CN106869172B - In-situ deposited prefabricated split-mounting type subway underground station construction method - Google Patents

In-situ deposited prefabricated split-mounting type subway underground station construction method Download PDF

Info

Publication number
CN106869172B
CN106869172B CN201710213504.5A CN201710213504A CN106869172B CN 106869172 B CN106869172 B CN 106869172B CN 201710213504 A CN201710213504 A CN 201710213504A CN 106869172 B CN106869172 B CN 106869172B
Authority
CN
China
Prior art keywords
prefabricated
side wall
construction
reinforcing bar
superimposed sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710213504.5A
Other languages
Chinese (zh)
Other versions
CN106869172A (en
Inventor
翟世鸿
唐衡
蒋道东
蔡超君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
CCCC Second Harbor Engineering Co
Original Assignee
Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd, CCCC Second Harbor Engineering Co filed Critical Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
Priority to CN201710213504.5A priority Critical patent/CN106869172B/en
Publication of CN106869172A publication Critical patent/CN106869172A/en
Application granted granted Critical
Publication of CN106869172B publication Critical patent/CN106869172B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Abstract

The invention discloses a kind of in-situ deposited prefabricated split-mounting type subway underground station construction methods, in its foundation pit constructed after the completion of excavation of subway foundation pit supporting, Step 1: baseplate reinforcing bar to be placed in the bottom of foundation pit, corresponded on the baseplate reinforcing bar and be provided with dowel at bottom column and bottom side wall, after-pouring underplate concrete;Step 2: bottom column and the construction of bottom side wall;Step 3: middle plate construction;Step 4: repeating step 2 and step 3, the superstructure construction of subway underground station is completed, backfill earthing is carried out to top plate of subway foundation pit or more later;Wherein, top plate is superimposed sheet, and reinforcing bar is equipped in top plate, two ends reserved steel bar as required.The present invention realizes the industrial streamlined production of subway underground station structure major part structure.

Description

In-situ deposited prefabricated split-mounting type subway underground station construction method
Technical field
The present invention relates to subway underground stations to build technical field of construction.It is more particularly related to a kind of cast-in-place Precast assembly combined type subway underground station construction method.
Background technique
The excavation method of subway underground station mainly includes cut and cover method, cap excavation method, shallow burial hidden digging.Various excavation methods When being related to the construction of subway underground station structure, the structures such as side wall, column, bottom plate, middle plate, top plate of station structure are often adopted With live formwork supporting plate, poured in place concrete, job-cured method.This cast-in-place construction method have good integrity, just The advantages that degree is big, antidetonation impact is good.But it requires to exist clearly for adapting to construction site scheduling and green construction The drawbacks of.A large amount of template is not only needed, but also the workload at scene is big, the duration is also longer.Cast-in-place wet construction will also result in ring Border water pollution, noise pollution and air pollution.Compared to traditional cast-in-place construction, the construction of precast assembly combined type then have than Obvious advantage.The component of subway underground station includes that middle plate, beam, side wall superimposed sheet, top plate superimposed sheet and column etc. can be with It first makes in factory or precasting yard, is then installed at the construction field (site).Connector reinforcing bar is reserved while prefabricated, after convenient It is continuous to carry out the cast-in-place connection formation entirety in joint at the scene.In addition, being filled to these prefabricated components in factory or precasting yard Decorations, can further shorten the construction time.A large amount of templates can be saved using precast assembly combined type form of construction work, improve construction Condition is raised labour productivity, and is accelerated construction progress.The discharge amount and noise pollution degree of building waste are also lower than traditional handicraft Very much, the standard of modern architecture and the requirement of green construction are more in line with.And the precast assembly group of current subway underground station It closes construction and utilization is not yet received.Based on this, in-situ deposited prefabricated split-mounting type subway underground station construction method is proposed.
Summary of the invention
It is an object of the invention to solve at least the above problems, and provide the advantages of at least will be described later.
It is a still further object of the present invention to provide a kind of in-situ deposited prefabricated split-mounting type subway underground station construction methods, real The industrial streamlined production of subway underground station structure major part structure is showed.
In order to realize these purposes and other advantages according to the present invention, with providing a kind of in-situ deposited prefabricated split-mounting type Iron underground station construction method, construction is in the foundation pit after the completion of excavation of subway foundation pit supporting, comprising the following steps:
Step 1: construction of bottom plates: baseplate reinforcing bar is placed in the bottom of foundation pit, corresponded on the baseplate reinforcing bar bottom column and Be provided with dowel at bottom side wall, after-pouring underplate concrete, met the requirements to underplate concrete intensity, remove bottom Foundation pit support;
Step 2: bottom column and the construction of bottom side wall:
The upper end of prefabricated side wall superimposed sheet reserves dowel, and lower end is provided with grout sleeve, and prefabricated side wall is folded The inside wall of plywood is provided with side reinforcing bar, and the upper end of prefabricated pile reserves dowel, grout sleeve is arranged in lower end;It first will be prefabricated The side reinforcing bar of side wall superimposed sheet is connected with corresponding bottom plate dowel, then erecting side wall superimposed sheet and prefabricated pile, specifically For, corresponding with the bottom plate dowel of the grout sleeve of prefabricated side wall superimposed sheet and prefabricated pile is connected respectively, to junction and Gap between prefabricated side wall superimposed sheet and foundation pit enclosure structure is by grout sleeve casting concrete, so that bottom column, bottom Layer side wall, bottom plate and foundation pit enclosure structure form entirety, and conserve to intensity and meet the requirements;
Step 3: the construction of middle plate: overlap prefabricated stringer in the reinforcing bar on bottom column, connecting contiguous prefabricated stringer end, And the connector of prefabricated stringer is poured, after concrete strength is met the requirements after joint, set up prefabricated middle plate, the prefabricated middle plate tool Have the dowel being connect with bottom side wall, the dowel being connect with contiguous prefabricated middle plate and and upper one layer of column connection company Connect muscle;To prefabricated middle plate and bottom side wall junction, contiguous prefabricated middle plate junction casting concrete, maintenance to intensity satisfaction is wanted It asks, removes the foundation pit support in middle layer;
Step 4: repeating step 2 and step 3, the superstructure construction of subway underground station is completed, it is iron-based over the ground later The top plate in hole or more carries out backfill earthing;Wherein, top plate is superimposed sheet, and reinforcing bar is equipped in top plate, and two ends are by wanting Seek reserved steel bar.
Preferably, further include waterproof construction:
Before baseplate reinforcing bar erection, the entire bottom surface of first laying water-proof coiled material covering bottom plate, and the length of waterproof roll two sides Degree is left to the top for extending to side wall in advance, and height of side wall includes the height of bottom side wall and upper layer side wall;
The vertical pre-embedded steel slab sealing of length direction after baseplate reinforcing bar erection, in the junction of bottom plate side wall and bottom plate Band pours underplate concrete again later.
Preferably, the upper end of the bottom column and the upper end of bottom side wall all have bracket.
Preferably,
Circular column leg, and circle are respectively and fixedly provided in the middle part of the middle part and prefabricated pile lower end of the prefabricated side wall superimposed sheet lower end Column leg is slightly longer than grout sleeve, to support prefabricated side wall superimposed sheet and prefabricated pile.
It preferably, further include multiple support rods, Specific construction step are as follows:
When the dowel connection corresponding with bottom plate of the grout sleeve of prefabricated side wall superimposed sheet and prefabricated pile in step 2, and After circular column leg supports prefabricated side wall superimposed sheet and prefabricated pile, the support rod is obliquely installed, and passes through fixing piece and prefabricated side wall Superimposed sheet, prefabricated pile and bottom plate are fixed, and remove support rod again after the completion of the construction of middle plate.
Preferably, when the position of plate in erection and top plate encounters prop, the middle plate and top plate and interim The infall of pillar is reserved with gap, and in the reserved connection reinforcing bar of opening position, after prop dismounting, connects adjacent middle plate and slit Reinforcing bar is connected at mouthful and adjacent top plate opening position connects reinforcing bar, and casting concrete.
Preferably, junction pours specifically, junction is first divided into inner ring and outer rings, and outer annular diameter is inner ring 1~3 times of diameter after inner ring concrete initial set, takes inner ring template away in inner ring formwork, and in inner ring casting concrete, it Afterwards in outer ring formwork, the first fiberglass gridding cloth is fixed in the circle of outer Monday of inner ring concrete, later from outer ring formwork to the The direction of one fiberglass gridding cloth tilts down 30 °~60 ° cricoid second fiberglass gridding cloths of setting, and in outer ring by Up to multiple second fiberglass gridding cloths are arranged with, the spacing of adjacent second fiberglass gridding cloth is 8~10cm, later The casting concrete in outer ring formwork.
The present invention is include at least the following beneficial effects:
1, the present invention is by in-situ deposited prefabricated assembling and construction method, has saved column, and middle plate underground station structure of awaiting a subway is mixed The curing time of soil is coagulated, the superimposed sheet and prefabricated pile of this external wall can decorate its surface during prefabricated, It avoids subway underground station structure construction individually to be fitted up on a large scale again after the completion, the finishing time is greatly saved, because This present invention can significantly improve the build efficiency of subway underground station, accelerate construction speed, so reduce pair The time that road traffic influences;
2, the present invention relates to the prefabricated of component, when on a large scale using this construction method, it can reach and reduce duration, machine Toolization substitutes artificial site operation, and reduces the use of template, steel pipe, brings apparent economic benefit;
3, the present invention reduces cast-in-place wet work largely using prefabricated components instead of original cast-in-place structural, because And reducing many side walls, the support shuttering of middle plate etc., common noise, dust, sawdust etc. largely reduce in subway work, ground Construction space and construction environment in iron underground station are greatly improved;
4, the present invention largely uses the prefabricated components produced in precasting yard, and prefabricated components are in factory or precasting yard Unified in mechanical assembly line to generate manufacture, control precision is high, has better quality compared to cast-in-place structural.Furthermore prefabricated components Adverse effect by season is small, therefore the present invention can promote subway underground station structure construction quality on the whole.
Construction method of the invention realizes the industrial streamlined production of subway underground station structure (middle plate, column etc.), Sectional, in conjunction with national industrial policies, energy-saving and emission-reduction, so that subway underground station architecture quality has better guarantee, Adapt to the rapid assembling combination construction in scene.Due to using prefabricated component, prefabrication synchronous can be carried out with site operation, Especially factory greatly shortens curing period, is obviously improved construction speed, shortens the construction period, and reduces the influence of road pavement traffic.Simultaneously Due to the prefabricated quality that can guarantee component, the invention is securely and reliably economical, and construction risk is small.
Further advantage, target and feature of the invention will be partially reflected by the following instructions, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of foundation pit after the completion of excavation of subway foundation pit supporting of the present invention;
Fig. 2 is construction of bottom plates schematic diagram of the present invention;
Fig. 3 is bottom column of the present invention and bottom side wall construction schematic diagram;
Fig. 4 is the structural schematic diagram of support rod temporary support of the present invention;
Fig. 5 is that grillage sets schematic diagram in the present invention;
Fig. 6 is the schematic diagram that plate and bottom column and bottom side wall pour connection in the present invention;
Fig. 7 is upper layer column of the present invention and upper layer side wall construction schematic diagram;
Fig. 8 is that upper layer column of the present invention and upper layer side wall complete the schematic diagram after pouring;
Fig. 9 is the schematic diagram of top plate beam of the present invention, template erection;
Figure 10 is that the present invention pours top plate, the schematic diagram of the rear foundation pit support for removing top layer;
Figure 11 is the structural schematic diagram of the subway underground station after present invention backfill earthing;
Figure 12 is the structural schematic diagram of subway underground station construction at prop;
Figure 13 is the longitudinal spliced schematic diagram of the middle plate with gap;
Figure 14 is that adjacent middle plate opening position connection reinforcing bar connects and completes the structural schematic diagram after pouring.
Specific embodiment
Present invention will be described in further detail below with reference to the accompanying drawings, to enable those skilled in the art referring to specification text Word can be implemented accordingly.
In the description of the present invention, term " transverse direction ", " longitudinal direction ", "upper", "lower", "front", "rear", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "top", "bottom", "inner", "outside" is orientation based on the figure or position Relationship is set, is merely for convenience of description of the present invention and simplification of the description, is not that device or the element of indication or suggestion meaning are necessary It with specific orientation, is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.
Such as Fig. 1-11, the present invention provides a kind of in-situ deposited prefabricated split-mounting type subway underground station construction method, such as Fig. 1 institute Show, in the foundation pit constructed after the completion of excavation of subway foundation pit supporting, foundation pit includes armored concrete crown beam 1, enclosure wall 2, branch The foundation pit support of foundation pit support 5 with bottom from the bottom to top, the foundation pit support 4 in middle layer and top layer in foundation pit after the completion of shield 3;
Construction method the following steps are included:
As shown in Fig. 2, Step 1: bottom plate 7 is constructed: foundation pit will be placed according to the baseplate reinforcing bar of construction requirement and specification binding Bottom, corresponded to according to detailing requiments on the baseplate reinforcing bar and be provided with dowel 6 at bottom column and bottom side wall, poured later Underplate concrete is built, is met the requirements to underplate concrete intensity, the foundation pit support of bottom, due in the technical program, side are removed Wall uses prefabricated+cast-in-place form, therefore to the fixing by gross bearings for the dowel for corresponding to side wall on bottom plate compared to having directlyed adopt Complete prefabricated side wall precision prescribed wants low, reduces difficulty of construction, needs between prior art insole board and prefabricated side wall Side is set and leads wall connection, while the construction error for leading dowel in wall requires control within ± 4mm, and the application, due to side Wall is cast-in-place using superimposed sheet and part, can be adjusted according to actual dowel location-appropriate, therefore construction error requires control Within ± 10mm, the construction time is saved instead compared to the prior art.Pre- embedded reinforcing bar conduct in prefabricated superimposed sheet On the other hand the bending resistance shearing strength of superimposed sheet can be improved up to 300% or more in subsequent side reinforcing bar, therefore superimposed sheet is from intensity Meet the condition as side wall template;The construction method of cast-in-place+prefabricated side wall only needs prefabricated to side wall folded in the construction process Plywood is lifted, positioned and is fixed temporarily, relatively entire precast wall body.The prefabricated superimposed sheet scale of construction is smaller, hangs to loop wheel machine Dress Capability Requirement can reduce up to 50% or so;Simultaneously as the relatively complete prefabricated side wall of quality gently about 80% or so, prefabricated overlapping Requirement of the plate to temporary support intensity and quantity is much lower, can totally reduce by about 80% temporary support component;Using it is prefabricated+ Cast-in-place construction scheme, waterproof roll can be laid in wall in advance, carry out afterwards it is cast-in-place, by waterproof roll be embedded to side wall in, can protect Protect waterproof roll damage.
In addition, side wall is using cast-in-place+prefabricated: prefabricated superimposed sheet therein can replace the effect of template, avoid construction existing The extensive formwork in field.And it is also inevitable in the cast-in-place concrete of joint itself of side wall and middle plate etc., therefore side wall uses Part is cast-in-place not to will cause additional equipment increase etc..
As shown in Figure 3-4, Step 2: bottom column and the construction of bottom side wall: the upper end of prefabricated side wall superimposed sheet 8 is reserved Dowel, lower end is provided with grout sleeve, and the inside wall of prefabricated side wall superimposed sheet is (close to the one of foundation pit enclosure structure Face) it is provided with side reinforcing bar and prefabricated side wall superimposed sheet is extended in lower end, (axial bearing capacity of prefabricated pile is more live existing for prefabricated pile 10 Column is poured to improve up to 20% or more) upper end reserve dowel, lower end setting grout sleeve;First by prefabricated side wall superimposed sheet Side reinforcing bar connected with corresponding bottom plate dowel, such as can be connected by screw shell, then erecting side wall overlaps Plate and prefabricated pile, specifically, respectively connecting the grout sleeve of prefabricated side wall superimposed sheet and prefabricated pile dowel corresponding with bottom plate It connects, grout sleeve casting concrete is passed through to the gap between junction and prefabricated side wall superimposed sheet and foundation pit enclosure structure, So that bottom column, bottom side wall 11, bottom plate and foundation pit enclosure structure form entirety, and conserves to intensity and meet the requirements;Its In, face when prefabricated side wall superimposed sheet pours using enclosure wall 2 as template saves template consumption, 12 be existing in figure Pour column plate connector.
As seen in figs. 5-6, Step 3: middle plate is constructed: overlapping prefabricated stringer 14, (prefabricated stringer designs are up big and down small ladder Shape structure) on bottom column, connecting the reinforcing bar of contiguous prefabricated stringer end, and the connector of prefabricated stringer is poured, to joint After concrete strength is met the requirements, prefabricated middle plate 13 is set up later, and the prefabricated middle plate has the connection connecting with bottom side wall Muscle, the dowel being connect with contiguous prefabricated middle plate and the dowel connected with upper layer column;To prefabricated middle plate and bottom side wall Junction, contiguous prefabricated middle plate junction casting concrete, maintenance are met the requirements to intensity, remove the foundation pit support in middle layer.? In above-mentioned technical proposal, middle plate is used as a load-carrying member in subway station, and precast concrete quality is stablized, entire Life cycle effect on environment is minimum;The production quality of prefabricated board is secure, and bending resistance is improved compared with condition of equivalent thickness Bars In Poured Concrete Slab 20% or more.Therefore, under the premise of meeting same bearing capacity, prefabricated board can be made relatively more thinner.
As Figure 7-8, Step 4: upper layer column and the construction of upper layer side wall: setting up upper layer side wall superimposed sheet using loop wheel machine And the prefabricated pile on upper layer, the upper end of same upper layer side wall superimposed sheet reserve dowel, lower end is provided with grout sleeve, And the inside wall of upper layer side wall superimposed sheet is provided with side reinforcing bar;The upper end of the prefabricated pile on upper layer reserves dowel, lower end Grout sleeve is set;Prefabricated pile can similarly be repaired in construction advance luggage, to save the duration.Later with the erection in step 2 Connection type is identical, and with each junction of plate in concreting upper layer side wall and subway station structure.
As shown in figure 9, Step 5: setting up the prefabricated stringer of top layer on the column of upper layer, the upper end of prefabricated stringer is wider, is convenient for Subsequent top layer template is set up, and the reinforcing bar of contiguous prefabricated stringer end is connected, and pours the connector of prefabricated stringer, mixed to joint After solidifying soil intensity is met the requirements, top plate 15 is set up later, the same step 3 of erection mode different from middle plate be top plate is herein folded Plywood, is equipped with reinforcing bar in top plate superimposed sheet, superimposed sheet two ends reserved steel bar as required.
As shown in figs. 10-11, Step 6: pouring the connector at subway underground station top board structure and top plate, maintenance is extremely Concrete roof intensity reaches requirement, forms casting top slab 16.After reaching requirement to intensity, the foundation pit support of top layer is removed.
