CN203247838U - Fully-buried basement side wall post-pouring belt advance water stop formwork - Google Patents

Fully-buried basement side wall post-pouring belt advance water stop formwork Download PDF

Info

Publication number
CN203247838U
CN203247838U CN 201320302261 CN201320302261U CN203247838U CN 203247838 U CN203247838 U CN 203247838U CN 201320302261 CN201320302261 CN 201320302261 CN 201320302261 U CN201320302261 U CN 201320302261U CN 203247838 U CN203247838 U CN 203247838U
Authority
CN
China
Prior art keywords
side wall
basement
fully
sides
pouring belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320302261
Other languages
Chinese (zh)
Inventor
吴碧桥
朱国梁
唐兵
周起太
施高成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huajian Construction Co Ltd
Original Assignee
Jiangsu Huajian Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huajian Construction Co Ltd filed Critical Jiangsu Huajian Construction Co Ltd
Priority to CN 201320302261 priority Critical patent/CN203247838U/en
Application granted granted Critical
Publication of CN203247838U publication Critical patent/CN203247838U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a fully-buried basement side wall post-pouring belt advance water stop formwork, and belongs to the technical field of building construction. The formwork comprises a lap plate, wherein two sides of the lap plate are fixed on the outer surfaces of side walls on two sides of a basement post-pouring belt by means of expansion bolts, the two sides of the lap plate are respectively provided with a row of expansion bolt penetrating holes vertically distributed at intervals, one row of the penetrating holes are long slotted holes extending in the horizontal direction, the other row of the penetrating holes are long slotted holes extending in the vertical direction, the outer surface of the lap plate is adhered to a waterproof layer extending to the outer surfaces of the side walls on the two sides of a basement, and the outer surface of the waterproof layer is a waterproof protection layer. So far, construction of the fully-buried basement side wall post-pouring belt advance water stop formwork is completed, and pouring of the post-pouring belt can be carried out later. According to the fully-buried basement side wall post-pouring belt advance water stop formwork, fully-buried permanent formwork advance water stop construction is adopted, and the fully-buried basement side wall post-pouring belt advance water stop formwork not only is convenient to construct, but also can adjust shrinkage distortion differences of the two side walls of the post-pouring belt of the basement in the longitudinal direction and the transverse direction, and effectively prevents water seepage for a long time.

Description

Fully buried basement side wall ater-casting advanced water-stopping template
Technical field
The utility model relates to a kind of ater-casting advanced water-stopping facility, and especially a kind of fully buried basement side wall ater-casting advanced water-stopping template belongs to technical field of building construction.
Background technology
The ater-casting be in building operations for preventing monolithic reinforced concrete structure owing to temperature, shrinking uneven issuable harmful cracks, according to design or job specfication requirement, stay the temporary construction seam of establishing in sole plate, wall, beam relevant position.During construction, building unit temporarily is divided into some parts, shrinks through component inside after building, water again the concrete of smashing the constuction joint place, finally make pouring structure be linked to be integral body.
When building basement is positioned at groundwater table when following, the ater-casting concrete can only after main structure construction is finished, just can be built usually in the sidewall ater-casting.Construction period must continue to take dewatering measure, until after agent structure finishes and build the ater-casting concrete, can stop precipitation.The shortcoming that this conventional practice exists is: 1) the precipitation cost is higher, has increased construction costs; 2) the local cubic metre of earth in time backfill at place, ater-casting affects follow-up construction; 3) long term exposure of post-pouring belt of outer wall is made troubles to external wall waterproof construction, finished product protection.
Application number is several typical job practices and the structure that 200810062467.3,201010148056.3,201120235429.0,201210063458.2 Chinese patent application discloses respectively basement post-pouring zone, but for mainly be base plate, shrink the basement side wall that also has vertical settlement difference about being not suitable for both existing, directly employing certainly will be difficult to guarantee to prevent reliably and with long-term the basement side wall infiltration because of the shrinkage strain difference that can't take into account simultaneously both direction in length and breadth, and it is complicated that structure all seems, construction is trouble comparatively.
The utility model content
The purpose of this utility model is: for the limitation that above-mentioned prior art exists, propose a kind of fully buried basement side wall ater-casting advanced water-stopping template of seeping water of can permanently effectively preventing, provide simultaneously corresponding job practices.
In order to reach above purpose, fully buried basement side wall of the present utility model ater-casting advanced water-stopping template comprises that both sides are fixed on the lapping plate of the side wall external surface of basement post-pouring zone both sides by expansion bolt, the both sides of described lapping plate have respectively the expansion bolt perforation that row's vertical spacing distributes, the long slot bore that one row's perforation is extended for horizontal direction, the long slot bore that another row's perforation is extended for vertical, the external surface of described lapping plate adheres to the waterproofing course that extends to both sides basement side wall external surface.
Further, described waterproofing course external surface has fish tail and waterproof layer.
Further, be full of elastic sealant between described lapping plate and side wall external surface and expansion bolt, the nut.
So far namely finish the construction of fully buried basement side wall ater-casting advanced water-stopping template, can carry out building of ater-casting afterwards.Place, basement side wall ater-casting adopts fully buried place of the present utility model permanent formwork advanced water-stopping structure, not only easy construction, need not to remove, can enter as early as possible outer wall of basement waterproof construction and basic earthwork backfill, stop precipitation, guarantee that follow-up construction carries out smoothly, and the long slot bore structure of the level of lapping plate and vertical can adjust the in length and breadth shrinkage strain difference of both direction of basement post-pouring zone two side, permanently effectively prevent infiltration.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further described.
Fig. 1 is the structural representation of the utility model embodiment one.
Fig. 2 is the lapping plate structural representation of Fig. 1 embodiment.
The specific embodiment
Embodiment one
The fully buried basement side wall ater-casting advanced water-stopping template of the present embodiment as shown in Figure 1 and Figure 2, comprise that both sides are fixed on the lapping plate 3 of side wall 2 external surfaces of basement post-pouring zone both sides by expansion bolt 1, this lapping plate is made of the 3mm steel plate, both sides have respectively the expansion bolt perforation 3-1 that row's vertical spacing distributes, the long slot bore that one row's perforation in left side is extended for horizontal direction, the long slot bore that row's perforation on right side is extended for vertical.The external surface of lapping plate 3 adheres to the waterproofing course 4 that extends to both sides basement side wall external surface.Waterproofing course 4 external surfaces are extruded sheet fish tail and waterproof layer 5.W among Fig. 1 is the ater-casting width.
Fully buried basement side wall of the present utility model ater-casting advanced water-stopping template construction method step is as follows:
The first step, making both sides have respectively the lapping plate of row's vertical spacing distribution expansion bolt perforation, and wherein row's perforation is the long slot bore of horizontal direction extension, and another row's perforation is the long slot bore that vertical is extended;
Second step, by the spacing between each long slot bore geometric center, bury expansion bolt underground in the side wall external surface correspondence of basement post-pouring zone both sides;
The 3rd goes on foot, each perforation of lapping plate is aligned respectively be inserted in corresponding expansion bolt, fixes with nut; In order further to guarantee waterproof effect, all fill with elastic sealant (for example glass cement) between lapping plate and side wall external surface and expansion bolt, the nut;
The 4th step, adhere to the waterproofing course that extends to both sides basement side wall external surface at the external surface of lapping plate;
The 5th the step, install the extruded sheet waterproofing course additional at the waterproofing course external surface;
The 6th step, the backfill earthwork outside fish tail and waterproof layer, compaction in layers.
Adopt the ater-casting advanced water-stopping way of the present embodiment, external wall waterproof, stemming operation are fulfiled ahead of schedule, the general layout that is conducive to the upper body construction is finished early, and basement is the group of envelope in time, avoids the intrusion of rainwater, construction water and foreign material.
Compare with common construction Technique of Late Poured Band; avoided the secondary construction of exterior wall outboard template; save the conventional steel plate for sealing water that should arrange in the both sides, ater-casting, also saved the quadratic cost of basic unit place amount, waterproof and the topping etc. of conventional way after the concreting of ater-casting.
In addition to the implementation, the present invention can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of requirement of the present invention.

Claims (3)

1. fully buried basement side wall ater-casting advanced water-stopping template, comprise that both sides are fixed on the lapping plate of the side wall external surface of basement post-pouring zone both sides by expansion bolt, it is characterized in that: the both sides of described lapping plate have respectively the expansion bolt perforation that row's vertical spacing distributes, the long slot bore that one row's perforation is extended for horizontal direction, the long slot bore that another row's perforation is extended for vertical, the external surface of described lapping plate adheres to the waterproofing course that extends to both sides basement side wall external surface.
2. fully buried basement side wall according to claim 1 ater-casting advanced water-stopping template, it is characterized in that: described waterproofing course external surface has fish tail and waterproof layer.
3. fully buried basement side wall according to claim 2 ater-casting advanced water-stopping template is characterized in that: be full of elastic sealant between described lapping plate and side wall external surface and expansion bolt, the nut.
CN 201320302261 2013-05-29 2013-05-29 Fully-buried basement side wall post-pouring belt advance water stop formwork Expired - Lifetime CN203247838U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320302261 CN203247838U (en) 2013-05-29 2013-05-29 Fully-buried basement side wall post-pouring belt advance water stop formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320302261 CN203247838U (en) 2013-05-29 2013-05-29 Fully-buried basement side wall post-pouring belt advance water stop formwork

Publications (1)

Publication Number Publication Date
CN203247838U true CN203247838U (en) 2013-10-23

Family

ID=49374285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320302261 Expired - Lifetime CN203247838U (en) 2013-05-29 2013-05-29 Fully-buried basement side wall post-pouring belt advance water stop formwork

Country Status (1)

Country Link
CN (1) CN203247838U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615019A (en) * 2013-12-16 2014-03-05 中建八局第四建设有限公司 Method for plugging outer wall post-cast strip in advance
CN104141321A (en) * 2014-05-16 2014-11-12 中国建筑第四工程局有限公司 Basement side wall late poured band blocking method and used blocking steel plate
CN110700268A (en) * 2019-10-14 2020-01-17 中国十七冶集团有限公司 Construction method for backfilling foundation pit at post-cast strip of basement wall plate in advance

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615019A (en) * 2013-12-16 2014-03-05 中建八局第四建设有限公司 Method for plugging outer wall post-cast strip in advance
CN103615019B (en) * 2013-12-16 2016-04-27 中建八局第四建设有限公司 The method for blocking in advance of post-pouring belt of outer wall
CN104141321A (en) * 2014-05-16 2014-11-12 中国建筑第四工程局有限公司 Basement side wall late poured band blocking method and used blocking steel plate
CN110700268A (en) * 2019-10-14 2020-01-17 中国十七冶集团有限公司 Construction method for backfilling foundation pit at post-cast strip of basement wall plate in advance

Similar Documents

Publication Publication Date Title
CN106869172B (en) In-situ deposited prefabricated split-mounting type subway underground station construction method
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN108204240B (en) Anti-floating reinforcement system and reinforcement method for newly-built tunnel to span existing tunnel in short distance
CN111519665A (en) Gapless filling method for foundation post-cast strip
CN203475456U (en) GRC forming die plate system
CN205653820U (en) Basement post -cast strip advances plugging device
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN103410173A (en) Construction method for vertical post pouring belt plugging of underground structural outer wall
CN105350581A (en) Advanced sealing structure for basement top slab settlement post-cast strips
CN202830989U (en) Semi-general formula of induced joint system for underground structure reinforced concrete wall
CN103590841A (en) Supporting method for primary support of underground excavated chamber
CN203247838U (en) Fully-buried basement side wall post-pouring belt advance water stop formwork
CN104652495A (en) Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
CN203270627U (en) Construction joint structure of shear wall
CN104790435A (en) Post-subsidence pouring belt advancing waterstop impermeable concrete structure and construction technology thereof
CN107326924A (en) Outer wall of underground structure HCMW engineering methods overlap wall and its construction method
CN203284814U (en) Transformer substation prefabricated concrete water-scattering device
CN106193120A (en) Basement is encorbelmented, and base plate is inverse makees structure and construction method
CN102926403B (en) Roof construction method by cover-excavation method
CN206205166U (en) It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure
CN105240023A (en) Method of adopting curved pipe-jacking supporting structure for extension of shield-driven subway station
CN212223970U (en) Prefabricated apron post-cast strip stagnant water temporary enclosed construction
CN211285715U (en) Basement lateral wall post-cast strip block structure
CN210768799U (en) Main body structure construction system at intersection of main line tunnel and construction transverse channel
CN205421279U (en) Underground works lid digs construction roof support structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20131023

CX01 Expiry of patent term