CN105781570A - Metro internal-bracing-free track panel shaft and construction method thereof - Google Patents

Metro internal-bracing-free track panel shaft and construction method thereof Download PDF

Info

Publication number
CN105781570A
CN105781570A CN201610235000.9A CN201610235000A CN105781570A CN 105781570 A CN105781570 A CN 105781570A CN 201610235000 A CN201610235000 A CN 201610235000A CN 105781570 A CN105781570 A CN 105781570A
Authority
CN
China
Prior art keywords
construction
wall
inner support
side wall
track well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610235000.9A
Other languages
Chinese (zh)
Other versions
CN105781570B (en
Inventor
王凌
翟利华
张跃明
史策辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Design and Research Institute Co Ltd
Original Assignee
Guangzhou Metro Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Metro Design and Research Institute Co Ltd filed Critical Guangzhou Metro Design and Research Institute Co Ltd
Priority to CN201610235000.9A priority Critical patent/CN105781570B/en
Publication of CN105781570A publication Critical patent/CN105781570A/en
Application granted granted Critical
Publication of CN105781570B publication Critical patent/CN105781570B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/003Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention provides a construction method of a metro internal-bracing-free track panel shaft. The construction method includes following steps: (1), constructing a diaphragm wall; (2), constructing a foundation pit, and sequentially constructing a top beam and an internal bracing along with excavating; (3), constructing a baseplate, and demounting the internal bracing positioned downmost the foundation pit after strength of the baseplate reaches a certain degree; (4), constructing a side wall of a negative first floor, synchronously constructing a vertical coupled shear wall, a waist beam and a side wall within a range of a negative second floor; (5), constructing a middle plate, reserving a hole for the track panel shaft on the middle plate, and synchronously constructing a vertical coupled shear wall, a waist beam and a side wall within a range of the negative first floor; (7), constructing a top plate, reserving a hole for the track panel shaft on the top plate, and after strength of the top plate reaches a certain degree, demounting the internal bracing uppermost the foundation pit. The construction method has good water stopping effect, so that water leakage is avoided and big influence on surrounding environment during construction is avoided.

Description

A kind of subway is without inner support section of track well and construction method thereof
Technical field
The present invention relates to a kind of subway without inner support section of track well and construction method thereof, belong to Railway Transit Construction technical field.
Background technology
Quickening along with urbanization paces, urban population, territory planning and urban ecological environment all suffer from huge pressure, developing urban underground space and become the focus of numerous care, people also recognize that developing with underground railway for key mass rapid transit system is solve the important channel of urban congestion gradually.Facts have proved: subway is quick with it, cleaning, efficient feature, plays irreplaceable effect in the world, such as Tokyo, Moscow, London etc. in the metropolitan traffic system in most of developed areas.In recent years, the subway construction of China have also been obtained swift and violent development.Ending for the end of the year 2015, China has 36 cities and gets permission to build city rail traffic route, and wherein 85 circuits in 19 cities have opened operation, and total kilometrage reaches 2509.52 kilometers.There is rail line in 36 granted cities in anxiety construction, 36,22 cities new line wherein will be had to go into operation, major part region, the radiation whole nation, total kilometrage reaches 927 kilometers, gross investment reaches 502,200,000,000 yuan, it may be said that China have been enter into Urban Rail Transit Project golden age.
In Construction of Urban Rail Traffic process, for meeting the needs laid a railway track, generally will the hole of reserved track lifting well on structural slab AT STATION, this is commonly referred to section of track well for hole of section of track construction.The function of section of track well is to be hung to track-laying vehicle by assembling district by section of track finished product, and transport to work surface of laying a railway track, its position and size should meet the requirement of the safe efficient lifting of the section of track.Unit of laying a railway track requires that section of track well is opened in directly over subway line.The length that rail often saves is generally 25m, and single dimension of opening is about 27m, and width is about 4.5m, hole number according to row rail it needs to be determined that.The section of track well size that punches is generally large, owing to the section of track needs, it will usually being respectively provided with section of track well above left and right line circuit AT STATION, the rigidity of structure is seriously impaired.The structure stress of research construction stage section of track Jing Chu, it is ensured that the station structure safety in the construction stage is just particularly important with stable.
According to section of track well construction lifting requirements, need during section of track well construction the reserved large scale hole of agent structure top board and middle plate.Owing to section of track well bore size is relatively big, on structural slab after reserved section of track well, the rigidity of plate is seriously impaired, and the effect of contraction of side wall is weakened by section of track well segment structure plate.The structure side wall of underground station to bear bigger lateral Water And Earth Pressures and the bigger mobile load caused of constructing, and the rigidity of side wall and effective span are bigger to its stress and deformation effect.Not during reserved section of track well, the rigidity of structure roof and middle plate is very big, and side wall is played good bearing effect by structural slab, and side wall force modes is typical one-way slabs stress, and moment of flexure and deformation are evenly distributed and numerical value is less.On structural slab after reserved section of track well, the effect of contraction of side wall is weakened by structure roof and middle plate, and the vertical effective span of side wall increases, and presents the feature of similar cantilever slab stress, the vertical Bending moment distribution of side wall is uneven, very big in the plate vertical moment of flexure of open area inside wall.Side wall top board has bigger transversely deforming.Therefore, when needs arrange section of track well, reducing perforated area and quantity, minimizing side wall bearing load, the rigidity improving side wall and enhancing support restraint needs emphasis to consider to reduce when the effective span of side wall is the design of section of track well construction.
In prior art, the structural shape of section of track well is usually independent section of track well, and building enclosure adopts cast-in-situ bored pile to add three axes agitating pile water-stop curtain, and reinforces with anchor cable, and agent structure adopts cantilever design scheme.But during anchor cable construction, punch three axes agitating pile water-stop curtain, stagnant water effect is produced very big impact.Anchor cable scheme applicable elements is restricted, for weak soil or poor stratum, because being limited by anchor force, anchorage length is bigger just can meet design requirement, construction risk is relatively big, after completing, the impact of the environment of periphery is relatively big, and some city domestic even forbids using cable bolting in urban area.
Summary of the invention
Based on above deficiency, one aspect of the present invention to solve the technical problem that the construction method being to provide a kind of subway without inner support section of track well, its stagnant water effect is good, avoid the later stage that percolating water phenomenon occurs, construction quality is easily controlled, it is suitable for stratum extensive, it is to avoid produce risk during construction and to surrounding enviroment large effect, avoid the later stage impact on the construction of other constructions of structures simultaneously.
In order to solve above technical problem, present invention employs techniques below scheme:
A kind of subway, without the construction method of inner support section of track well, comprises the following steps:
(1) construction ground-connecting-wall;
(2) within the scope of ground-connecting-wall, below substrate bed course from top to bottom it is excavated to successively, substrate bed course of constructing, complete foundation ditch and close, and along with excavation successively construction Guan Liang and inner support;
(3) construction base plate, reaches after intensity until base plate, removes the inner support being positioned at foundation ditch bottom;
(4) side wall of negative one layer of construction, and the vertical limb wall of synchronous construction, the waist rail bearing two layers of scope and side wall;
(5) plate in construction, and on middle plate, reserve the hole of section of track well, after middle plate reaches intensity, remove the inner support being positioned in the middle part of foundation ditch;
(6) side wall of negative one layer of construction the negative vertical limb wall of one layer of scope of synchronous construction, waist rail and side wall are continued;
(7) construction top board, and on top board, reserve the hole of section of track well, reach after intensity until top board, remove the inner support being positioned at foundation ditch the top.
The step of construction steel architecture neutral post and bearing pile was also had before described step (2).
In described step (3), the construction method of base plate is specifically, longitudinally built concrete to opposite side by foundation ditch side, is laterally built by two lateral middle parts.
In described step (7), while construction top board, carry out the construction of section of track well retaining wall.
In described step (7), before the support removing described the top, also carry out the construction of waterproof roofing layer.
Adopting above technical scheme, the present invention achieves techniques below effect:
Subway provided by the invention is without the construction method of inner support section of track well, its stagnant water effect is good, avoid the later stage that percolating water phenomenon occurs, construction quality is easily controlled, it is suitable for stratum extensive, produce risk when avoiding constructing and to surrounding enviroment large effect, avoid the later stage impact on the construction of other constructions of structures simultaneously.
Another aspect of the present invention to solve the technical problem that and to be to provide a kind of subway without inner support section of track well, and its stagnant water effect is good, adapts to stratum extensive, and construction quality is easily controlled and risk is less, and surrounding enviroment impact is little.
In order to solve above technical problem, present invention employs techniques below scheme:
A kind of subway is without inner support section of track well, including building enclosure and agent structure, described building enclosure includes the ground-connecting-wall being oppositely arranged, described agent structure is arranged in described building enclosure, including being close to the side wall of described ground-connecting-wall setting and being arranged on the vertically limb wall waist rail together with at least of at least one on described side wall.
Described vertical limb wall is set to 4 roads, and is arranged between two on relative side wall.
Described ground-connecting-wall top is provided with Guan Liang, and the two ends of described Guan Liang are connected with described ground-connecting-wall respectively.
It is additionally provided with top board, middle plate and base plate between described side wall, top board, middle plate and base plate are provided with section of track wellhole hole.
Described waist rail is arranged near described middle plate and top board.
Adopting above technical scheme, the present invention achieves techniques below effect:
(1) subway provided by the invention is without inner support section of track well, and its stagnant water effect is good, adapts to stratum extensive, and construction quality is easily controlled and risk is less, and surrounding enviroment impact is little.
(2) section of track well provided by the invention is also used as shield well, reduces construction site and construction investment, reduces top board and middle plate punches area, realize section of track well standardization, construction of conveniently laying a railway track simultaneously.
(3) by arranging limb wall and waist rail shared lateral load at side wall, making full use of the drag of structure own, it is not necessary to other temporary support measures, improve efficiency of construction and quality, the scope of application is more extensive.
Accompanying drawing explanation
Fig. 1 is the subway of the present invention cross-sectional structure chart without inner support section of track well;
Fig. 2 is that subway of the present invention is without the top view after the building enclosure construction of inner support section of track well;
Fig. 3 is A-A sectional view shown in Fig. 2;
Fig. 4 is B-B sectional view shown in Fig. 2.
Detailed description of the invention
As Figure 1-Figure 4, the invention provides a kind of subway without inner support section of track well, including building enclosure and agent structure, described building enclosure includes the ground-connecting-wall 1 being oppositely arranged, described agent structure is arranged in described building enclosure, including side wall 2, at least one vertical limb wall 3 waist rail 4 together with at least of being arranged on side wall 2, described side wall 2 is close to ground-connecting-wall 1 and is arranged.
Ground-connecting-wall 1 is reinforced concrete structure, and described ground-connecting-wall top is provided with hat beam 5, and relative ground-connecting-wall 1 is coupled together by hat beam 5.Building enclosure also includes being arranged on the central post 6 between relative side wall 2 and inner support 12, and central post 6 is connected by coupling beam, and central post top is connected with inner support, inner support 12 is supported;Inner support at least 3 road, lays respectively at the top of ground-connecting-wall, middle part and bottom.When inner support 12 and central post 6 are for section of track well main structure construction, ground-connecting-wall being supported, in main structure construction process, inner support 12 and central post 6 are removed successively.Being additionally provided with top board 7 and base plate 8 between relative side wall 2, top board 7 and be provided with section of track wellhole hole 9 on base plate 8, section of track wellhole hole 9 can also serve as shield machine working shaft hole.Being also respectively provided with vertical limb wall 3 on side wall 2, vertical limb wall 3 is set to 4 roads, and is arranged between two on relative side wall 2.Waist rail 4 is arranged near middle plate 10 and top board 11, vertically suitably has additional waist rail, makes limb wall and waist rail shared lateral load.
The building enclosure of section of track well of the present invention adopts the form of ground-connecting-wall, and stagnant water effect is good, adapts to stratum extensive, and construction quality is easily controlled and risk is less, and surrounding enviroment impact is little;Section of track well can serve as shield well, reduces construction site and construction investment, reduces top board and middle plate punches area, realize section of track well standardization, construction of conveniently laying a railway track simultaneously;Arranging limb wall and waist rail shared lateral load at side wall, make full use of the drag of structure own, it is not necessary to other temporary support measures, improve efficiency of construction and quality, the scope of application is more extensive.
Present invention also offers a kind of subway construction method without inner support section of track well, comprise the following steps:
(1) construction of ground-connecting-wall 1 is carried out;
(2) first construction steel architecture neutral post 6 and bearing pile, be then from top to bottom excavated to below substrate bed course successively in ground-connecting-wall 1 scope, substrate bed course of constructing, and completes foundation ditch and closes, and along with excavation successively construction Guan Liang and inner support 12;
(3) construction base plate 8, after base plate 8 reaches intensity, removes the inner support 12 being positioned at foundation ditch bottom;The construction method of base plate, specifically, longitudinally built to opposite side by foundation ditch side by concrete, is laterally built by two lateral middle parts;
(4) side wall of negative one layer of construction, and be synchronously performed vertical limb wall 3, bear the waist rail of two layers of scope and the construction of side wall 2;
(5) plate 10 in construction, and on middle plate 10, reserve section of track wellhole hole 9, after middle plate 10 reaches intensity, remove the inner support being positioned in the middle part of foundation ditch;
(6) side wall of negative one layer of construction the negative vertical limb wall 3 of one layer of scope of synchronous construction, waist rail 4 and side wall 2 are continued;
(7) construction top board 7, and on top board 7, reserve section of track wellhole hole 9, after top board 7 reaches intensity, carry out the construction of top board 7 waterproof layer, then remove the inner support being positioned at foundation ditch the top;The construction of section of track well retaining wall is carried out while construction top board.
Subway of the present invention adds the support system of inner support without the ground-connecting-wall that the construction method employing stagnant water effect of inner support section of track well is good, work progress is progressively removed inner support, ground-connecting-wall stagnant water effect is good, avoid the later stage that percolating water phenomenon occurs, inner support construction quality is easily controlled, and is suitable for stratum wide, it is to avoid produce risk during construction and to surrounding enviroment large effect, avoid the later stage impact on the construction of other buildings simultaneously, make full use of the underground space;And agent structure adopts shield machine working shaft to also serve as section of track well, reduce plate and punch area and quantity, and at side wall limb wall is set and waist rail increases structure reactance shared lateral load, it is not necessary to other temporary support measures, improve efficiency of construction and quality.
Last it is noted that these are only the preferred embodiments of the present invention; it is not limited to the present invention; although the present invention being described in detail with reference to embodiment; for a person skilled in the art; technical scheme described in foregoing embodiments still can be modified by it; or wherein portion of techniques feature is carried out equivalent replacement; but all within the spirit and principles in the present invention; any amendment of being made, equivalent replacement, improvement etc., should be included within protection scope of the present invention.

Claims (10)

1. a subway is without the construction method of inner support section of track well, it is characterised in that comprise the following steps:
(1) construction ground-connecting-wall;
(2) within the scope of ground-connecting-wall, below substrate bed course from top to bottom it is excavated to successively, substrate bed course of constructing, complete foundation ditch and close, and along with excavation successively construction Guan Liang and inner support;
(3) construction base plate, reaches after intensity until base plate, removes the inner support being positioned at foundation ditch bottom;
(4) side wall of negative one layer of construction, and the vertical limb wall of synchronous construction, the waist rail bearing two layers of scope and side wall;
(5) plate in construction, and on middle plate, reserve the hole of section of track well, after middle plate reaches intensity, remove the inner support being positioned in the middle part of foundation ditch;
(6) side wall of negative one layer of construction the negative vertical limb wall of one layer of scope of synchronous construction, waist rail and side wall are continued;
(7) construction top board, and on top board, reserve the hole of section of track well, reach after intensity until top board, remove the inner support being positioned at foundation ditch the top.
2. subway according to claim 1 is without the construction method of inner support section of track well, it is characterised in that: before described step (2), also have the step of construction steel architecture neutral post and bearing pile.
3. subway according to claim 1 is without the construction method of inner support section of track well, it is characterized in that: in described step (3), the construction method of base plate is specially, concrete is longitudinally built to opposite side by foundation ditch side, is laterally built by two lateral middle parts.
4. subway according to claim 1 is without the construction method of inner support section of track well, it is characterised in that: in described step (7), while construction top board, carry out the construction of section of track well retaining wall.
5. subway according to claim 1 is without the construction method of inner support section of track well, it is characterised in that: in described step (7), before the support removing described the top, also carry out the construction of waterproof roofing layer.
6. a subway is without inner support section of track well, including building enclosure and agent structure, it is characterized in that: described building enclosure includes the ground-connecting-wall being oppositely arranged, described agent structure is arranged in described building enclosure, including being close to the side wall of described ground-connecting-wall setting and being arranged on the vertically limb wall waist rail together with at least of at least one on described side wall.
7. subway according to claim 6 is without inner support section of track well, it is characterised in that: described vertical limb wall is set to 4 roads, and is arranged between two on relative side wall.
8. subway according to claim 6 is without inner support section of track well, it is characterised in that: described ground-connecting-wall top is provided with Guan Liang, and the two ends of described Guan Liang are connected with described ground-connecting-wall respectively.
9. subway according to claim 6 is without inner support section of track well, it is characterised in that: it is additionally provided with top board, middle plate and base plate between described side wall, top board, middle plate and base plate are provided with section of track wellhole hole.
10. subway according to claim 9 is without inner support section of track well, it is characterised in that: described waist rail is arranged near described middle plate and top board.
CN201610235000.9A 2016-04-14 2016-04-14 A kind of construction method of subway without inner support section of track well Active CN105781570B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610235000.9A CN105781570B (en) 2016-04-14 2016-04-14 A kind of construction method of subway without inner support section of track well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610235000.9A CN105781570B (en) 2016-04-14 2016-04-14 A kind of construction method of subway without inner support section of track well

Publications (2)

Publication Number Publication Date
CN105781570A true CN105781570A (en) 2016-07-20
CN105781570B CN105781570B (en) 2018-06-26

Family

ID=56396586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610235000.9A Active CN105781570B (en) 2016-04-14 2016-04-14 A kind of construction method of subway without inner support section of track well

Country Status (1)

Country Link
CN (1) CN105781570B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869172A (en) * 2017-04-01 2017-06-20 中交第二航务工程局有限公司 In-situ deposited prefabricated split-mounting type subway underground station construction method
CN108487252A (en) * 2018-03-13 2018-09-04 中铁第四勘察设计院集团有限公司 A kind of deep foundation pit open cutting is suitable to make construction method
CN110258633A (en) * 2019-06-27 2019-09-20 中铁第四勘察设计院集团有限公司 A kind of Underground Station section of track well with prestressed concrete beam
CN113186761A (en) * 2021-04-02 2021-07-30 北京城建设计发展集团股份有限公司 Single-hole double-path intensive track laying system for subway open-cut station
CN113529792A (en) * 2021-08-09 2021-10-22 中铁工程装备集团有限公司 Subway station construction method, foundation pit excavation method and foundation pit

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007332724A (en) * 2006-06-19 2007-12-27 East Japan Railway Co Method of constructing impervious wall, and method of preventing liquefaction
CN103422863A (en) * 2013-07-24 2013-12-04 中铁四局集团第四工程有限公司 Method for ultra-deep foundation pit construction in complex environments
CN203684234U (en) * 2013-12-31 2014-07-02 中铁十二局集团第二工程有限公司 Hoisting reserved-well supporting structure for track panel construction
CN204282399U (en) * 2014-11-14 2015-04-22 广州地铁设计研究院有限公司 A kind of subway space enclosing structure
CN205532617U (en) * 2016-04-14 2016-08-31 广州地铁设计研究院有限公司 In not having, supports in subway section of track well

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007332724A (en) * 2006-06-19 2007-12-27 East Japan Railway Co Method of constructing impervious wall, and method of preventing liquefaction
CN103422863A (en) * 2013-07-24 2013-12-04 中铁四局集团第四工程有限公司 Method for ultra-deep foundation pit construction in complex environments
CN203684234U (en) * 2013-12-31 2014-07-02 中铁十二局集团第二工程有限公司 Hoisting reserved-well supporting structure for track panel construction
CN204282399U (en) * 2014-11-14 2015-04-22 广州地铁设计研究院有限公司 A kind of subway space enclosing structure
CN205532617U (en) * 2016-04-14 2016-08-31 广州地铁设计研究院有限公司 In not having, supports in subway section of track well

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张昆: "地铁轨排井段结构设计与分析", 《都市快轨交通》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869172A (en) * 2017-04-01 2017-06-20 中交第二航务工程局有限公司 In-situ deposited prefabricated split-mounting type subway underground station construction method
CN106869172B (en) * 2017-04-01 2019-01-04 中交第二航务工程局有限公司 In-situ deposited prefabricated split-mounting type subway underground station construction method
CN108487252A (en) * 2018-03-13 2018-09-04 中铁第四勘察设计院集团有限公司 A kind of deep foundation pit open cutting is suitable to make construction method
CN110258633A (en) * 2019-06-27 2019-09-20 中铁第四勘察设计院集团有限公司 A kind of Underground Station section of track well with prestressed concrete beam
CN113186761A (en) * 2021-04-02 2021-07-30 北京城建设计发展集团股份有限公司 Single-hole double-path intensive track laying system for subway open-cut station
CN113529792A (en) * 2021-08-09 2021-10-22 中铁工程装备集团有限公司 Subway station construction method, foundation pit excavation method and foundation pit

Also Published As

Publication number Publication date
CN105781570B (en) 2018-06-26

Similar Documents

Publication Publication Date Title
CN106703828B (en) The construction method of subway station is built using prefabricated assembled lining cutting combination PBA
CN105781570A (en) Metro internal-bracing-free track panel shaft and construction method thereof
CN105064397B (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN101280568A (en) Station pit construction method forming protection for neighboring operated subway interval tunnel
Paul et al. Comparative study of construction technologies for underground metro stations in India
CN108252329A (en) The assembled pipe gallery and its construction method of building enclosure load
CN109958445A (en) The frame construction method in Large Underground space is buried for an ultra shallow
CN210086295U (en) Compound assembled underground structure
CN108571321A (en) A kind of construction method of the subway station of combined highway and metro
CN102031785A (en) Foundation pit supporting technique for replacing temporary enclosing purlin by using plate belt of permanent structure
CN107905794A (en) Method is widened in a kind of subway station for retaining tunnel part section of jurisdiction
CN111997084A (en) Frame-structure type pile wall structure embedded with retaining plates and construction method thereof
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN107489284B (en) Construction method for local newly-added deep underground garage of basement
JP7503730B1 (en) Separated subway station structure and its construction method in land-sea junction area
CN112922646B (en) Building method of underground excavation station excavated by large-section single-span support through superposed arch-wall integrated type
CN107246014A (en) Detachable foundation pit trestle system and its construction method
CN112982481B (en) Structure construction method for crossing subway intersection node on pipe gallery
CN110306591A (en) A kind of base pit engineering exempts to set the construction method of the underground structure of temporary support
CN211115052U (en) Shaft type underground stereo garage structure
CN210597377U (en) Utility tunnel constructs structure with building together of subway station
CN210562287U (en) Compound assembled underground structure
CN115324104B (en) Permanent-face combined assembled station and construction method thereof
CN205532617U (en) In not having, supports in subway section of track well
CN207728018U (en) The building structure of skyscraper is built suitable for tier building set

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 510010 No. 204 Huanshi West Road, Guangzhou City, Guangdong Province

Patentee after: Guangzhou Metro Design and Research Institute Co., Ltd.

Address before: 510010 No. 204 Huanshi West Road, Guangzhou City, Guangdong Province

Patentee before: Guangzhou Metro Design & Research Institute Co., Ltd.

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Nong Xingzhong

Inventor after: Wang Ling

Inventor after: Di Lihua

Inventor after: Shi Haiou