Step 7: completing the superstructure construction of subway underground station, top plate of subway foundation pit or more is carried out later Earthing 17 is backfilled, traffic above-ground can be restored.
Further include waterproof construction in another technical solution:
Before baseplate reinforcing bar erection, the entire bottom surface of first laying water-proof coiled material covering bottom plate, and the length of waterproof roll two sides Degree is left to the top for extending to side wall in advance, and height of side wall includes the height of bottom side wall and upper layer side wall, it should be noted that anti- The length of water coiled material not enough extends to side wall from bottom plate, and therefore, it is necessary to the splicings of multiple waterproof rolls.
The vertical pre-embedded steel slab sealing of length direction after baseplate reinforcing bar erection, in the junction of bottom plate side wall and bottom plate Band pours underplate concrete again later.
In the above-mentioned technical solutions, for compared to station construction under existing subway, reduce the construction of fertile slot, one As the construction of fertile slot be to carry out waterproof construction and be fixed temporarily prefabricated side wall in building enclosure, the later period is still with element Concrete backfill not only increases construction cost and extends the duration, and the width of general fertile slot is suitable with lateral wall width, is 0.8~1m, the foundation pit two sides of subway underground station will reserve fertile slot, therefore width will at least increase in excavation pit 1.6m is again increased and is excavated cost and difficulty of construction.It is used using cast-in-place+prefabricated side wall concrete that can be saved by about one time Amount;Meanwhile the presence of fertile slot increases the width of excavation of foundation pit, is required in stringent urban district in effect on environment, has it certain Limitation.Cast-in-place+prefabricated construction subway station side wall can evade this problem, reduce the shadow that excavation of foundation pit settles surrounding It rings.
In another technical solution, the upper end of the bottom column and the upper end of bottom side wall all have bracket, Herein, the bracket frame setting of prefabricated side wall superimposed sheet is on its top, after final side wall superimposed sheet completion pours, the top of formation Area is big, similar up big and down small trapezoidal bracket;The bracket of same prefabricated pile top setting be directly poured it is upper greatly Under small trapezium structure, inside has reinforcing bar, and setting bracket is for facilitating setting up for prefabricated stringer.
In another technical solution, the middle part of the prefabricated side wall superimposed sheet lower end and the middle part of prefabricated pile lower end It is respectively and fixedly provided with circular column leg, and circular column leg is slightly longer than grout sleeve, to support prefabricated side wall superimposed sheet and prefabricated pile.
In the above-mentioned technical solutions, temporarily connecting between prefabricated side wall superimposed sheet and building enclosure (ground-connecting-wall) is eliminated It connects, directly a part by circular column leg as support, is poured to be integrated later and save the construction time.
It further include multiple support rods, Specific construction step in another technical solution are as follows:
When the dowel connection corresponding with bottom plate of the grout sleeve of prefabricated side wall superimposed sheet and prefabricated pile in step 2, and After circular column leg supports prefabricated side wall superimposed sheet and prefabricated pile, the support rod 9 is obliquely installed, and passes through fixing piece and prefabricated side wall Superimposed sheet, prefabricated pile and bottom plate are fixed, and remove support rod again after the completion of the construction of middle plate.
In the above-mentioned technical solutions, support rod set-up mode such as Fig. 4, support rod by fixing piece both ends respectively with prefabricated side Wall superimposed sheet and bottom plate are fixed, likewise, more support rods resist bottom column from two sides, it is more optimized to ensure that bottom side The limit of wall and bottom column prevents from tilting.
Side wall superimposed sheet is supported with the used temporary support of this construction method (support rod), it is convenient and efficient.It avoids Temporary support load is transmitted in building enclosure, generates hidden danger to prevent the general safety to building enclosure;Temporary support, with pre- The component being embedded on prefabricated component and plate is firm.Temporary support stress, power transmission are rationally simple.
Such as Figure 12-14, in another technical solution, it should be noted that being horizontal from left to right in Fig. 1~Figure 12 To, be from front to back longitudinal direction, when the position of plate in erection and top plate encounters prop 18 (prop be typically all tearing open Except being removed again after the foundation pit support 3 of top layer), the infall of the middle plate and top plate and prop is reserved with gap, gap Positioned at the side of middle plate and top plate longitudinal direction, the gap 20 of upper two middle plates 13 or two top plates is spliced into an entirety along longitudinal direction, It is passed through for prop, and the reserved connection reinforcing bar 19 in side of gap longitudinal direction connects adjacent middle plate gap after prop dismounting Place's connection reinforcing bar and adjacent top plate opening position connect reinforcing bar, and casting concrete.
In another technical solution, junction is poured specifically, junction is first divided into inner ring and outer rings, outer ring Diameter is 1~3 times of annular diameters, is taken away after inner ring concrete initial set in inner ring formwork, and in inner ring casting concrete Inner ring template fixes the first fiberglass gridding cloth in the circle of outer Monday of inner ring concrete, later by outer later in outer ring formwork Ring formwork tilts down 30 °~60 ° cricoid second fiberglass gridding cloths of setting to the direction of the first fiberglass gridding cloth, And multiple second fiberglass gridding cloths are from top to bottom provided in outer ring, the spacing of adjacent second fiberglass gridding cloth is 8 ~10cm, the later casting concrete in outer ring formwork.
After being poured due to existing junction, the later period is easy to appear crackle, for this problem, in the technical program, leads to Cross it is secondary pour and be arranged the first fiberglass gridding cloth and the second fiberglass gridding cloth, junction can be significantly improved Anti-crack ability improves construction quality.Compare through overtesting, a direct formwork pours junction, and factor of safety against cracking is 1.27, the 28th day infiltration grade resistant to pressure is greater than P8 and is less than P12, and formwork pours and glass fibre is arranged twice using this method Grid cloth, factor of safety against cracking 1.48, and the 28th day infiltration grade resistant to pressure is greater than P12.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily Realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and legend shown and described herein.

Claims (6)

1. a kind of in-situ deposited prefabricated split-mounting type subway underground station construction method, construction is completed in excavation of subway foundation pit supporting In foundation pit afterwards, which comprises the following steps:
Step 1: construction of bottom plates: baseplate reinforcing bar being placed in the bottom of foundation pit, bottom column and bottom are corresponded on the baseplate reinforcing bar Dowel is provided at side wall, after-pouring underplate concrete, met the requirements to underplate concrete intensity, remove the foundation pit of bottom Support;
Step 2: bottom column and the construction of bottom side wall:
The upper end of prefabricated side wall superimposed sheet reserves dowel, and lower end is provided with grout sleeve, and prefabricated side wall superimposed sheet Inside wall be provided with side reinforcing bar, the upper end of prefabricated pile reserves dowel, grout sleeve is arranged in lower end;First by prefabricated side wall The side reinforcing bar of superimposed sheet is connected with corresponding bottom plate dowel, then erecting side wall superimposed sheet and prefabricated pile, specifically, point Corresponding with the bottom plate dowel of the grout sleeve of prefabricated side wall superimposed sheet and prefabricated pile is not connected, to junction and prefabricated Gap between side wall superimposed sheet and foundation pit enclosure structure is by grout sleeve casting concrete, so that bottom column, bottom side Wall, bottom plate and foundation pit enclosure structure form entirety, and conserve to intensity and meet the requirements;
Step 3: the construction of middle plate: overlapping prefabricated stringer on bottom column, connecting the reinforcing bar of contiguous prefabricated stringer end, and pour The connector for building prefabricated stringer after concrete strength is met the requirements after joint, sets up prefabricated middle plate, the prefabricated middle plate have with The dowel of bottom side wall connection, the dowel that is connect with contiguous prefabricated middle plate and and the dowel that connects of upper one layer of column; To prefabricated middle plate and bottom side wall junction, contiguous prefabricated middle plate junction casting concrete, maintenance meets the requirements to intensity, tears open Except the foundation pit support in middle layer;
Step 4: repeating step 2 and step 3, the superstructure construction of subway underground station is completed, later to subway foundation pit Top plate or more carries out backfill earthing;Wherein, top plate is superimposed sheet, and reinforcing bar is equipped in top plate, and two ends are pre- as required Stay reinforcing bar;
Wherein, junction pours specifically, junction is first divided into inner ring and outer rings, and outer annular diameter is the 1 of annular diameters ~3 times, in inner ring formwork, and in inner ring casting concrete, after inner ring concrete initial set, take inner ring template away, outside later Ring formwork fixes the first fiberglass gridding cloth in the circle of outer Monday of inner ring concrete, later from outer ring formwork to the first glass The direction of fibrous mesh cloth tilts down 30 °~60 ° cricoid second fiberglass gridding cloths of setting, and in outer ring from top to bottom Multiple second fiberglass gridding cloths are provided with, the spacing of adjacent second fiberglass gridding cloth is 8~10cm, later in outer ring Casting concrete in formwork.
2. in-situ deposited prefabricated split-mounting type subway underground station as described in claim 1 construction method, which is characterized in that also wrap Include waterproof construction:
Before baseplate reinforcing bar erection, the entire bottom surface of first laying water-proof coiled material covering bottom plate, and the length of waterproof roll two sides is pre- It is left to the top for extending to side wall, height of side wall includes the height of bottom side wall and upper layer side wall;
After baseplate reinforcing bar erection, the vertical pre-embedded steel slab waterstop of length direction in the junction of bottom plate side wall and bottom plate, it Pour underplate concrete again afterwards.
3. in-situ deposited prefabricated split-mounting type subway underground station as described in claim 1 construction method, which is characterized in that described The upper end of bottom column and the upper end of bottom side wall all have bracket.
4. in-situ deposited prefabricated split-mounting type subway underground station as described in claim 1 construction method, which is characterized in that
Circular column leg, and circular column leg are respectively and fixedly provided in the middle part of the middle part and prefabricated pile lower end of the prefabricated side wall superimposed sheet lower end It is slightly longer than grout sleeve, to support prefabricated side wall superimposed sheet and prefabricated pile.
5. in-situ deposited prefabricated split-mounting type subway underground station as claimed in claim 4 construction method, which is characterized in that also wrap Include multiple support rods, Specific construction step are as follows:
When corresponding with the bottom plate dowel connection of the grout sleeve of prefabricated side wall superimposed sheet and prefabricated pile in step 2, and cylinder After leg supports prefabricated side wall superimposed sheet and prefabricated pile, the support rod is obliquely installed, and is overlapped by fixing piece and prefabricated side wall Plate, prefabricated pile and bottom plate are fixed, and remove support rod again after the completion of the construction of middle plate.
6. in-situ deposited prefabricated split-mounting type subway underground station as described in claim 1 construction method, which is characterized in that work as frame If the position of middle plate and top plate encounters prop, the infall of the middle plate and top plate and prop is reserved with open-minded Mouthful, and in the reserved connection reinforcing bar of opening position, after prop dismounting, connect adjacent middle plate opening position connection reinforcing bar and adjacent Top plate opening position connects reinforcing bar, and casting concrete.
CN201710213504.5A 2017-04-01 2017-04-01 In-situ deposited prefabricated split-mounting type subway underground station construction method Active CN106869172B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710213504.5A CN106869172B (en) 2017-04-01 2017-04-01 In-situ deposited prefabricated split-mounting type subway underground station construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710213504.5A CN106869172B (en) 2017-04-01 2017-04-01 In-situ deposited prefabricated split-mounting type subway underground station construction method

Publications (2)

Publication Number Publication Date
CN106869172A CN106869172A (en) 2017-06-20
CN106869172B true CN106869172B (en) 2019-01-04

Family

ID=59160646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710213504.5A Active CN106869172B (en) 2017-04-01 2017-04-01 In-situ deposited prefabricated split-mounting type subway underground station construction method

Country Status (1)

Country Link
CN (1) CN106869172B (en)

Families Citing this family (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476341A (en) * 2017-08-21 2017-12-15 中铁六局集团有限公司 Using cast in place and precast construction subway station prefabricated board assembling method
CN107676106A (en) * 2017-08-21 2018-02-09 北京市轨道交通建设管理有限公司 The connection method of the lining structure of tunnel assembled two and cast-in-place structural joint
CN107761765B (en) * 2017-11-01 2023-07-18 中国铁路设计集团有限公司 Fully assembled subway station double-column main body structure and construction method thereof
CN108020450B (en) * 2017-11-10 2020-03-13 北京工业大学 Assembled integral type subway station model structure and manufacturing method thereof
CN107939074A (en) * 2017-11-27 2018-04-20 广州地铁设计研究院有限公司 The Subway Station Platform and its construction method of a kind of precast splice type
CN108104160A (en) * 2018-01-08 2018-06-01 北京工业大学 A kind of assembled integral underground structure of replaceable prefabricated post damageable zone
CN108222064B (en) * 2018-01-08 2020-11-03 北京工业大学 Assembled integral underground frame structure with shear pin bolt connecting column with self-resetting function
CN108396778A (en) * 2018-01-25 2018-08-14 成都城投建筑科技投资管理集团有限公司 A kind of construction method in precast assembly tunnel
CN110080294A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of lid of assembled vault greatly across no column underground structure digs half reversed construction method
CN110080292A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of assembled integral vault is greatly across no column underground structure
CN110080291A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of assembled flat-top is greatly across no column underground structure
CN110080287A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of assembled flat-top has the open cutting construction method of column underground structure
CN110080295A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of lid of assembled vault greatly across no column underground structure digs full-reverse construction method
CN110080293A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of assembled flat-top has column underground structure
CN110080285A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of prefabricated side wall positioning connection structure of underground structure and connection method
CN110080288A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of open cutting construction method of assembled vault greatly across no column underground structure
CN110080289A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of open cutting construction method of assembled flat-top greatly across no column underground structure
CN110080290A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of assembled vault is greatly across no column underground structure
CN110258640B (en) * 2019-07-11 2020-07-03 吉林大学 Construction method of superposed wall system for cover-excavation top-down construction
CN110258642A (en) * 2019-07-11 2019-09-20 中铁第四勘察设计院集团有限公司 A kind of combined assembled underground structure of cut and cover method and its construction method
CN110318426B (en) * 2019-08-07 2024-01-09 哈尔滨工业大学 Assembled steel-concrete mixed structure subway station and assembling method
CN110512647B (en) * 2019-08-28 2021-06-25 北京工业大学 Partial assembly type subway station structure design and construction method
CN111074941A (en) * 2019-12-31 2020-04-28 中车建设工程有限公司 Large-span composite structural underground station and construction method thereof
CN111287190B (en) * 2020-02-17 2021-05-11 中国建筑第八工程局有限公司 Construction method for open-cut and underground-buried tunnel under condition that foundation pit has stand column
CN111364509A (en) * 2020-03-24 2020-07-03 石家庄铁源工程咨询有限公司 Construction method for underground space below existing road
CN111519824A (en) * 2020-04-14 2020-08-11 中铁第四勘察设计院集团有限公司 Prefabricated station platen, assembly type station and construction method of assembly type station
CN113006133B (en) * 2021-01-29 2022-10-14 广州地铁设计研究院股份有限公司 Construction method of middle plate hole suitable for assembly type station
CN113404073B (en) * 2021-07-01 2022-09-09 上海三凯工程咨询有限公司 Pre-buried subway station frame structure and construction method thereof
CN114809015B (en) * 2022-05-11 2023-06-23 中铁第六勘察设计院集团有限公司 Temporary support system and permanent structure combined construction method for open cut subway station
CN115288148A (en) * 2022-06-28 2022-11-04 北京城建设计发展集团股份有限公司 Middle floor based on internal support system and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101457548A (en) * 2008-12-31 2009-06-17 华南理工大学 Node for connecting round steel tube concrete column with reinforced concrete floor and method for making same
KR101278687B1 (en) * 2012-12-28 2013-06-24 원하종합건설 주식회사 Box-type thrust tube structure, and method of building underground structure using the box-type thrust tube structure
CN103669730A (en) * 2013-12-24 2014-03-26 北京振利节能环保科技股份有限公司 Lightweight concrete-filled steel tube composite column for steel structure building and construction method
CN105178357A (en) * 2015-07-16 2015-12-23 中国建筑股份有限公司 Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN105736001A (en) * 2016-03-31 2016-07-06 济南轨道交通集团有限公司 Construction method for building subway station through precast parts
CN105781570A (en) * 2016-04-14 2016-07-20 广州地铁设计研究院有限公司 Metro internal-bracing-free track panel shaft and construction method thereof
CN105862916A (en) * 2016-06-03 2016-08-17 长沙远大住宅工业集团股份有限公司 Superimposed assembled type underground pipe gallery system and construction and manufacturing process

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101457548A (en) * 2008-12-31 2009-06-17 华南理工大学 Node for connecting round steel tube concrete column with reinforced concrete floor and method for making same
KR101278687B1 (en) * 2012-12-28 2013-06-24 원하종합건설 주식회사 Box-type thrust tube structure, and method of building underground structure using the box-type thrust tube structure
CN103669730A (en) * 2013-12-24 2014-03-26 北京振利节能环保科技股份有限公司 Lightweight concrete-filled steel tube composite column for steel structure building and construction method
CN105178357A (en) * 2015-07-16 2015-12-23 中国建筑股份有限公司 Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN105736001A (en) * 2016-03-31 2016-07-06 济南轨道交通集团有限公司 Construction method for building subway station through precast parts
CN105781570A (en) * 2016-04-14 2016-07-20 广州地铁设计研究院有限公司 Metro internal-bracing-free track panel shaft and construction method thereof
CN105862916A (en) * 2016-06-03 2016-08-17 长沙远大住宅工业集团股份有限公司 Superimposed assembled type underground pipe gallery system and construction and manufacturing process

Also Published As

Publication number Publication date
CN106869172A (en) 2017-06-20

Similar Documents

Publication Publication Date Title
CN106869172B (en) In-situ deposited prefabricated split-mounting type subway underground station construction method
CN105178357B (en) Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN110630283B (en) Three-layer supporting structure suitable for double-arch tunnel and construction method
CN206070562U (en) Subassembly formula underground structure
CN102966114B (en) Tower crane foundation structure and construction method thereof
CN106854873A (en) A kind of engineering method and garage parking in precast spliced sinking type garage parking
CN106284412B (en) A kind of prefabricated pipe gallery and construction method
CN202645584U (en) Combined type tunnel lining structure
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN104594361B (en) A kind of I shape fender post and building enclosure also serve as the construction method of agent structure
CN206545215U (en) A kind of precast spliced sinking type garage parking
CN209703525U (en) A kind of side slope precast assembly lattice girder connected by wet seam
CN107090908A (en) A kind of new vertical prefabricated components joint connecting method
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN106958259B (en) A kind of concrete towers column foundation and its construction method
CN109797777A (en) Assembled is constructed from sealing underground pipe gallery and construction method
CN112761158B (en) Green construction method of integral three-wall-in-one outer wall of reverse engineering steel concrete key pin meshed row pile
CN107083776B (en) A kind of basement raft foundation rear pouring tape construction method
CN106193120A (en) Basement is encorbelmented, and base plate is inverse makees structure and construction method
CN111877626A (en) Overhead laminated slab construction structure and construction method
CN205476487U (en) Dismantled cyclic utilization device of centre form come -up is packed to control light block
CN101929245A (en) Thin webbed girder vertical construction method
CN204645093U (en) Poured band of outer wall of basement advanced processing constructs
CN203247838U (en) Fully-buried basement side wall post-pouring belt advance water stop formwork

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant