CN108914965A - The continuous construction method of aluminum alloy mould plate for pipe gallery - Google Patents

The continuous construction method of aluminum alloy mould plate for pipe gallery Download PDF

Info

Publication number
CN108914965A
CN108914965A CN201810922232.0A CN201810922232A CN108914965A CN 108914965 A CN108914965 A CN 108914965A CN 201810922232 A CN201810922232 A CN 201810922232A CN 108914965 A CN108914965 A CN 108914965A
Authority
CN
China
Prior art keywords
pipe gallery
aluminum alloy
alloy mould
mould plate
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810922232.0A
Other languages
Chinese (zh)
Other versions
CN108914965B (en
Inventor
杨宝仓
张丽丽
张颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongye Heavy Industry (tangshan) Co Ltd
Original Assignee
Zhongye Heavy Industry (tangshan) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongye Heavy Industry (tangshan) Co Ltd filed Critical Zhongye Heavy Industry (tangshan) Co Ltd
Priority to CN201810922232.0A priority Critical patent/CN108914965B/en
Publication of CN108914965A publication Critical patent/CN108914965A/en
Application granted granted Critical
Publication of CN108914965B publication Critical patent/CN108914965B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

The present invention relates to underground pipe gallery construction, the continuous construction method of specifically a kind of aluminum alloy mould plate for pipe gallery.Include the following steps:A, first segment pipe gallery first time pouring construction;B, second of pouring construction of first segment pipe gallery carries out simultaneously with second segment pipe gallery first time pouring construction;C, first segment pipe gallery demoulding;D, second of pouring construction of second segment pipe gallery;F, the first time pouring construction of third section pipe gallery.The present invention realizes continuous cycle operation, quickly turnover construction, accelerates speed of application, shortens construction period, saves construction material, and construction environment is safer, more green, environmentally friendly.The concrete structure formed simultaneously using the present invention, surface quality is smooth bright and clean, reaches the requirement of facing and clear-water concrete, without carrying out secondary plastering, saves construction cost.

Description

The continuous construction method of aluminum alloy mould plate for pipe gallery
Technical field
The present invention relates to underground pipe gallery construction, specifically a kind of aluminum alloy mould plate for pipe gallery is continuously applied Work method.
Background technique
With the fast development of urban network city planting ductwork system, because road is anti-caused by pipeline dilatation, update, maintenance etc. It is very common that phenomenon is excavated again, and pipe gallery is gradually obtained as the contradictory new model of urban infrastructure construction is effectively solved Approve and promotes.
Currently, pipe gallery form work engineering is mainly traditional three large forms, i.e. plank sheathing, steel form and plastic formwork.Wood Template is non-watertight, and easily mildew is rotted, and reuse rate is low, consumes timber resources, is unfavorable for the guarantor of ecological environment and the forest reserves Shield;Steel form preponderance, construction need mechanical equipment to assist, easily get rusty, and easily viscous with concrete in concrete placement It is combined, demoulding is difficult;Plastic formwork poor rigidity, flexible type, and it is at high cost.With the proposition of " green building " concept, state Family increasingly payes attention to " low-carbon, energy conservation ", and the growing quality requirement of building trade, aluminum alloy mould plate is applied as green building Work new technology also achieves significant development in recent decades, with light-weight, precision is high, easy for construction famous, meets low-carbon energy-saving Emission reduction and green construction technology, and be considered as the developing direction of following green building.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of continuous construction parties of aluminum alloy mould plate for pipe gallery Method can be realized continuous cycle operation, quickly turnover construction, accelerate speed of application, shorten construction period.
The technical solution used to solve the technical problems of the present invention is that:
1, a kind of continuous construction method of the aluminum alloy mould plate for pipe gallery, includes the following steps:
A, first segment pipe gallery first time pouring construction
A, bottom plate and lead wall reinforcing bar binding;
B, installation first set leads wall aluminum alloy mould plate
1. installation armpit aluminum corner brace alloy templates and interior leading wall aluminum alloy mould plate;
2. installation is outer to lead wall aluminum alloy mould plate, fastened using water-stop opposite-pulling screw rod;
3. installing adjustable bearing diagonal, the flatness and verticality of wall aluminum alloy mould plate and outer guide wall form board are led in adjustment;
4. carrying out first time concreting after first set leads the installation acceptance(check) of wall aluminum alloy mould plate;
B, second of pouring construction of first segment pipe gallery carries out simultaneously with second segment pipe gallery first time pouring construction
(Shown in Fig. 3)
A, second of pouring construction of first segment pipe gallery
1. bottom plate and leading wall concrete strength and reaching requirement;
2. installing the first set wall aluminum alloy mould plate of first segment pipe gallery, the interior wall aluminium of first set wall aluminum alloy mould plate is closed Golden template and exterior wall aluminum alloy mould plate by first set lead wall aluminum alloy mould plate based on installed, using water-stop opposite-pulling screw rod into Row fastening;
3. installing armpit aluminum corner brace alloy templates;
4. installation is early to tear support and top plate aluminum alloy mould plate open, the internal wall aluminum alloy mould plate of adjustable bearing diagonal and exterior wall aluminium alloy are utilized Template is leveled;
5. after acceptance(check), carrying out second of concreting;
B, second of pouring construction of second segment pipe gallery first time pouring construction and first segment pipe gallery carries out simultaneously, with It leads wall aluminum alloy mould plate for two sets and repeats step A, carry out the bottom plate of second segment pipe gallery and lead wall first time pouring construction;
C, first segment pipe gallery demoulding
After the wall of first segment pipe gallery and concrete roof intensity reach requirement, premature removal first set wall and top plate Aluminum alloy mould plate retains and early tears support open, removes after concrete strength reaches 100%;
D, second of pouring construction of second segment pipe gallery
The first set wall of the first segment pipe gallery of dismounting and top plate aluminum alloy mould plate are repeated into a step in step B, carried out The wall of second segment pipe gallery and second of pouring construction of top plate;
E, the first time pouring construction of third section pipe gallery
The first segment pipe gallery first set of dismounting is led into wall aluminum alloy mould plate and repeats step A, carries out third section pipe gallery First time pouring construction.
The present invention by adopting the above technical scheme, compared with prior art, beneficial effect is:
It realizes continuous cycle operation, quickly turnover construction, accelerates speed of application, shorten construction period, save construction material, and apply Work environment is safer, more green, environmentally friendly.The concrete structure formed simultaneously using the present invention, surface quality is smooth bright and clean, The requirement for reaching facing and clear-water concrete saves construction cost without carrying out secondary plastering.
Detailed description of the invention
Fig. 1 is comprehensive pipe gallery structure schematic diagram;
Fig. 2 is the first time aluminum alloy mould plate scheme of installation of the embodiment of the present invention;
Fig. 3 is second of aluminum alloy mould plate scheme of installation of the embodiment of the present invention;
In figure:Concrete cushion 1;Bottom plate and lead wall 2;Horizontal construction joint 3;Steel plate for sealing water 4;Slope protection 5;Wall and top plate 6;Only Water Screw arbor with nut at both-ends 7;Wall aluminum alloy mould plate 8 is led outside;Armpit Angle formwork 9;Inside lead wall aluminum alloy mould plate 10;Adjustable bearing diagonal 11;Steel Muscle stirrup 12;Exterior wall aluminum alloy mould plate 13;Top plate aluminum alloy mould plate 14;Early tear support 15 open;Adjustable single support 16;Interior wall aluminium Alloy templates 17.
Specific embodiment
It is of the invention into being described in detail with reference to the accompanying drawings and examples.
Refering to fig. 1, a kind of continuous construction method of the aluminum alloy mould plate for pipe gallery, pipe gallery main structure point Construct for two layers, i.e., bottom plate and lead the construction of wall 2, wall and top plate 6 are constructed.Horizontal direction is hung down by structure design expansion joint segmentation Histogram installs steel plate for sealing water 4 and rubber fastening band, first time concreting bottom plate to setting horizontal construction joint, construction joint position And lead wall 2, second of concreting wall and top plate 6, wherein pour for the first time with combination aluminum alloy mould plate be 2 sets, second Secondary pour with aluminum alloy mould plate is 1 set, and early tearing support open is 3 sets, realizes continuous cycle operation.Steps are as follows for Specific construction:
A, first segment pipe gallery first time pouring construction(Shown in Fig. 2)
A, bottom plate and lead wall reinforcing bar binding;
B, installation first set leads wall aluminum alloy mould plate;
1. installation armpit aluminum corner brace alloy templates 9 and interior leading wall aluminum alloy mould plate 10;
2. installation is outer to lead wall aluminum alloy mould plate 8, fastened using water-stop opposite-pulling screw rod 7;
3. installing adjustable bearing diagonal 11, wall aluminum alloy mould plate 10 is led in adjustment and leading the flatness of wall aluminum alloy mould plate 8 outside and hang down Straight degree;
4. carrying out first time concreting after first set leads the installation acceptance(check) of wall aluminum alloy mould plate;
B, second of pouring construction of first segment pipe gallery carries out simultaneously with second segment pipe gallery first time pouring construction
(Shown in Fig. 3)
A, second of pouring construction of first segment pipe gallery
1. bottom plate and leading wall concrete strength and reaching requirement;
2. installing the first set wall aluminum alloy mould plate of first segment pipe gallery, the interior wall aluminium of first set wall aluminum alloy mould plate is closed Golden template 17 and exterior wall aluminum alloy mould plate 13 by first set lead wall aluminum alloy mould plate based on installed, using sealing to drawing spiral shell Bar 7 is fastened;
3. installing armpit aluminum corner brace alloy templates 9;
4. installation is early to tear support 15 and top plate aluminum alloy mould plate 14 open, using adjustable bearing diagonal 11 to 17 He of interior wall aluminum alloy mould plate Exterior wall aluminum alloy mould plate 13 is leveled;
5. after acceptance(check), carrying out second of concreting;
B, second of pouring construction of second segment pipe gallery first time pouring construction and first segment pipe gallery carries out simultaneously, with It leads wall aluminum alloy mould plate for two sets and repeats step A, carry out the bottom plate of second segment pipe gallery and lead wall first time pouring construction;
C, first segment pipe gallery demoulding
After the concrete strength of first segment pipe gallery wall and top plate reaches requirement, premature removal first set wall and top plate Aluminum alloy mould plate retains and early tears support 15 open, removes after concrete strength reaches 100%;
D, second of pouring construction of second segment pipe gallery
The first segment pipe gallery first set wall and top plate aluminum alloy mould plate of dismounting are repeated into a step in step B, carry out the Second of pouring construction of two sections of pipe gallery walls and top plate;
E, the first time pouring construction of third section pipe gallery
The first set of the first segment pipe gallery of dismounting is led into wall aluminum alloy mould plate and repeats step A, carries out third section pipe gallery First time pouring construction.
In the present embodiment, second of pouring construction of first segment pipe gallery and second segment pipe gallery first time pouring construction It carries out simultaneously, accelerates speed of application, shorten construction period.First segment pipe gallery first set wall and top plate aluminum alloy mould plate peace While dress, the bottom plate and construction of guide wall that wall aluminum alloy pattern plate carries out second segment pipe gallery are led using second set;It is comprehensive to first segment After piping lane wall and concrete roof intensity reach requirement, premature removal first set wall and top plate aluminum alloy mould plate retain early It tears support open, is removed again after concrete strength reaches 100%.Meanwhile the bottom plate and construction of guide wall of second segment pipe gallery are completed, The first set wall of dismounting and top plate aluminum alloy mould plate are continued into second segment pipe gallery wall and top board construction;It removes First set, which leads wall aluminum alloy mould plate, can proceed with the bottom plate and construction of guide wall of third section pipe gallery.So realize continuous circulation Operation.
The foregoing is merely preferably feasible embodiment of the invention, not thereby limiting the scope of the invention, It is all to change with equivalent structure made by description of the invention and accompanying drawing content, it is intended to be included within the scope of the present invention.

Claims (1)

1. a kind of continuous construction method of the aluminum alloy mould plate for pipe gallery, which is characterized in that include the following steps:
A, first segment pipe gallery first time pouring construction
A, bottom plate and lead wall reinforcing bar binding;
B, installation first set leads wall aluminum alloy mould plate
1. installation armpit aluminum corner brace alloy templates and interior leading wall aluminum alloy mould plate;
2. installation is outer to lead wall aluminum alloy mould plate, fastened using water-stop opposite-pulling screw rod;
3. installing adjustable bearing diagonal, the flatness and verticality of wall aluminum alloy mould plate and outer guide wall form board are led in adjustment;
4. carrying out first time concreting after first set leads the installation acceptance(check) of wall aluminum alloy mould plate;
B, second of pouring construction of first segment pipe gallery carries out simultaneously with second segment pipe gallery first time pouring construction
A, second of pouring construction of first segment pipe gallery
1. bottom plate and leading wall concrete strength and reaching requirement;
2. installing the first set wall aluminum alloy mould plate of first segment pipe gallery, the interior wall aluminium of first set wall aluminum alloy mould plate is closed Golden template and exterior wall aluminum alloy mould plate by first set lead wall aluminum alloy mould plate based on installed, using water-stop opposite-pulling screw rod into Row fastening;
3. installing armpit aluminum corner brace alloy templates;
4. installation is early to tear support and top plate aluminum alloy mould plate open, closed using the internal wall aluminum alloy mould plate of adjustable bearing diagonal and exterior wall aluminium Golden template is leveled;
5. after acceptance(check), carrying out second of concreting;
B, second of pouring construction of second segment pipe gallery first time pouring construction and first segment pipe gallery carries out simultaneously, with It leads wall aluminum alloy mould plate for two sets and repeats step A, carry out the bottom plate of second segment pipe gallery and lead wall first time pouring construction;
C, first segment pipe gallery demoulding
After the wall of first segment pipe gallery and concrete roof intensity reach requirement, premature removal first set wall and top plate Aluminum alloy mould plate retains and early tears support open, removes after concrete strength reaches 100%;
D, second of pouring construction of second segment pipe gallery
The first set wall of the first segment pipe gallery of dismounting and top plate aluminum alloy mould plate are repeated into a step in step B, carried out The wall of second segment pipe gallery and second of pouring construction of top plate;
E, the first time pouring construction of third section pipe gallery
The first segment pipe gallery first set of dismounting is led into wall aluminum alloy mould plate and repeats step A, carries out third section pipe gallery First time pouring construction.
CN201810922232.0A 2018-08-11 2018-08-11 Continuous construction method of aluminum alloy template for comprehensive pipe gallery Active CN108914965B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810922232.0A CN108914965B (en) 2018-08-11 2018-08-11 Continuous construction method of aluminum alloy template for comprehensive pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810922232.0A CN108914965B (en) 2018-08-11 2018-08-11 Continuous construction method of aluminum alloy template for comprehensive pipe gallery

Publications (2)

Publication Number Publication Date
CN108914965A true CN108914965A (en) 2018-11-30
CN108914965B CN108914965B (en) 2020-09-11

Family

ID=64404612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810922232.0A Active CN108914965B (en) 2018-08-11 2018-08-11 Continuous construction method of aluminum alloy template for comprehensive pipe gallery

Country Status (1)

Country Link
CN (1) CN108914965B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109404010A (en) * 2018-10-29 2019-03-01 高渭泉 A kind of aluminum tunnel modular system and its operating method
CN109505308A (en) * 2018-12-12 2019-03-22 中国十七冶集团有限公司 Underground pipe gallery, pipe trench concrete lateral pressure and the outer support soil body balance construction method
CN109605567A (en) * 2018-12-25 2019-04-12 上海公路桥梁(集团)有限公司 The manufacturing method of prefabricated piping lane
CN109778911A (en) * 2019-03-19 2019-05-21 赵新生 A kind of underground pipe gallery composite plastic template, which is taken, tears construction method open
CN110344441A (en) * 2019-07-12 2019-10-18 中国建筑一局(集团)有限公司 It is a kind of to design the sponge urban road and road construction method for having pipe gallery
CN110777659A (en) * 2019-10-17 2020-02-11 闫相明 Construction method of box culvert template system
CN111251448A (en) * 2020-01-19 2020-06-09 上海建工四建集团有限公司 Pouring method of prefabricated tunnel structure
CN111305261A (en) * 2019-12-27 2020-06-19 北京市政路桥股份有限公司 Continuous construction method of aluminum alloy template for comprehensive pipe gallery
CN112746628A (en) * 2020-12-23 2021-05-04 北京市政路桥股份有限公司 Cast-in-place comprehensive pipe gallery formwork supporting structure and cast-in-place comprehensive pipe gallery construction method
CN113322842A (en) * 2021-06-24 2021-08-31 中铁北京工程局集团有限公司 Double-hole box culvert wall communicated opening formwork and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103206089A (en) * 2013-04-18 2013-07-17 成军 Fabricated aluminum alloy formwork system construction method
CN106088148A (en) * 2016-08-04 2016-11-09 中国华冶科工集团有限公司 Pipe gallery template and application thereof
CN106677211A (en) * 2017-01-24 2017-05-17 中国建筑第二工程局有限公司 Early-dismantling fabricated pipe rack aluminum formwork trolley system capable of integrally pouring walls and top plate and construction method of system
CN108374434A (en) * 2018-05-07 2018-08-07 北京市政建设集团有限责任公司 A kind of quick pacify of piping lane monoblock type tears aluminium alloy mould bases support construction construction method open

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103206089A (en) * 2013-04-18 2013-07-17 成军 Fabricated aluminum alloy formwork system construction method
CN106088148A (en) * 2016-08-04 2016-11-09 中国华冶科工集团有限公司 Pipe gallery template and application thereof
CN106677211A (en) * 2017-01-24 2017-05-17 中国建筑第二工程局有限公司 Early-dismantling fabricated pipe rack aluminum formwork trolley system capable of integrally pouring walls and top plate and construction method of system
CN108374434A (en) * 2018-05-07 2018-08-07 北京市政建设集团有限责任公司 A kind of quick pacify of piping lane monoblock type tears aluminium alloy mould bases support construction construction method open

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109404010A (en) * 2018-10-29 2019-03-01 高渭泉 A kind of aluminum tunnel modular system and its operating method
CN109505308A (en) * 2018-12-12 2019-03-22 中国十七冶集团有限公司 Underground pipe gallery, pipe trench concrete lateral pressure and the outer support soil body balance construction method
CN109605567A (en) * 2018-12-25 2019-04-12 上海公路桥梁(集团)有限公司 The manufacturing method of prefabricated piping lane
CN109778911A (en) * 2019-03-19 2019-05-21 赵新生 A kind of underground pipe gallery composite plastic template, which is taken, tears construction method open
CN109778911B (en) * 2019-03-19 2020-08-28 赵新生 Underground pipe gallery composite plastic formwork assembling and disassembling construction method
CN110344441A (en) * 2019-07-12 2019-10-18 中国建筑一局(集团)有限公司 It is a kind of to design the sponge urban road and road construction method for having pipe gallery
CN110777659A (en) * 2019-10-17 2020-02-11 闫相明 Construction method of box culvert template system
CN111305261A (en) * 2019-12-27 2020-06-19 北京市政路桥股份有限公司 Continuous construction method of aluminum alloy template for comprehensive pipe gallery
CN111305261B (en) * 2019-12-27 2021-06-22 北京市政路桥股份有限公司 Continuous construction method of aluminum alloy template for comprehensive pipe gallery
CN111251448A (en) * 2020-01-19 2020-06-09 上海建工四建集团有限公司 Pouring method of prefabricated tunnel structure
CN112746628A (en) * 2020-12-23 2021-05-04 北京市政路桥股份有限公司 Cast-in-place comprehensive pipe gallery formwork supporting structure and cast-in-place comprehensive pipe gallery construction method
CN113322842A (en) * 2021-06-24 2021-08-31 中铁北京工程局集团有限公司 Double-hole box culvert wall communicated opening formwork and construction method

Also Published As

Publication number Publication date
CN108914965B (en) 2020-09-11

Similar Documents

Publication Publication Date Title
CN108914965A (en) The continuous construction method of aluminum alloy mould plate for pipe gallery
CN106088148B (en) Pipe gallery template and its application
CN101831985A (en) Precast concrete wallboard and preparation method thereof
CN101818541A (en) Precast composite wallboard with door/window holes and manufacturing method thereof
CN203022024U (en) Integrally-movable formwork for pipe gallery cast-in-situ construction
CN105804292A (en) Environment-friendly and energy-saving integrated cast-in-situ lightweight concrete wall and construction method thereof
CN103866885A (en) Energy-saving insulation structure of lighting window and construction method thereof
CN207032468U (en) Assembled architecture
CN106894538A (en) Filling wall and agent structure concrete integral shaping method
CN105178256B (en) One kind is used for the deep nonmetallic horizontal slip-form system of narrow gutter wall continuous placing
CN107083804B (en) A kind of wall structure column joint bar construction method
CN204059417U (en) A kind of complete inverse impervious node structure of method wall beam
CN204001212U (en) Band ring-type rebar connector
CN203834809U (en) Steel pipe column structure for steel pipe column concrete side pouring method
CN206769180U (en) A kind of shaped steel hole prefabricated section through walls
CN107245983A (en) Gutter wall continuous placing horizontal slip-form device
CN106760502A (en) Shear wall end cylinder construction method
CN110847598A (en) Thin-wall hollow pier diaphragm plate bottom formwork and construction method
CN109779104A (en) The fixed external mold assembled of internal model exempts to tear composite shuttering and installation method open
CN103882992A (en) Connection piece with annular steel bar
CN205636936U (en) Structure of making an uproar falls in pipeline sound insulation
CN204238244U (en) Deep foundation pit construction structure
CN103556825A (en) Construction method for reserved pipe sleeve in concrete of structural layers of high-rise building
CN101886470B (en) Construction method of exposed concrete ribbed beams
CN105113783B (en) A kind of construction formwork and its construction method of gypsum cast-in-situ wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant