construction is built the present invention relates to subway underground station.It is more particularly related to a kind of cast-in-place Precast assembly combined type subway underground station construction method.
Background technology
The excavation method of subway underground station mainly includes cut and cover method, cap excavation method, shallow burial hidden digging.Various excavation methods When the construction of subway underground station structure is related to, the structure such as side wall, column, base plate, middle plate, top board of station structure is often adopted With live formwork supporting plate, poured in place concrete, job-cured side.This cast-in-place construction method has good integrity, rigidity Greatly, the advantages of antidetonation impact is good.But exist for adaptation job site scheduling and green construction requirement apparent Drawback.Substantial amounts of template, and the workload at scene is not only needed to beat, the duration is also more long.Cast-in-place wet trade will also result in environment Water pollution, noise pollution and air pollution.Compared to traditional cast-in-place construction, the construction of precast assembly combined type then has compares Obvious advantage.The component of subway underground station can be including middle plate, beam, side wall superimposed sheet, top board superimposed sheet and column etc. Factory or precasting yard are first made, and are then installed at the construction field (site).Joint reinforcing bar is reserved while prefabricated, it is convenient follow-up The cast-in-place connection in joint is carried out at the scene forms overall.Additionally, be that these prefabricated components are decorated in factory or precasting yard, The engineering time can further be shortened.A large amount of templates can be saved using precast assembly combined type form of construction work, improve construction bar Part is raised labour productivity, accelerating construction progress.The discharge capacity and noise pollution degree of building waste are also lower than traditional handicraft very It is many, more conform to the requirement of the standard and green construction of modern architecture.And the precast assembly combination of subway underground station at present Construction not yet finds application.Based on this, in-situ deposited prefabricated split-mounting type subway underground station construction method is proposed.
The content of the invention
It is an object of the invention to solve at least the above, and provide the advantage that at least will be described later.
It is real it is a still further object of the present invention to provide a kind of in-situ deposited prefabricated split-mounting type subway underground station construction method The industrial streamlined production of subway underground station structure major part structure is showed.
In order to realize these purposes of the invention and further advantage, there is provided a kind of in-situ deposited prefabricated split-mounting type ground In iron underground station construction method, its foundation ditch constructed after the completion of excavation of subway foundation pit supporting, comprise the following steps:
Step one, construction of bottom plates:Baseplate reinforcing bar is placed in the bottom of foundation ditch, on the baseplate reinforcing bar correspondence bottom column and Be provided with dowel at bottom side wall, after-pouring underplate concrete, treat that underplate concrete intensity meets and require, remove bottom Foundation ditch is supported;
The construction of step 2, bottom column and bottom side wall:
The reserved dowel of the upper end of prefabricated side wall superimposed sheet, lower end is provided with grout sleeve, and prefabricated side wall is folded The inside wall of plywood is provided with side reinforcing bar, and the reserved dowel of upper end of prefabricated pile, lower end set grout sleeve;First will be prefabricated The side reinforcing bar of side wall superimposed sheet is connected with corresponding base plate dowel, then erecting side wall superimposed sheet and prefabricated pile, specifically For, respectively by the connection of the grout sleeve of prefabricated side wall superimposed sheet and prefabricated pile corresponding with base plate dowel, to junction and Gap between prefabricated side wall superimposed sheet and foundation pit enclosure structure passes through grout sleeve casting concrete so that bottom column, bottom Layer side wall, base plate and foundation pit enclosure structure form entirety, and conserve to intensity satisfaction requirement;
Step 3, the construction of middle plate:Prefabricated longeron is overlapped on bottom column, the reinforcing bar of contiguous prefabricated longeron termination is connected, And pour the joint of prefabricated longeron, after joint concrete strength meets and requires, set up prefabricated middle plate, the prefabricated middle plate tool The company for having the dowel of the dowel and contiguous prefabricated middle plate connection being connected with bottom side wall and being connected with last layer column Connect muscle;To prefabricated middle plate and bottom side wall junction, contiguous prefabricated middle plate junction casting concrete, maintenance to intensity meets will Ask, remove the foundation ditch support in middle level;
Step 4, repeat step two and step 3, complete the superstructure construction of subway underground station, afterwards iron-based over the ground The top board and the above in hole carry out backfill earthing;Wherein, top board is that reinforcing bar is equipped with superimposed sheet, and top board, and its two ends is pressed will Seek reserved steel bar.
Preferably, also including waterproof construction:
Before baseplate reinforcing bar erection, first laying water-proof coiled material covers the whole bottom surface of base plate, and waterproof roll both sides length Degree is pre- to be left to the top for extending to side wall, and height of side wall includes the height of bottom side wall and upper strata side wall;
After baseplate reinforcing bar erection, the vertical pre-embedded steel slab sealing of length direction in base plate side wall and the junction of base plate Band, pours underplate concrete again afterwards.
Preferably, the upper end of the bottom column and the upper end of bottom side wall are respectively provided with bracket.
Preferably,
Circular column leg, and circle are respectively and fixedly provided with the middle part of the middle part and prefabricated pile lower end of the prefabricated side wall superimposed sheet lower end Post leg is slightly longer than grout sleeve, to support prefabricated side wall superimposed sheet and prefabricated pile.
Preferably, also including multiple support bars, Specific construction step is:
When prefabricated side wall superimposed sheet and the grout sleeve of prefabricated pile the dowel connection corresponding with base plate in step 2, and After circular column leg supports prefabricated side wall superimposed sheet and prefabricated pile, the support bar is obliquely installed, and by fixture and prefabricated side wall Superimposed sheet, prefabricated pile and base plate are fixed, and support bar is removed again after the completion of the construction of middle plate.
Preferably, when the position of plate in erection and top board runs into prop, the middle plate and top board with it is interim The infall of pillar is reserved with gap, and in the reserved connection reinforcing bar of opening position, after after prop dismounting, connects adjacent middle plate and slit Reinforcing bar and adjacent top board opening position connection reinforcing bar, and casting concrete are connected at mouthful.
Preferably, junction pours specifically, junction first is divided into inner ring and outer rings, inner ring is directly outer shroud 1~3 times of diameter, in inner ring formwork, and in inner ring casting concrete, after after inner ring concrete initial set, takes inner ring template away, it Afterwards in outer shroud formwork, the first fiberglass gridding cloth is fixed in the circle of outer Monday of inner ring concrete, afterwards from outer shroud formwork to the Second fiberglass gridding cloth of downward-sloping 30 °~60 ° of the direction setting ring-type of one fiberglass gridding cloth, and in outer shroud by Multiple second fiberglass gridding cloths are up to arranged with, the spacing of adjacent second fiberglass gridding cloth is 8~10cm, afterwards The casting concrete in outer shroud formwork.
The present invention at least includes following beneficial effect:
1st, the present invention is by in-situ deposited prefabricated assembling and construction method, has saved column, and middle plate underground station structure of awaiting a subway is mixed The curing time of soil is coagulated, the superimposed sheet and prefabricated pile of this external wall can be decorated during prefabricated to its surface, Avoid and individually fitted up on a large scale again after the completion of the structure construction of subway underground station, greatly save the finishing time, because This present invention can significantly improve the build efficiency of subway underground station, accelerate construction speed, so reduce it is right The time of road traffic influence;
2nd, the present invention relates to the prefabricated of component, when this construction method of use on a large scale, reduction duration, machine can be reached Toolization substitutes manual site and constructs, and reduces the use of template, steel pipe, brings obvious economic benefit;
3rd, substantial amounts of use prefabricated components of the invention instead of original cast-in-place structural, reduce cast-in-place wet work, because And many side walls are reduced, and the support shuttering of middle plate etc., common noise, dust, wood chip etc. are largely reduced in subway work, ground Construction space and construction environment in iron underground station are greatly improved;
4th, the substantial amounts of prefabricated components employed in precasting yard production of the present invention, prefabricated components are in factory or precasting yard Unified in mechanical streamline to produce manufacture, control accuracy is high, has better quality compared to cast-in-place structural.In addition prefabricated components Harmful effect by season is small, therefore the present invention can on the whole lift subway underground station structure construction quality.
Construction method of the invention realizes the industrial streamlined production of subway underground station structure (middle plate, column etc.), Sectional, is combined, energy-saving and emission-reduction with national industrial policies so that subway underground station architecture quality has preferably guarantee, Adapt to live rapid assembling combination construction.Due to using prefabricated component, prefabrication and site operation can synchronously carry out, Particularly factory greatly shortens curing period, is obviously improved construction speed, shortens the duration, reduces the influence of road pavement traffic.Simultaneously Due to the prefabricated quality that can ensure component, this safe and reliable economy of invention, construction risk is small.
Further advantage of the invention, target and feature embody part by following explanation, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Brief description of the drawings
Fig. 1 is the structural representation of foundation ditch after the completion of excavation of subway foundation pit supporting of the present invention;
Fig. 2 is construction of bottom plates schematic diagram of the present invention;
Fig. 3 is bottom column of the present invention and bottom side wall construction schematic diagram;
Fig. 4 is the structural representation of support bar temporary support of the present invention;
Fig. 5 for the present invention in grillage set schematic diagram;
Fig. 6 is that plate pours the schematic diagram being connected with bottom column and bottom side wall in the present invention;
Fig. 7 is upper strata column of the present invention and upper strata side wall construction schematic diagram;
Fig. 8 is that upper strata column of the present invention and upper strata side wall complete the schematic diagram after pouring;
Fig. 9 is top board beam of the present invention, the schematic diagram of template erection;
Figure 10 pours top board for the present invention, and the schematic diagram of the foundation ditch support of top layer is removed afterwards;
Figure 11 is the structural representation of the subway underground station after present invention backfill earthing;
Figure 12 is the structural representation of subway underground station construction at prop;
Figure 13 is the longitudinal spliced schematic diagram of the middle plate with gap;
Figure 14 is adjacent middle plate opening position connection bar connecting and completes the structural representation after pouring.
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to specification text Word can be implemented according to this.
In the description of the invention, term " transverse direction ", " longitudinal direction ", " on ", it is D score, "front", "rear", "left", "right", " perpendicular Directly ", the orientation or position relationship of the instruction such as " level ", " top ", " bottom ", " interior ", " outward " are based on orientation shown in the drawings or position Relation is put, the description present invention is for only for ease of and is simplified description, be not to indicate or imply that the device or element of meaning are necessary With specific orientation, with specific azimuth configuration and operation, therefore it is not considered as limiting the invention.
Such as Fig. 1-11, the present invention provides a kind of in-situ deposited prefabricated split-mounting type subway underground station construction method, such as Fig. 1 institutes Show, in its foundation ditch constructed after the completion of excavation of subway foundation pit supporting, foundation ditch includes armored concrete Guan Liang 1, enclosure wall 2, branch The foundation ditch support 4 of the foundation ditch support 5, middle level with bottom from the bottom to top and the foundation ditch support of top layer in foundation ditch after the completion of shield 3;
Construction method is comprised the following steps:
As shown in Fig. 2 step one, base plate 7 are constructed:Foundation ditch will be placed according to construction requirement and the baseplate reinforcing bar of specification colligation Bottom, on the baseplate reinforcing bar according to detailing requiments correspondence bottom column and bottom side wall at be provided with dowel 6, pour afterwards Underplate concrete is built, is treated that underplate concrete intensity meets and is required, remove the foundation ditch support of bottom, due in the technical program, side Wall uses prefabricated+cast-in-place form, therefore to the fixing by gross bearings of the dowel of correspondence side wall on base plate compared to directly having used Complete prefabricated side wall precision prescribed is low, reduces difficulty of construction, is needed between base plate and prefabricated side wall in the prior art Side is set and leads wall connection, while the construction error requirement control of dowel in wall is led within ± 4mm, and the application, due to side Wall is cast-in-place using superimposed sheet and part, can be adjusted according to actual dowel location-appropriate, therefore construction error requirement control Within ± 10mm, the engineering time is saved on the contrary compared to prior art.Pre- embedded reinforcing bar conduct in prefabricated superimposed sheet Follow-up side reinforcing bar, on the other hand can improve the bending resistance shearing strength of superimposed sheet up to more than 300%, therefore superimposed sheet is from intensity Meet as the condition of side wall template;The construction method of cast-in-place+prefabricated side wall, only needs prefabricated to side wall folded in work progress Plywood is lifted, positioned and fixed temporarily, relatively whole precast wall body.The prefabricated superimposed sheet scale of construction is smaller, and loop wheel machine is hung Dress Capability Requirement can reduce up to 50% or so;Simultaneously as the relatively complete prefabricated side wall light about 80% or so of quality, prefabricated overlapping Requirement of the plate to temporary support intensity and quantity is much lower, can totally reduce by about 80% temporary support component;Using it is prefabricated+ Cast-in-place construction scheme, waterproof roll can be laid in wall in advance, after carry out it is cast-in-place, by waterproof roll imbed side wall in, can protect Shield waterproof roll damage.
In addition, side wall is using cast-in-place+prefabricated:Prefabricated superimposed sheet therein can replace the effect of template, it is to avoid construction is existing The extensive formwork in field.And cast-in-place concrete in side wall with the joint of middle plate etc. is also inevitable in itself, therefore side wall is used Part is cast-in-place not to result in extra equipment increase etc..
As shown in Figure 3-4, step 2, bottom column and bottom side wall construction:The upper end of prefabricated side wall superimposed sheet 8 is reserved Dowel, lower end is provided with grout sleeve, and the inside wall of prefabricated side wall superimposed sheet (is close to the one of foundation pit enclosure structure Face) it is provided with side reinforcing bar and prefabricated side wall superimposed sheet is extended in lower end, (axial bearing capacity of prefabricated pile is more live existing for prefabricated pile 10 Post is poured to improve up to more than 20%) the reserved dowel of upper end, lower end grout sleeve is set;First by prefabricated side wall superimposed sheet Side reinforcing bar connected with corresponding base plate dowel, can for example be connected by screw shell, then erecting side wall overlapping Plate and prefabricated pile, specifically, respectively connecting the grout sleeve of prefabricated side wall superimposed sheet and prefabricated pile dowel corresponding with base plate Connect, to the gap between junction and prefabricated side wall superimposed sheet and foundation pit enclosure structure by grout sleeve casting concrete, So that bottom column, bottom side wall 11, base plate and foundation pit enclosure structure form entirety, and conserve to intensity satisfaction requirement;Its In, template consumption is saved as a face of template using enclosure wall 2 when prefabricated side wall superimposed sheet is poured, 12 is existing in figure Pour post plate joint.
As seen in figs. 5-6, step 3, the construction of middle plate:(prefabricated stringer designs are up big and down small ladder to overlap prefabricated longeron 14 Shape structure) on bottom column, the reinforcing bar of contiguous prefabricated longeron termination is connected, and the joint of prefabricated longeron is poured, treat joint After concrete strength meets requirement, prefabricated middle plate 13 is set up afterwards, the prefabricated middle plate has the connection being connected with bottom side wall Muscle and the dowel and the dowel with the connection of upper strata column of contiguous prefabricated middle plate connection;To prefabricated middle plate and bottom side wall Junction, contiguous prefabricated middle plate junction casting concrete, maintenance to intensity meet requirement, remove the foundation ditch support in middle level. In above-mentioned technical proposal, middle plate is in subway station as a load-carrying member, precast concrete steady quality, whole Life cycle effect on environment is minimum;The making quality of prefabricated board is secure, and its bending resistance is improved compared with condition of equivalent thickness Bars In Poured Concrete Slab More than 20%.Therefore, under the premise of equal bearing capacity is met, it is relatively more thinner that prefabricated board can make.
As Figure 7-8, step 4, upper strata column and upper strata side wall construction:Upper layer side wall superimposed sheet is set up using loop wheel machine And the prefabricated pile on upper strata, the reserved dowel of upper end of same upper strata side wall superimposed sheet, lower end is provided with grout sleeve, And the inside wall of upper strata side wall superimposed sheet is provided with side reinforcing bar;The upper end of the prefabricated pile on upper strata reserved dowel, lower end Grout sleeve is set;Prefabricated pile is same can be repaiied in construction advance luggage, to save the duration.Afterwards with step 2 in erection Connected mode is identical, and with each junction of plate in concreting upper strata side wall and subway station structure.
As shown in figure 9, step 5, the erection prefabricated longeron of top layer are on the column of upper strata, the upper end of prefabricated longeron is wider, is easy to Follow-up top layer template is set up, and connects the reinforcing bar of contiguous prefabricated longeron termination, and pours the joint of prefabricated longeron, treats that joint is mixed After solidifying soil intensity meets and requires, top board 15 is set up afterwards, the same step 3 of erection mode different from middle plate is herein that top board is folded Plywood, is equipped with reinforcing bar in top board superimposed sheet, superimposed sheet two ends reserved steel bar on request.
As shown in figs. 10-11, step 6, pour joint at subway underground station top board structure and top board, maintenance is extremely Concrete roof intensity reaches requirement, forms casting top slab 16.After treating that intensity reaches requirement, the foundation ditch support of top layer is removed.
Step 7, the superstructure construction for completing subway underground station, the top board and the above to subway foundation pit are carried out afterwards Backfill earthing 17, you can recover traffic above-ground.
In another technical scheme, also including waterproof construction:
Before baseplate reinforcing bar erection, first laying water-proof coiled material covers the whole bottom surface of base plate, and waterproof roll both sides length Degree is pre- to be left to the top for extending to side wall, and height of side wall includes the height of bottom side wall and upper strata side wall, it is necessary to explanation is anti- The length of water coiled material not enough extends to side wall from base plate, accordingly, it would be desirable to multiple waterproof roll splicings.
After baseplate reinforcing bar erection, the vertical pre-embedded steel slab sealing of length direction in base plate side wall and the junction of base plate Band, pours underplate concrete again afterwards.
In the above-mentioned technical solutions, for compared to station construction under existing subway, the construction of fertile groove, one are reduced As the construction of fertile groove be that the later stage is still with element in order to carry out waterproof construction and fix prefabricated side wall temporarily in building enclosure Concrete backfill, not only increases construction cost and extends the duration, and the width of general fertilizer groove is suitable with lateral wall width, is 0.8~1m, the foundation ditch both sides of subway underground station will reserve fertile groove, therefore width will at least increase in excavation pit 1.6m, again increases excavation cost and difficulty of construction.Used using cast-in-place+prefabricated side wall concrete that can be saved by about one time Amount;Meanwhile, the presence of fertile groove increases the width of excavation of foundation pit, in the strict urban district of effect on environment requirement, has its certain Limitation.Cast-in-place+prefabricated construction subway station side wall can evade this problem, reduce excavation of foundation pit to the shadow that around settles Ring.
In another technical scheme, the upper end of the bottom column and the upper end of bottom side wall are respectively provided with bracket, Herein, the bracket framework of prefabricated side wall superimposed sheet is arranged on its top, after final side wall superimposed sheet completes to pour, the top of formation Area is big, is similar to up big and down small trapezoidal bracket;The bracket that same prefabricated pile top is set is directly upper big for what is poured Under small trapezium structure, inside has reinforcing bar, sets bracket and be for facilitating setting up for prefabricated longeron.
In another technical scheme, the middle part of the prefabricated side wall superimposed sheet lower end and the middle part of prefabricated pile lower end Circular column leg is respectively and fixedly provided with, and circular column leg is slightly longer than grout sleeve, to support prefabricated side wall superimposed sheet and prefabricated pile.
In the above-mentioned technical solutions, connecting temporarily between prefabricated side wall superimposed sheet and building enclosure (ground-connecting-wall) is eliminated Connect, directly poured to be integrated afterwards and save the engineering time as a part for support by circular column leg.
In another technical scheme, also including multiple support bars, Specific construction step is:
When prefabricated side wall superimposed sheet and the grout sleeve of prefabricated pile the dowel connection corresponding with base plate in step 2, and After circular column leg supports prefabricated side wall superimposed sheet and prefabricated pile, the support bar 9 is obliquely installed, and by fixture and prefabricated side wall Superimposed sheet, prefabricated pile and base plate are fixed, and support bar is removed again after the completion of the construction of middle plate.
In the above-mentioned technical solutions, support bar set-up mode such as Fig. 4, support bar by fixture two ends respectively with prefabricated side Wall superimposed sheet and base plate are fixed, likewise, many support bars prop up bottom column from both sides, what is more optimized ensure that bottom side Wall and bottom column it is spacing, prevent from inclining.
Temporary support (support bar) is used to be supported side wall superimposed sheet with this construction method, it is convenient and swift.Avoid Temporary support load is delivered in building enclosure, in case producing hidden danger to the general safety of building enclosure;Temporary support, with pre- The component being embedded on prefabricated component and plate is consolidated.Temporary support stress, power transmission are rationally simple.
Such as Figure 12-14, in another technical scheme, it is necessary to explanation be from left to right horizontal in Fig. 1~Figure 12 To, it is from front to back longitudinal direction, when the position of plate in erection and top board runs into prop 18, (prop is typically all to tear open Removed again after supporting 3 except the foundation ditch of top layer), the middle plate and top board are reserved with gap, gap with the infall of prop Positioned at the side of middle plate and top board longitudinal direction, an entirety is spliced into along the upper two middle plates 13 in longitudinal direction or two gap of top board 20, Passed through for prop, and connection reinforcing bar 19 is reserved on the side of gap longitudinal direction, after after prop dismounting, connects adjacent middle plate gap Place's connection reinforcing bar and adjacent top board opening position connection reinforcing bar, and casting concrete.
In another technical scheme, junction pours specifically, junction first is divided into inner ring and outer rings, inner ring It is directly 1~3 times of outer annular diameter, in inner ring formwork, and in inner ring casting concrete, after after inner ring concrete initial set, takes away Inner ring template, afterwards in outer shroud formwork, fixes the first fiberglass gridding cloth, afterwards by outer in the circle of outer Monday of inner ring concrete Ring formwork sets the second fiberglass gridding cloth of ring-type to downward-sloping 30 °~60 ° of the direction of the first fiberglass gridding cloth, And multiple second fiberglass gridding cloths are from top to bottom provided with outer shroud, the spacing of adjacent second fiberglass gridding cloth is 8 ~10cm, the afterwards casting concrete in outer shroud formwork.
After being poured due to existing junction, easily there is crackle in the later stage, for this problem, in the technical program, leads to Cross it is secondary pour and the first fiberglass gridding cloth be set and the second fiberglass gridding cloth, junction can be significantly improved Anti-crack ability, improves construction quality.Compare through overtesting, a direct formwork pours junction, and its factor of safety against cracking is Infiltration grade resistant to pressure is less than P12 more than P8 within 1.27, the 28th day, and formwork is poured and sets glass fibre twice using this method Grid cloth, its factor of safety against cracking is 1.48, and the 28th day infiltration grade resistant to pressure is more than P12.
Although embodiment of the present invention is disclosed as above, it is not restricted to listed in specification and implementation method With, it can be applied to various suitable the field of the invention completely, for those skilled in the art, can be easily Other modification is realized, therefore under the universal limited without departing substantially from claim and equivalency range, the present invention is not limited In specific details and shown here as the legend with description.

Claims (7)

1. a kind of in-situ deposited prefabricated split-mounting type subway underground station construction method, it is constructed and is completed in excavation of subway foundation pit supporting In foundation ditch afterwards, it is characterised in that comprise the following steps:
Step one, construction of bottom plates:Baseplate reinforcing bar is placed in the bottom of foundation ditch, correspondence bottom column and bottom on the baseplate reinforcing bar Dowel is provided with side wall, after-pouring underplate concrete, treat underplate concrete intensity meet require, remove bottom foundation ditch Support;
The construction of step 2, bottom column and bottom side wall:
The reserved dowel of the upper end of prefabricated side wall superimposed sheet, lower end is provided with grout sleeve, and prefabricated side wall superimposed sheet Inside wall be provided with side reinforcing bar, the reserved dowel of upper end of prefabricated pile, lower end set grout sleeve;First by prefabricated side wall The side reinforcing bar of superimposed sheet is connected with corresponding base plate dowel, then erecting side wall superimposed sheet and prefabricated pile, specifically, point Not by the connection of the grout sleeve of prefabricated side wall superimposed sheet and prefabricated pile corresponding with base plate dowel, to junction and prefabricated Gap between side wall superimposed sheet and foundation pit enclosure structure passes through grout sleeve casting concrete so that bottom column, bottom side Wall, base plate and foundation pit enclosure structure form entirety, and conserve to intensity satisfaction requirement;
Step 3, the construction of middle plate:Prefabricated longeron is overlapped on bottom column, the reinforcing bar of contiguous prefabricated longeron termination is connected, and pour Build the joint of prefabricated longeron, after joint concrete strength meets and requires, set up prefabricated middle plate, the prefabricated middle plate have with The dowel of bottom side wall connection and the dowel and the dowel with the connection of last layer column of contiguous prefabricated middle plate connection; To prefabricated middle plate and bottom side wall junction, contiguous prefabricated middle plate junction casting concrete, maintenance to intensity meets requirement, tears open Except the foundation ditch in middle level is supported;
Step 4, repeat step two and step 3, complete the superstructure construction of subway underground station, afterwards to subway foundation pit Top board and the above carry out backfill earthing;Wherein, top board is that reinforcing bar is equipped with superimposed sheet, and top board, and its two ends is pre- on request Stay reinforcing bar.
2. in-situ deposited prefabricated split-mounting type subway underground station construction method as claimed in claim 1, it is characterised in that also wrap Include waterproof construction:
Before baseplate reinforcing bar erection, first laying water-proof coiled material covers the whole bottom surface of base plate, and the length of waterproof roll both sides is pre- The top for extending to side wall is left to, height of side wall includes the height of bottom side wall and upper strata side wall;
After baseplate reinforcing bar erection, the vertical pre-embedded steel slab waterstop of length direction in base plate side wall and the junction of base plate, it Pour underplate concrete again afterwards.
3. in-situ deposited prefabricated split-mounting type subway underground station construction method as claimed in claim 1, it is characterised in that described The upper end of bottom column and the upper end of bottom side wall are respectively provided with bracket.
4. in-situ deposited prefabricated split-mounting type subway underground station construction method as claimed in claim 1, it is characterised in that
Circular column leg, and circular column leg are respectively and fixedly provided with the middle part of the middle part and prefabricated pile lower end of the prefabricated side wall superimposed sheet lower end Grout sleeve is slightly longer than, to support prefabricated side wall superimposed sheet and prefabricated pile.
5. in-situ deposited prefabricated split-mounting type subway underground station construction method as claimed in claim 4, it is characterised in that also wrap Multiple support bars are included, Specific construction step is:
When prefabricated side wall superimposed sheet and the grout sleeve of prefabricated pile the dowel connection corresponding with base plate in step 2, and cylinder After leg supports prefabricated side wall superimposed sheet and prefabricated pile, the support bar is obliquely installed, and is overlapped with prefabricated side wall by fixture Plate, prefabricated pile and base plate are fixed, and support bar is removed again after the completion of the construction of middle plate.
6. in-situ deposited prefabricated split-mounting type subway underground station construction method as claimed in claim 1, it is characterised in that work as frame If the position of middle plate and top board runs into prop, the middle plate and top board are reserved with open-minded with the infall of prop Mouthful, and in the reserved connection reinforcing bar of opening position, after after prop dismounting, connecting adjacent middle plate opening position connection reinforcing bar and adjacent Top board opening position connects reinforcing bar, and casting concrete.
7. in-situ deposited prefabricated split-mounting type subway underground station construction method as claimed in claim 1, it is characterised in that connection Place is poured specifically, junction first is divided into inner ring and outer rings, inner ring is directly 1~3 times of outer annular diameter, in inner ring branch Mould, and in inner ring casting concrete, after after inner ring concrete initial set, take inner ring template away, it is mixed in inner ring afterwards in outer shroud formwork Coagulate soil outer Monday circle fix the first fiberglass gridding cloth, afterwards from direction from outer shroud formwork to the first fiberglass gridding cloth Downward-sloping 30 °~60 ° the second fiberglass gridding cloths of setting ring-type, and from top to bottom it is provided with multiple second glass in outer shroud Glass fibrous mesh cloth, the spacing of adjacent second fiberglass gridding cloth is 8~10cm, pours coagulation in outer shroud formwork afterwards Soil.
CN201710213504.5A 2017-04-01 2017-04-01 In-situ deposited prefabricated split-mounting type subway underground station construction method Active CN106869172B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710213504.5A CN106869172B (en) 2017-04-01 2017-04-01 In-situ deposited prefabricated split-mounting type subway underground station construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710213504.5A CN106869172B (en) 2017-04-01 2017-04-01 In-situ deposited prefabricated split-mounting type subway underground station construction method

Publications (2)

Publication Number Publication Date
CN106869172A true CN106869172A (en) 2017-06-20
CN106869172B CN106869172B (en) 2019-01-04

Family

ID=59160646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710213504.5A Active CN106869172B (en) 2017-04-01 2017-04-01 In-situ deposited prefabricated split-mounting type subway underground station construction method

Country Status (1)

Country Link
CN (1) CN106869172B (en)

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476341A (en) * 2017-08-21 2017-12-15 中铁六局集团有限公司 Using cast in place and precast construction subway station prefabricated board assembling method
CN107676106A (en) * 2017-08-21 2018-02-09 北京市轨道交通建设管理有限公司 The connection method of the lining structure of tunnel assembled two and cast-in-place structural joint
CN107761765A (en) * 2017-11-01 2018-03-06 中国铁路设计集团有限公司 Full assembled subway station twin columns agent structure and its construction method
CN107939074A (en) * 2017-11-27 2018-04-20 广州地铁设计研究院有限公司 The Subway Station Platform and its construction method of a kind of precast splice type
CN108020450A (en) * 2017-11-10 2018-05-11 北京工业大学 A kind of assembled integral subway station model structure and preparation method thereof
CN108104160A (en) * 2018-01-08 2018-06-01 北京工业大学 A kind of assembled integral underground structure of replaceable prefabricated post damageable zone
CN108222064A (en) * 2018-01-08 2018-06-29 北京工业大学 A kind of assembled integral of shear pin bolt connecting pole for having runback bit function ground frame structures under action
CN108396778A (en) * 2018-01-25 2018-08-14 成都城投建筑科技投资管理集团有限公司 A kind of construction method in precast assembly tunnel
CN110080285A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of prefabricated side wall positioning connection structure of underground structure and connection method
CN110080294A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of lid of assembled vault greatly across no column underground structure digs half reversed construction method
CN110080293A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of assembled flat-top has column underground structure
CN110080287A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of assembled flat-top has the open cutting construction method of column underground structure
CN110080291A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of assembled flat-top is greatly across no column underground structure
CN110080288A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of open cutting construction method of assembled vault greatly across no column underground structure
CN110080290A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of assembled vault is greatly across no column underground structure
CN110080292A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of assembled integral vault is greatly across no column underground structure
CN110080295A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of lid of assembled vault greatly across no column underground structure digs full-reverse construction method
CN110080289A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of open cutting construction method of assembled flat-top greatly across no column underground structure
CN110258642A (en) * 2019-07-11 2019-09-20 中铁第四勘察设计院集团有限公司 A kind of combined assembled underground structure of cut and cover method and its construction method
CN110258640A (en) * 2019-07-11 2019-09-20 吉林大学 A kind of construction method of the overlapping wall system of covered back-digging
CN110318426A (en) * 2019-08-07 2019-10-11 哈尔滨工业大学 A kind of assembled Steel-concrete Composite subway station and assembly method
CN110512647A (en) * 2019-08-28 2019-11-29 北京工业大学 A kind of partial assembled formula Metro Station Structure design and construction method
CN111074941A (en) * 2019-12-31 2020-04-28 中车建设工程有限公司 Large-span composite structural underground station and construction method thereof
CN111287190A (en) * 2020-02-17 2020-06-16 中国建筑第八工程局有限公司 Construction method for open-cut and underground-buried tunnel under condition that foundation pit has stand column
CN111364509A (en) * 2020-03-24 2020-07-03 石家庄铁源工程咨询有限公司 Construction method for underground space below existing road
CN111519824A (en) * 2020-04-14 2020-08-11 中铁第四勘察设计院集团有限公司 Prefabricated station platen, assembly type station and construction method of assembly type station
CN113006133A (en) * 2021-01-29 2021-06-22 广州地铁设计研究院股份有限公司 Construction method of middle plate hole suitable for assembly type station
CN113404073A (en) * 2021-07-01 2021-09-17 上海三凯工程咨询有限公司 Pre-buried subway station frame structure and construction method thereof
CN114809015A (en) * 2022-05-11 2022-07-29 中铁第六勘察设计院集团有限公司 Construction method for combining temporary support system and permanent structure of open-cut subway station
CN115288148A (en) * 2022-06-28 2022-11-04 北京城建设计发展集团股份有限公司 Middle floor based on internal support system and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101457548A (en) * 2008-12-31 2009-06-17 华南理工大学 Node for connecting round steel tube concrete column with reinforced concrete floor and method for making same
KR101278687B1 (en) * 2012-12-28 2013-06-24 원하종합건설 주식회사 Box-type thrust tube structure, and method of building underground structure using the box-type thrust tube structure
CN103669730A (en) * 2013-12-24 2014-03-26 北京振利节能环保科技股份有限公司 Lightweight concrete-filled steel tube composite column for steel structure building and construction method
CN105178357A (en) * 2015-07-16 2015-12-23 中国建筑股份有限公司 Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN105736001A (en) * 2016-03-31 2016-07-06 济南轨道交通集团有限公司 Construction method for building subway station through precast parts
CN105781570A (en) * 2016-04-14 2016-07-20 广州地铁设计研究院有限公司 Metro internal-bracing-free track panel shaft and construction method thereof
CN105862916A (en) * 2016-06-03 2016-08-17 长沙远大住宅工业集团股份有限公司 Superimposed assembled type underground pipe gallery system and construction and manufacturing process

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101457548A (en) * 2008-12-31 2009-06-17 华南理工大学 Node for connecting round steel tube concrete column with reinforced concrete floor and method for making same
KR101278687B1 (en) * 2012-12-28 2013-06-24 원하종합건설 주식회사 Box-type thrust tube structure, and method of building underground structure using the box-type thrust tube structure
CN103669730A (en) * 2013-12-24 2014-03-26 北京振利节能环保科技股份有限公司 Lightweight concrete-filled steel tube composite column for steel structure building and construction method
CN105178357A (en) * 2015-07-16 2015-12-23 中国建筑股份有限公司 Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN105736001A (en) * 2016-03-31 2016-07-06 济南轨道交通集团有限公司 Construction method for building subway station through precast parts
CN105781570A (en) * 2016-04-14 2016-07-20 广州地铁设计研究院有限公司 Metro internal-bracing-free track panel shaft and construction method thereof
CN105862916A (en) * 2016-06-03 2016-08-17 长沙远大住宅工业集团股份有限公司 Superimposed assembled type underground pipe gallery system and construction and manufacturing process

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476341A (en) * 2017-08-21 2017-12-15 中铁六局集团有限公司 Using cast in place and precast construction subway station prefabricated board assembling method
CN107676106A (en) * 2017-08-21 2018-02-09 北京市轨道交通建设管理有限公司 The connection method of the lining structure of tunnel assembled two and cast-in-place structural joint
CN107761765A (en) * 2017-11-01 2018-03-06 中国铁路设计集团有限公司 Full assembled subway station twin columns agent structure and its construction method
CN108020450A (en) * 2017-11-10 2018-05-11 北京工业大学 A kind of assembled integral subway station model structure and preparation method thereof
CN108020450B (en) * 2017-11-10 2020-03-13 北京工业大学 Assembled integral type subway station model structure and manufacturing method thereof
CN107939074A (en) * 2017-11-27 2018-04-20 广州地铁设计研究院有限公司 The Subway Station Platform and its construction method of a kind of precast splice type
CN108104160A (en) * 2018-01-08 2018-06-01 北京工业大学 A kind of assembled integral underground structure of replaceable prefabricated post damageable zone
CN108222064A (en) * 2018-01-08 2018-06-29 北京工业大学 A kind of assembled integral of shear pin bolt connecting pole for having runback bit function ground frame structures under action
CN108396778A (en) * 2018-01-25 2018-08-14 成都城投建筑科技投资管理集团有限公司 A kind of construction method in precast assembly tunnel
CN110080295A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of lid of assembled vault greatly across no column underground structure digs full-reverse construction method
CN110080285A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of prefabricated side wall positioning connection structure of underground structure and connection method
CN110080287A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of assembled flat-top has the open cutting construction method of column underground structure
CN110080291A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of assembled flat-top is greatly across no column underground structure
CN110080288A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of open cutting construction method of assembled vault greatly across no column underground structure
CN110080290A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of assembled vault is greatly across no column underground structure
CN110080292A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of assembled integral vault is greatly across no column underground structure
CN110080294A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of lid of assembled vault greatly across no column underground structure digs half reversed construction method
CN110080289A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of open cutting construction method of assembled flat-top greatly across no column underground structure
CN110080293A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of assembled flat-top has column underground structure
CN110258642A (en) * 2019-07-11 2019-09-20 中铁第四勘察设计院集团有限公司 A kind of combined assembled underground structure of cut and cover method and its construction method
CN110258640B (en) * 2019-07-11 2020-07-03 吉林大学 Construction method of superposed wall system for cover-excavation top-down construction
CN110258640A (en) * 2019-07-11 2019-09-20 吉林大学 A kind of construction method of the overlapping wall system of covered back-digging
CN110318426A (en) * 2019-08-07 2019-10-11 哈尔滨工业大学 A kind of assembled Steel-concrete Composite subway station and assembly method
CN110318426B (en) * 2019-08-07 2024-01-09 哈尔滨工业大学 Assembled steel-concrete mixed structure subway station and assembling method
CN110512647B (en) * 2019-08-28 2021-06-25 北京工业大学 Partial assembly type subway station structure design and construction method
CN110512647A (en) * 2019-08-28 2019-11-29 北京工业大学 A kind of partial assembled formula Metro Station Structure design and construction method
CN111074941A (en) * 2019-12-31 2020-04-28 中车建设工程有限公司 Large-span composite structural underground station and construction method thereof
CN111287190A (en) * 2020-02-17 2020-06-16 中国建筑第八工程局有限公司 Construction method for open-cut and underground-buried tunnel under condition that foundation pit has stand column
CN111364509A (en) * 2020-03-24 2020-07-03 石家庄铁源工程咨询有限公司 Construction method for underground space below existing road
CN111519824A (en) * 2020-04-14 2020-08-11 中铁第四勘察设计院集团有限公司 Prefabricated station platen, assembly type station and construction method of assembly type station
CN113006133B (en) * 2021-01-29 2022-10-14 广州地铁设计研究院股份有限公司 Construction method of middle plate hole suitable for assembly type station
CN113006133A (en) * 2021-01-29 2021-06-22 广州地铁设计研究院股份有限公司 Construction method of middle plate hole suitable for assembly type station
CN113404073A (en) * 2021-07-01 2021-09-17 上海三凯工程咨询有限公司 Pre-buried subway station frame structure and construction method thereof
CN114809015A (en) * 2022-05-11 2022-07-29 中铁第六勘察设计院集团有限公司 Construction method for combining temporary support system and permanent structure of open-cut subway station
CN115288148A (en) * 2022-06-28 2022-11-04 北京城建设计发展集团股份有限公司 Middle floor based on internal support system and construction method thereof

Also Published As

Publication number Publication date
CN106869172B (en) 2019-01-04

Similar Documents

Publication Publication Date Title
CN106869172B (en) In-situ deposited prefabricated split-mounting type subway underground station construction method
CN106223360B (en) Using the open cut cast in place and precast construction subway station construction method of stake supporting system
CN106677049B (en) Assembled steel-concrete combined structure bridge and construction method
CN105178357B (en) Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN110630283B (en) Three-layer supporting structure suitable for double-arch tunnel and construction method
CN206070562U (en) Subassembly formula underground structure
CN106869321A (en) The prefabricated regeneration concrete bean column node and its construction method of a kind of reinforcement
CN109235499A (en) A kind of open cut hypogee Standard formula construction method
CN102251667B (en) Construction method for reinforced concrete arched roof of grain store
CN202645584U (en) Combined type tunnel lining structure
CN106639093A (en) Close splicing seam-type laminated slab
CN104594361B (en) A kind of I shape fender post and building enclosure also serve as the construction method of agent structure
CN205503146U (en) Novel supporting construction of shallow tunnel suitable for city sensitizing range
CN106930777A (en) The construction method of the lining of Bored Section of Metro main track assembled two
CN109577539A (en) Build inclined roof fabricated construction technique
CN108265623A (en) A kind of prefabricated superposed type anti-collision wall and its construction method for urban viaduct
CN209703525U (en) A kind of side slope precast assembly lattice girder connected by wet seam
CN107806349A (en) A kind of steel FRP complex waves card tunnel secondary liner structure and its apply method
CN110158645A (en) Prefabricated components Hybrid connections assembly concrete pipe gallery
CN101418569A (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN103161176A (en) Tower crane foundation construction method in main building connected garage
CN112761158B (en) Green construction method of integral three-wall-in-one outer wall of reverse engineering steel concrete key pin meshed row pile
CN109797777A (en) Assembled is constructed from sealing underground pipe gallery and construction method
CN106337530B (en) A kind of construction of frame beam seams stifled construction method
CN109083184A (en) A kind of prefabricated cushion cap of land sectional type and its production and installation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant