CN201687125U - Precast concrete wallboard - Google Patents

Precast concrete wallboard Download PDF

Info

Publication number
CN201687125U
CN201687125U CN2010202152063U CN201020215206U CN201687125U CN 201687125 U CN201687125 U CN 201687125U CN 2010202152063 U CN2010202152063 U CN 2010202152063U CN 201020215206 U CN201020215206 U CN 201020215206U CN 201687125 U CN201687125 U CN 201687125U
Authority
CN
China
Prior art keywords
deck
topping
sleeve
concrete panel
reinforced bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010202152063U
Other languages
Chinese (zh)
Inventor
秦珩
李建树
张景明
周松
刘国权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Vanke Enterprise Co Ltd
Original Assignee
Beijing Vanke Enterprise Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Vanke Enterprise Co Ltd filed Critical Beijing Vanke Enterprise Co Ltd
Priority to CN2010202152063U priority Critical patent/CN201687125U/en
Application granted granted Critical
Publication of CN201687125U publication Critical patent/CN201687125U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Panels For Use In Building Construction (AREA)

Abstract

The utility model provides a precast concrete wallboard which sequentially comprises a structure layer and a protection layer from the inner to the outer, wherein the structure layer is internally provided with a steel reinforcement cage, the concrete of the protection layer is internally provided with a reinforcing steel bar net piece, the protection layer is connected with the structure layer through a transverse connecting reinforcing steel bar on the reinforcing steel bar net piece, the left edge and the right edge of the protection layer are extruded out of the structure layer, the lower edge of the protection layer is downward extended to be provided with a convex port, the top of the protection layer is upward extended out of the structure layer, the upper edge of the protection layer is provided with a concave port which corresponds to the convex port of an upper layer adjoining precast concrete wallboard, and the two ends of the transverse rid of the steel reinforcement cage are extended out of the left side and the right side of the structure layer of the wall body to have two rows of inward and oppositely-bent transverse steel tie reinforcing steel bars. The wallboard simplifies the construction working procedure, accelerates the construction speed, reduces the engineering cost, leads the standard and the quality of the product remanufactured by a factory to be uniform, sufficiently guarantees the construction quality of a building structure, and can be widely applied to the construction of a reinforced concrete building in the building industry.

Description

A kind of precast concrete panel
Technical field
The utility model relates to a kind of prefabricated reinforced concrete wallboard.
Background technology
The method of cast-in-place concrete is adopted in present dwelling construction, the site operation of exterior wall agent structure generally will be through installing template, laying reinforcing bar, the placing of concrete working procedure of form removal again, after the exterior wall main structure construction finishes, a series of a large amount of loaded down with trivial details work such as outer decorative layer construction and interior decoration construction.The energy consumption that every square metre of dwelling house will cause to be equivalent to 20 kilograms of standard coals, consumption, 3% concrete loss, the loss of 3% steel and the consumption of 0.05 cubic metre of timber of 0.05 cubic metre of water.Hand over the room mode computation with the rough house that generally adopts at present, the client is in fitment process, and each household also can bring the decoration garbage consumption about 2 tons.Each engineering all needs to use a lot of haulage vehicles that a large amount of building materials are transported to the building site from outside the city, and construction finishes and more a large amount of building wastes transported to outside the city from the building site, and this makes the matter worse original urban traffic of just blocking up very much more.Site operation also has following defectives: site operation program and complex management, and construction cost is bigger; Building waste is more, and project site is not easy to clean; The noise of site operation has a strong impact on the live and work of surrounding resident, is unfavorable for the protection of environment; Because be subjected to the influence of factors such as constructional materials, weather conditions, field control, quality of workers, the site operation quality also is not easy to be guaranteed.
The industrialization of construction industry of China was sign with the prestressed hollow slab mainly since the starting seventies in last century at that time, and to the beginning of the eighties, ground such as Beijing are introduced dwelling house and built industrialized significant technology from Eastern Europe---full assembling type large plate structure system.But because the cold bridge heat bridge problem of wallboard seam crossing, surface layer cracking and the problem that comes off, structure load-bearing security problems all are not well solved, therefore, prefabricating technique is not only not prosperous along with upsurge in construction, is tending towards decline on the contrary rapidly.
On August 12nd, 2009, Premier Wen Jiabao held Executive Meeting of the State Council, proposed China first and will cultivate low-carbon economy as new growth point, " greatly develop green economy.The decision and deployment that combining closely expands domestic demand boosts economic growth, cultivating with the low-carbon emission is the new growth engines of feature, accelerating to build with the low emission is industry, building, the railway and highway system of feature ".Know that therefrom housing industrialization is a kind of inexorable trend, the problem, prefabricated, the site-assembled dwelling house mass production method of a kind of new batch production of research that solve housing industrialization have become the task of top priority.
The utility model content
The purpose of this utility model provides a kind of precast concrete panel, solve that the conventional construction method freight volume is big, construction cost is high, construction quality do not guarantee, the serious problem of environment pollution.
For achieving the above object; the utility model adopts following technical scheme: a kind of precast concrete panel; its body of wall order from the inside to the outside has deck and topping; reinforcing cage is arranged in the deck; in the concrete of topping reinforced mesh is arranged; it is characterized in that: described topping is connected with deck by the horizontal connecting reinforcement that is connected on the reinforced mesh; the left and right edges of topping protrudes in deck; the lower limb of topping extends tang downwards; the top of topping projects upwards in deck, and the top edge of topping has the recess corresponding with the tang of the contiguous prefabricated concrete panel in upper strata.
The horizontal bar two ends of described reinforcing cage are stretched out wall body structure layer left and right sides face and are presented two rows inwardly to curved horizontal steel tie, the vertical muscle of reinforcing cage stretches out from wall body structure layer end face, become the vertical connecting reinforcement that is connected with the contiguous prefabricated concrete panel in upper strata, the bottom of deck is embedded with and the corresponding reinforced bar sleeve of the vertical connecting reinforcement of the contiguous prefabricated concrete panel of lower floor, fixedly connected with the vertical muscle of reinforcing cage in the deck in the top of described reinforced bar sleeve, on the reinforced bar sleeve sidewall of the end that enters the mouth near reinforcing bar, have an injected hole, on the sidewall that comes directly towards an end near reinforced bar sleeve, open slurry outlet, slurry outlet is connected with the slip casting short tube with the pulp short tube with injected hole, the medial surface of deck is stretched out in the outer end of pulp short tube and slip casting short tube, also is embedded with the inner thread sleeve perpendicular to the plate face on the medial surface of deck.
Have door and window hole on the described body of wall, build-in has anticorrosion wooden unit on the side of door and window hole, is installed with anchor bar in the anticorrosion wooden unit, an end of anchor bar bend to 45 the degree and be embedded in the deck, the other end bend to 90 the degree and be embedded in the topping.
The lateral surface of described topping can be connected with outer decorative layer, and outer decorative layer is face brick, coating or decorative panel.
Left and right sides face, end face and the bottom surface of described deck is undisguised material matsurface.
The material of described reinforced bar sleeve is a rolled section steel, profile is drum or prism shape, the tube inwall of reinforced bar sleeve is for all directly or undergauge, wherein tube inwall one end of the reinforced bar sleeve of undergauge is provided with the screwed hole of undergauge, screwed hole is threaded with vertical muscle in the deck, the tube inwall other end of reinforced bar sleeve is provided with sleeve nose end bulge loop, tube between described screwed hole and the sleeve nose end bulge loop has a plurality of spaced apart vertically protruding ring ribs on the inwall, is being equipped with groove between the adjacent protruding ring rib and between the two ends of the protruding ring rib at two ends and reinforced bar sleeve.
Compared with prior art the utlity model has following characteristics and beneficial effect: the utility model is transported to the job site after being prefabricated in the factory and finishing, the job site adopts lifting to install, member is assembled into integral body by reliable connected mode, help realizing housing industrialization, overcome the defective of the on-the-spot formwork of traditional form of construction work, assembling reinforcement, concreting, after finishing, major structure of construction do not need to carry out again the construction of door and window installation, outside finish, simplified working procedure, accelerate speed of application, reduced construction costs.And prefabricate product specification unanimity, quality is unified, and the construction quality of building structure can access sufficient assurance.
When side fascia of the present utility model is prefabricated in the factory, by the good mould of prior customization, with counter the spreading of ceramic tile of well cutting, concreting overleaf after ceramic tile is completed, because the coagulation soil pressure builds on ceramic tile, its firm degree be traditional construction technology can not compare.Because ceramic tile and side fascia one-shot forming in factory are compared with traditional method, saved the outer facade finishing duration greatly simultaneously, not only accelerated the construction period, when guaranteeing safety in production and top quality, saving energy, lowering energy consumption and reducing pollutants discharge greatly reduce building waste, avoid the pollution to environment.The utility model by the building of separate type, changes the mode of concreting by the propelling of housing industrialization process, all can bring significantly to change on building waste, electric energy, water resource, timber, steel.Suppose 2012, the Chinese Urbanization's process still keeps present speed, the dwelling construction amount reaches 1,000,000,000 square metres, the housing industrialization ratio reaches 10%, this means the water yield that using water wisely is equivalent to 10 West Lakes, reduce power consumption and be equivalent to one month the generated energy in Ge Zhou Ba, reduce deforestation and be equivalent to 9,000 hectares of forests.If the industrialization ratio reaches 20%, will mean the water yield of the West Lake, 20,340 ten thousand cubes=19 Hangzhou of using water wisely, 90.4 ten thousand tons of standard coals of energy efficient=22.6 hundred million degree electric weight=2 months generated energy in power station, pact Ge Zhou Ba; Reduce concrete loss 142.4 ten thousand steres=285 18 floor dwelling house concrete amounts; Reduce 13.56 ten thousand tons=188 18 floor dwelling house steel using amounts of steel loss, surpass 1 Bird's Nest steel using amount.
The building that adopts the utility model to build, the building that the traditional mode of identical employing with scale is built is in whole building course, and the statistics that its material consumption, energy consumption are carried out is compared as follows:
Figure 285916DEST_PATH_IMAGE001
Above data show that the building that adopts the utility model to build is compared with conventional art construction project, has clear superiority aspect material consumption, the energy consumption, is especially achieving noticeable achievement aspect constructional materials consumption and the building waste minimizing.Accelerated the construction period, when guaranteeing safety in production and top quality, saving energy, lowering energy consumption and reducing pollutants discharge greatly, disposable finishing puts in place, reduces decoration garbage, avoids finishing pollution.
The utility model has improved the machining accuracy and the quality of construction wall greatly, has realized industrialization, standardization, the generalization of construction wall, can be widely used in the construction of building trade concrete steel building.The building that has used the utility model to build, compare in also greatly lifting aspect the quality with the building that traditional handicraft is built, common and common quality defects such as the seepage that is difficult to effect a radical cure, cracking, hollowing, room-sized deviation almost reduce to zero in traditional handicraft, save about 3 months of duration, improved efficiency about 20% than the building of identical construction scope equal height simultaneously.
The utility model adopts embedded bar sleeve+slip casting to connect in the connection of levels precast concrete panel reinforcing bar, pours into the cementation material through the injected hole of cartridges sides, reinforcing bar is built with the grouting material be one, and safety of structure is improved greatly.Injected hole on the reinforced bar sleeve can the joints cement mortar, and slurry outlet can make filling process more smooth and easy.The hole wall of injected hole and slurry outlet is provided with one section screw thread, with it in conjunction with closely, avoids the grouting material to flow out metal sleeve before setting and harden when being convenient to Grouting Pipe and being screwed into.Protruding ring rib and groove on the reinforced bar sleeve tube inwall, aspect tensile strength, played tangible effect, promptly when the vertical muscle in the deck is received opposing pulling force with vertical connecting reinforcement, produce relative axial force between the cement mortar of microdilatancy and the reinforced bar sleeve tube inwall, promptly to cement mortar generation systolic pressure radially, make the cement mortar of microdilatancy encircle vertical connecting reinforcement more tightly, increased the bonding strength of the two greatly, and then increased the tensile strength of joint.
The horizontal steel tie of the utility model body of wall both sides is changed into the reinforcing bar of open band crotch by the reinforcing bar of former sealing, because the reinforcing bar of open band crotch random shift position when running into the vertical muscle of dislocation, so the shortcoming of having avoided reinforcing bar to block mutually, the speed when having improved the lifting wallboard.
Described inner thread sleeve one end is embedded in the deck, the other end has three kinds of purposes, the one, when installing, lifting can be connected with the hook of loop wheel machine, the 2nd, when fixing body of wall, can connect one to one with the contact of diagonal brace, three are arranged on the deck left and right sides, can be used to connect template, this template is used to build the seam of adjacent two precast concrete panels, is set shaped steel formwork.What inner thread sleeve used is internal thread, is convenient to connect and back-out, and is suitable for hanging out installation after body of wall completes.
Left and right sides face, end face and the bottom surface of described deck is undisguised material matsurface, and it is firmer to make that the utility model is connected with cast-in-place perps, can prevent that also this from locating the shrinkage crack that concrete contraction causes this place.
The utlity model has the antiseep system, comprise that structure is from waterproof, constructional waterproofing, material waterproofing three parts.Precast concrete panel is vertical seam when contiguous prefabricated concrete panel with one deck is connected, and vertical seam adopts structure from waterproof, and promptly the edge joint position of two blocks of precast concrete panels adopts cast-in-situ concrete to build, and makes it one integrated mass; When precast concrete panel is connected with the contiguous prefabricated concrete panel of levels, be horizontal joint, horizontal joint adopts constructional waterproofing, i.e. all prefabricated tongue and groove in the top of precast concrete panel and bottom, and it is indoor to stop water to flow to; Seam crossing at precast concrete panel and precast concrete panel can also adopt polyethylene foamed plug and waterproof gasket cement etc. to carry out material waterproofing, can adopt the improvement silicone adhesive such as waterproof gasket cement, have advantages such as superior cold-resistant, heat-resisting, weather, durability, the motion of adaptation precast concrete panel that can be soft, and can as polyurethane, not be subjected to ultraviolet ray and can make the surface produce cracking.Described vertical seam and horizontal joint are when concreting, and topping has played the effect of exterior sheathing, so need not to set up outboard template, the technology of simplification has been saved time and cost again.
Window seepage under the traditional method is that the client concentrates the focus of complaining, and the utility model has door and window hole, because side fascia is at produce in factory, the scale error of door and window hole is controlled at the millimeter level, window and door are installed accurately, are fitted together perfectly, so fundamentally solved the external window leakage problem.But the anticorrosion wooden unit of reserving in the door and window hole of corrosion-resistant can effectively prevent cold bridge, also convenient on-the-spot the installation.
Description of drawings
The utility model is described in more detail below in conjunction with accompanying drawing.
Fig. 1 is that the master of precast concrete panel embodiment one looks schematic diagram.
Fig. 2 is that schematic diagram is looked on the left side of precast concrete panel embodiment one.
Fig. 3 is the elevational schematic view of precast concrete panel embodiment one.
Fig. 4 is the schematic diagram of A-A section among Fig. 1.
Fig. 5 is the schematic diagram of precast concrete panel embodiment two.
Fig. 6 is the structural representation of first kind of reinforced bar sleeve.
Fig. 7 schematic diagram that to be first kind of reinforced bar sleeve be connected with vertical muscle with vertical connecting reinforcement.
Fig. 8 is the schematic diagram of inner thread sleeve.
Fig. 9 is the schematic top plan view of Fig. 8.
Figure 10 is that the master who has the precast concrete panel of window opening mouth looks schematic diagram.
Figure 11 is that the master who has the precast concrete panel of door opening looks schematic diagram.
Figure 12 is the schematic diagram of B-B section among Figure 10.
Figure 13 is the schematic diagram of C-C section among Figure 10.
Figure 14 schematic diagram that to be the utility model of having adopted second kind of reinforced bar sleeve be connected with lower floor contiguous prefabricated concrete panel.
Reference numeral: 1-deck; the 2-topping; the 3-door and window hole; the 4-outer decorative layer; the anticorrosion wooden unit of 5-; the 7-tang; the 8-recess; the 9-inner thread sleeve; the vertical connecting reinforcement of 10-; 11-slip casting short tube; 12-indulges muscle; 13-pulp short tube; the horizontal steel tie of 14-; 15-reinforcing bar suspension ring; the 16-cement mortar; the 17-floor; the 18-floor bar; the 19-rubber strip; 20-polyethylene foamed plug; the 21-waterproof gasket cement; the 22-anchor bar; the 23-jamb; the horizontal connecting reinforcement of 24-.
6-reinforced bar sleeve, 6.1-screwed hole, 6.2-sleeve nose end bulge loop, 6.3-protruding ring rib, 6.4-slurry outlet, 6.5-injected hole, 6.6-groove.
The specific embodiment
Embodiment one is referring to shown in Fig. 1-4; this precast concrete panel; its body of wall order from the inside to the outside has deck 1 and topping 2; reinforcing cage is arranged in the deck; in the concrete of topping 2 reinforced mesh is arranged; described topping 2 is connected with deck 1 by the horizontal connecting reinforcement 24 that is connected on the reinforced mesh; the left and right edges of topping 2 protrudes in deck 1; the lower limb of topping 2 extends tang 7 downwards; the top of topping 2 projects upwards in deck 1, and the top edge of topping has the recess corresponding with the tang of the contiguous prefabricated concrete panel in upper strata 8.When the company seam crossing concreting of adjacent two precast concrete panels, topping 2 can serve as template, has simplified technology.
The horizontal bar two ends of described reinforcing cage are stretched out wall body structure layer left and right sides face and are presented two rows inwardly to curved horizontal steel tie 14; and this horizontal steel tie 14 does not protrude in the edge, the left and right sides of topping 2; the vertical muscle of reinforcing cage stretches out from wall body structure layer end face; become the vertical connecting reinforcement 10 that is connected with the contiguous prefabricated concrete panel in upper strata; and this vertical connecting reinforcement 10 projects upwards in the top edge of topping 2, and the end face of deck has also protruded upward reinforcing bar suspension ring 15.The bottom of deck 1 is embedded with and the corresponding reinforced bar sleeve 6 of lower floor's vertical connecting reinforcement of contiguous prefabricated concrete panel.
Described reinforced bar sleeve 6 has two kinds, material is a rolled section steel, profile is drum or prism shape, on the reinforced bar sleeve sidewall of the end that enters the mouth near reinforcing bar, have an injected hole 6.5, on the sidewall that comes directly towards an end near reinforced bar sleeve, open slurry outlet 6.4, described slurry outlet is connected with pulp short tube 13, and injected hole is connected with slip casting short tube 11, and the medial surface of deck 1 is stretched out in the outer end of pulp short tube 13 and slip casting short tube 11.Fig. 6, among Fig. 7 first kind of reinforced bar sleeve, the tube inwall of this reinforced bar sleeve is a undergauge, tube inwall one end of reinforced bar sleeve 6 is provided with the screwed hole 6.1 of undergauge, screwed hole 6.1 is threaded with vertical muscle 12 in the deck, go back reinforcement of weld simultaneously, the tube inwall other end of reinforced bar sleeve 6 is provided with sleeve nose end bulge loop 6.2, tube between described screwed hole 6.1 and the sleeve nose end bulge loop 6.2 has a plurality of spaced apart vertically protruding ring ribs 6.3 on the inwall, is being equipped with groove 6.6 between the adjacent protruding ring rib and between the two ends of the protruding ring rib at two ends and reinforced bar sleeve.
Among Figure 14 second kind of reinforced bar sleeve, compare with first kind of reinforced bar sleeve, the tube inwall of second kind of reinforced bar sleeve is for all directly, fixedly connected with the vertical muscle 12 of reinforcing cage in the deck 1 in the top of this reinforced bar sleeve, on the reinforced bar sleeve sidewall of the end that enters the mouth near reinforcing bar, have an injected hole, on the sidewall that comes directly towards an end near reinforced bar sleeve, open slurry outlet.Vertical connecting reinforcement 10 on the contiguous prefabricated concrete panel of lower floor stretches in the reinforced bar sleeve from the lower end, is connected with reinforced bar sleeve by cement mortar 16 then.
Also be embedded with the inner thread sleeve 9 perpendicular to the plate face on the medial surface of deck 1, the structure of this inner thread sleeve 9 can be referring to Fig. 8, Fig. 9.Referring to Fig. 1, the inner thread sleeve 9 that is positioned at deck 1 left and right sides is used to connect template, and this template is that the perps of building between adjacent two precast concrete panels is used; Two pairs of inner thread sleeves about the inboard of the inner thread sleeve that the connection template is used also has, two pairs of inner thread sleeves are used to connect hanger about this.
Referring to Figure 10-13; have door and window hole 3(on the described body of wall and wherein be the window opening mouth among Figure 10; among Figure 11 door opening); build-in has anticorrosion wooden unit 5 on the side of door and window hole 3; be installed with anchor bar 34 in the anticorrosion wooden unit 5, an end of anchor bar 34 bend to 45 the degree and be embedded in the deck 1, the other end bend to 90 the degree and be embedded in the topping 2.In the present embodiment, jamb 23 by screw on anticorrosion wooden unit 5.
Referring to Figure 14; accompany floor 17 between the contiguous prefabricated concrete panel in the utility model and lower floor or upper strata; also be lined with rubber strip 19 between the lower end of the deck 1 of precast concrete panel and the floor 17; floor bar 18 is arranged in the floor 17; described reinforced bar sleeve 6 is enclosed within on vertical connecting reinforcement 10 on the contiguous prefabricated concrete panel; joints cement mortar 16 is fixing then, also is filled with polyethylene foamed plug 20 and waterproof gasket cement 21 between the topping of the contiguous prefabricated concrete panel of topping 2 of the present utility model and lower floor or upper strata.
Embodiment two is referring to Fig. 5, and the lateral surface of described topping 2 is connected with outer decorative layer 4, and outer decorative layer 4 is face brick, coating or decorative panel.
The preparation method of this precast concrete panel, step 1, assembly unit bed die; Step 2, on bed die, place the topping reinforced mesh, on reinforced mesh, connect horizontal connecting reinforcement 24; Step 3, build the topping concrete; Step 4, before the topping concrete initial set, on the topping concrete, insert horizontal connecting reinforcement 24; Step 5, integral body are vibrated, and horizontal connecting reinforcement 24 is combined closely with the topping concrete; Step 6, a side form; Step 7, on topping, place reinforcing cage, reinforcing bar suspension ring 15 and inner thread sleeve 9, comprise horizontal steel tie 14, vertical connecting reinforcement 10 on the reinforcing cage, reinforced bar sleeve 6 is fixedlyed connected with the deck reinforcing cage, pulp short tube 13 is fixedlyed connected with reinforced bar sleeve 6 with slip casting short tube 11; Step 8, pouring structure layer concrete; Step 9, maintenance; Step 10, tear side form open, lifting.In the described step 9, the system of maintenance is quietly to stop, heat up, constant temperature, cooling respectively are 2 hours, 2 hours, 8 hours and 2 hours, wherein programming rate be controlled at 15 the degree/hour, the constant temperature maximum temperature is controlled at 60 degree, cooling rate be controlled at 10 degree/hour, when wallboard and atmosphere temperature-difference are not more than 15 when spending, remove covering.
If have door and window hole 3 on the body of wall; then in step 1; also to prop up door-window opening mould plate in the time of the assembly unit bed die; in described step 4; before the topping concrete initial set, on the topping concrete, insert horizontal connecting reinforcement 24; and place anticorrosion wooden unit 5 and anchor bar 22, and anchor bar 22 also will be through in the anticorrosion wooden unit.
If the lateral surface of described topping 2 is connected with outer decorative layer 4; and outer decorative layer is a face brick; then in described step 2; on bed die, stick earlier two-sided tape; then with the outer decorative layer surface brick adherence on two-sided tape; and then the reinforced mesh of placement topping, after step 10 finishes, again the film of outer decorative layer tile surface and the dividing strip in the brickwork joint are removed, and sticked at outer decorative layer tile surface and the interior cement paste of seam with cleaning.
In order to make undisguised material matsurface, after described step 8 finishes, on side, the left and right sides, end face and the bottom surface of deck 1, be coated with the slow setting interfacial agents, then after step 10 finishes, wash away side, the left and right sides, end face and the bottom surface of deck 1 with giant, make side, the left and right sides, end face and the bottom surface of deck become undisguised material matsurface.

Claims (5)

1. precast concrete panel, its body of wall order from the inside to the outside has deck (1) and topping (2), reinforcing cage is arranged in the deck, in the concrete of topping (2) reinforced mesh is arranged, it is characterized in that: described topping (2) is connected with deck (1) by the horizontal connecting reinforcement (24) that is connected on the reinforced mesh, the left and right edges of topping (2) protrudes in deck (1), the lower limb of topping (2) extends tang (7) downwards, the top of topping (2) projects upwards in deck (1), and the top edge of topping has the recess corresponding with the tang of the contiguous prefabricated concrete panel in upper strata (8);
The horizontal bar two ends of described reinforcing cage are stretched out wall body structure layer left and right sides face and are presented two rows inwardly to curved horizontal steel tie (14), the vertical muscle of reinforcing cage stretches out from wall body structure layer end face, become the vertical connecting reinforcement (10) that is connected with the contiguous prefabricated concrete panel in upper strata, the bottom of deck (1) is embedded with and the corresponding reinforced bar sleeve (6) of lower floor's vertical connecting reinforcement of contiguous prefabricated concrete panel, fixedly connected with the vertical muscle (12) of reinforcing cage in the deck (1) in the top of described reinforced bar sleeve (6), on the reinforced bar sleeve sidewall of the end that enters the mouth near reinforcing bar, have an injected hole (6.5), on the sidewall that comes directly towards an end near reinforced bar sleeve, open slurry outlet (6.4), slurry outlet (6.4) is connected with slip casting short tube (11) with pulp short tube (13) with injected hole (6.5), the medial surface of deck (1) is stretched out in the outer end of pulp short tube (13) and slip casting short tube (11), also is embedded with the inner thread sleeve (9) perpendicular to the plate face on the medial surface of deck (1).
2. a kind of precast concrete panel according to claim 1; it is characterized in that: have door and window hole (3) on the described body of wall; build-in has anticorrosion wooden unit (5) on the side of door and window hole (3); be installed with anchor bar (34) in the anticorrosion wooden unit (5), an end of anchor bar (34) bend to 45 the degree and be embedded in the deck (1), the other end bend to 90 the degree and be embedded in the topping (2).
3. a kind of precast concrete panel according to claim 1 is characterized in that: the lateral surface of described topping (2) is connected with outer decorative layer (4), and outer decorative layer is face brick, coating or decorative panel.
4. a kind of precast concrete panel according to claim 1 is characterized in that: left and right sides face, end face and the bottom surface of described deck (1) is undisguised material matsurface.
5. a kind of precast concrete panel according to claim 1, it is characterized in that: the material of described reinforced bar sleeve (6) is a rolled section steel, profile is drum or prism shape, the tube inwall of reinforced bar sleeve (6) is for all directly or undergauge, wherein tube inwall one end of the reinforced bar sleeve of undergauge is provided with the screwed hole (6.1) of undergauge, screwed hole (6.1) is threaded with vertical muscle (12) in the deck (1), the tube inwall other end of reinforced bar sleeve (6) is provided with sleeve nose end bulge loop (6.2), tube between described screwed hole (6.1) and the sleeve nose end bulge loop (6.2) has a plurality of spaced apart vertically protruding ring ribs (6.3) on the inwall, is being equipped with groove (6.6) between the adjacent protruding ring rib and between the two ends of the protruding ring rib at two ends and reinforced bar sleeve.
CN2010202152063U 2010-06-04 2010-06-04 Precast concrete wallboard Expired - Lifetime CN201687125U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202152063U CN201687125U (en) 2010-06-04 2010-06-04 Precast concrete wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202152063U CN201687125U (en) 2010-06-04 2010-06-04 Precast concrete wallboard

Publications (1)

Publication Number Publication Date
CN201687125U true CN201687125U (en) 2010-12-29

Family

ID=43375410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202152063U Expired - Lifetime CN201687125U (en) 2010-06-04 2010-06-04 Precast concrete wallboard

Country Status (1)

Country Link
CN (1) CN201687125U (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831985A (en) * 2010-06-04 2010-09-15 北京万科企业有限公司 Precast concrete wallboard and preparation method thereof
CN103568109A (en) * 2012-08-09 2014-02-12 初明进 Hole forming method of precast concrete hollow component
CN103669696A (en) * 2012-09-02 2014-03-26 初明进 Hollow precast concrete member and manufacturing method thereof
CN103806593A (en) * 2014-03-11 2014-05-21 初明进 Precast concrete member
CN103802209A (en) * 2012-11-15 2014-05-21 初明进 Prefabricated concrete hollow component pore-forming method
CN103899033A (en) * 2012-12-29 2014-07-02 青岛市城阳区新世纪预制构件有限公司 Precast plant building wallboard
CN103899103A (en) * 2012-12-29 2014-07-02 青岛市城阳区新世纪预制构件有限公司 Industrial plant
CN103981998A (en) * 2014-05-28 2014-08-13 王睿敏 Pre-cast shear wallboard as well as shear wall and construction method for shear wall
CN104018622A (en) * 2014-06-07 2014-09-03 王睿敏 Reinforcement mesh easy to automatically produce for shear wall, production method of reinforcement mesh and formed shear wall
CN104831811A (en) * 2014-02-12 2015-08-12 赵光林 Hollow reinforced concrete prefabricated wall body module
WO2017028475A1 (en) * 2015-08-19 2017-02-23 周兆弟 Prefabricated wall for assembled house
CN106988482A (en) * 2017-04-07 2017-07-28 中建科技有限公司深圳分公司 Sleeve connection prefabricated panel and its making, transport, installation method
CN108755991A (en) * 2018-08-27 2018-11-06 唐明才 A kind of remodeling tempered glass thermal insulation board
CN109457965A (en) * 2018-10-30 2019-03-12 北京建筑机械化研究院有限公司 The Efficient installation method and its device of precast concrete wall panel
CN110685371A (en) * 2019-09-11 2020-01-14 江阴天孚新型墙体材料有限公司 Rapid hoisting construction process for prefabricated composite wallboard

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831985A (en) * 2010-06-04 2010-09-15 北京万科企业有限公司 Precast concrete wallboard and preparation method thereof
CN101831985B (en) * 2010-06-04 2012-04-18 北京万科企业有限公司 Precast concrete wallboard and preparation method thereof
CN103568109A (en) * 2012-08-09 2014-02-12 初明进 Hole forming method of precast concrete hollow component
CN103669696A (en) * 2012-09-02 2014-03-26 初明进 Hollow precast concrete member and manufacturing method thereof
CN103802209A (en) * 2012-11-15 2014-05-21 初明进 Prefabricated concrete hollow component pore-forming method
CN103899103B (en) * 2012-12-29 2016-06-15 青岛新世纪预制构件有限公司 Industrial premises
CN103899033A (en) * 2012-12-29 2014-07-02 青岛市城阳区新世纪预制构件有限公司 Precast plant building wallboard
CN103899103A (en) * 2012-12-29 2014-07-02 青岛市城阳区新世纪预制构件有限公司 Industrial plant
CN104831811A (en) * 2014-02-12 2015-08-12 赵光林 Hollow reinforced concrete prefabricated wall body module
CN104831811B (en) * 2014-02-12 2017-12-19 赵光林 A kind of hollow armored concrete precast wall body module
CN103806593A (en) * 2014-03-11 2014-05-21 初明进 Precast concrete member
CN103806593B (en) * 2014-03-11 2016-07-06 初明进 A kind of precast concrete
CN103981998A (en) * 2014-05-28 2014-08-13 王睿敏 Pre-cast shear wallboard as well as shear wall and construction method for shear wall
CN104018622A (en) * 2014-06-07 2014-09-03 王睿敏 Reinforcement mesh easy to automatically produce for shear wall, production method of reinforcement mesh and formed shear wall
WO2017028475A1 (en) * 2015-08-19 2017-02-23 周兆弟 Prefabricated wall for assembled house
CN106988482A (en) * 2017-04-07 2017-07-28 中建科技有限公司深圳分公司 Sleeve connection prefabricated panel and its making, transport, installation method
CN108755991A (en) * 2018-08-27 2018-11-06 唐明才 A kind of remodeling tempered glass thermal insulation board
CN109457965A (en) * 2018-10-30 2019-03-12 北京建筑机械化研究院有限公司 The Efficient installation method and its device of precast concrete wall panel
CN109457965B (en) * 2018-10-30 2020-10-20 北京建筑机械化研究院有限公司 High-efficiency installation method and device of precast concrete wall panel
CN110685371A (en) * 2019-09-11 2020-01-14 江阴天孚新型墙体材料有限公司 Rapid hoisting construction process for prefabricated composite wallboard

Similar Documents

Publication Publication Date Title
CN101831985B (en) Precast concrete wallboard and preparation method thereof
CN201687125U (en) Precast concrete wallboard
CN101818541B (en) Precast composite wallboard with door/window holes and manufacturing method thereof
CN101818539B (en) Assembled integral building and construction method thereof
CN201738600U (en) Assembled integrated type building
CN101831986B (en) Precast composite outer insulated wall plate and manufacturing method thereof
CN101818527B (en) Assembled integral shear wall structure system and construction method thereof
CN201687102U (en) Assembled integral type shear wall structure system
CN201738494U (en) Prefabricated composite wall slab with door/window opening
CN201687127U (en) Prefabricated composite outer heat preservation wallboard
CN106436893A (en) Fully-prefabricated structure and construction method thereof
CN207499403U (en) A kind of FS composite thermal-insulating exterior formworks system
CN209723052U (en) The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure
CN102116061A (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN105484391A (en) Construction method for manufacturing heat-preservation waterproof wall through light heat-preservation GRC disassembling-free formworks
CN206220238U (en) Fully-prefabricated assembled structure
CN109707052A (en) Assembled beam and plate connecting node
CN112112295A (en) Reinforcing construction method for post-cast strip of post-sealed outer wall
CN105019593B (en) Building heat preservation prefabricated section and modular arrangement of reinforcement cast-in-place method construction method thereof
CN207829511U (en) A kind of existing building external wall reconstruction structure
CN101886470B (en) Construction method of exposed concrete ribbed beams
CN203129402U (en) Self-insulating building block
CN113931352B (en) Composite heat-insulating wall containing high-ductility solid waste base disassembly-free template and preparation method thereof
CN215563533U (en) Composite prefabricated wallboard with reinforcing belt
CN106869331A (en) The connection method of precast shear wall composite beam in assembled RC frame-shear structures

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20101229

Effective date of abandoning: 20120502