CN109779090A - Prefabricated shear wall, building structure and the construction method of the building structure - Google Patents

Prefabricated shear wall, building structure and the construction method of the building structure Download PDF

Info

Publication number
CN109779090A
CN109779090A CN201910093296.9A CN201910093296A CN109779090A CN 109779090 A CN109779090 A CN 109779090A CN 201910093296 A CN201910093296 A CN 201910093296A CN 109779090 A CN109779090 A CN 109779090A
Authority
CN
China
Prior art keywords
wallboard
connecting portion
floor
shear wall
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910093296.9A
Other languages
Chinese (zh)
Inventor
王宁
孙占琦
王洪欣
方园
王庆华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Technology Group Co Ltd Shenzhen Branch
Original Assignee
China Construction Science and Technology Co Ltd Shenzhen Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Science and Technology Co Ltd Shenzhen Branch filed Critical China Construction Science and Technology Co Ltd Shenzhen Branch
Priority to CN201910093296.9A priority Critical patent/CN109779090A/en
Publication of CN109779090A publication Critical patent/CN109779090A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The present invention is suitable for technical field of building construction, provides the construction method of a kind of prefabricated shear wall, building structure and the building structure.Precast shear wall includes the first wallboard interconnected, second wallboard and several reinforcing bars, the opposite sides of second wallboard all has vacant portion, reinforcing bar runs through the first wallboard along the short transverse of the first wallboard, and it is laid along the width direction of the first wallboard, reinforcing bar includes first connecting portion, second connecting portion and middle interconnecting piece, middle interconnecting piece is connected between first connecting portion and second connecting portion, middle interconnecting piece is fixedly arranged in the first wallboard, first connecting portion protrudes from the one end of the first wallboard far from the second wallboard, second connecting portion protrudes from the first wallboard close to one end of the second wallboard, second connecting portion is located in omission portion.Building structure includes floor prefabricated board, floor in-situ layer, concrete and precast shear wall.The connection type of precast shear wall of the invention has the advantages that construction technology is simple and construction efficiency is high.

Description

Prefabricated shear wall, building structure and the construction method of the building structure
Technical field
The invention belongs to technical field of building construction more particularly to a kind of prefabricated shear wall, building structure and it is somebody's turn to do The construction method of building structure.
Background technique
The reinforcing bar connection of traditional cast-in-place steel concrete wallboard is most common to have welded connecting, binding connection and machinery even It connects, either above-mentioned any connection type, is all first to connect reinforcing bar, which belongs to concealed work, to concealed work After examination passes through, just carries out next process, belong to positive operation.
In current assembly of shear wall structure system, the vertical connection type of upper and lower level precast shear wall generallys use double The vertical reinforcement of irrigation and drainage slurry sleeve connection upper and lower level wallboard.This connection type is being filled after precast shear wall installation is in place Grouting fixed steel bars are carried out in slurry sleeve, this mode concealed work carries out after casting concrete, belongs to contrary operation.? In Practical Project, there are shortcomings for this connection type: grout sleeve is thicker, causes joint reinforcing bar sleeve clear distance smaller, It is difficult to lead to concrete discharging, and is easy leakiness of vibrating;Precast shear wall requirement on machining accuracy is high, once it is inaccurate contraposition occur True situation is it is necessary to do over again or bending reinforcing steel bar aligns roughly, and grout pipe is easy blocking, grouting quality is difficult to ensure and inconvenient inspection The problems such as survey, haves the shortcomings that complicated construction technique, difficult to install and construction efficiency are low.
Summary of the invention
The technical problem to be solved by the embodiment of the invention is that provide a kind of prefabricated shear wall, building structure and The construction method of the building structure, it is intended to solve construction work present in the connection type of fabricated shear wall in the prior art The problem that skill is complicated, difficulty of construction is big and construction efficiency is low.
The embodiments of the present invention are implemented as follows, provides a kind of prefabricated shear wall comprising the first wallboard, second Wallboard and several reinforcing bars, first wallboard are integrated with the interconnection of the second wallboard, and in the phase of second wallboard Vacant portion is all had to two sides, several reinforcing bars run through first wallboard along the short transverse of first wallboard, and And laid along the width direction of first wallboard, the reinforcing bar includes the first connecting portion being molded as one, second connecting portion And middle interconnecting piece, the middle interconnecting piece are connected between the first connecting portion and second connecting portion, the centre connects Socket part is fixedly arranged in first wallboard, and the first connecting portion protrudes from the described one end of first wallboard far from the second wallboard, The second connecting portion protrudes from first wallboard close to one end of second wallboard, and the second connecting portion is located at In the omission portion, the height of the length of the second connecting portion less than the second wallboard.
Further, second wallboard is located in the middle part of the lower end of first wallboard.
Further, first wallboard and second wallboard are in rectangle, and the cross-sectional area of first wallboard is big In the cross-sectional area of the second wallboard.
Further, several reinforcing bars are uniformly distributed along the width direction of first wallboard.
The embodiment of the present invention also provides a kind of building structure comprising floor prefabricated board, floor in-situ layer, concrete and Above-mentioned several prefabricated shear walls pass through the floor between the prefabricated shear wall of adjacent two In-situ layer connection, the floor prefabricated board are installed between the floor in-situ layer and first floor, and the concrete pours It builds in the omission portion;
After two adjacent prefabricated shear walls are connected with each other, second wallboard is resisted against the floor On in-situ layer, the first connecting portion and the interlaced vacant portion for being set to second wallboard two sides of the second connecting portion In, and the first connecting portion for being located at second wallboard the same side and the second connecting portion are in the same plane, institute The a part for stating first connecting portion is embedded in advance in the floor in-situ layer, and another part of the first connecting portion is connect with second Portion is embedded in the concrete.
The invention also includes a kind of construction method of above-mentioned building structure, which includes the following steps:
S1, several assembly that the prefabricated floor prefabricated board is mixed by concrete and rebar and is reserved with vacant portion Formula precast shear wall;
S2, the bottom end of first prefabricated shear wall is installed on the basis of after, in first wallboard After the floor prefabricated board is installed in upper end, then it is poured the floor in-situ layer, is embedded in a part of the first connecting portion in advance In the floor in-situ layer, another part of the first connecting portion exposes the upper end of the floor in-situ layer;
S3, the second wallboard on second prefabricated shear wall is resisted against on the floor in-situ layer, is made Second connecting portion on second prefabricated shear wall and first on first prefabricated shear wall Interconnecting piece mutually staggers, and the first connecting portion and second connecting portion that are located at second wallboard the same side are same In plane;
S4, the concrete is poured in the vacant portion on second prefabricated shear wall, makes the coagulation Soil coats the first connecting portion and second connecting portion.
Compared with prior art, beneficial effect is the embodiment of the present invention: prefabricated shear wall of the invention is in phase It connects when installing, after the first wallboard upper end installation floor prefabricated board on the prefabricated shear wall of lower layer, the building Zai Layer prefabricated board upper floor in-situ layer is embedded in a part of the first connecting portion on the prefabricated shear wall of lower layer in advance In floor in-situ layer, another part of first connecting portion exposes outside floor in-situ layer;Then by the prefabricated shearing on upper layer The second wallboard lower end on wall is resisted against on floor, makes second connecting portion on the prefabricated shear wall on upper layer and lower layer First connecting portion on prefabricated shear wall mutually staggers, finally the second wall on the prefabricated shear wall on upper layer It is poured concrete in the vacant portion of plate two sides, is embedded in first connecting portion and second connecting portion in concrete, to make to assemble It is formed and is stably connected between formula precast shear wall.Steel bar connecting joints between prefabricated shear wall of the invention are pre-buried Preceding naked eyes belong to positive operation as it can be seen that convenient for operation, i.e., first connect reinforcing bar casting concrete again, avoid conventionally employed grouting The mode bring hidden danger of this contrary operation of sleeve connection, strong operability simplify construction technology, improve construction effect Rate, and can guarantee the reliability of shear wall connection.
Detailed description of the invention
Fig. 1 is prefabricated shear wall structure schematic diagram provided in an embodiment of the present invention;
Fig. 2 is the schematic cross-sectional view in the direction A-A in Fig. 1;
Fig. 3 is structural schematic diagram when prefabricated shear wall structure provided in an embodiment of the present invention is mutually butted;
Fig. 4 is that building structure provided in an embodiment of the present invention is poured longitudinal sectional structure before concrete in vacant portion and shows It is intended to;
Fig. 5 is that building structure provided in an embodiment of the present invention is poured longitudinal sectional structure after concrete in vacant portion and shows It is intended to;
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
It as shown in Figures 1 and 2, is a kind of prefabricated shear wall provided in an embodiment of the present invention.This is prefabricated Shear wall 10 includes the first wallboard 11, the second wallboard 12 and several reinforcing bars 13, and the first wallboard 11 is interconnected with 12 phase of the second wallboard It is connected in one, and all has vacant portion 14 in the opposite sides of the second wallboard 12.Specifically, the middle part of several reinforcing bars 13 is buried In the first wallboard 11, the cross-sectional area of the first wallboard 11 is greater than the cross-sectional area of the second wallboard 12, so that in the second wallboard 12 opposite sides forms vacant portion 14.Reinforcing bar 13 runs through the first wallboard 11 along the short transverse of the first wallboard 11, makes reinforcing bar 13 Both ends stretch out in outside the first wallboard 11, wherein one end of reinforcing bar 13 is located in omission portion 14.
In above-described embodiment, the second wallboard 12 is located in the middle part of the lower end of the first wallboard 11, and several reinforcing bars 13 are along the first wallboard 11 width direction is uniformly distributed.Reinforcing bar 13 include be molded as one first connecting portion 131, second connecting portion 132 and in Between interconnecting piece 133, for middle interconnecting piece 133 between first connecting portion 131 and second connecting portion 132, middle interconnecting piece 133 is solid In the first wallboard 11, first connecting portion 131 protrudes from the one end of the first wallboard 11 far from the second wallboard 12, second connecting portion 132 protrude from the first wallboard 11 close to one end of the second wallboard 12, and second connecting portion 132 is located at opposite the two of the second wallboard 12 Side, and be located in omission portion 14, the height of the length of second connecting portion 132 less than the second wallboard 12.
In the present embodiment, the first wallboard 11 and the second wallboard 12 are into a single integrated structure by concreting, the first wallboard 11 Cross section with the second wallboard 12 is in rectangle, and in other embodiments, the first wallboard 11 and the second wallboard 12 can also be by steel Plate is formed by connecting, and the cross section of the first wallboard 11 and the second wallboard 12 can also be in other shapes, and concrete shape is according to construction requirement Depending on.
It as shown in Figures 3 to 5, is that the embodiment of the present invention provides a kind of building structure, which includes that floor is pre- Making sheet 20, floor in-situ layer 30, concrete 40 and above-mentioned several prefabricated shear walls 10, two adjacent assembleds It is connected between precast shear wall 10 by floor in-situ layer 30, floor prefabricated board 20 is installed on floor in-situ layer 30 and the first floor Between 11, concrete 40 is poured in the vacant portion 14 of 12 two sides of the second wallboard.When two adjacent prefabricated shear walls When 10 interconnection, the second wallboard 12 is resisted against on floor in-situ layer 30, first connecting portion 131 and second connecting portion 132 are made In the interlaced vacant portion 14 for being set to 12 two sides of the second wallboard, and it is located at the first connecting portion of 12 the same side of the second wallboard 131 with second connecting portion 132 in the same plane, the fill concrete 40 in vacant portion 14 makes first connecting portion 131 and second Interconnecting piece 132 is embedded in concrete 40, and a part of first connecting portion 131 is embedded in floor in-situ layer 30 in advance, the first connection The another part and second connecting portion 132 in portion 131 are embedded in concrete 40, thus by prefabricated shear wall 10, floor Prefabricated board 20, floor in-situ layer 30 and concrete 40 are integrally fixed, and constitute above-mentioned building structure.
The construction method of above-mentioned building structure includes the following steps:
S1, prefabricated floor prefabricated board is mixed by concrete and rebar and is reserved with the several of vacant portion and prefabricated is cut Power wall.
S2, the bottom end of first prefabricated shear wall 10 is installed on the basis of after, in the upper end of the first wallboard 11 After floor prefabricated board 20 is installed, then it is poured floor in-situ layer 30, a part of first connecting portion 131 is made to be embedded in floor in-situ layer in advance In 30, another part of first connecting portion 131 exposes the upper end of floor in-situ layer 30.
S3, second wallboard 12 on second prefabricated shear wall 10 is resisted against on floor in-situ layer 30, and And by the second connecting portion 132 and first prefabricated shear wall 10 on second prefabricated shear wall 10 One interconnecting piece 131 mutually staggers, and the first connecting portion 131 positioned at 12 the same side of the second wallboard exists with second connecting portion 132 In approximately the same plane.
S4, the casting concrete 40 in the vacant portion 14 on second prefabricated shear wall 10 wrap concrete 40 It covers first connecting portion 131 and second connecting portion 132 and is covered on floor in-situ layer 30, keep precast shear wall 10, floor pre- Making sheet 20, floor in-situ layer 30 and concrete 40 are integrally fixed, to complete the construction of building structure.
In conclusion building structure of the invention has the advantages that the steel bar connecting joints between precast shear wall 10 In pre-buried preceding naked eyes as it can be seen that belonging to positive operation convenient for operation, i.e., casting concrete 40 again of reinforcing bar 13 are first connected, biography is avoided System bring hidden danger in such a way that grout sleeve connects this contrary operation;Between the prefabricated shear wall 10 of upper and lower level The connection type that vertical reinforcement 13 is fixed to each other by concrete 40 is not high to the requirement on machining accuracy of precast shear wall 10, can be with Precast shear wall 10 is avoided because the contraposition of reinforcing bar 13 is not allowed to cause the case where doing over again, construction cost is greatly reduced, is effectively reduced Difficulty of construction simplifies construction technology, improves construction efficiency, and can guarantee the reliability of precast shear wall connection.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (6)

1. a kind of prefabricated shear wall, which is characterized in that described including the first wallboard, the second wallboard and several reinforcing bars First wallboard is integrated with the interconnection of the second wallboard, and all has vacant portion, institute in the opposite sides of second wallboard Several reinforcing bars stated run through first wallboard along the short transverse of first wallboard, and along the width of first wallboard Direction is laid, and the reinforcing bar includes the first connecting portion, second connecting portion and middle interconnecting piece being molded as one, the centre Interconnecting piece is connected between the first connecting portion and second connecting portion, and the middle interconnecting piece is fixedly arranged on first wallboard In, the first connecting portion protrudes from the described one end of first wallboard far from the second wallboard, and the second connecting portion protrudes from institute The first wallboard is stated close to one end of second wallboard, and the second connecting portion is located in the omission portion, described second Height of the length of interconnecting piece less than the second wallboard.
2. prefabricated shear wall as described in claim 1, which is characterized in that second wallboard is located at first wall In the middle part of the lower end of plate.
3. prefabricated shear wall as described in claim 1, which is characterized in that first wallboard and second wallboard It is in rectangle, the cross-sectional area of first wallboard is greater than the cross-sectional area of the second wallboard.
4. prefabricated shear wall as described in claim 1, which is characterized in that several reinforcing bars are along first wall The width direction of plate is uniformly distributed.
5. a kind of building structure, which is characterized in that including floor prefabricated board, floor in-situ layer, concrete and such as claim 1 To any one of 4 several prefabricated shear walls, lead between the prefabricated shear wall of adjacent two The floor in-situ layer connection is crossed, the floor prefabricated board is installed between the floor in-situ layer and first floor, institute Concreting is stated in the omission portion;
After two adjacent prefabricated shear walls are connected with each other, it is cast-in-place that second wallboard is resisted against the floor On layer, in the first connecting portion and the interlaced vacant portion for being set to second wallboard two sides of the second connecting portion, And the first connecting portion and the second connecting portion for being located at second wallboard the same side are in the same plane, and described the A part of one interconnecting piece is embedded in advance in the floor in-situ layer, and another part and the second connecting portion of the first connecting portion are buried In the concrete.
6. a kind of construction method of building structure as claimed in claim 5, which is characterized in that the construction method includes as follows Step:
S1, mixed by concrete and rebar the prefabricated floor prefabricated board and be reserved with vacant portion several assembleds it is pre- Shear wall processed;
S2, the bottom end of first prefabricated shear wall is installed on the basis of after, in the upper end of first wallboard After the floor prefabricated board is installed, then it is poured the floor in-situ layer, is embedded in a part of the first connecting portion in advance described In floor in-situ layer, another part of the first connecting portion exposes the upper end of the floor in-situ layer;
S3, the second wallboard on second prefabricated shear wall is resisted against on the floor in-situ layer, makes second Second connecting portion on a prefabricated shear wall is connect with first on first prefabricated shear wall Portion mutually staggers, and the first connecting portion and second connecting portion that are located at second wallboard the same side are in approximately the same plane It is interior;
S4, the concrete is poured in the vacant portion on second prefabricated shear wall, makes the concrete packet Cover the first connecting portion and second connecting portion.
CN201910093296.9A 2019-01-30 2019-01-30 Prefabricated shear wall, building structure and the construction method of the building structure Pending CN109779090A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910093296.9A CN109779090A (en) 2019-01-30 2019-01-30 Prefabricated shear wall, building structure and the construction method of the building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910093296.9A CN109779090A (en) 2019-01-30 2019-01-30 Prefabricated shear wall, building structure and the construction method of the building structure

Publications (1)

Publication Number Publication Date
CN109779090A true CN109779090A (en) 2019-05-21

Family

ID=66503008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910093296.9A Pending CN109779090A (en) 2019-01-30 2019-01-30 Prefabricated shear wall, building structure and the construction method of the building structure

Country Status (1)

Country Link
CN (1) CN109779090A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439140A (en) * 2019-07-17 2019-11-12 广州大学 A kind of modular assembly formula shear wall structure and its construction method
CN110847421A (en) * 2019-11-26 2020-02-28 三一筑工科技有限公司 Prefabricated plate wall connecting joint and construction method thereof
CN112982743A (en) * 2021-02-23 2021-06-18 浙江省建筑科学设计研究院有限公司 Gypsum wallboard, assembly type gypsum internal partition wall and mounting method of assembly type gypsum internal partition wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120019048A (en) * 2010-08-24 2012-03-06 쌍용건설 주식회사 Shear wall type vibration control apparatus
CN103628594A (en) * 2013-12-16 2014-03-12 长沙远大住宅工业有限公司 Cast-in-place shear wall structure equivalent to prefabricated sandwiched superposed shear wall continuous steel bar
CN103726607A (en) * 2014-01-20 2014-04-16 王睿敏 Wall board for assembling integral shear wall, shear wall and construction method of shear wall
CN106869399A (en) * 2017-02-21 2017-06-20 孔祥雨 A kind of high-strength biomass fiber insulation composite shear wall and preparation method thereof
CN106988482A (en) * 2017-04-07 2017-07-28 中建科技有限公司深圳分公司 Sleeve connection prefabricated panel and its making, transport, installation method
CN207700447U (en) * 2017-12-29 2018-08-07 常州工程职业技术学院 A kind of reliable prefabricated assembled shear wall of connection
CN208396071U (en) * 2018-06-15 2019-01-18 浙江绿筑集成科技有限公司 It is a kind of without support SP plate and compound shear wall connecting node

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120019048A (en) * 2010-08-24 2012-03-06 쌍용건설 주식회사 Shear wall type vibration control apparatus
CN103628594A (en) * 2013-12-16 2014-03-12 长沙远大住宅工业有限公司 Cast-in-place shear wall structure equivalent to prefabricated sandwiched superposed shear wall continuous steel bar
CN103726607A (en) * 2014-01-20 2014-04-16 王睿敏 Wall board for assembling integral shear wall, shear wall and construction method of shear wall
CN106869399A (en) * 2017-02-21 2017-06-20 孔祥雨 A kind of high-strength biomass fiber insulation composite shear wall and preparation method thereof
CN106988482A (en) * 2017-04-07 2017-07-28 中建科技有限公司深圳分公司 Sleeve connection prefabricated panel and its making, transport, installation method
CN207700447U (en) * 2017-12-29 2018-08-07 常州工程职业技术学院 A kind of reliable prefabricated assembled shear wall of connection
CN208396071U (en) * 2018-06-15 2019-01-18 浙江绿筑集成科技有限公司 It is a kind of without support SP plate and compound shear wall connecting node

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439140A (en) * 2019-07-17 2019-11-12 广州大学 A kind of modular assembly formula shear wall structure and its construction method
CN110847421A (en) * 2019-11-26 2020-02-28 三一筑工科技有限公司 Prefabricated plate wall connecting joint and construction method thereof
CN112982743A (en) * 2021-02-23 2021-06-18 浙江省建筑科学设计研究院有限公司 Gypsum wallboard, assembly type gypsum internal partition wall and mounting method of assembly type gypsum internal partition wall
CN112982743B (en) * 2021-02-23 2023-02-03 浙江省建筑科学设计研究院有限公司 Gypsum wallboard, assembly type gypsum internal partition wall and mounting method of assembly type gypsum internal partition wall

Similar Documents

Publication Publication Date Title
EP3670778B1 (en) Prefabricated frame
EP3263795B1 (en) Composite structural wall and method of construction thereof
CN104652654B (en) Assembled shear wall structure
KR101204763B1 (en) Structure of sandwich pannel with precast concrete and cast in place concrete for pipe utility conduit
KR100640716B1 (en) Precast concrete block for cantilever retaining wall and construction method using the same
JP6691880B2 (en) Precast wall balustrade mounting structure and mounting method
CN107044177A (en) A kind of assembly concrete shear wall fractionation, assembled attachment structure and connection method
CN109779090A (en) Prefabricated shear wall, building structure and the construction method of the building structure
KR101973565B1 (en) Sheathing method for constructing both sheathing wall and cutoff collar by welding cutoff plate to phc pile with longitudinal plate
CN108951869A (en) A kind of full assembly concrete shear wall structure system of low layer
CN209179247U (en) A kind of novel precast reinforced concrete shearing force wall connection structure
KR20080061580A (en) Precast concrete file and method for constructing thereof
KR101167511B1 (en) Underpass using precast concrete pile and method for constructing the same
CN113833162B (en) Shear wall structure system with high prefabrication rate and low cost and construction method
KR20190069910A (en) Installation structure and method of precast concrete culvert
KR102153857B1 (en) Coupler for connecting pc panels
KR20010091697A (en) PC wall member connection method with loop bar
CA2892704C (en) Reinforced blockwork construction method
CN110939138A (en) Underground diaphragm wall subassembly
JP2001220763A (en) Draining method for underground wall and underground wall constructed using it
CN212452765U (en) Two-in-one underground pipe gallery structure
CN115419176A (en) Assembled beam slab node
CN212507063U (en) Inverted inserting grouting type precast concrete column structure
CN209958393U (en) Laminated pipe gallery connected by extrusion sleeve
KR101884462B1 (en) Installation method of reinforced soil retaining wall grid in cut slope section and embankment section

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190521

RJ01 Rejection of invention patent application after publication