CN109457965B - Efficient installation method and device for precast concrete wall panels - Google Patents

Efficient installation method and device for precast concrete wall panels Download PDF

Info

Publication number
CN109457965B
CN109457965B CN201811294342.3A CN201811294342A CN109457965B CN 109457965 B CN109457965 B CN 109457965B CN 201811294342 A CN201811294342 A CN 201811294342A CN 109457965 B CN109457965 B CN 109457965B
Authority
CN
China
Prior art keywords
wall panel
verticality
sleeve
steel bars
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811294342.3A
Other languages
Chinese (zh)
Other versions
CN109457965A (en
Inventor
石小虎
张声军
陈炜宁
曹国巍
周磊
韦赵滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Building Mechanization Research Institute Co ltd
Cabr Construction Machinery Technology Co ltd
Original Assignee
Cabr Construction Machinery Technology Co ltd
Beijing Building Mechanization Research Institute Co ltd
Institute of Building Mechanization of Chinese Academy of Building Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cabr Construction Machinery Technology Co ltd, Beijing Building Mechanization Research Institute Co ltd, Institute of Building Mechanization of Chinese Academy of Building Research filed Critical Cabr Construction Machinery Technology Co ltd
Priority to CN201811294342.3A priority Critical patent/CN109457965B/en
Publication of CN109457965A publication Critical patent/CN109457965A/en
Application granted granted Critical
Publication of CN109457965B publication Critical patent/CN109457965B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a high-efficient installation method of precast concrete wallboard, grout sleeve position degree before the wallboard assembly, reserve the detection and the correction of the straightness that hangs down of vertical reinforcement position degree and assembly back wallboard, grout sleeve position degree and straightness detection frock include insert telescopic inserted post and base, coincide floor bottom strutting arrangement with the holding power direct action on vertical wallboard, the coincide floor support area has been increased, wallboard installation adjustment and grouting equipment effort can direct action on strutting arrangement, provide complete set of frock for promoting the high-efficient high accuracy installation of precast concrete wallboard and effectively guarantee the whole straightness of wall body, provide essential technical support for advancing the high-efficient high quality construction of assembled precast concrete building.

Description

预制混凝土墙板的高效安装方法及其装置Efficient installation method and device for precast concrete wall panels

技术领域technical field

本发明涉及一种预制混凝土墙板的高效安装方法及其装置,具体涉及预制混凝土墙体结构,灌浆套筒和预留竖向钢筋的生产过程的定位、检验环节和装配现场的位置度检验,预留竖向钢筋垂直度不合格的校正方法,灌浆套筒位置度、垂直度不合格及预留钢筋位置度不合格的修正,叠合楼板底部支撑结构、墙板安装后垂直度的检验等。The invention relates to an efficient installation method and device of prefabricated concrete wall panels, in particular to prefabricated concrete wall structures, grouting sleeves and reserved vertical steel bars in the production process of positioning, inspection links and location degree inspection at the assembly site, Correction method for unqualified verticality of reserved vertical steel bars, correction of unqualified position of grouting sleeve, unqualified verticality and unqualified position of reserved steel bars, bottom support structure of superimposed floor, inspection of verticality after wall panel installation, etc. .

背景技术Background technique

预制混凝土墙板在生产过程中,钢筋及灌浆套筒的预埋位置决定于浇筑模具边框,由于边框定位套筒及钢筋定位孔的间隙量大、边模较薄、定位导向长度短等原因,套筒及钢筋的位置度和垂直度在生产过程中往往不能有效保证。而在装配施工现场,目前缺乏对套筒及预留钢筋位置度的专用检验工装、预留钢筋调整工装及不合格墙板的修复方法及装置,在套筒或预留钢筋不合格、不配对时经常需要塔机吊着墙板等待预留钢筋的校正,甚至经常因缺乏可行可靠的修复方法而导致墙板构件无法安装,严重影响施工安全、质量及效率。并且,在遇到底层的墙板预留钢筋位置度不合格无法修复时,有时需要拆除已装配好的整层楼板、梁、等结构,浪费时间、增加建造成本,使装配式建筑高效施工的高效性不能有效实现。在监管不到位时,部分施工人员甚至会违规草率切掉不入筒的竖向钢筋而直接装配,导致实际连接钢筋数量减少,质量隐患严重。In the production process of precast concrete wall panels, the pre-embedded position of steel bars and grouting sleeves is determined by the frame of the pouring mold. Due to the large gap between frame positioning sleeves and steel positioning holes, thin side molds, and short positioning guide lengths, etc. The position and verticality of sleeves and steel bars are often not guaranteed in the production process. In the assembly construction site, there is currently a lack of special inspection tooling for the position of sleeves and reserved steel bars, reserved steel bar adjustment tooling and repair methods and devices for unqualified wall panels. From time to time, the tower crane is often required to hang the wall panels to wait for the correction of the reserved steel bars, and even the wall panel components cannot be installed due to the lack of feasible and reliable repair methods, which seriously affects the construction safety, quality and efficiency. In addition, when the position of the steel bars reserved for the bottom wall panel is unqualified and cannot be repaired, it is sometimes necessary to dismantle the assembled floor slabs, beams, and other structures, which wastes time and increases construction costs, so that the prefabricated buildings can be constructed efficiently. Efficiency cannot be achieved effectively. When the supervision is not in place, some construction workers will even cut off the vertical steel bars that do not enter the tube and assemble them directly in violation of regulations, resulting in a reduction in the actual number of connected steel bars and serious potential quality problems.

其次,因楼板及上层墙板较重,在上层墙板安装过程中,往往会产生较大集中载荷作用于下层楼板,容易导致其局部过载破坏或整体失稳。现有全胎模全方位支撑技术的支护和拆除效率低、耗材巨大、增加整个楼层的自重、下层作业空间异常狭小,且最大受力区域没有针对性支撑,支撑结构直接作用在下层浇筑后尚未达到必要强度的叠合楼板上,表面破坏严重,需要修复,且有压垮下层叠合楼板的安全隐患。Secondly, because the floor slab and the upper wall panel are heavier, during the installation of the upper wall panel, a large concentrated load is often generated on the lower floor slab, which is easy to cause partial overload damage or overall instability. The existing full tire mold all-round support technology has low support and removal efficiency, huge consumables, increased self-weight of the entire floor, extremely narrow working space on the lower floor, and no targeted support in the maximum stress area, and the support structure directly acts after the lower floor is poured. Laminated floors that have not yet reached the necessary strength have serious surface damage and need to be repaired, and there is a potential safety hazard of crushing the underlying laminated floor.

另一方面,现有的墙板垂直度检验一般将仪器放置于楼板之上,先把仪器调为水平,多点逐步找水平测量,方可进行墙板垂直度的检验,工作效率低且易受外部及人为因素的干扰,或者是使用铅锤、靠尺等低精度的方式检测,无法兼顾高效和高精度。On the other hand, in the existing wall panel verticality inspection, the instrument is generally placed on the floor, the instrument is first adjusted to the level, and the horizontal measurement is gradually found at multiple points before the wall panel verticality inspection can be carried out. The work efficiency is low and easy to use. Interference from external and human factors, or the use of low-precision methods such as plumb bob and ruler, cannot take into account both high efficiency and high precision.

因此,为了解决上述现有技术的诸多不足和缺陷,有必要研究一种预制混凝土墙板的高效安装方法及其装置。Therefore, in order to solve many deficiencies and defects of the above-mentioned prior art, it is necessary to study an efficient installation method and device for precast concrete wall panels.

发明内容SUMMARY OF THE INVENTION

考虑到至少一个上述问题而完成了本发明,本发明提供了一种便于施工的墙板灌浆套筒和竖向预留钢筋位置度及垂直度检验工装,预留钢筋校正工装,灌浆套筒及预留钢筋不合格品现场修正装置,附着于墙板的叠合楼板底部支撑装置,快速、准确的墙板垂直度检具。解决了墙板安装过程中竖向钢筋与灌浆套筒位置度可能存在不完全互换的问题,工装检验后的墙板和另外一块墙板均能正确无误的安装,遇到个别因生产或运输导致套筒或预留钢筋的不合格的墙板可在装配现场很快修正。楼板底部支撑装置的支撑架附着于下层墙板上,增加了楼板的受力面积且支撑在受力最大区域正下方,可有效预防叠合楼板因安装墙板及调整操作受损。墙板安装后垂直度检验工装解决墙板安装过程中与地面垂直度的问题,无需多点调检测仪器水平来检测墙板的垂直度,可以更加高效、直观地检测墙板与地面是否垂直。The present invention has been completed in consideration of at least one of the above-mentioned problems, and the present invention provides a wallboard grouting sleeve and a vertical reserved steel bar position and verticality inspection tool, a reserved steel bar correction tool, a grouting sleeve and Reserve the on-site correction device for unqualified steel bars, the bottom support device of the laminated floor attached to the wall panel, and the fast and accurate wall panel verticality inspection tool. It solves the problem that the position of the vertical steel bar and the grouting sleeve may not be completely interchangeable during the installation of the wall panel. After the tooling inspection, the wall panel and another wall panel can be installed correctly. Unqualified wall panels that result in sleeves or reserved reinforcement can be quickly corrected at the assembly site. The support frame of the bottom support device of the floor slab is attached to the lower wall panel, which increases the stress area of the floor slab and is supported directly below the area with the greatest stress, which can effectively prevent the laminated floor slab from being damaged due to wall panel installation and adjustment operations. The verticality inspection tool after installation of the wallboard solves the problem of the verticality of the wallboard to the ground during the installation process. There is no need to adjust the level of the detection instrument at multiple points to detect the verticality of the wallboard. It can more efficiently and intuitively detect whether the wallboard is vertical to the ground.

根据本发明一方面,提供了According to one aspect of the present invention, there is provided

一种用于套筒灌浆连接的预制混凝土墙板的高效安装方法,其特征在于包括以下步骤:An efficient installation method for prefabricated concrete wall panels connected by sleeve grouting is characterized by comprising the following steps:

用钢筋位置度及垂直度检具检验第一墙板上与套筒配合安装的竖向钢筋的位置度与垂直度;Use the steel bar position and verticality inspection tool to check the position and verticality of the vertical steel bars installed with the sleeve on the first wall panel;

用套筒位置度及垂直度检具检验第二墙板上套筒的位置度及垂直度;对垂直度不合格的竖向钢筋采用校正装置现场校直;Use the sleeve position and verticality inspection tool to check the position and verticality of the sleeve on the second wall panel; the vertical steel bar with unqualified verticality is straightened on site by a correction device;

对于因套筒位置度、垂直度及竖向钢筋位置度不合格而无法配对安装的预制墙板使用修复件现场修复,其中,修复件包括焊接板和焊接钢筋,焊接板上设置有多个长圆通孔,修复时切除无法安装进入套筒对应的预留钢筋,通过所述通孔将焊接板套在其它预留钢筋上,将焊接钢筋和未切除的预留钢筋与焊接板牢固焊接;For prefabricated wall panels that cannot be installed in pairs due to unqualified sleeve position, verticality and vertical steel bar position Round through holes, when repairing, cut off the reserved steel bars that cannot be installed into the sleeve, put the welding plate on other reserved steel bars through the through holes, and firmly weld the welded steel bars and the uncut reserved steel bars with the welding plate;

对检验并修复后的墙板进行装配;Assemble the inspected and repaired wall panels;

墙板装配完成后使用墙板垂直度检具检验,检验合格后进行灌浆作业并将所述第二墙板固定连接到第一墙板上;After the wall panel is assembled, use the wall panel verticality inspection tool to check, after passing the inspection, carry out the grouting operation and fix the second wall panel to the first wall panel;

在所述第二墙板上方装配楼板,使用附着于第二墙板的楼板支撑装置临时加固所述楼板;assembling a floor slab over the second wall panel, temporarily reinforcing the floor panel using a floor support device attached to the second wall panel;

其中,墙板垂直度检具包括竖直部、水平透明管体和钢球,所述竖直部用于检验时与墙板贴紧,水平透明管体与竖直部垂直连接固定,钢球设置在水平透明管体内,当钢球能够在非两端的任意位置稳定地停留不动时表明墙板垂直度已调好。Wherein, the wall panel verticality inspection tool includes a vertical part, a horizontal transparent tube body and a steel ball. The vertical part is used to closely adhere to the wall panel during inspection, the horizontal transparent tube body and the vertical part are vertically connected and fixed, and the steel ball It is arranged in a horizontal transparent tube. When the steel ball can stay stably at any position other than both ends, it indicates that the verticality of the wall panel has been adjusted.

根据本发明另一方面,套筒位置度及垂直度检具包括螺柱安装主体、螺柱和把手,所述螺柱安装主体上设有螺纹孔,螺柱设置在螺纹孔内,螺柱的位置与墙板的灌浆套筒设计预埋的位置一致,螺柱的外径略小于灌浆套筒内径最小处的尺寸。According to another aspect of the present invention, the sleeve position and verticality inspection tool includes a stud installation body, a stud and a handle, the stud installation body is provided with a threaded hole, the stud is arranged in the threaded hole, and the stud is arranged in the threaded hole. The position is consistent with the pre-embedded position of the grouting sleeve of the wall panel, and the outer diameter of the stud is slightly smaller than the size of the smallest inner diameter of the grouting sleeve.

根据本发明另一方面,钢筋位置度及垂直度检具包括位置检测主体和把手,位置检测主体上设置有通孔,通孔的位置与墙板钢筋设计位置一致,通孔略大于预留钢筋的最大外廓尺寸。According to another aspect of the present invention, the steel bar position and verticality checker includes a position detection body and a handle, the position detection body is provided with a through hole, the position of the through hole is consistent with the design position of the wall panel steel bar, and the through hole is slightly larger than the reserved steel bar maximum outline size.

根据本发明另一方面,在不配对的套筒内插入焊接钢筋,缓慢放下第二墙板至标高,将插入不配对的套筒内的所述钢筋和未切除的预留钢筋与焊接板牢固焊接,调整好墙板的垂直度,然后在灌浆套筒内灌浆连接。According to another aspect of the present invention, the welded steel bars are inserted into the unmatched sleeves, the second wall panel is slowly lowered to the level, and the steel bars inserted into the unmatched sleeves and the uncut reserved steel bars are firmly attached to the welded plates Weld, adjust the verticality of the wall panels, and then grout the connection in the grout sleeve.

根据本发明另一方面,楼板支撑装置包括附着于墙板的三角支撑架,三角支撑架包括竖直杆、水平杆和斜杆,竖直杆竖直设置于墙板上,水平杆与竖直杆相连,斜杆的一端连接于水平杆上设置的支撑座上,另一端与竖直杆相连。According to another aspect of the present invention, the floor support device includes a triangular support frame attached to the wall panel, the triangular support frame includes a vertical rod, a horizontal rod and an inclined rod, the vertical rod is vertically arranged on the wall panel, and the horizontal rod is connected to the vertical rod. The rods are connected, one end of the inclined rod is connected to the support seat arranged on the horizontal rod, and the other end is connected with the vertical rod.

根据本发明另一方面,套筒位置度及垂直度检具在预制墙板生产浇注过程中用于直接插入套筒中保证其定位准确性,待构件凝固达到一定强度后撤出,以保证预制墙板套筒位置度、垂直度的准确性及互换性。According to another aspect of the present invention, the sleeve position and verticality checker is used to directly insert the sleeve into the sleeve during the production and pouring process of the prefabricated wall panel to ensure its positioning accuracy. The accuracy and interchangeability of the position and verticality of the wall panel sleeve.

根据本发明另一方面,钢筋位置度及垂直度检具在预制墙板浇注过程中用于套入预留钢筋中保证其定位准确,待构件凝固达到一定强度后取出,以保证预制墙板预留钢筋位置度、垂直度的准确性及互换性。According to another aspect of the present invention, the steel bar position and verticality checker is used to insert the reserved steel bars during the pouring process of the prefabricated wall panel to ensure its accurate positioning, and is taken out after the components are solidified to a certain strength, so as to ensure that the prefabricated wall panel is pre-fabricated. The accuracy and interchangeability of the position and verticality of the steel bars are kept.

根据本发明另一方面,还提供了一种用于实施前述方法的预制混凝土墙板的高效安装装置,其特征在于包括:According to another aspect of the present invention, an efficient installation device for precast concrete wall panels for implementing the aforementioned method is also provided, which is characterized by comprising:

套筒位置度及垂直度检具,用于检验墙板上套筒的位置度及垂直度;Sleeve position and verticality inspection tool, used to check the position and verticality of the sleeve on the wall;

钢筋位置度及垂直度检具,用于检验墙板上与套筒配合安装的竖向钢筋的位置度与垂直度;The steel bar position and verticality inspection tool is used to check the position and verticality of the vertical steel bars installed with the sleeve on the wall panel;

修复件,用于对套筒位置度及垂直度不合格及竖向钢筋位置度不合格的预制墙板进行现场修复,修复件包括焊接板和焊接钢筋,焊接板上设置有多个长圆通孔;Repair parts are used for on-site repair of prefabricated wall panels with unqualified sleeve position and verticality and unqualified vertical steel bar position. ;

校正装置,用于对垂直度不合格的竖向钢筋进行现场校直;Correction device for on-site straightening of vertical steel bars with unqualified verticality;

墙板垂直度检具,用于在墙板装配完成后对墙板垂直度进行检验,墙板垂直度检具包括竖直部、水平透明管体和钢球,所述竖直部用于与墙板贴紧,水平透明管体与竖直部垂直连接,钢球设置在水平透明管体内;The wall panel verticality inspection tool is used to inspect the verticality of the wall panel after the wall panel is assembled. The wall panel verticality inspection tool includes a vertical part, a horizontal transparent pipe body and a steel ball. The wall panels are closely attached, the horizontal transparent tube body is vertically connected with the vertical part, and the steel ball is arranged in the horizontal transparent tube body;

灌浆作业装置,用于在墙板垂直度检验合格后进行灌浆作业以将所述第二墙板固定到第一墙板上;以及a grouting operation device for performing a grouting operation to fix the second wall panel to the first wall panel after the verticality inspection of the wall panel is passed; and

楼板支撑装置,用于在所述第二墙板上方装配楼板后将其附着于第二墙板上以临时加固所述楼板。A floor support device for attaching a floor panel to the second wall panel after assembling the floor panel above the second wall panel to temporarily reinforce the floor panel.

与现有技术相比,本发明的有益效果在于:Compared with the prior art, the beneficial effects of the present invention are:

本发明的方法和装置操作简单、准确度高、适用性强且效率高。The method and device of the present invention have simple operation, high accuracy, strong applicability and high efficiency.

附图说明Description of drawings

图1是根据本发明一种优选实施例的套筒位置度及垂直度检测示意图及检具示意图。FIG. 1 is a schematic diagram of a sleeve position and verticality detection and a schematic diagram of a checking tool according to a preferred embodiment of the present invention.

图2是根据本发明一种优选实施例的预留竖向钢筋的位置度检验、检验工装、及校正示意图。FIG. 2 is a schematic diagram of position degree inspection, inspection tooling, and calibration of reserved vertical steel bars according to a preferred embodiment of the present invention.

图3是根据本发明一种优选实施例的灌浆套筒预埋位置度及垂直度不合格的修复方法及装置示意图。3 is a schematic diagram of a method and device for repairing unqualified pre-embedded position and verticality of a grouting sleeve according to a preferred embodiment of the present invention.

图4是根据本发明一种优选实施例的预留竖向钢筋位置度不合格修复方法及装置示意图。4 is a schematic diagram of a method and device for repairing unqualified positions of reserved vertical steel bars according to a preferred embodiment of the present invention.

图5是根据本发明一种优选实施例的叠合楼板底部支撑装置示意图。Fig. 5 is a schematic diagram of a bottom support device for a laminated floor slab according to a preferred embodiment of the present invention.

图6是根据本发明一种优选实施例的混凝土墙板垂直度检验工装施工示意图。FIG. 6 is a schematic diagram of construction of a tool for inspecting the verticality of a concrete wall panel according to a preferred embodiment of the present invention.

图7是根据本发明一种优选实施例的混凝土墙板垂直度检验工装示意图。FIG. 7 is a schematic diagram of a tool for inspecting the verticality of a concrete wall panel according to a preferred embodiment of the present invention.

具体实施方式Detailed ways

下面结合附图,通过优选实施例来描述本发明的最佳实施方式,这里的具体实施方式在于详细地说明本发明,而不应理解为对本发明的限制,在不脱离本发明的精神和实质范围的情况下,可以做出各种变形和修改,这些都应包含在本发明的保护范围之内。Below in conjunction with the accompanying drawings, the best mode of implementation of the present invention will be described through preferred embodiments. The specific embodiments herein are intended to describe the present invention in detail, and should not be construed as a limitation to the present invention, without departing from the spirit and essence of the present invention. Various deformations and modifications can be made within the scope of the present invention, and these should be included within the protection scope of the present invention.

实施例1Example 1

参见图1-7,本发明的预制混凝土墙板的安装施工流程是:墙板先在工厂预制成型并运输吊装至现场指定位置后,将安装于其上的墙板的灌浆套筒套入下层已安装好的墙板的预留竖向钢筋中,精调墙板位置及角度,而后采用斜支撑临时支护,最后将灌浆料灌入套筒,完成竖向连接。Referring to Figures 1-7, the installation and construction process of the precast concrete wall panel of the present invention is as follows: after the wall panel is prefabricated in the factory, transported and hoisted to a designated location on site, the grouting sleeve of the wall panel installed on it is sleeved into the lower layer In the reserved vertical steel bars of the installed wall panels, the position and angle of the wall panels are fine-tuned, and then temporary support is adopted with oblique supports. Finally, the grouting material is poured into the sleeve to complete the vertical connection.

优选地,本发明提供了一种用于套筒灌浆连接的预制混凝土墙板的高效安装方法,其特征在于包括以下步骤:Preferably, the present invention provides an efficient installation method for precast concrete wall panels connected by sleeve grouting, which is characterized by comprising the following steps:

用钢筋位置度及垂直度检具检验第一墙板上与套筒配合安装的竖向钢筋的位置度与垂直度;Use the steel bar position and verticality inspection tool to check the position and verticality of the vertical steel bars installed with the sleeve on the first wall panel;

用套筒位置度及垂直度检具检验第二墙板上套筒的位置度及垂直度;对垂直度不合格的竖向钢筋采用校正装置现场校直;Use the sleeve position and verticality inspection tool to check the position and verticality of the sleeve on the second wall panel; the vertical steel bar with unqualified verticality is straightened on site by a correction device;

对于因套筒位置度、垂直度及竖向钢筋位置度不合格而无法配对安装的预制墙板使用修复件现场修复,其中,修复件包括焊接板和焊接钢筋,焊接板上设置有多个长圆通孔,修复时切除无法安装进入套筒对应的预留钢筋,通过所述通孔将焊接板套在其它预留钢筋上,将焊接钢筋和未切除的预留钢筋与焊接板牢固焊接;For prefabricated wall panels that cannot be installed in pairs due to unqualified sleeve position, verticality and vertical steel bar position Round through holes, when repairing, cut off the reserved steel bars that cannot be installed into the sleeve, put the welding plate on other reserved steel bars through the through holes, and firmly weld the welded steel bars and the uncut reserved steel bars with the welding plate;

对检验并修复后的墙板进行装配;Assemble the inspected and repaired wall panels;

墙板装配完成后使用墙板垂直度检具检验,检验合格后进行灌浆作业并将所述第二墙板固定连接到第一墙板上;After the wall panel is assembled, use the wall panel verticality inspection tool to check, after passing the inspection, carry out the grouting operation and fix the second wall panel to the first wall panel;

在所述第二墙板上方装配楼板,使用附着于第二墙板的楼板支撑装置临时加固所述楼板;assembling a floor slab over the second wall panel, temporarily reinforcing the floor panel using a floor support device attached to the second wall panel;

其中,墙板垂直度检具包括竖直部、水平透明管体和钢球,所述竖直部用于检验时与墙板贴紧,水平透明管体与竖直部垂直连接固定,钢球设置在水平透明管体内,当钢球能够在非两端的任意位置稳定地停留不动时表明墙板垂直度已调好。Wherein, the wall panel verticality inspection tool includes a vertical part, a horizontal transparent tube body and a steel ball. The vertical part is used to closely adhere to the wall panel during inspection, the horizontal transparent tube body and the vertical part are vertically connected and fixed, and the steel ball It is arranged in a horizontal transparent tube. When the steel ball can stay stably at any position other than both ends, it indicates that the verticality of the wall panel has been adjusted.

有利地,墙板垂直度检具与传统垂直度检验中检验装置需要调整水平方可对墙板垂直度检测相比,此装置只需将附着架贴紧在墙板上,检验装置无需调水平,墙板是否垂直易于观察及判断,有效提高墙板垂直度检验的效率。Advantageously, compared with the traditional verticality inspection device that needs to be adjusted horizontally to detect the verticality of the wallboard, this device only needs to attach the attachment frame to the wallboard, and the inspection device does not need to be leveled. , It is easy to observe and judge whether the wall panel is vertical, which effectively improves the efficiency of the verticality inspection of the wall panel.

优选地,每块墙板下方是套筒,上方是外露钢。Preferably, each wall panel is below the sleeve and above is exposed steel.

优选地,套筒位置度及垂直度检具包括螺柱安装主体、螺柱和把手,所述螺柱安装主体上设有螺纹孔,螺柱设置在螺纹孔内,螺柱的位置与墙板的灌浆套筒设计预埋的位置一致,螺柱的外径略小于灌浆套筒内径最小处的尺寸。将检具的所有杆沿竖直方向全部插入到墙板预埋灌浆套筒内且主体与墙板外形对齐时,墙板预埋套筒位置度及垂直度为合格,所述装置既可以在构件生产厂墙板浇注过程中套筒定位及浇筑完成后检验使用,也可以在施工单位验收的检验使用,通过本工装的使用,可有大幅提高安装效率和预防大量不合格墙板的产生。Preferably, the sleeve position and verticality inspection tool includes a stud installation body, a stud and a handle, the stud installation body is provided with a threaded hole, the stud is arranged in the threaded hole, and the position of the stud is consistent with the wall plate. The grouting sleeve is designed to be embedded in the same position, and the outer diameter of the stud is slightly smaller than the minimum inner diameter of the grouting sleeve. When all the rods of the inspection tool are inserted into the wallboard pre-embedded grouting sleeve along the vertical direction and the main body is aligned with the wallboard shape, the position and verticality of the wallboard pre-embedded sleeve are qualified, and the device can be used in both It can be used for the positioning of the sleeve during the casting process of the wallboard in the component manufacturer and the inspection after the pouring is completed. It can also be used in the inspection and acceptance of the construction unit. Through the use of this tooling, the installation efficiency can be greatly improved and the production of a large number of unqualified wallboards can be prevented.

优选地,钢筋位置度及垂直度检具包括位置检测主体和把手,位置检测主体上设置有通孔,通孔的位置与墙板钢筋设计位置一致,通孔略大于预留钢筋的最大外廓尺寸。将该检具套沿竖向全部套在所有的预留钢筋上且检测体与墙板外形对齐则视为合格,所述检具可作为构件厂浇筑墙板预留钢筋的定位、生产过程及出厂的检验、施工单位验收检验和施工现场的检验,当出现工装不能套入所有的预留钢筋时,需配合预留钢筋校正装置或修复件配合施工,直至所有的都能套上时方可进行墙板的安装。所述过程是在墙板吊装的过程中完成的,因此可大幅降低因预留钢筋因运输和吊装等施工引起的变形的修正而占用起重设备的时间,从而实现墙板安装的高效施工。Preferably, the steel bar position and verticality inspection tool includes a position detection body and a handle, the position detection body is provided with a through hole, the position of the through hole is consistent with the design position of the wall panel steel bar, and the through hole is slightly larger than the maximum outline of the reserved steel bar. size. The inspection tool set is vertically placed on all the reserved steel bars and the detection body is aligned with the shape of the wall panel. The inspection tool can be used as the positioning, production process and Factory inspection, construction unit acceptance inspection and construction site inspection, when the tooling cannot fit all the reserved steel bars, it is necessary to cooperate with the reserved steel bar correction device or repair parts to cooperate with the construction until all the reserved steel bars can be put on. Install the wall panel. The process is completed in the process of hoisting the wallboard, so the time occupied by the lifting equipment due to the correction of the deformation of the reserved steel bars due to construction such as transportation and hoisting can be greatly reduced, thereby realizing the efficient construction of the wallboard installation.

优选地,在不配对的套筒内插入焊接钢筋,缓慢放下第二墙板至标高,将插入不配对的套筒内的所述钢筋和未切除的预留钢筋与焊接板牢固焊接,调整好墙板的垂直度,然后在灌浆套筒内灌浆连接。本发明可以将因生产不合格的墙板现场修复使用,节约维修的运输成本及维修费用。Preferably, insert the welded steel bar into the unmatched sleeve, slowly lower the second wall panel to the level, and firmly weld the steel bar inserted into the unmatched sleeve and the uncut reserved steel bar with the welding plate, and adjust the The verticality of the wall panels is then grouted within the grouting sleeve. The invention can repair and use the unqualified wall panels on site, and save the transportation cost and the maintenance cost of the repair.

优选地,修复时切除位置度不合格的钢筋,通过所述通孔将焊接钢板套在其它预留钢筋上,用钢筋位置度及垂直度检具在上方定位并插入焊接钢筋,然后将预留钢筋和焊接钢筋与焊接板焊接牢固,拔出钢筋位置度及垂直度检具后再进行墙板的安装。本发明提出了一种预留钢筋现场修复的方法,使已装配且加固的底层墙板得以修复,不会因预留钢筋位置度不合格而拆除已安装好的墙板、楼板、梁、柱等结构,节约维修时间及维修成本。Preferably, the steel bars with unqualified position are cut off during repair, the welded steel plates are put on other reserved steel bars through the through holes, and the steel bars are positioned above and inserted with the steel bar position and verticality checker, and then the reserved steel bars are inserted. The steel bars and welding steel bars are firmly welded to the welding plates. Pull out the steel bar position and verticality checker before installing the wall panels. The invention proposes a method for on-site repair of reserved steel bars, so that the assembled and reinforced bottom wall panels can be repaired, and the installed wall panels, floors, beams and columns will not be removed due to the unqualified position of the reserved steel bars. and other structures, saving maintenance time and maintenance costs.

优选地,楼板支撑装置包括附着于墙板的三角支撑架,三角支撑架包括竖直杆、水平杆和斜杆,竖直杆竖直设置于墙板上,水平杆与竖直杆相连,斜杆的一端连接于水平杆上设置的支撑座上,另一端与竖直杆相连。楼板安装后,用调整装置将垫板顶紧在墙板上方的楼板,顶紧后增加楼板的受力面积,同时上一楼层的墙板安装设备及施工人员在所述装置上方放置均不受影响,所述装置将上层墙板安装及施工过程中的作用力传递到下层的墙板上,从而增加施工的安全性。Preferably, the floor support device includes a triangular support frame attached to the wall panel, the triangular support frame includes a vertical rod, a horizontal rod and an inclined rod, the vertical rod is vertically arranged on the wall panel, the horizontal rod is connected with the vertical rod, and the inclined rod One end of the rod is connected to the support seat provided on the horizontal rod, and the other end is connected to the vertical rod. After the floor is installed, use the adjusting device to tighten the backing plate to the floor above the wall, and increase the bearing area of the floor after the top is tightened. The device transmits the force during the installation and construction of the upper wall panel to the lower wall panel, thereby increasing the safety of construction.

优选地,楼板支撑装置包括附着于墙板的三角支撑架,三角支撑架包括竖直杆、水平杆和斜杆,竖直杆竖直设置于墙板上,水平杆与竖直杆相连,斜杆的一端连接于水平杆上设置的支撑座上,另一端与竖直杆相连。Preferably, the floor support device includes a triangular support frame attached to the wall panel, the triangular support frame includes a vertical rod, a horizontal rod and an inclined rod, the vertical rod is vertically arranged on the wall panel, the horizontal rod is connected with the vertical rod, and the inclined rod One end of the rod is connected to the support seat provided on the horizontal rod, and the other end is connected to the vertical rod.

优选地,套筒位置度及垂直度检具在预制墙板生产浇注过程中用于直接插入套筒中保证其定位准确性,待构件凝固达到一定强度后撤出,以保证预制墙板套筒位置度、垂直度的准确性及互换性。Preferably, the sleeve position and verticality inspection tool is used to directly insert the sleeve into the sleeve during the production and pouring process of the prefabricated wallboard to ensure its positioning accuracy. Accuracy and interchangeability of position and verticality.

优选地,钢筋位置度及垂直度检具在预制墙板浇注过程中用于套入预留钢筋中保证其定位准确,待构件凝固达到一定强度后取出,以保证预制墙板预留钢筋位置度、垂直度的准确性及互换性。Preferably, the steel bar position and verticality check tool is used to insert the reserved steel bars in the prefabricated wall panel during the pouring process to ensure its accurate positioning, and take it out after the components have solidified to a certain strength, so as to ensure the prefabricated wall panel reserved steel bar position. , Accuracy and interchangeability of verticality.

优选地,还提供了一种用于实施前述方法的预制混凝土墙板的高效安装装置,其特征在于包括:Preferably, an efficient installation device for precast concrete wall panels for implementing the aforementioned method is also provided, which is characterized by comprising:

套筒位置度及垂直度检具,用于检验墙板上套筒的位置度及垂直度;Sleeve position and verticality inspection tool, used to check the position and verticality of the sleeve on the wall;

钢筋位置度及垂直度检具,用于检验墙板上与套筒配合安装的竖向钢筋的位置度与垂直度;The steel bar position and verticality inspection tool is used to check the position and verticality of the vertical steel bars installed with the sleeve on the wall panel;

修复件,用于对套筒位置度及垂直度不合格及竖向钢筋位置度不合格的预制墙板进行现场修复,修复件包括焊接板和焊接钢筋,焊接板上设置有多个长圆通孔;Repair parts are used for on-site repair of prefabricated wall panels with unqualified sleeve position and verticality and unqualified vertical steel bar position. ;

校正装置,用于对垂直度不合格的竖向钢筋进行现场校直;Correction device for on-site straightening of vertical steel bars with unqualified verticality;

墙板垂直度检具,用于在墙板装配完成后对墙板垂直度进行检验,墙板垂直度检具包括竖直部、水平透明管体和钢球,所述竖直部用于与墙板贴紧,水平透明管体与竖直部垂直连接,钢球设置在水平透明管体内;The wall panel verticality inspection tool is used to inspect the verticality of the wall panel after the wall panel is assembled. The wall panel verticality inspection tool includes a vertical part, a horizontal transparent pipe body and a steel ball. The wall panels are closely attached, the horizontal transparent tube body is vertically connected with the vertical part, and the steel ball is arranged in the horizontal transparent tube body;

灌浆作业装置,用于在墙板垂直度检验合格后进行灌浆作业以将所述第二墙板固定到第一墙板上;以及a grouting operation device for performing a grouting operation to fix the second wall panel to the first wall panel after the verticality inspection of the wall panel is passed; and

楼板支撑装置,用于在所述第二墙板上方装配楼板后将其附着于第二墙板上以临时加固所述楼板。A floor support device for attaching a floor panel to the second wall panel after assembling the floor panel above the second wall panel to temporarily reinforce the floor panel.

优选地,预制墙板灌浆套筒位置度检验装置,包括预制混凝土墙板、螺柱安装主体、螺柱、把手、灌浆套筒,所述螺柱安装体上有螺纹孔,螺纹孔位与墙板灌浆套筒预埋的位置一致,螺柱的外径略小于灌浆套筒最小截面的尺寸。将检测工装的所有杆沿竖直方向全部插入到墙板预埋灌浆套筒内外形对齐时,墙板预埋套筒位置度为合格,所述装置在生产浇筑时可做套筒定位装置使用,可以作为构件生产厂的检验装置使用,可以作为施工单位验收的检验使用,也可以在装配现场装配前复检使用,通过本装置的使用,可有大幅提高生产过程中的合格率、安装过程的施工效率和预防不合格墙板被吊到安装位置的发生。Preferably, the prefabricated wall panel grouting sleeve position degree inspection device includes a prefabricated concrete wall panel, a stud installation body, a stud, a handle, and a grouting sleeve. The stud installation body has threaded holes, and the threaded holes are connected to the wall. The pre-embedded position of the slab grouting sleeve is the same, and the outer diameter of the stud is slightly smaller than the size of the smallest section of the grouting sleeve. When all the rods of the inspection tool are inserted into the wallboard pre-embedded grouting sleeve in the vertical direction, the position of the wallboard pre-embedded grouting sleeve is aligned, and the position of the wallboard pre-embedded sleeve is qualified, and the device can be used as a sleeve positioning device during production and pouring. , it can be used as an inspection device for component manufacturers, as an inspection for acceptance by construction units, or for re-inspection before assembly at the assembly site. Through the use of this device, the qualification rate in the production process and the installation process can be greatly improved. Improve the construction efficiency and prevent the occurrence of unqualified wall panels being hoisted to the installation location.

优选地,预制墙板预留钢筋位置度检验及校正装置,包括预制混凝土墙体、孔位检测体、把手、预留钢筋和预留钢筋校正装置,检测主体的孔位与墙板的钢筋设计位置一致,孔略大于预留钢筋的最大外廓尺寸;将所述装置沿竖向全部套在所有的预留钢筋上则视为合格,所述装置可以在墙板生产过程中预留钢筋定位使用,可作在构件厂检验使用、可以在施工单位验收检验使用,也可以在装配现场吊装前的检验。预留钢筋垂直度不合格时,需配合预留钢筋校正装置配合施工,直至所有的都能套上时方可进行墙板的安装。所述过程是在墙板吊装的过程中完成,不占用起重设备的工作时间,因此可大幅降低因预留钢筋在运输和吊装等施工引起的变形而占用起重设备的时间,从而实现墙板安装的高效施工。Preferably, the prefabricated wall panel reserved steel bar position degree inspection and correction device includes a prefabricated concrete wall, a hole position detector, a handle, a reserved steel bar and a reserved steel bar correction device, which detects the hole position of the main body and the steel bar design of the wall panel. The position is the same, and the hole is slightly larger than the maximum outline size of the reserved steel bars; the device is deemed qualified if the device is completely placed on all the reserved steel bars in the vertical direction, and the device can be used for the positioning of the reserved steel bars during the production process of the wall panel. It can be used for inspection in component factory, acceptance inspection in construction unit, and inspection before hoisting at assembly site. When the verticality of the reserved steel bar is unqualified, it is necessary to cooperate with the reserved steel bar correction device to cooperate with the construction, and the wall panel installation can be carried out until all the steel bars can be covered. The process is completed in the process of hoisting the wall panels, and does not occupy the working time of the lifting equipment, so it can greatly reduce the time occupied by the lifting equipment due to the deformation of the reserved steel bars during transportation and hoisting construction. Efficient construction of panel installation.

优选地,灌浆套筒预埋位置度及垂直度不合格修复装置包括预制混凝土墙板、预留竖向钢筋、焊接板、焊接钢筋,装配现场遇到套筒位置度、垂直度或位置及垂直度都不合格时,切开与其对应安装的预留钢筋,将焊接板套在其它预留竖筋上,在不合格的套筒内插入焊接钢筋,缓慢放下上层的墙板至标高,调整好墙板的垂直度,将插入套筒的钢筋、焊接板和其它的竖向钢筋焊接牢固,加斜支撑临时加固,然后灌浆套筒灌浆加固,通过本装置的使用,可以将因生产不合格的墙板现场修复使用,节约维修的运输成本及维修费用。Preferably, the device for repairing unqualified pre-embedded position and verticality of the grouting sleeve includes prefabricated concrete wall panels, reserved vertical steel bars, welded plates, and welded steel bars. When the height is unqualified, cut the reserved steel bar correspondingly installed, put the welding plate on other reserved vertical bars, insert the welding steel bar into the unqualified sleeve, slowly lower the upper wall panel to the level, and adjust it properly. The verticality of the wall panel, the steel bars inserted into the sleeve, the welded plates and other vertical steel bars are welded firmly, and the inclined support is temporarily strengthened, and then the grouting sleeve is grouted for reinforcement. On-site repair and use of wall panels saves transportation costs and maintenance costs for repairs.

优选地,预留竖向钢筋位置度不合格修复装置包含预制混凝土墙板、焊接板、预留竖向钢筋、焊接钢筋,现场装配遇到钢筋位置度不合格墙板时,沿墙板端面切断不合格的钢筋,将焊接钢板套在预留钢筋上并将位置度不合格的预留钢筋通过下方与焊接板焊接牢固,用检具在上方定位插入焊接钢筋并组焊牢固,然后将预留钢筋、焊接钢筋、焊接板焊接牢固,然后再进行墙板的安装,本装置的使用提出了一种预留钢筋现场修复的方法,使已装配且加固的底层墙板得以修复,不会因预留钢筋位置度不合格而拆除墙板、楼板、梁、柱等结构,节约维修时间及维修成本。Preferably, the device for repairing the unqualified position of reserved vertical steel bars includes prefabricated concrete wall panels, welded panels, reserved vertical steel bars, and welded steel bars. When the on-site assembly encounters wall panels with unqualified positions of steel bars, they are cut along the end face of the wall panels. For the unqualified steel bars, put the welded steel plates on the reserved steel bars and weld the unqualified reserved steel bars to the welded steel plates through the bottom. Use the inspection tool to position and insert the welded steel bars from the top and weld them firmly, and then place the reserved steel bars. The steel bars, welded steel bars, and welded plates are firmly welded, and then the wall panels are installed. The use of this device proposes a method of on-site repair of reserved steel bars, so that the assembled and reinforced bottom wall panels can be repaired without pre-installation. If the position of the steel bar is not qualified, the wall panels, floor slabs, beams, columns and other structures are removed to save maintenance time and maintenance costs.

优选地,叠合楼板底部支撑装置包括预制混凝土墙板、附着于墙板的支撑架、可调节机构、预制叠合楼板,所述附着于墙板的支撑架通过螺栓拧紧到墙板的预埋件上,支撑架上留有斜拉杆安装的支撑座。楼板安装后,用调整螺栓将垫板顶紧在楼板,顶紧后增加楼板的受力面积,同时上一楼层的墙板安装设备及施工人员在所述装置上方均不受影响,所述装置增加了施工的安全性,有效解决上层墙板安装中楼板受力集中或破坏的问题。Preferably, the bottom support device of the laminated floor slab comprises a prefabricated concrete wall panel, a support frame attached to the wall panel, an adjustable mechanism, and a prefabricated laminated floor slab, and the support frame attached to the wall panel is screwed to the pre-embedded wall panel by bolts. On the support frame, there is a support seat installed on the inclined rod. After the floor is installed, use the adjusting bolts to tighten the backing plate on the floor, and increase the bearing area of the floor after the top is tightened. It increases the safety of construction and effectively solves the problem of force concentration or damage to the floor slab during the installation of the upper wall panel.

优选地,墙板安装后的垂直度检验装置包括预制混凝土墙板、检具附着装置、透明管体、金属钢球、管体支撑座、管体固定装置等,所述附着装置与墙体贴紧,当钢球能够在非两端的任意位置稳定停留不动时表明墙板垂直度已调好。Preferably, the verticality inspection device after the wall panel is installed includes a prefabricated concrete wall panel, a fixture attachment device, a transparent tube body, a metal steel ball, a tube body support seat, a tube body fixing device, etc., and the attachment device is attached to the wall body. Tight, when the steel ball can stay stably at any position other than both ends, it means that the verticality of the wall panel has been adjusted.

优选地,结合附图1,灌浆套筒的位置度及垂直度检验方式为:用手紧握把手103,将螺纹柱102沿着垂直于墙板端面插入,检具101的表面与墙板104的表面全部贴紧外形对齐则判定为墙板预埋灌浆套筒的垂直度与位置度合格,不能插入或插入困难、检具表面与墙板表面不能贴紧、检具外表面不能对齐等视为不合格。Preferably, with reference to FIG. 1 , the inspection method for the position and verticality of the grouting sleeve is: hold the handle 103 tightly by hand, insert the threaded column 102 along the end face perpendicular to the wall panel, and the surface of the inspection tool 101 is connected to the wall panel 104. The verticality and position of the pre-embedded grouting sleeve of the wallboard are judged to be qualified, it cannot be inserted or is difficult to insert, the surface of the inspection tool cannot be closely attached to the surface of the wallboard, the outer surface of the inspection tool cannot be aligned, etc. is unqualified.

优选地,结合附图2,预留竖向钢筋的位置度检验方式为:双手紧握把手103将检具沿着垂直于预留钢筋端面的方向套入预留钢筋,检具101与墙板104的端面贴紧,检具外形与墙板外形对齐则视为预留钢筋位置度及垂直度合格,若不能插入则用校正钢筋205直至插入即可,钢筋垂直度校正后依然不能插入的视为位置度不合格,需修复后方可装配。Preferably, with reference to FIG. 2, the inspection method of the position degree of the reserved vertical steel bars is: hold the handle 103 tightly with both hands and insert the inspection tool into the reserved steel bars along the direction perpendicular to the end face of the reserved steel bars, and the inspection tool 101 and the wall panel The end face of 104 is close to each other, and the shape of the inspection tool is aligned with the shape of the wall panel, it is considered that the position and verticality of the reserved steel bar are qualified. If it cannot be inserted, use the correction steel bar 205 until it is inserted. Because the position is not qualified, it needs to be repaired before assembly.

优选地,结合附图3,当灌浆套筒位置度及垂直度预埋不合格时,切开与不合格灌浆套筒302对应安装的预留钢筋,焊接板305套在预留竖筋上,在不合格的套筒内插入焊接钢筋303,缓慢放下安装的墙板调整至标高,调整好墙板的垂直度,将插入套筒的焊接钢筋303、焊接板305和未切开的竖向钢筋301焊接牢固,加斜支撑临时加固,然后灌浆套筒灌浆加固。Preferably, with reference to FIG. 3, when the pre-embedded grouting sleeve is unqualified in position and verticality, the reserved steel bars installed corresponding to the unqualified grouting sleeve 302 are cut, and the welding plate 305 is sleeved on the reserved vertical bars, Insert the welded steel bar 303 into the unqualified sleeve, slowly lower the installed wall panel to adjust the elevation, adjust the verticality of the wall panel, insert the welded steel bar 303, welded plate 305 and uncut vertical steel bar into the sleeve 301 is welded firmly, temporarily reinforced with inclined support, and then grouted with grouting sleeve.

优选地,结合附图4,当安装现场有预留竖向钢筋位置度不合格时,切开不合格的预留钢筋406,将焊接钢板套402在预留钢筋上,清除部分切口处的混凝土至可以实施焊接的小破口,用检具101在上方定位并插入焊接钢筋303并组焊牢固,并将位置度不合格的预留钢筋通过下方与焊接板焊接牢固,然后将预留钢筋406、焊接钢筋303、焊接板305焊接牢固,然后再进行墙板的安装、斜支撑、角度调整及灌浆加固等。Preferably, with reference to FIG. 4, when there is an unqualified position of the reserved vertical steel bars on the installation site, cut the unqualified reserved steel bars 406, put the welded steel plates 402 on the reserved steel bars, and remove the concrete at the part of the cut. To the small crack that can be welded, use the inspection tool 101 to locate and insert the welding steel bar 303 above and weld it firmly, and weld the reserved steel bar with unqualified position to the welding plate through the bottom, and then place the reserved steel bar 406. , Welded steel bar 303, welded plate 305 are welded firmly, and then the wall panel installation, diagonal support, angle adjustment and grouting reinforcement are carried out.

优选地,结合附图5,叠合楼板底部支撑加固装置的施工方式为:将附着架507拧紧到墙板上,底部4个调节装置506顶紧垫板505与叠合楼板504底部贴紧,当垫板505的上端面与叠合楼板完全贴紧则视为完成,这样做可以增大叠合楼板的承载能力。Preferably, with reference to FIG. 5, the construction method of the supporting and reinforcing device at the bottom of the superimposed floor slab is as follows: the attachment frame 507 is screwed to the wall plate, and the four adjusting devices 506 at the bottom are pressed against the backing plate 505 and the bottom of the superimposed floor slab 504. When the upper end face of the backing plate 505 is in complete contact with the superimposed floor slab, it is regarded as complete, which can increase the bearing capacity of the superimposed floor slab.

优选地,结合附图6,混凝土墙板垂直度检验施工方式为:将检验工装通过螺栓605整体附着在墙板104上,保证工装的面与墙板完全贴紧,在墙板调解过程中当墙板与地面的夹角小于90度时球603会向右边滚至端面,当角度大于90度时球603会滚至与墙体附着端的端面,当墙体与地面的夹角为90度(墙板垂直度合格)时,球603能够在非端面的任何位置稳定停留不动则视为垂直,此工装的优点在于直接作用于被检墙板且接触面积大,检验精度高,可实现快速施工。Preferably, with reference to FIG. 6, the construction method for the verticality inspection of the concrete wall panel is: the inspection tool is integrally attached to the wall panel 104 through bolts 605 to ensure that the surface of the tool is completely close to the wall panel. When the angle between the wall panel and the ground is less than 90 degrees, the ball 603 will roll to the right to the end face, and when the angle is greater than 90 degrees, the ball 603 will roll to the end face of the attachment end of the wall. When the angle between the wall and the ground is 90 degrees ( When the verticality of the wallboard is qualified), the ball 603 can be regarded as vertical if it can stay at any position other than the end face stably. construction.

综上所述,本发明的预制墙板预埋灌浆套筒位置度与垂直度检验工装,墙板预埋竖向钢筋位置度、垂直度检验及钢筋校正工装,预埋套筒位置度及垂直度不合格修复方法及装置,预留竖向钢筋位置度不合格修复方法及装置修复件,叠合楼板底部支撑加固装置,混凝土墙板垂直度检验工装是混凝土墙板生产过程定位及检验、施工方验收检验、安装过程检验、安装过程不合格品的修复及底部支撑的成套装置,操作简单、准确度高、适用性强、效率高。To sum up, the prefabricated wallboard pre-embedded grouting sleeve position and verticality inspection tooling of the present invention, the wallboard pre-embedded vertical steel bar positional degree, verticality inspection and steel bar correction tooling, the pre-embedded sleeve positional degree and verticality Unqualified repair method and device, reserved vertical steel bar position unqualified repair method and device repair parts, bottom support reinforcement device of superimposed floor, concrete wall panel verticality inspection tooling is the production process of concrete wall panel positioning and inspection, construction It is a complete set of equipment for side acceptance inspection, installation process inspection, repair of unqualified products in the installation process and bottom support, with simple operation, high accuracy, strong applicability and high efficiency.

本发明不限于上述具体实施例。可以理解的是,在不脱离本发明的精神和实质范围的情况下,可以做出各种变形和修改,这些都应包含在本发明的保护范围之内。The present invention is not limited to the specific embodiments described above. It should be understood that various variations and modifications can be made without departing from the spirit and essential scope of the present invention, which should all be included within the protection scope of the present invention.

Claims (8)

1.一种用于套筒灌浆连接的预制混凝土墙板的高效安装方法,其特征在于:包括以下步骤:1. an efficient installation method for the precast concrete wall panel connected by sleeve grouting, it is characterized in that: comprise the following steps: 用钢筋位置度及垂直度检具检验第一墙板上与套筒配合安装的竖向钢筋的位置度与垂直度;Use the steel bar position and verticality inspection tool to check the position and verticality of the vertical steel bars installed with the sleeve on the first wall panel; 用套筒位置度及垂直度检具检验第二墙板上套筒的位置度及垂直度;对垂直度不合格的竖向钢筋采用校正装置现场校直;Use the sleeve position and verticality inspection tool to check the position and verticality of the sleeve on the second wall panel; the vertical steel bar with unqualified verticality is straightened on site by a correction device; 对于因套筒位置度、垂直度及竖向钢筋位置度不合格而无法配对安装的预制墙板使用修复件现场修复,其中,修复件包括焊接板和焊接钢筋,焊接板上设置有多个长圆通孔,修复时切除无法安装进入套筒对应的预留钢筋,通过所述通孔将焊接板套在其它预留钢筋上,将焊接钢筋和未切除的预留钢筋与焊接板牢固焊接;For prefabricated wall panels that cannot be installed in pairs due to unqualified sleeve position, verticality and vertical steel bar position Round through holes, when repairing, cut off the reserved steel bars that cannot be installed into the sleeve, put the welding plate on other reserved steel bars through the through holes, and firmly weld the welded steel bars and the uncut reserved steel bars with the welding plate; 对检验并修复后的墙板进行装配;Assemble the inspected and repaired wall panels; 墙板装配完成后使用墙板垂直度检具检验,检验合格后进行灌浆作业并将所述第二墙板固定连接到第一墙板上;After the wall panel is assembled, use the wall panel verticality inspection tool to check, after passing the inspection, carry out the grouting operation and fix the second wall panel to the first wall panel; 在所述第二墙板上方装配楼板,使用附着于第二墙板的楼板支撑装置临时加固所述楼板;assembling a floor slab over the second wall panel, temporarily reinforcing the floor panel using a floor support device attached to the second wall panel; 其中,墙板垂直度检具包括竖直部、水平透明管体和钢球,所述竖直部用于检验时与墙板贴紧,水平透明管体与竖直部垂直连接固定,钢球设置在水平透明管体内,当钢球能够在非两端的任意位置稳定地停留不动时表明墙板垂直度已调好。Wherein, the wall panel verticality inspection tool includes a vertical part, a horizontal transparent tube body and a steel ball. The vertical part is used to closely adhere to the wall panel during inspection, the horizontal transparent tube body and the vertical part are vertically connected and fixed, and the steel ball It is arranged in a horizontal transparent tube. When the steel ball can stay stably at any position other than both ends, it indicates that the verticality of the wall panel has been adjusted. 2.根据权利要求1所述的方法,其特征在于:套筒位置度及垂直度检具包括螺柱安装主体、螺柱和把手,所述螺柱安装主体上设有螺纹孔,螺柱设置在螺纹孔内,螺柱的位置与墙板的灌浆套筒设计预埋的位置一致,螺柱的外径略小于灌浆套筒内径最小处的尺寸。2. The method according to claim 1, wherein the sleeve position and verticality checking tool comprises a stud installation body, a stud and a handle, the stud installation body is provided with threaded holes, and the stud is provided with In the threaded hole, the position of the stud is consistent with the pre-embedded position of the grouting sleeve of the wall panel, and the outer diameter of the stud is slightly smaller than the minimum inner diameter of the grouting sleeve. 3.根据权利要求1所述的方法,其特征在于:钢筋位置度及垂直度检具包括位置检测主体和把手,位置检测主体上设置有通孔,通孔的位置与墙板钢筋设计位置一致,通孔略大于预留钢筋的最大外廓尺寸。3. The method according to claim 1, characterized in that: the steel bar position and verticality checking tool comprises a position detection body and a handle, the position detection body is provided with a through hole, and the position of the through hole is consistent with the design position of the wall panel steel bar , the through hole is slightly larger than the maximum outline size of the reserved steel bar. 4.根据权利要求1所述的方法,其特征在于:在不配对的套筒内插入焊接钢筋,缓慢放下第二墙板至标高,将插入不配对的套筒内的所述焊接钢筋和未切除的预留钢筋与焊接板牢固焊接,调整好墙板的垂直度,然后在灌浆套筒内灌浆连接。4. The method according to claim 1, characterized in that: inserting welded steel bars in the unmatched sleeves, slowly lowering the second wall panel to the level, and inserting the welded steel bars and unmatched sleeves into the unmatched sleeves. The excised reserved steel bars are firmly welded to the welding plate, the verticality of the wall plate is adjusted, and then the grouting connection is made in the grouting sleeve. 5.根据权利要求1所述的方法,其特征在于:楼板支撑装置包括附着于墙板的三角支撑架,三角支撑架包括竖直杆、水平杆和斜杆,竖直杆竖直设置于墙板上,水平杆与竖直杆相连,斜杆的一端连接于水平杆上设置的支撑座上,另一端与竖直杆相连。5. The method according to claim 1, wherein the floor support device comprises a triangular support frame attached to the wall panel, the triangular support frame comprises a vertical rod, a horizontal rod and an inclined rod, and the vertical rod is vertically arranged on the wall On the board, the horizontal rod is connected with the vertical rod, one end of the inclined rod is connected with the support seat provided on the horizontal rod, and the other end is connected with the vertical rod. 6.根据权利要求2所述的方法,其特征在于:套筒位置度及垂直度检具在预制墙板生产浇注过程中用于直接插入套筒中保证其定位准确性,待构件凝固达到一定强度后撤出,以保证预制墙板套筒位置度、垂直度的准确性及互换性。6. The method according to claim 2, characterized in that: the sleeve position and verticality checking tool is used to directly insert the sleeve into the sleeve during the production and pouring process of the prefabricated wallboard to ensure its positioning accuracy, until the component solidifies to a certain level. After the strength, it is withdrawn to ensure the accuracy and interchangeability of the position and verticality of the prefabricated wallboard sleeve. 7.根据权利要求3所述的方法,其特征在于:钢筋位置度及垂直度检具在预制墙板浇注过程中用于套入预留钢筋中保证其定位准确,待构件凝固达到一定强度后取出,以保证预制墙板预留钢筋位置度、垂直度的准确性及互换性。7. The method according to claim 3, characterized in that: the steel bar position degree and verticality check tool is used to insert the reserved steel bar in the prefabricated wall panel pouring process to ensure its accurate positioning, and after the solidification of the component reaches a certain strength Take it out to ensure the accuracy and interchangeability of the position, verticality and interchangeability of the steel bars reserved for the prefabricated wall panels. 8.一种用于实施权利要求1-7任一项所述方法的预制混凝土墙板的高效安装装置,其特征在于,包括:8. An efficient installation device for precast concrete wall panels for implementing the method of any one of claims 1-7, characterized in that, comprising: 套筒位置度及垂直度检具,用于检验墙板上套筒的位置度及垂直度;Sleeve position and verticality inspection tool, used to check the position and verticality of the sleeve on the wall; 钢筋位置度及垂直度检具,用于检验墙板上与套筒配合安装的竖向钢筋的位置度与垂直度;The steel bar position and verticality inspection tool is used to check the position and verticality of the vertical steel bars installed with the sleeve on the wall panel; 修复件,用于对套筒位置度及垂直度不合格及竖向钢筋位置度不合格的预制墙板进行现场修复,修复件包括焊接板和焊接钢筋,焊接板上设置有多个长圆通孔;Repair parts are used for on-site repair of prefabricated wall panels with unqualified sleeve position and verticality and unqualified vertical steel bar position. ; 校正装置,用于对垂直度不合格的竖向钢筋进行现场校直;Correction device for on-site straightening of vertical steel bars with unqualified verticality; 墙板垂直度检具,用于在墙板装配完成后对墙板垂直度进行检验,墙板垂直度检具包括竖直部、水平透明管体和钢球,所述竖直部用于与墙板贴紧,水平透明管体与竖直部垂直连接,钢球设置在水平透明管体内;The wall panel verticality inspection tool is used to inspect the verticality of the wall panel after the wall panel is assembled. The wall panel verticality inspection tool includes a vertical part, a horizontal transparent pipe body and a steel ball. The wall panels are closely attached, the horizontal transparent tube body is vertically connected with the vertical part, and the steel ball is arranged in the horizontal transparent tube body; 灌浆作业装置,用于在墙板垂直度检验合格后进行灌浆作业以将所述第二墙板固定到第一墙板上;以及a grouting operation device for performing a grouting operation to fix the second wall panel to the first wall panel after the verticality inspection of the wall panel is passed; and 楼板支撑装置,用于在所述第二墙板上方装配楼板后将其附着于第二墙板上以临时加固所述楼板。A floor support device for attaching a floor panel to the second wall panel after assembling the floor panel above the second wall panel to temporarily reinforce the floor panel.
CN201811294342.3A 2018-10-30 2018-10-30 Efficient installation method and device for precast concrete wall panels Active CN109457965B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811294342.3A CN109457965B (en) 2018-10-30 2018-10-30 Efficient installation method and device for precast concrete wall panels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811294342.3A CN109457965B (en) 2018-10-30 2018-10-30 Efficient installation method and device for precast concrete wall panels

Publications (2)

Publication Number Publication Date
CN109457965A CN109457965A (en) 2019-03-12
CN109457965B true CN109457965B (en) 2020-10-20

Family

ID=65609163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811294342.3A Active CN109457965B (en) 2018-10-30 2018-10-30 Efficient installation method and device for precast concrete wall panels

Country Status (1)

Country Link
CN (1) CN109457965B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282381A (en) * 2020-10-28 2021-01-29 浙江工业职业技术学院 Mounting and positioning device for assembly type building wall and working method thereof
CN113323486B (en) * 2021-06-01 2022-05-24 台州学院 Prefabricated concrete wallboard and floor slab connecting joint and construction method thereof
CN114131730B (en) * 2021-12-03 2023-01-20 瑞洲建设集团有限公司 Steel bar grouting process for assembled prefabricated wall plate of high-rise building
CN115354870B (en) * 2022-08-18 2023-10-24 济南一建集团有限公司 Guide for hoisting assembled building body and hoisting installation method thereof
CN116498093B (en) * 2023-03-28 2025-10-14 北京建筑材料科学研究总院有限公司 Prefabricated wall panel installation system and control method and device thereof
CN118029543B (en) * 2024-04-12 2024-07-05 内蒙古工业大学 Assembled building structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1735738A (en) * 2003-01-09 2006-02-15 芝加哥桥梁&铁公司 Use of partially prefabricated slabs for construction of concrete walls and shells
CN201687125U (en) * 2010-06-04 2010-12-29 北京万科企业有限公司 Precast concrete wallboard
CN203531178U (en) * 2013-11-11 2014-04-09 内蒙古蒙西工程设计有限公司 Wholly prefabricated shear wall
CN205134634U (en) * 2015-10-29 2016-04-06 苏州设计研究院股份有限公司 Precast reinforced concrete shear force wall
CN106499051A (en) * 2016-11-21 2017-03-15 中国建筑股份有限公司 A column-through assembled prestressed concrete frame system and its construction method
CN206360377U (en) * 2016-12-27 2017-07-28 中建科技有限公司 The mounting structure of precast concrete wall column

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1735738A (en) * 2003-01-09 2006-02-15 芝加哥桥梁&铁公司 Use of partially prefabricated slabs for construction of concrete walls and shells
CN201687125U (en) * 2010-06-04 2010-12-29 北京万科企业有限公司 Precast concrete wallboard
CN203531178U (en) * 2013-11-11 2014-04-09 内蒙古蒙西工程设计有限公司 Wholly prefabricated shear wall
CN205134634U (en) * 2015-10-29 2016-04-06 苏州设计研究院股份有限公司 Precast reinforced concrete shear force wall
CN106499051A (en) * 2016-11-21 2017-03-15 中国建筑股份有限公司 A column-through assembled prestressed concrete frame system and its construction method
CN206360377U (en) * 2016-12-27 2017-07-28 中建科技有限公司 The mounting structure of precast concrete wall column

Also Published As

Publication number Publication date
CN109457965A (en) 2019-03-12

Similar Documents

Publication Publication Date Title
CN105525625A (en) Construction method and device of pre-embedded bolts of fixed steel column base
CN203947771U (en) A kind of Bailey beam pendent form support system
CN106592775B (en) A high-precision embedded parts reinforcement installation device, method and application
CN109457965A (en) The Efficient installation method and its device of precast concrete wall panel
CN107859037B (en) An installation and positioning method for an installation and positioning mechanism of a large-scale embedded bolt structure
CN210685444U (en) Quick leveling, mounting and supporting device for prefabricated external wall panel
CN103669883A (en) A method for installation and adjustment of combined shock-isolation bearing
CN102926554A (en) Steel hanging seat formwork support and construction method thereof
CN111254968A (en) Installation device and installation method for large-diameter embedded bolt of large-scale equipment foundation
CN216613830U (en) Recoverable tower crane adheres to and buries a structure
CN106639500A (en) One-time slip-form construction method for square variable-section multi-layer platform chimney under high air pressure
CN104153479B (en) Construction method and construction device for loading hole of reaction force plate
CN101838986B (en) Disassembling tool type lattice column and construction method thereof
CN218668474U (en) Basket type overhanging bearing frame
CN104831832B (en) Assembly of shear wall structure and its installation method
CN103470036A (en) Overhanging structure construction method
CN103132494B (en) Embedded anchor cone accurate positioning method
CN102155097B (en) Locating device for installing large embedded member of concrete wall and installing method thereof
CN113738125B (en) Construction method for lifting limited-space large-span steel structure of station house under line
CN115182482A (en) Construction method of cavity prefabricated wall body matched with external frame free
CN112593717B (en) Fixing device for inclined support of prefabricated wallboard in board descending area
CN110790113B (en) Construction method suitable for mounting wall-attached frame of ultra-long-distance construction elevator
CN110700574A (en) Post-cast strip supporting structure and construction method thereof
CN209244243U (en) A kind of fixed device of fashioned iron sizing tripod for builder's jack
CN207672599U (en) A kind of foundation bolt mounting tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210113

Address after: 065000 Chuangye Road, development zone, Langfang City, Hebei Province

Patentee after: CABR CONSTRUCTION MACHINERY TECHNOLOGY Co.,Ltd.

Patentee after: BEIJING BUILDING MECHANIZATION RESEARCH INSTITUTE Co.,Ltd.

Address before: 100007 Beijing Dongcheng District city Andingmen Fangjia Hutong No. 21

Patentee before: BEIJING BUILDING MECHANIZATION RESEARCH INSTITUTE Co.,Ltd.

Patentee before: INSTITUTE OF BUILDING MECHANIZATION/CHINA ACADEMY OF BUILDING RESEARCH

Patentee before: CABR CONSTRUCTION MACHINERY TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right