CN110080285A - A kind of prefabricated side wall positioning connection structure of underground structure and connection method - Google Patents
A kind of prefabricated side wall positioning connection structure of underground structure and connection method Download PDFInfo
- Publication number
- CN110080285A CN110080285A CN201910326549.2A CN201910326549A CN110080285A CN 110080285 A CN110080285 A CN 110080285A CN 201910326549 A CN201910326549 A CN 201910326549A CN 110080285 A CN110080285 A CN 110080285A
- Authority
- CN
- China
- Prior art keywords
- structure part
- prefabricated
- earlier
- locating piece
- buried
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims description 12
- 210000003205 muscle Anatomy 0.000 claims description 76
- 229910000831 Steel Inorganic materials 0.000 claims description 14
- 238000010276 construction Methods 0.000 claims description 14
- 239000010959 steel Substances 0.000 claims description 14
- 238000009415 formwork Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 description 6
- 230000003014 reinforcing effect Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 238000005457 optimization Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 230000017105 transposition Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/04—Making large underground spaces, e.g. for underground plants, e.g. stations of underground railways; Construction or layout thereof
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Architecture (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Electromagnetism (AREA)
- Sustainable Development (AREA)
- Physics & Mathematics (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The present invention provides a kind of prefabricated side wall positioning connection structures of underground structure, including earlier enclosure structure component, earlier main structure part and prefabricated sidewall structure part, prefabricated sidewall structure part top and bottom are respectively equipped with the pre-buried locating piece of the pre-buried locating piece in upper end and lower end, earlier enclosure structure component is equipped with the first built-in fitting, earlier main structure part is equipped with the second built-in fitting, it is cast-in-place between earlier enclosure structure component and prefabricated sidewall structure part, and earlier main structure part and prefabricated sidewall structure part to have built cast-in-place structural part.The invention adjusts positioning fixation using pre-buried locating piece and according to absolute altitude tolerance, solves the problems, such as that prefabricated side wall and the positioning of earlier constructing structure are difficult;The pre-buried locating piece in lower end plays the role of fixed split bolt simultaneously, facilitates formwork, prefabricated side wall component can be done template, and passing through cast-in-place with earlier constructing structure is entirety, can effectively solve the problems, such as iterative structure holistic resistant behavior and component seam crossing leak.
Description
Technical field
The invention belongs to construction engineering technical fields, and in particular to a kind of prefabricated side wall positioning connection structure of underground structure and
Connection method is suitable for the similar underground structure work such as urban subway station, basement, pipe gallery, open cut section
Journey design and construction scheme.
Background technique
With the development of national economy, building industrialization degree is increasing, and assembled underground structure thinking is common at present
Have: using integral prefabricated pipeline section longitudinal direction assembly form, using cement material sealing filling between pipeline section ring and ring;Or use piecemeal
Assembly, the cast-in-place way of bottom plate seam;Or structure roof, side wall, column and the equal prefabrication and assembly construction of girder construction, bottom plate use cast-in-place steel
The forms such as reinforced concrete and reserved rim of a cup, steel bushing are connected for the upper component later period.Wherein, the cast-in-place reserved rim of a cup of bottom plate, steel bushing
The methods of cylinder has certain generalization in underground structure assembled, but also there are the following problems:
(1) between side wall and bottom plate using mechanical, sleeve grouting connection, positioning is easily generated inclined when embedded bar and sleeve construction
Difference causes engineering to invade limit, influences engineering use.
(2) frequently with mechanical, sleeve grouting connection between site concrete and prefabricated components, live reinforcing bar connection is difficult, holds
Easily cause structure security risk.
(3) in rich groundwater area, due to the effect of underground water hydraulic pressure, joint is easy to leak.
Therefore, be accelerate building industrialization process, reduce due to component node handle it is bad to fabricated construction promote
It influences, needs to design a kind of convenient construction, simple structure, safe and reliable structural elements form and scene positioning, embodiment party
Method solves the problems such as poor hardly possible, joints and the easy leak in part are implemented in existing fabricated construction prefabricated components positioning.
Summary of the invention
The purpose of the present invention is overcoming existing fabricated construction prefabricated components positioning to implement, difficult, joints are poor and part is easy
The problem of leak.
For this purpose, the present invention provides a kind of prefabricated side wall positioning connection structure of underground structure, including earlier enclosure structure component,
Earlier main structure part and prefabricated sidewall structure part, the prefabricated sidewall structure part upper end is equipped with to carry out with earlier enclosure structure component
The pre-buried locating piece in the upper end being located by connecting, the earlier enclosure structure component are equipped with the with the cooperation positioning of the pre-buried locating piece in upper end
One built-in fitting, the prefabricated sidewall structure part lower end are equipped with the pre-buried positioning in lower end being located by connecting with earlier main structure part
Part, the earlier main structure part is equipped with the second built-in fitting with the pre-buried locating piece cooperation positioning in lower end, described to go along with sb. to guard him in advance
It is cast-in-place between structural member and prefabricated sidewall structure part, and earlier main structure part and prefabricated sidewall structure part to have built cast-in-place knot
Component.
Further, the pre-buried locating piece in the lower end is equipped with the mounting hole for installing cast-in-place node template.
Further, the pre-buried locating piece in the lower end has multiple, is arranged along prefabricated sidewall structure part length direction interval;Institute
State the pre-buried locating piece in upper end have it is multiple, along prefabricated sidewall structure part length direction interval be arranged.
Further, U-shaped muscle one is reserved on the prefabricated sidewall structure part, the side of the U-shaped muscle one partially protrudes into pre-
Inside sidewall structure part processed, the other side of U-shaped muscle one is cast-in-place between earlier enclosure structure component and prefabricated sidewall structure part
In structural member.
Further, U-shaped muscle two is reserved on the earlier main structure part, the two side portions of the U-shaped muscle two protrude into elder generation
Inside phase main structure part, earlier main structure part is stretched out in the bottom of U-shaped muscle two, and the lower end of U-shaped muscle one and U-shaped muscle two is overlapped
Overlap joint positioning.
Further, the U-shaped muscle one and U-shaped muscle two have more, and U-shaped muscle one and U-shaped muscle two are alternately arranged.
Further, more transverse steels are equipped at intervals on the two sides of the U-shaped muscle one, and more transverse directions on two sides
Reinforcing bar is positioned opposite one by one.
Further, wavy vertical drawknot ledges, and the wave of vertical drawknot ledges are equipped between the two sides of the U-shaped muscle one
Peak and trough are connected on the transverse steel of U-shaped one two sides of muscle.
In addition, the present invention also provides the connection methods of the prefabricated side wall positioning connection structure of above-mentioned underground structure, including such as
Lower step:
1) it constructs in advance earlier enclosure structure component and earlier main structure part, and respectively in earlier enclosure structure component and earlier main body
Pre-buried first built-in fitting and the second built-in fitting on structural member;
2) prefabricated sidewall structure part is precast, and distinguishes the pre-buried pre-buried positioning in upper end in the top and bottom of prefabricated sidewall structure part
The pre-buried locating piece of part and lower end, and the mounting hole for installing cast-in-place node template is reserved on the pre-buried locating piece in lower end;
3) the prefabricated sidewall structure part for lifting step 2) keeps prefabricated sidewall structure part pre-buried by upper end with earlier enclosure structure component
Locating piece and the first built-in fitting are located by connecting, prefabricated sidewall structure part and earlier main structure part by the pre-buried locating piece in lower end and
Second built-in fitting is located by connecting;
4) the fixed cast-in-place node template of split bolt is installed on the mounting hole of the pre-buried locating piece in lower end;
5) using prefabricated sidewall structure part and cast-in-place node template as template, in prefabricated sidewall structure part and earlier enclosure structure component
Cast-in-place structural part is poured by cast-in-place mode between earlier main structure part, makes prefabricated sidewall structure part and earlier building enclosure
Part and earlier main structure part form an overall structure;
6) the cast-in-place node template installed on the pre-buried locating piece in lower end is dismantled, that is, completes prefabricated side wall and is located by connecting.
Further, U-shaped muscle two is reserved in the top of the earlier main structure part, and U-shaped two both ends of muscle are inserted into a manner of U by falling
In earlier main structure part;Embedded U-shaped muscle one in the prefabricated sidewall structure part, the side of U-shaped muscle one is from prefabricated sidewall structure
Part bottom is protruded into prefabricated sidewall structure part, and the other side is located at outside prefabricated sidewall structure part;Prefabricated sidewall structure part and earlier
When main structure part is located by connecting, one bottom of U-shaped muscle of prefabricated sidewall structure part and the U-shaped muscle two of earlier main structure part expose
Partial transposition is engaged overlap joint, limits the relative position between prefabricated sidewall structure part and earlier main structure part.
Compared with prior art, beneficial effects of the present invention:
(1) the prefabricated side wall positioning connection structure of this underground structure provided by the invention passes through the upper end on prefabricated sidewall structure part
The pre-buried locating piece of pre-buried locating piece and lower end adjusts according to absolute altitude tolerance with the structural member constructed in advance and positions and be connected and fixed, right
Prefabricated components in-site installation required precision severity reduces, and efficiently solves prefabricated side wall with earlier constructing structure and positions difficult ask
Topic.
(2) the prefabricated side wall positioning connection structure of this underground structure provided by the invention is by the pre-buried locating piece in upper end under
After holding pre-buried locating piece to fix the positioning of prefabricated sidewall structure part, lifting transloading equipment can be taken off in time with prefabricated sidewall structure part
From shortening equipment holding time.
(3) the pre-buried locating piece in lower end of the prefabricated side wall positioning connection structure of this underground structure provided by the invention can play
Fixed split bolt effect, facilitates formwork, prefabricated side wall component can be done template, and it is whole for passing through cast-in-place with earlier constructing structure
Body can effectively solve the problems, such as component seam crossing leak.
(4) the prefabricated side wall positioning connection structure of this underground structure provided by the invention passes through prefabricated sidewall structure part and elder generation
Phase constructing structure embedded U-shaped reinforcing bar, is engaged overlap joint using U-shaped steel muscle, efficiently solves prefabricated sidewall structure part and earlier construction
The problem of structure reinforcing bars joint connection in site difficulty.
The present invention is described in further details below with reference to attached drawing.
Detailed description of the invention
Fig. 1 is the schematic diagram of the prefabricated side wall positioning connection structure of underground structure of the present invention;
Fig. 2 is Section A-A schematic diagram in Fig. 1;
Fig. 3 is the connection schematic diagram of earlier main structure part and prefabricated sidewall structure part in the present invention;
Fig. 4 is the structural schematic diagram of prefabricated sidewall structure part in the present invention.
Description of symbols: 1, earlier enclosure structure component;2, the first built-in fitting;3, the pre-buried locating piece in upper end;4, prefabricated side
Wall construction part;5, cast-in-place structural part;6, cast-in-place node template;7, split bolt;8, the second built-in fitting;9, earlier main structure
Part;10, the pre-buried locating piece in lower end;11, drawknot ledges is found;12, transverse steel;13, U-shaped muscle one;14, U-shaped muscle two.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other
Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, term " center ", "upper", "lower", "front", "rear", " left side ",
The orientation or positional relationship of the instructions such as " right side ", "vertical", "horizontal", "top", "bottom", "inner", "outside" is based on the figure
Orientation or positional relationship is merely for convenience of description of the present invention and simplification of the description, rather than the device of indication or suggestion meaning or
Element must have a particular orientation, be constructed and operated in a specific orientation, therefore be not considered as limiting the invention.
Term " first ", " second " be used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance or
Implicitly indicate the quantity of indicated technical characteristic." first " is defined as a result, the feature of " second " can be expressed or imply
Ground includes one or more of the features;In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or
It is more than two.
As shown in Figure 1, present embodiments providing a kind of prefabricated side wall positioning connection structure of underground structure, including go along with sb. to guard him in advance
Structural member 1, earlier main structure part 9 and prefabricated sidewall structure part 4, prefabricated 4 upper end of sidewall structure part are equipped with and enclose in advance
The pre-buried locating piece 3 in the upper end that protection structure part 1 is located by connecting, the earlier enclosure structure component 1 are equipped with pre-buried fixed with upper end
First built-in fitting 2 of the position cooperation positioning of part 3, fixed by the pre-buried locating piece 3 in upper end and the first built-in fitting 2 are realized to enclosing in advance
Protection structure part 1 and prefabricated sidewall structure part 4 are located by connecting;Prefabricated 4 lower end of sidewall structure part is equipped with and earlier main body
The pre-buried locating piece 10 in the lower end that structural member 9 is located by connecting, the earlier main structure part 9 are equipped with and the pre-buried positioning in lower end
Second built-in fitting 8 of the cooperation positioning of part 10, by the realization that is located by connecting of the pre-buried locating piece 10 in lower end and the second built-in fitting 8 to pre-
Sidewall structure part 4 processed and earlier main structure part 9 are located by connecting;Wherein, the pre-buried locating piece 3 in upper end and the pre-buried positioning in lower end
Part 10 can be using positioning fashioned iron, and the first built-in fitting 2 and the second built-in fitting 8 can use fixing steel plate;Meanwhile it described enclosing in advance
It is cast-in-place between protection structure part 1 and prefabricated sidewall structure part 4, and earlier main structure part 9 and prefabricated sidewall structure part 4 to have built
Cast-in-place structural part 5 is connected earlier enclosure structure component 1, earlier main structure part 9 and prefabricated sidewall structure part 4 by cast-in-place mode
It is connected into overall structure, solves the problems, such as iterative structure holistic resistant behavior and component seam crossing leak.
A kind of embodiment, the pre-buried locating piece 10 in lower end is equipped with mounting hole, for installing split bolt 7, with side
Just formwork;Cast-in-place node template 6 can be also set up directly on to prefabricated 4 bottom of sidewall structure part certainly and carry out formwork.
The embodiment of refinement, as shown in Fig. 2, the pre-buried locating piece 10 in the lower end have it is multiple, along prefabricated sidewall structure part 4
The setting of length direction interval, the pre-buried locating piece 10 in lower end has tolerance function, can be adjusted according to absolute altitude relationship, pre-buried by lower end
Locating piece 10 positions the carry out tolerance of prefabricated 4 lower part of sidewall structure part and fixes;Meanwhile the pre-buried locating piece 3 in upper end have it is more
It is a, it is arranged along prefabricated 4 length direction interval of sidewall structure part, by the pre-buried locating piece 3 in multiple upper ends to prefabricated sidewall structure part 4
Top is fixed on the positioning, and the accurate positionin installed to prefabricated sidewall structure part 4 can be achieved in this way, to prefabricated components in-site installation
Required precision severity reduces, and solves the problems, such as that existing prefabricated side wall and the structure positioning constructed in advance are difficult;And prefabricated side
Wall construction part 4, can be by prefabricated components and transhipment after the positioning of the pre-buried locating piece 10 of the pre-buried locating piece 3 in upper end and lower end is fixed
Equipment is detached from time, shortens equipment holding time.
The embodiment of optimization reserves U-shaped muscle 1 as shown in Figure 3 and Figure 4 on the prefabricated sidewall structure part 4, described
The side of U-shaped muscle 1 partially protrudes into inside prefabricated sidewall structure part 4, and the other side of U-shaped muscle 1 is located at earlier building enclosure
In cast-in-place structural part 5 between part 1 and prefabricated sidewall structure part 4;By U-shaped muscle 1 enhance prefabricated sidewall structure part 4 with
The stress intensity of the connecting node of cast-in-place structural part 5.Further, U-shaped muscle 2 14 is reserved on the earlier main structure part 9,
The two side portions of the U-shaped muscle 2 14 protrude into inside earlier main structure part 9, and earlier main body knot is stretched out in the bottom of U-shaped muscle 2 14
Component 9, and the lower end of U-shaped muscle 1 and U-shaped muscle 2 14 overlapping overlap joint positioning, are engaged by U-shaped muscle 1 and U-shaped muscle 2 14
It connects, prefabricated sidewall structure part 4 and the reinforcing bar joint connection in site difficulty for the earlier main structure part 9 constructed in advance can be efficiently solved
Problem.Optimization, the U-shaped muscle 1 and U-shaped muscle 2 14 have more, and U-shaped muscle 1 and U-shaped muscle 2 14 are alternately arranged,
Further enhance the bonding strength of prefabricated sidewall structure part 4 and earlier main structure part 9.Wherein, prefabricated sidewall structure part 4
The pre-buried locating piece 10 in lower end misplaces with the overlapping part of U-shaped muscle 1 and U-shaped muscle 2 14 to be arranged, the pre-buried locating piece 10 in lower end and U
Type muscle 1, U-shaped muscle 2 14 position be independent of each other, both ensure that the pre-buried locating piece 10 in lower end to prefabricated sidewall structure part 4
Locating effect, and the effect of U-shaped muscle 1 and 2 14 pairs of U-shaped muscle reinforcement connecting node stress intensities is not influenced.
Further, more transverse steels 12 are equipped at intervals on the two sides of the U-shaped muscle 1, and more on two sides
Transverse steel 12 is positioned opposite one by one, and wavy vertical drawknot ledges 11, and vertical drawing are equipped between the two sides of the U-shaped muscle 1
The wave crest and trough for tying ledges 11 are connected on the transverse steel 12 of U-shaped one 13 two sides of muscle;In prefabricated 4 He of sidewall structure part
It is designed between cast-in-place structural part 5 by the vertical this construction and arrangement mode of drawknot ledges 11, strengthens prefabricated 4 He of sidewall structure part
The bonding strength of cast-in-place structural part 5, while may also function as the effect of the fixed 4 U-shaped muscle 1 in outside of prefabricated sidewall structure part, it improves
Prefabricated sidewall structure part 4 and cast-in-place structural part 5 connect it is integral after bearing capacity.
The present embodiment additionally provides the connection method of the prefabricated side wall positioning connection structure of above-mentioned underground structure, and detailed process is such as
Under:
Firstly, construct in advance earlier enclosure structure component 1 and earlier main structure part 9 when, respectively earlier enclosure structure component 1 and first
Pre-buried first built-in fitting 2 and the second built-in fitting 8 on phase main structure part 9.Meanwhile the prefabricated sidewall structure part 4 that is prefabricated in the factory out,
And in the pre-buried locating piece 3 in the top and bottom of the prefabricated sidewall structure part 4 pre-buried upper end of difference and the pre-buried locating piece 10 in lower end, and under
Hold the mounting hole being reserved on pre-buried locating piece 10 for installing cast-in-place node template 6.
Optimization, U-shaped muscle 2 14 is reserved in the top of earlier main structure part 9, and U-shaped 2 14 both ends of muscle are inserted in a manner of U to fall
Enter in earlier main structure part 9;Embedded U-shaped muscle 1 in the prefabricated sidewall structure part 4, the side of U-shaped muscle 1 is from prefabricated
4 bottom of sidewall structure part is protruded into prefabricated sidewall structure part 4, and the other side is located at outside prefabricated sidewall structure part 4.
Secondly, the above-mentioned prefabricated sidewall structure part 4 of lifting, passes through prefabricated sidewall structure part 4 with earlier enclosure structure component 1 upper
Pre-buried locating piece 3 and the first built-in fitting 2 is held to be located by connecting, meanwhile, prefabricated sidewall structure part 4 passes through with earlier main structure part 9
The pre-buried locating piece 10 in lower end and the second built-in fitting 8 are adjusted according to absolute altitude tolerance to be positioned and is connected and fixed.At the same time, can also pass through
One 13 bottom of U-shaped muscle of prefabricated sidewall structure part 4 and 2 14 exposed portion of the U-shaped muscle dislocation of earlier main structure part 9 are engaged
It connects, to further limit the relative position between prefabricated sidewall structure part 4 and earlier main structure part 9.
Then, split bolt 7 is installed on the mounting hole of the pre-buried locating piece 10 in lower end, then existing by the connection of split bolt 7
Node template 6 is poured, to keep the pre-buried locating piece 10 in the lower end of cast-in-place node template 6 and prefabricated sidewall structure part 4 fixed, completes branch
Mould.
Finally, using prefabricated sidewall structure part 4 and cast-in-place node template 6 as cast-in-situ template, prefabricated sidewall structure part 4 with
Cast-in-place structural part 5 is poured by cast-in-place mode between earlier enclosure structure component 1 and earlier main structure part 9, makes prefabricated side wall knot
Component 4 and earlier enclosure structure component 1 and earlier main structure part 9 form an overall structure;The pre-buried locating piece 10 in lower end is dismantled again
The cast-in-place node template 6 of upper installation completes prefabricated side wall and is located by connecting.
In conclusion the prefabricated side wall positioning connection structure of this underground structure provided by the invention passes through prefabricated sidewall structure
The pre-buried locating piece of the pre-buried locating piece in upper end and lower end on part adjusts positioning simultaneously according to absolute altitude tolerance with the structural member constructed in advance
It is connected and fixed, efficiently solves the problems, such as that prefabricated side wall and the positioning of earlier constructing structure are difficult, and prefabricated components and transhipment can be set
It is standby to be detached from time, shorten equipment holding time;The pre-buried locating piece in lower end may also function as fixed split bolt effect simultaneously, facilitate branch
Prefabricated side wall component can be done template by mould, and passing through cast-in-place with earlier constructing structure is entirety, can effectively solve iterative structure entirety
The problem of stress performance and component seam crossing leak.
The foregoing examples are only illustrative of the present invention, does not constitute the limitation to protection scope of the present invention, all
It is within being all belonged to the scope of protection of the present invention with the same or similar design of the present invention.
Claims (10)
1. a kind of prefabricated side wall positioning connection structure of underground structure, it is characterised in that: including earlier enclosure structure component, earlier main body
Structural member and prefabricated sidewall structure part, the prefabricated sidewall structure part upper end are equipped with and are located by connecting with earlier enclosure structure component
The pre-buried locating piece in upper end, the earlier enclosure structure component be equipped with it is the first of the cooperation positioning of the pre-buried locating piece in upper end pre-buried
Part, the prefabricated sidewall structure part lower end are equipped with the pre-buried locating piece in lower end being located by connecting with earlier main structure part, institute
It states earlier main structure part and is equipped with the second built-in fitting positioned with the pre-buried locating piece cooperation in lower end, the earlier enclosure structure component
It is cast-in-place between prefabricated sidewall structure part, and earlier main structure part and prefabricated sidewall structure part to have built cast-in-place structural part.
2. the prefabricated side wall positioning connection structure of underground structure as described in claim 1, it is characterised in that: the lower end is pre-buried fixed
Position part is equipped with the mounting hole for installing cast-in-place node template.
3. the prefabricated side wall positioning connection structure of underground structure as described in claim 1, it is characterised in that: the lower end is pre-buried fixed
Position part have it is multiple, along prefabricated sidewall structure part length direction interval be arranged;The pre-buried locating piece in upper end have it is multiple, along prefabricated side
The setting of wall construction part length direction interval.
4. the prefabricated side wall positioning connection structure of underground structure as described in claim 1, it is characterised in that: the prefabricated side wall knot
U-shaped muscle one is reserved on component, the side of the U-shaped muscle one partially protrudes into inside prefabricated sidewall structure part, the other side of U-shaped muscle one
In cast-in-place structural part between earlier enclosure structure component and prefabricated sidewall structure part.
5. the prefabricated side wall positioning connection structure of underground structure as claimed in claim 4, it is characterised in that: the earlier main body knot
U-shaped muscle two is reserved on component, the two side portions of the U-shaped muscle two protrude into inside earlier main structure part, and the bottom of U-shaped muscle two is stretched
Earlier main structure part out, and the lower end of U-shaped muscle one and U-shaped muscle two overlapping overlap joint positioning.
6. the prefabricated side wall positioning connection structure of underground structure as claimed in claim 5, it is characterised in that: the U-shaped muscle one and U
Type muscle two has more, and U-shaped muscle one and U-shaped muscle two are alternately arranged.
7. the prefabricated side wall positioning connection structure of underground structure as claimed in claim 4, it is characterised in that: the U-shaped muscle one
More transverse steels are equipped at intervals on two sides, and more transverse steels on two sides are positioned opposite one by one.
8. the prefabricated side wall positioning connection structure of underground structure as claimed in claim 7, it is characterised in that: the U-shaped muscle one
Wavy vertical drawknot ledges is equipped between two sides, and the wave crest of vertical drawknot ledges and trough are connected to U-shaped one two sides of muscle
Transverse steel on.
9. a kind of connection method of the prefabricated side wall positioning connection structure of underground structure, characterized by the following steps:
1) it constructs in advance earlier enclosure structure component and earlier main structure part, and respectively in earlier enclosure structure component and earlier main body
Pre-buried first built-in fitting and the second built-in fitting on structural member;
2) prefabricated sidewall structure part is precast, and distinguishes the pre-buried pre-buried positioning in upper end in the top and bottom of prefabricated sidewall structure part
The pre-buried locating piece of part and lower end, and the mounting hole for installing cast-in-place node template is reserved on the pre-buried locating piece in lower end;
3) the prefabricated sidewall structure part for lifting step 2) keeps prefabricated sidewall structure part pre-buried by upper end with earlier enclosure structure component
Locating piece and the first built-in fitting are located by connecting, prefabricated sidewall structure part and earlier main structure part by the pre-buried locating piece in lower end and
Second built-in fitting is located by connecting;
4) the fixed cast-in-place node template of split bolt is installed on the mounting hole of the pre-buried locating piece in lower end;
5) using prefabricated sidewall structure part and cast-in-place node template as template, in prefabricated sidewall structure part and earlier enclosure structure component
Cast-in-place structural part is poured by cast-in-place mode between earlier main structure part, makes prefabricated sidewall structure part and earlier building enclosure
Part and earlier main structure part form an overall structure;
6) the cast-in-place node template installed on the pre-buried locating piece in lower end is dismantled, that is, completes prefabricated side wall and is located by connecting.
10. the connection method of the prefabricated side wall positioning connection structure of underground structure as claimed in claim 9, it is characterised in that: institute
U-shaped muscle two is reserved in the top for stating earlier main structure part, and U-shaped two both ends of muscle are inserted into earlier main structure part in a manner of U by falling;Institute
Embedded U-shaped muscle one in prefabricated sidewall structure part is stated, prefabricated side wall knot is protruded into from prefabricated sidewall structure part bottom in the side of U-shaped muscle one
In component, the other side is located at outside prefabricated sidewall structure part;When prefabricated sidewall structure part and earlier main structure part are located by connecting,
One bottom of U-shaped muscle of prefabricated sidewall structure part and two exposed portion of the U-shaped muscle dislocation of earlier main structure part are engaged overlap joint, limit
Relative position between prefabricated sidewall structure part and earlier main structure part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910326549.2A CN110080285A (en) | 2019-04-23 | 2019-04-23 | A kind of prefabricated side wall positioning connection structure of underground structure and connection method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910326549.2A CN110080285A (en) | 2019-04-23 | 2019-04-23 | A kind of prefabricated side wall positioning connection structure of underground structure and connection method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110080285A true CN110080285A (en) | 2019-08-02 |
Family
ID=67416206
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910326549.2A Pending CN110080285A (en) | 2019-04-23 | 2019-04-23 | A kind of prefabricated side wall positioning connection structure of underground structure and connection method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110080285A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111535471A (en) * | 2020-04-14 | 2020-08-14 | 中铁第四勘察设计院集团有限公司 | Assembly type plate wall connecting joint and construction method thereof |
CN112813979A (en) * | 2021-01-22 | 2021-05-18 | 中铁第四勘察设计院集团有限公司 | Concrete pouring system and method for wet joint of beam column connection of fabricated structure |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105839666A (en) * | 2016-06-03 | 2016-08-10 | 长沙远大住宅工业集团股份有限公司 | Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof |
CN106013228A (en) * | 2016-06-24 | 2016-10-12 | 中国建筑股份有限公司 | Overlapping integral type prefabricated assembly structure for comprehensive pipe gallery and construction method thereof |
CN106869172A (en) * | 2017-04-01 | 2017-06-20 | 中交第二航务工程局有限公司 | In-situ deposited prefabricated split-mounting type subway underground station construction method |
WO2017206412A1 (en) * | 2016-06-03 | 2017-12-07 | 长沙远大住宅工业集团股份有限公司 | Superimposed assembly-type underground pipe gallery system and construction and manufacturing process |
CN108166525A (en) * | 2017-12-05 | 2018-06-15 | 中建五局第三建设有限公司 | Semi-prefabricated assembled comprehensive pipe gallery spliced by cast-in-place hidden beams and construction method thereof |
CN208023710U (en) * | 2018-03-07 | 2018-10-30 | 内蒙古工大建筑设计有限责任公司 | A kind of connection structure of assembly concrete shear wall |
CN109505368A (en) * | 2018-12-25 | 2019-03-22 | 湘潭远大住宅工业有限公司 | Wallboard connecting node for assembled architecture |
CN210066815U (en) * | 2019-04-23 | 2020-02-14 | 中铁第四勘察设计院集团有限公司 | Underground structure prefabricated side wall positioning and connecting structure |
-
2019
- 2019-04-23 CN CN201910326549.2A patent/CN110080285A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105839666A (en) * | 2016-06-03 | 2016-08-10 | 长沙远大住宅工业集团股份有限公司 | Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof |
WO2017206412A1 (en) * | 2016-06-03 | 2017-12-07 | 长沙远大住宅工业集团股份有限公司 | Superimposed assembly-type underground pipe gallery system and construction and manufacturing process |
WO2017206411A1 (en) * | 2016-06-03 | 2017-12-07 | 长沙远大住宅工业集团股份有限公司 | Full-prefabricated superimposed assembly-type underground pipe gallery and connection node thereof |
CN106013228A (en) * | 2016-06-24 | 2016-10-12 | 中国建筑股份有限公司 | Overlapping integral type prefabricated assembly structure for comprehensive pipe gallery and construction method thereof |
CN106869172A (en) * | 2017-04-01 | 2017-06-20 | 中交第二航务工程局有限公司 | In-situ deposited prefabricated split-mounting type subway underground station construction method |
CN108166525A (en) * | 2017-12-05 | 2018-06-15 | 中建五局第三建设有限公司 | Semi-prefabricated assembled comprehensive pipe gallery spliced by cast-in-place hidden beams and construction method thereof |
CN208023710U (en) * | 2018-03-07 | 2018-10-30 | 内蒙古工大建筑设计有限责任公司 | A kind of connection structure of assembly concrete shear wall |
CN109505368A (en) * | 2018-12-25 | 2019-03-22 | 湘潭远大住宅工业有限公司 | Wallboard connecting node for assembled architecture |
CN210066815U (en) * | 2019-04-23 | 2020-02-14 | 中铁第四勘察设计院集团有限公司 | Underground structure prefabricated side wall positioning and connecting structure |
Non-Patent Citations (1)
Title |
---|
汪杰等: "装配式混凝土建筑设计与应用", 东南大学出版社, pages: 65 - 67 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111535471A (en) * | 2020-04-14 | 2020-08-14 | 中铁第四勘察设计院集团有限公司 | Assembly type plate wall connecting joint and construction method thereof |
CN112813979A (en) * | 2021-01-22 | 2021-05-18 | 中铁第四勘察设计院集团有限公司 | Concrete pouring system and method for wet joint of beam column connection of fabricated structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108867889A (en) | A kind of prefabricated reinforced concrete composite beam and steel pipe column connected node and its construction method | |
CN110080285A (en) | A kind of prefabricated side wall positioning connection structure of underground structure and connection method | |
CN110080287A (en) | A kind of assembled flat-top has the open cutting construction method of column underground structure | |
CN110080295A (en) | A kind of lid of assembled vault greatly across no column underground structure digs full-reverse construction method | |
CN113550317A (en) | Permanent-temporary combined supporting structure and construction method for open excavation reverse construction foundation pit of large shield starting well | |
CN207498985U (en) | A kind of partial precast assembly steel concrete combination underground pipe gallery for exempting from template | |
CN111287764A (en) | Tunnel secondary lining structure and construction method thereof | |
CN209837117U (en) | Connecting structure of assembled structural member | |
KR20110132909A (en) | Underpass using precast concrete pile and method for constructing the same | |
CN109779090A (en) | Prefabricated shear wall, building structure and the construction method of the building structure | |
CN111305627B (en) | Concrete tank room construction method | |
CN109881714A (en) | A kind of connection structure and connection method of fabricated construction part | |
CN107514012A (en) | A kind of partial precast assembly steel concrete combination underground pipe gallery for exempting from template | |
CN110080394B (en) | Connecting structure and connecting method of assembled prefabricated components | |
JPH08284159A (en) | Connection structure of pile head | |
CN211228597U (en) | Enclosure component of assembled underground structure and connection structure of enclosure component and arch plate | |
CN210066815U (en) | Underground structure prefabricated side wall positioning and connecting structure | |
CN110080291A (en) | A kind of assembled flat-top is greatly across no column underground structure | |
CN110359488A (en) | A kind of fender member of assembled underground structure and its connecting structure with arch sheet | |
CN110080292A (en) | A kind of assembled integral vault is greatly across no column underground structure | |
CN215289655U (en) | Connecting structure for fixedly connecting reinforced concrete pier stud and upper steel box girder of motor vehicle bridge | |
CN209975745U (en) | Connection structure of assembled prefabricated component | |
CN110080385B (en) | Assembled prefabricated component | |
JP3804440B2 (en) | Shield tunnel connection construction method | |
CN210368626U (en) | Guardrail is assembled to precast concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |