CN109457965B - High-efficiency installation method and device of precast concrete wall panel - Google Patents

High-efficiency installation method and device of precast concrete wall panel Download PDF

Info

Publication number
CN109457965B
CN109457965B CN201811294342.3A CN201811294342A CN109457965B CN 109457965 B CN109457965 B CN 109457965B CN 201811294342 A CN201811294342 A CN 201811294342A CN 109457965 B CN109457965 B CN 109457965B
Authority
CN
China
Prior art keywords
wallboard
sleeve
position degree
steel bar
perpendicularity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811294342.3A
Other languages
Chinese (zh)
Other versions
CN109457965A (en
Inventor
石小虎
张声军
陈炜宁
曹国巍
周磊
韦赵滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING BUILDING MECHANIZATION RESEARCH INSTITUTE Co.,Ltd.
CABR CONSTRUCTION MACHINERY TECHNOLOGY Co.,Ltd.
Original Assignee
Cabr Construction Machinery Technology Co ltd
Beijing Building Mechanization Research Institute Co ltd
Institute of Building Mechanization of Chinese Academy of Building Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cabr Construction Machinery Technology Co ltd, Beijing Building Mechanization Research Institute Co ltd, Institute of Building Mechanization of Chinese Academy of Building Research filed Critical Cabr Construction Machinery Technology Co ltd
Priority to CN201811294342.3A priority Critical patent/CN109457965B/en
Publication of CN109457965A publication Critical patent/CN109457965A/en
Application granted granted Critical
Publication of CN109457965B publication Critical patent/CN109457965B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a high-efficient installation method of precast concrete wallboard, grout sleeve position degree before the wallboard assembly, reserve the detection and the correction of the straightness that hangs down of vertical reinforcement position degree and assembly back wallboard, grout sleeve position degree and straightness detection frock include insert telescopic inserted post and base, coincide floor bottom strutting arrangement with the holding power direct action on vertical wallboard, the coincide floor support area has been increased, wallboard installation adjustment and grouting equipment effort can direct action on strutting arrangement, provide complete set of frock for promoting the high-efficient high accuracy installation of precast concrete wallboard and effectively guarantee the whole straightness of wall body, provide essential technical support for advancing the high-efficient high quality construction of assembled precast concrete building.

Description

High-efficiency installation method and device of precast concrete wall panel
Technical Field
The invention relates to a high-efficiency installation method and a device thereof for a precast concrete wallboard, in particular to a precast concrete wallboard structure, a positioning and inspection link of the production process of a grouting sleeve and a reserved vertical steel bar, position degree inspection of an assembly site, a correction method for unqualified verticality of the reserved vertical steel bar, correction of unqualified grouting sleeve position degree and verticality and unqualified reserved steel bar position degree, inspection of verticality after a composite floor slab bottom supporting structure and a wallboard are installed and the like.
Background
The pre-buried position of reinforcing bar and grout sleeve is decided by the casting die frame at precast concrete wallboard in process of production, because the clearance volume of frame locating sleeve and reinforcing bar locating hole is big, the side forms is thinner, location direction length is short etc. reason, the position degree and the straightness that hangs down of sleeve and reinforcing bar often can not effectively guarantee in process of production. In an assembly construction site, a special inspection tool for the position degrees of a sleeve and a reserved steel bar, a reserved steel bar adjusting tool and a repairing method and device for an unqualified wallboard are lacked at present, a tower crane is often required to hang the wallboard to wait for the correction of the reserved steel bar when the sleeve or the reserved steel bar is unqualified and is not matched, even a wallboard component cannot be installed due to the lack of a feasible and reliable repairing method, and the construction safety, quality and efficiency are seriously influenced. Moreover, when the position degree of the reserved steel bars of the wallboard at the bottom layer is unqualified and the prefabricated building can not be repaired, the assembled whole floor slab, beam and other structures are required to be dismantled sometimes, so that the time is wasted, the construction cost is increased, and the high efficiency of the high-efficiency construction of the prefabricated building can not be effectively realized. When supervision is not in place, part constructors can even rule violating the careless rate and cut off the vertical reinforcing bar that does not go into a section of thick bamboo and direct assembly, leads to actual connection reinforcing bar quantity to reduce, and the quality hidden danger is serious.
Secondly, because floor and upper wallboard are heavier, in the upper wallboard installation process, often can produce great concentrated load and act on lower floor's floor, lead to its local overload destruction or whole unstability easily. The existing full-tire-mold all-directional supporting technology has the advantages of low supporting and dismantling efficiency, huge material consumption, increase of dead weight of the whole floor, abnormal narrow and small lower-layer operation space, no targeted support in the maximum stress area, direct action of a supporting structure on a laminated floor slab which does not reach necessary strength after lower-layer pouring, serious surface damage, need of repair and potential safety hazard of the laminated floor slab under pressure.
On the other hand, the existing wallboard verticality inspection generally places an instrument on a floor slab, firstly adjusts the instrument to be horizontal, measures the horizontal level step by step at multiple points, can inspect the wallboard verticality, is low in working efficiency and easy to be interfered by external factors and human factors, or detects in a low-precision mode such as a plumb bob and a running rule, and cannot give consideration to high efficiency and high precision.
Therefore, in order to solve the above-mentioned drawbacks and defects of the prior art, it is necessary to research an efficient installation method of precast concrete wall panels and an apparatus thereof.
Disclosure of Invention
The invention has been made in view of at least one of the above problems, and provides a wallboard perpendicularity gauge which is convenient for construction, a wallboard grouting sleeve and a vertical reserved steel bar position degree and perpendicularity inspection tool, a reserved steel bar correction tool, a grouting sleeve and reserved steel bar unqualified product on-site correction device, a laminated floor slab bottom supporting device attached to a wallboard, and is rapid and accurate. The problem of vertical reinforcing bar and grout sleeve position degree probably have incomplete interchange in the wallboard installation, wallboard and another wallboard homoenergetic after the frock inspection are correctly installed, meet individual production or transportation and lead to the unqualified wallboard of sleeve or reservation reinforcing bar and can revise at the assembly scene very fast. The support frame of the floor bottom support device is attached to the lower-layer wallboard, the stress area of the floor is increased, the floor is supported under the maximum stress area, and damage to the laminated floor caused by installation of the wallboard and adjustment operation can be effectively prevented. The problem of hang down straightness with ground in the wallboard installation is solved to hang down straightness inspection frock behind wallboard installation, need not the multiple spot and transfers the straightness that hangs down that detects the wallboard that detecting instrument level detected the wallboard, can detect wallboard and ground more high-efficiently, directly perceivedly whether perpendicular.
According to an aspect of the present invention, there is provided
An efficient installation method of precast concrete wall panels for grouted joints of sleeves is characterized by comprising the following steps:
the position degree and the verticality of the vertical steel bar which is arranged on the first wallboard in a matched mode with the sleeve are detected by a steel bar position degree and verticality detection tool;
the sleeve position degree and the perpendicularity of the second wallboard are detected by a sleeve position degree and perpendicularity detection tool; straightening vertical steel bars with unqualified verticality on site by adopting a correction device;
the prefabricated wall panel which cannot be installed in a matched mode due to unqualified sleeve position degree, verticality and vertical steel bar position degree is repaired on site by using a repairing part, wherein the repairing part comprises a welding plate and a welding steel bar, a plurality of long round through holes are formed in the welding plate, the reserved steel bar which cannot enter the sleeve in a mounted mode is cut off during repair, the welding plate is sleeved on other reserved steel bars through the through holes, and the welding steel bar and the reserved steel bar which is not cut off are firmly welded with the welding plate;
assembling the inspected and repaired wallboard;
after the wallboard is assembled, the wallboard perpendicularity gauge is used for checking, grouting operation is carried out after the wallboard is checked to be qualified, and the second wallboard is fixedly connected to the first wallboard;
assembling a floor above the second wall panel, the floor being temporarily reinforced using floor support means attached to the second wall panel;
the wallboard perpendicularity gauge comprises a vertical portion, a horizontal transparent pipe body and a steel ball, wherein the vertical portion is used for being attached to a wallboard in a checking process, the horizontal transparent pipe body is perpendicularly connected and fixed with the vertical portion, the steel ball is arranged in the horizontal transparent pipe body, and the fact that the wallboard perpendicularity is adjusted when the steel ball can stably stay at any position of two ends and cannot move is shown.
According to another aspect of the invention, the sleeve position degree and perpendicularity gauge comprises a stud mounting main body, a stud and a handle, wherein a threaded hole is formed in the stud mounting main body, the stud is arranged in the threaded hole, the position of the stud is consistent with the designed and pre-embedded position of a grouting sleeve of a wallboard, and the outer diameter of the stud is slightly smaller than the size of the minimum inner diameter position of the grouting sleeve.
According to another aspect of the invention, the steel bar position and verticality gauge comprises a position detection main body and a handle, wherein the position detection main body is provided with a through hole, the position of the through hole is consistent with the design position of the wall plate steel bar, and the through hole is slightly larger than the maximum overall dimension of the reserved steel bar.
According to another aspect of the present invention, welding steel bars are inserted into the unmated sleeves, the second wall panel is slowly lowered to an elevation, the steel bars inserted into the unmated sleeves and the unresectable reserved steel bars are firmly welded to the welding plates, the verticality of the wall panel is adjusted, and then grouting connection is performed in the grouting sleeves.
According to another aspect of the present invention, the floor slab supporting device includes a triangular support frame attached to the wall panel, the triangular support frame including a vertical rod vertically disposed on the wall panel, a horizontal rod connected to the vertical rod, and an inclined rod having one end connected to a support seat disposed on the horizontal rod and the other end connected to the vertical rod.
According to another aspect of the invention, the sleeve position degree and perpendicularity gauge is used for being directly inserted into the sleeve to ensure the positioning accuracy of the prefabricated wall plate in the production and pouring process of the prefabricated wall plate, and is withdrawn after the component is solidified to reach certain strength so as to ensure the accuracy and interchangeability of the sleeve position degree and perpendicularity of the prefabricated wall plate.
According to another aspect of the invention, the steel bar position degree and perpendicularity gauge is used for being sleeved into the reserved steel bar to ensure accurate positioning in the pouring process of the prefabricated wall panel, and is taken out after the component is solidified to reach a certain strength, so as to ensure the accuracy and interchangeability of the position degree and perpendicularity of the reserved steel bar of the prefabricated wall panel.
According to another aspect of the present invention, there is also provided an efficient installation apparatus of precast concrete wall panel for implementing the aforementioned method, characterized by comprising:
the sleeve position degree and perpendicularity gauge is used for checking the position degree and perpendicularity of the sleeve on the wallboard;
the steel bar position degree and perpendicularity gauge is used for checking the position degree and perpendicularity of a vertical steel bar which is arranged on the wallboard in a matched mode with the sleeve;
the repairing piece is used for performing on-site repairing on the prefabricated wall panel with unqualified sleeve position degree and verticality and unqualified vertical steel bar position degree, and comprises a welding plate and a welding steel bar, wherein the welding plate is provided with a plurality of long round through holes;
the correcting device is used for carrying out on-site straightening on the vertical steel bars with unqualified verticality;
the wallboard verticality detection tool is used for detecting the verticality of a wallboard after the wallboard is assembled, and comprises a vertical part, a horizontal transparent pipe body and a steel ball, wherein the vertical part is tightly attached to the wallboard, the horizontal transparent pipe body is vertically connected with the vertical part, and the steel ball is arranged in the horizontal transparent pipe body;
the grouting operation device is used for performing grouting operation to fix the second wallboard to the first wallboard after the verticality of the wallboard is qualified; and
and the floor supporting device is used for attaching the floor to the second wallboard after the floor is assembled above the second wallboard so as to temporarily reinforce the floor.
Compared with the prior art, the invention has the beneficial effects that:
the method and the device have the advantages of simple operation, high accuracy, strong applicability and high efficiency.
Drawings
Fig. 1 is a schematic diagram of a detection and inspection tool for sleeve position and perpendicularity according to a preferred embodiment of the invention.
Fig. 2 is a schematic diagram of a position degree inspection, inspection tool and correction of a reserved vertical steel bar according to a preferred embodiment of the present invention.
Fig. 3 is a schematic diagram of a repairing method and device for failure in the pre-buried position degree and verticality of a grouting sleeve according to a preferred embodiment of the present invention.
Fig. 4 is a schematic diagram of a method and an apparatus for repairing a defective position of a reserved vertical steel bar according to a preferred embodiment of the present invention.
Figure 5 is a schematic view of a composite floor bottom support arrangement according to a preferred embodiment of the present invention.
Fig. 6 is a construction schematic diagram of a concrete wallboard perpendicularity testing tool according to a preferred embodiment of the invention.
Fig. 7 is a schematic view of a concrete wallboard perpendicularity testing tool according to a preferred embodiment of the invention.
Detailed Description
The best mode for carrying out the present invention will be described in detail with reference to the accompanying drawings, wherein the detailed description is for the purpose of illustrating the invention in detail, and is not to be construed as limiting the invention, as various changes and modifications can be made therein without departing from the spirit and scope thereof, which are intended to be encompassed within the appended claims.
Example 1
Referring to fig. 1 to 7, the installation and construction process of the precast concrete wall panel of the present invention is: the method comprises the steps of prefabricating and forming a wallboard in a factory, transporting and hoisting the wallboard to a site designated position, sleeving a grouting sleeve of the wallboard arranged on the wallboard into a reserved vertical steel bar of the wallboard arranged on the lower layer, finely adjusting the position and the angle of the wallboard, then adopting an inclined support for temporary support, and finally grouting the grouting material into the sleeve to complete vertical connection.
Preferably, the present invention provides a method for efficiently installing precast concrete wall panels for grouted connection of sleeves, characterized by comprising the steps of:
the position degree and the verticality of the vertical steel bar which is arranged on the first wallboard in a matched mode with the sleeve are detected by a steel bar position degree and verticality detection tool;
the sleeve position degree and the perpendicularity of the second wallboard are detected by a sleeve position degree and perpendicularity detection tool; straightening vertical steel bars with unqualified verticality on site by adopting a correction device;
the prefabricated wall panel which cannot be installed in a matched mode due to unqualified sleeve position degree, verticality and vertical steel bar position degree is repaired on site by using a repairing part, wherein the repairing part comprises a welding plate and a welding steel bar, a plurality of long round through holes are formed in the welding plate, the reserved steel bar which cannot enter the sleeve in a mounted mode is cut off during repair, the welding plate is sleeved on other reserved steel bars through the through holes, and the welding steel bar and the reserved steel bar which is not cut off are firmly welded with the welding plate;
assembling the inspected and repaired wallboard;
after the wallboard is assembled, the wallboard perpendicularity gauge is used for checking, grouting operation is carried out after the wallboard is checked to be qualified, and the second wallboard is fixedly connected to the first wallboard;
assembling a floor above the second wall panel, the floor being temporarily reinforced using floor support means attached to the second wall panel;
the wallboard perpendicularity gauge comprises a vertical portion, a horizontal transparent pipe body and a steel ball, wherein the vertical portion is used for being attached to a wallboard in a checking process, the horizontal transparent pipe body is perpendicularly connected and fixed with the vertical portion, the steel ball is arranged in the horizontal transparent pipe body, and the fact that the wallboard perpendicularity is adjusted when the steel ball can stably stay at any position of two ends and cannot move is shown.
Advantageously, the wallboard perpendicularity testing fixture can be compared with the wallboard perpendicularity testing fixture in the traditional perpendicularity testing process by adjusting the level, the device only needs to attach the frame tightly to the wallboard, the testing fixture does not need to adjust the level, whether the wallboard is perpendicular or not is easy to observe and judge, and the efficiency of the wallboard perpendicularity testing is effectively improved.
Preferably, each panel has a sleeve below and exposed steel above.
Preferably, the sleeve position degree and perpendicularity gauge comprises a stud mounting main body, a stud and a handle, wherein a threaded hole is formed in the stud mounting main body, the stud is arranged in the threaded hole, the position of the stud is consistent with the designed and pre-embedded position of a grouting sleeve of the wallboard, and the outer diameter of the stud is slightly smaller than the size of the minimum inner diameter position of the grouting sleeve. All the rods of the checking fixture are inserted into the wallboard embedded grouting sleeve along the vertical direction, and when the main body is aligned with the appearance of the wallboard, the position degree and the verticality of the wallboard embedded sleeve are qualified.
Preferably, the steel bar position degree and perpendicularity gauge comprises a position detection main body and a handle, a through hole is formed in the position detection main body, the position of the through hole is consistent with the design position of the wall plate steel bar, and the through hole is slightly larger than the maximum overall size of the reserved steel bar. The detection tool sleeve is completely sleeved on all the reserved steel bars along the vertical direction, and the detection body is aligned with the appearance of the wallboard, so that the detection tool is qualified, the detection tool can be used for positioning the reserved steel bars of the poured wallboard in a component factory, the production process and the factory inspection, the inspection of acceptance and acceptance of a construction unit and the inspection of a construction site, when the tool cannot be sleeved on all the reserved steel bars, the reserved steel bar correction device or the repair part needs to be matched for construction, and the wallboard can be installed until all the tools can be sleeved on the wall. The process is completed in the process of hoisting the wallboard, so that the time for occupying hoisting equipment due to the correction of deformation of the reserved steel bars caused by the construction such as transportation and hoisting can be greatly reduced, and the efficient construction of wallboard installation is realized.
Preferably, the welding steel bars are inserted into the unmatched sleeves, the second wallboard is slowly put down to the elevation, the steel bars inserted into the unmatched sleeves and the unresectable reserved steel bars are firmly welded with the welding plate, the verticality of the wallboard is well adjusted, and then grouting connection is performed in the grouting sleeves. The invention can repair and use the unqualified wallboard produced in site, and saves the transportation cost and the maintenance cost of maintenance.
Preferably, the reinforcing steel bars with unqualified position degrees are cut off during repair, the welding steel plates are sleeved on other reserved reinforcing steel bars through the through holes, the reinforcing steel bar position degree and verticality detection tools are used for positioning at the upper part and inserting the welding reinforcing steel bars, then the reserved reinforcing steel bars and the welding reinforcing steel bars are firmly welded with the welding plate, and the wallboard is installed after the reinforcing steel bar position degree and verticality detection tools are pulled out. The invention provides a reserved steel bar on-site repairing method, which can repair an assembled and reinforced bottom wallboard, can not demolish the installed wallboard, floor slab, beam, column and other structures due to unqualified position of the reserved steel bar, and saves maintenance time and maintenance cost.
Preferably, floor strutting arrangement is including the triangular support frame who adheres to the wallboard, and triangular support frame includes vertical pole, horizon bar and down tube, and vertical pole is vertical to be set up on the wallboard, and the horizon bar links to each other with vertical pole, and the one end of down tube is connected on the supporting seat that sets up on the horizon bar, and the other end links to each other with vertical pole. After the floor installation, with the floor of adjusting device with the tie-plate top tight in wallboard top, increase the lifting surface area of floor after the top is tight, wallboard erection equipment and the constructor of last floor are in simultaneously it is all not influenced to place the device top, the device transmits the effort in upper wallboard installation and the work progress to the wallboard of lower floor on to increase the security of construction.
Preferably, floor strutting arrangement is including the triangular support frame who adheres to the wallboard, and triangular support frame includes vertical pole, horizon bar and down tube, and vertical pole is vertical to be set up on the wallboard, and the horizon bar links to each other with vertical pole, and the one end of down tube is connected on the supporting seat that sets up on the horizon bar, and the other end links to each other with vertical pole.
Preferably, the sleeve position degree and perpendicularity gauge is used for being directly inserted into the sleeve to ensure the positioning accuracy of the prefabricated wall plate in the production and pouring process of the prefabricated wall plate, and the prefabricated wall plate is withdrawn after the component is solidified to reach certain strength so as to ensure the accuracy and interchangeability of the sleeve position degree and the perpendicularity of the prefabricated wall plate.
Preferably, the steel bar position degree and perpendicularity gauge is used for being sleeved into the reserved steel bars in the pouring process of the prefabricated wall board to ensure accurate positioning of the prefabricated wall board, and the prefabricated wall board is taken out after the components are solidified to reach certain strength so as to ensure the accuracy and interchangeability of the position degree and the perpendicularity of the reserved steel bars of the prefabricated wall board.
Preferably, there is also provided an efficient installation apparatus for precast concrete wall panels implementing the aforementioned method, characterized by comprising:
the sleeve position degree and perpendicularity gauge is used for checking the position degree and perpendicularity of the sleeve on the wallboard;
the steel bar position degree and perpendicularity gauge is used for checking the position degree and perpendicularity of a vertical steel bar which is arranged on the wallboard in a matched mode with the sleeve;
the repairing piece is used for performing on-site repairing on the prefabricated wall panel with unqualified sleeve position degree and verticality and unqualified vertical steel bar position degree, and comprises a welding plate and a welding steel bar, wherein the welding plate is provided with a plurality of long round through holes;
the correcting device is used for carrying out on-site straightening on the vertical steel bars with unqualified verticality;
the wallboard verticality detection tool is used for detecting the verticality of a wallboard after the wallboard is assembled, and comprises a vertical part, a horizontal transparent pipe body and a steel ball, wherein the vertical part is tightly attached to the wallboard, the horizontal transparent pipe body is vertically connected with the vertical part, and the steel ball is arranged in the horizontal transparent pipe body;
the grouting operation device is used for performing grouting operation to fix the second wallboard to the first wallboard after the verticality of the wallboard is qualified; and
and the floor supporting device is used for attaching the floor to the second wallboard after the floor is assembled above the second wallboard so as to temporarily reinforce the floor.
Preferably, prefabricated wallboard grout sleeve position degree verifying attachment, including precast concrete wallboard, double-screw bolt installation main part, double-screw bolt, handle, grout sleeve, threaded hole on the double-screw bolt installation body, the screw hole site is unanimous with the pre-buried position of wallboard grout sleeve, and the external diameter of double-screw bolt slightly is less than the size of grout sleeve minimum cross-section. When all poles that will detect the frock are all inserted the interior appearance alignment of the pre-buried grout sleeve of wallboard along vertical direction, the pre-buried sleeve position degree of wallboard is qualified, the device can be done sleeve positioner and use when putting into production and pouring, can regard as the verifying attachment of component manufacturing factory to use, can regard as the inspection use that the construction unit accepted, also can reinspection before the assembly field assembly uses, through the use of this device, can have the qualification rate that improves in the production process by a wide margin, the efficiency of construction of installation and the emergence that the unqualified wallboard of prevention was hung to the mounted position.
Preferably, the prefabricated wall panel reserved steel bar position degree detection and correction device comprises a prefabricated concrete wall body, a hole position detection body, a handle, a reserved steel bar and a reserved steel bar correction device, wherein the hole position of the detection main body is consistent with the design position of the steel bar of the wall panel, and the hole is slightly larger than the maximum outline size of the reserved steel bar; the device is completely sleeved on all the reserved steel bars along the vertical direction to be qualified, the device can be used for positioning the reserved steel bars in the production process of the wallboard, can be used for inspection in a component factory, can be used for acceptance inspection in a construction unit, and can also be used for inspection before hoisting in an assembly site. When the reserved steel bar verticality is unqualified, the reserved steel bar correction device needs to be matched for construction, and the wallboard can be installed when all the reserved steel bars can be sleeved. The process is completed in the process of wallboard hoisting, and the working time of the hoisting equipment is not occupied, so that the time for occupying the hoisting equipment due to the deformation caused by the construction of the reserved steel bars in transportation, hoisting and the like can be greatly reduced, and the efficient construction of wallboard installation is realized.
Preferably, grout sleeve pre-buried position degree and the unqualified prosthetic devices of straightness that hangs down include precast concrete wallboard, reserve vertical reinforcement, the welded plate, the welded reinforcement, when assembly field meets sleeve position degree, hang down straightness or position and hang down all unqualifiedly, cut the reserved reinforcement rather than corresponding installation, overlap the welded plate on other reserved vertical reinforcements, insert the welded reinforcement in unqualified sleeve, put down wallboard to the elevation on upper strata slowly, adjust the straightness that hangs down of wallboard, the reinforcing bar that will insert the sleeve, the welded plate welds firmly with other vertical reinforcement, add the bracing temporarily to consolidate to one side, then grout sleeve grout and consolidate, use through this device, can be with using because of the on-the-spot restoration of the unqualified wallboard of production, practice thrift the cost of transportation and the maintenance expense of maintenance.
Preferably, the device for repairing the unqualified reserved vertical steel bar position degree comprises a precast concrete wallboard, a welding plate, reserved vertical steel bars and welded steel bars, when the site assembly meets the wallboard with the unqualified steel bar position degree, the unqualified steel bars are cut off along the end face of the wallboard, a welded steel plate is sleeved on the reserved steel bars, the reserved steel bars with the unqualified position degree are firmly welded with the welding plate through the lower part, a checking tool is used for positioning and inserting the welded steel bars above the reserved steel bars and firmly assembling and welding the reserved steel bars, the welded steel bars and the welding plate are firmly welded, and then the wallboard is installed.
Preferably, coincide floor bottom strutting arrangement includes precast concrete wallboard, attaches to support frame, adjustable mechanism, the prefabricated coincide floor of wallboard, the support frame that attaches to the wallboard is screwed up to the built-in fitting of wallboard through the bolt on, leaves the supporting seat of diagonal draw bar installation on the support frame. After the floor is installed, the backing plate is tightly propped against the floor by the adjusting bolt, the stressed area of the floor is increased after the backing plate is tightly propped against the floor, meanwhile, the wallboard installing equipment and the constructors on the previous floor are not affected above the device, the device increases the safety of construction, and the problem that the stress of the floor is concentrated or damaged in the installation of the upper-layer wallboard is effectively solved.
Preferably, the verticality inspection device after the wallboard is installed comprises a precast concrete wallboard, an inspection tool attachment device, a transparent pipe body, a metal steel ball, a pipe body supporting seat, a pipe body fixing device and the like, wherein the attachment device is tightly attached to the wall body, and when the steel ball can be stably stopped at any position other than two ends and is not moved, the verticality of the wallboard is adjusted.
Preferably, with reference to fig. 1, the grouting sleeve position and verticality testing method is as follows: and (3) tightly holding a handle 103 by hand, inserting the threaded column 102 along the direction vertical to the end face of the wallboard, and judging that the verticality and the position degree of the wallboard embedded grouting sleeve are qualified if the surface of the detection tool 101 is completely attached to the surface of the wallboard 104 and aligned in shape, and judging that the wallboard embedded grouting sleeve cannot be inserted or is difficult to insert, the surface of the detection tool cannot be attached to the surface of the wallboard, the outer surface of the detection tool cannot be aligned and the like as unqualified.
Preferably, with reference to fig. 2, the position degree inspection method of the reserved vertical steel bars is as follows: the reserved steel bars are sleeved with the detection tools along the direction perpendicular to the end faces of the reserved steel bars by holding the handles 103 with two hands, the detection tools 101 are tightly attached to the end faces of the wall boards 104, the position degree and the verticality of the reserved steel bars are considered to be qualified if the detection tools are aligned to the appearance of the wall boards, the correction steel bars 205 are used until the detection tools are inserted if the detection tools cannot be inserted, the position degree which cannot be inserted after the verticality correction of the steel bars is considered to be unqualified, and the assembly can be.
Preferably, combine figure 3, when grout sleeve position degree and the pre-buried unqualified of straightness that hangs down, cut the reservation reinforcing bar of corresponding installation with unqualified grout sleeve 302, welded plate 305 overlaps on reserving the vertical bar, inserts welded steel bar 303 in unqualified sleeve, slowly puts down the wallboard of installation and adjusts to the elevation, adjusts the straightness that hangs down of wallboard, and the welded steel bar 303, welded plate 305 that will insert the sleeve and the vertical steel bar 301 that does not cut weld firmly, adds the temporary reinforcement of bearing diagonal, then grout sleeve grout and consolidate.
Preferably, with reference to fig. 4, when the position degree of the reserved vertical steel bar is not qualified in the installation site, the unqualified reserved steel bar 406 is cut, the welded steel plate sleeve 402 is placed on the reserved steel bar, the concrete at the part of the cut is removed to a small break capable of implementing welding, the checking fixture 101 is used for positioning above and inserting the welded steel bar 303 and firmly assembling and welding, the unqualified reserved steel bar in position is firmly welded with the welded plate through below, then the reserved steel bar 406, the welded steel bar 303 and the welded plate 305 are firmly welded, and then the installation, the inclined support, the angle adjustment, the grouting reinforcement and the like of the wall panel are performed.
Preferably, with reference to fig. 5, the construction method of the bottom supporting and reinforcing device for the composite floor slab is as follows: the attachment frame 507 is screwed to the wall plate, the bottom 4 adjusting devices 506 tightly press the backing plate 505 to be attached to the bottom of the composite floor slab 504, and the upper end surface of the backing plate 505 is completely attached to the composite floor slab, so that the bearing capacity of the composite floor slab can be increased.
Preferably, combine fig. 6, concrete wall panel straightness construction mode that hangs down does: pass through bolt 605 whole attached to wallboard 104 with the inspection frock, guarantee that the face of frock pastes tightly with the wallboard completely, mediate the in-process at the wallboard and when the contained angle of wallboard and ground is less than 90 degrees ball 603 can roll to the terminal surface to the right side, when the angle is greater than 90 degrees ball 603 can roll to the terminal surface with wall body attached end, when the contained angle of wall body and ground is 90 degrees (wallboard straightness is qualified that hangs down), ball 603 can be in any position of non-terminal surface stably stay motionless then regard as perpendicularly, the advantage of this frock lies in that direct action is examined wallboard and area of contact big, it is high to inspect the precision, can realize quick construction.
In conclusion, the prefabricated wallboard embedded grouting sleeve position degree and perpendicularity inspection tool, the wallboard embedded vertical steel bar position degree, perpendicularity inspection and steel bar correction tool, the embedded sleeve position degree and perpendicularity unqualified repair method and device, the reserved vertical steel bar position degree unqualified repair piece and device repair piece, and the composite floor slab bottom support reinforcing device are integrated, and the concrete wallboard perpendicularity inspection tool is a complete device for positioning and inspection in the concrete wallboard production process, inspection of a construction party, inspection in the installation process, repair of unqualified products in the installation process and bottom support, and is simple in operation, high in accuracy, strong in applicability and high in efficiency.
The present invention is not limited to the specific embodiments described above. It will be understood that various changes and modifications may be made without departing from the spirit and scope of the invention, which should be considered as within the scope of the invention.

Claims (8)

1. The utility model provides a high-efficient installation method of precast concrete wallboard for sleeve grout connects which characterized in that: the method comprises the following steps:
the position degree and the verticality of the vertical steel bar which is arranged on the first wallboard in a matched mode with the sleeve are detected by a steel bar position degree and verticality detection tool;
the sleeve position degree and the perpendicularity of the second wallboard are detected by a sleeve position degree and perpendicularity detection tool; straightening vertical steel bars with unqualified verticality on site by adopting a correction device;
the prefabricated wall panel which cannot be installed in a matched mode due to unqualified sleeve position degree, verticality and vertical steel bar position degree is repaired on site by using a repairing part, wherein the repairing part comprises a welding plate and a welding steel bar, a plurality of long round through holes are formed in the welding plate, the reserved steel bar which cannot enter the sleeve in a mounted mode is cut off during repair, the welding plate is sleeved on other reserved steel bars through the through holes, and the welding steel bar and the reserved steel bar which is not cut off are firmly welded with the welding plate;
assembling the inspected and repaired wallboard;
after the wallboard is assembled, the wallboard perpendicularity gauge is used for checking, grouting operation is carried out after the wallboard is checked to be qualified, and the second wallboard is fixedly connected to the first wallboard;
assembling a floor above the second wall panel, the floor being temporarily reinforced using floor support means attached to the second wall panel;
the wallboard perpendicularity gauge comprises a vertical portion, a horizontal transparent pipe body and a steel ball, wherein the vertical portion is used for being attached to a wallboard in a checking process, the horizontal transparent pipe body is perpendicularly connected and fixed with the vertical portion, the steel ball is arranged in the horizontal transparent pipe body, and the fact that the wallboard perpendicularity is adjusted when the steel ball can stably stay at any position of two ends and cannot move is shown.
2. The method of claim 1, wherein: the sleeve position degree and perpendicularity gauge comprises a stud mounting main body, a stud and a handle, wherein a threaded hole is formed in the stud mounting main body, the stud is arranged in the threaded hole, the position of the stud is consistent with the designed and pre-embedded position of a grouting sleeve of a wallboard, and the outer diameter of the stud is slightly smaller than the size of the minimum inner diameter position of the grouting sleeve.
3. The method of claim 1, wherein: the steel bar position degree and perpendicularity gauge comprises a position detection main body and a handle, wherein a through hole is formed in the position detection main body, the position of the through hole is consistent with the design position of a wallboard steel bar, and the through hole is slightly larger than the maximum overall size of a reserved steel bar.
4. The method of claim 1, wherein: insert the welding reinforcement in unpaired sleeve, slowly put down second wallboard to elevation, will insert in unpaired sleeve the welding reinforcement and the unresectable reservation reinforcing bar firmly weld with the welded plate, adjust the straightness that hangs down of wallboard, then grout in the grout sleeve and connect.
5. The method of claim 1, wherein: the floor supporting device comprises a triangular supporting frame attached to the wallboard, the triangular supporting frame comprises a vertical rod, a horizontal rod and an inclined rod, the vertical rod is vertically arranged on the wallboard, the horizontal rod is connected with the vertical rod, one end of the inclined rod is connected to a supporting seat arranged on the horizontal rod, and the other end of the inclined rod is connected with the vertical rod.
6. The method of claim 2, wherein: the sleeve position degree and perpendicularity gauge is used for being directly inserted into the sleeve to ensure the positioning accuracy of the sleeve in the production and pouring process of the prefabricated wallboard, and is withdrawn after the component is solidified to reach certain strength so as to ensure the accuracy and interchangeability of the sleeve position degree and perpendicularity of the prefabricated wallboard.
7. The method of claim 3, wherein: the steel bar position degree and perpendicularity gauge is used for being sleeved into a reserved steel bar in the pouring process of the prefabricated wall board to ensure accurate positioning of the prefabricated wall board, and the prefabricated wall board is taken out after a component is solidified to reach certain strength so as to ensure the accuracy and interchangeability of the position degree and perpendicularity of the reserved steel bar of the prefabricated wall board.
8. An efficient installation apparatus for precast concrete wall panels for carrying out the method of any one of claims 1 to 7, comprising:
the sleeve position degree and perpendicularity gauge is used for checking the position degree and perpendicularity of the sleeve on the wallboard;
the steel bar position degree and perpendicularity gauge is used for checking the position degree and perpendicularity of a vertical steel bar which is arranged on the wallboard in a matched mode with the sleeve;
the repairing piece is used for performing on-site repairing on the prefabricated wall panel with unqualified sleeve position degree and verticality and unqualified vertical steel bar position degree, and comprises a welding plate and a welding steel bar, wherein the welding plate is provided with a plurality of long round through holes;
the correcting device is used for carrying out on-site straightening on the vertical steel bars with unqualified verticality;
the wallboard verticality detection tool is used for detecting the verticality of a wallboard after the wallboard is assembled, and comprises a vertical part, a horizontal transparent pipe body and a steel ball, wherein the vertical part is tightly attached to the wallboard, the horizontal transparent pipe body is vertically connected with the vertical part, and the steel ball is arranged in the horizontal transparent pipe body;
the grouting operation device is used for performing grouting operation to fix the second wallboard to the first wallboard after the verticality of the wallboard is qualified; and
and the floor supporting device is used for attaching the floor to the second wallboard after the floor is assembled above the second wallboard so as to temporarily reinforce the floor.
CN201811294342.3A 2018-10-30 2018-10-30 High-efficiency installation method and device of precast concrete wall panel Active CN109457965B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811294342.3A CN109457965B (en) 2018-10-30 2018-10-30 High-efficiency installation method and device of precast concrete wall panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811294342.3A CN109457965B (en) 2018-10-30 2018-10-30 High-efficiency installation method and device of precast concrete wall panel

Publications (2)

Publication Number Publication Date
CN109457965A CN109457965A (en) 2019-03-12
CN109457965B true CN109457965B (en) 2020-10-20

Family

ID=65609163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811294342.3A Active CN109457965B (en) 2018-10-30 2018-10-30 High-efficiency installation method and device of precast concrete wall panel

Country Status (1)

Country Link
CN (1) CN109457965B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282381A (en) * 2020-10-28 2021-01-29 浙江工业职业技术学院 Mounting and positioning device for assembly type building wall and working method thereof
CN113323486B (en) * 2021-06-01 2022-05-24 台州学院 Prefabricated concrete wallboard and floor slab connecting joint and construction method thereof
CN114131730B (en) * 2021-12-03 2023-01-20 瑞洲建设集团有限公司 Steel bar grouting process for assembled prefabricated wall plate of high-rise building
CN115354870B (en) * 2022-08-18 2023-10-24 济南一建集团有限公司 Guide for hoisting assembled building body and hoisting installation method thereof
CN118029543B (en) * 2024-04-12 2024-07-05 内蒙古工业大学 Assembled building structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1735738A (en) * 2003-01-09 2006-02-15 芝加哥桥梁&铁公司 Use of partial precast panels for construction of concrete walls and shells
CN201687125U (en) * 2010-06-04 2010-12-29 北京万科企业有限公司 Precast concrete wallboard
CN203531178U (en) * 2013-11-11 2014-04-09 内蒙古蒙西工程设计有限公司 Wholly prefabricated shear wall
CN205134634U (en) * 2015-10-29 2016-04-06 苏州设计研究院股份有限公司 Precast reinforced concrete shear force wall
CN106499051A (en) * 2016-11-21 2017-03-15 中国建筑股份有限公司 A kind of post insertion prefabricated PC concrete frame frame system and its construction method
CN206360377U (en) * 2016-12-27 2017-07-28 中建科技有限公司 The mounting structure of precast concrete wall column

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1735738A (en) * 2003-01-09 2006-02-15 芝加哥桥梁&铁公司 Use of partial precast panels for construction of concrete walls and shells
CN201687125U (en) * 2010-06-04 2010-12-29 北京万科企业有限公司 Precast concrete wallboard
CN203531178U (en) * 2013-11-11 2014-04-09 内蒙古蒙西工程设计有限公司 Wholly prefabricated shear wall
CN205134634U (en) * 2015-10-29 2016-04-06 苏州设计研究院股份有限公司 Precast reinforced concrete shear force wall
CN106499051A (en) * 2016-11-21 2017-03-15 中国建筑股份有限公司 A kind of post insertion prefabricated PC concrete frame frame system and its construction method
CN206360377U (en) * 2016-12-27 2017-07-28 中建科技有限公司 The mounting structure of precast concrete wall column

Also Published As

Publication number Publication date
CN109457965A (en) 2019-03-12

Similar Documents

Publication Publication Date Title
CN109457965B (en) High-efficiency installation method and device of precast concrete wall panel
CN112012340B (en) Suspension connection node for large-span cantilever steel truss and construction method thereof
CN101956457B (en) Method for constructing rectangular steel pipe concrete column
CN103526954B (en) Construction method of overweight precision embedded part
CN108643572B (en) Combined installation method of concrete girder support, bailey platform construction and steel strand
CN115419277B (en) Construction method of heavy steel box type diagonal column
CN111254968A (en) Installation device and installation method for large-diameter embedded bolt of large-scale equipment foundation
CN113323359A (en) Novel flower basket pull rod tool type overhanging frame construction method
CN110318344B (en) Novel steel box girder No. 0 block support and No. 0 block erection construction method
CN109779247A (en) The formwork erection device and construction method of steel column cornerite
CN102926554A (en) Steel hanging seat formwork support and construction method thereof
CN112695898A (en) Construction method of steel structure embedded part capable of bearing large tension force and limited in space
JP2008502822A (en) Architectural elements and construction methods
CN108661301B (en) Modular assembly platform for vertical frames of well frames and use method
CN111648611A (en) Embedded part supporting device and embedded part installation method using embedded part supporting device
JP2011074632A (en) Unit structure of anchor bolt used for construction of foundation for equipment, and method of construction of foundation for equipment using the unit structure
CN115807508A (en) Construction method and node for building steel structure column base installation foundation
CN217438712U (en) Special-shaped curve structure steel-concrete combined tower segment
CN109252526A (en) Assembled support construction technique based on prestressing force fish belly sill support technology
CN210529741U (en) Independent foundation embedded bolt mounting structure
CN110790113B (en) Construction method suitable for mounting wall-attached frame of ultra-long-distance construction elevator
JP2015055079A (en) Anchor frame, and method for constructing anchor structure using the anchor frame
CN210239143U (en) Reserved hole sleeve fixing part for laminated floor slab
CN114086665A (en) Connecting construction method for steel bars in beam column joint area of section steel composite structure
CN112942809A (en) Combined template assembling method capable of realizing mechanical construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210113

Address after: 065000 Chuangye Road, development zone, Langfang City, Hebei Province

Patentee after: CABR CONSTRUCTION MACHINERY TECHNOLOGY Co.,Ltd.

Patentee after: BEIJING BUILDING MECHANIZATION RESEARCH INSTITUTE Co.,Ltd.

Address before: 100007 Beijing Dongcheng District city Andingmen Fangjia Hutong No. 21

Patentee before: BEIJING BUILDING MECHANIZATION RESEARCH INSTITUTE Co.,Ltd.

Patentee before: INSTITUTE OF BUILDING MECHANIZATION/CHINA ACADEMY OF BUILDING RESEARCH

Patentee before: CABR CONSTRUCTION MACHINERY TECHNOLOGY Co.,Ltd.